CN210828608U - A kind of protective fence for flying stones in dynamic compaction operation which is convenient for splicing - Google Patents

A kind of protective fence for flying stones in dynamic compaction operation which is convenient for splicing Download PDF

Info

Publication number
CN210828608U
CN210828608U CN201921472151.1U CN201921472151U CN210828608U CN 210828608 U CN210828608 U CN 210828608U CN 201921472151 U CN201921472151 U CN 201921472151U CN 210828608 U CN210828608 U CN 210828608U
Authority
CN
China
Prior art keywords
supporting rod
support rod
block
compaction operation
connecting block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921472151.1U
Other languages
Chinese (zh)
Inventor
高健
熊斌
秦程
李�荣
张琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Seventh Engineering Co Ltd
Original Assignee
CCCC Seventh Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Seventh Engineering Co Ltd filed Critical CCCC Seventh Engineering Co Ltd
Priority to CN201921472151.1U priority Critical patent/CN210828608U/en
Application granted granted Critical
Publication of CN210828608U publication Critical patent/CN210828608U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

本实用新型公开了一种便于拼接的强夯作业飞石用防护栏,包括防护网,所述防护网的左右两侧分别安装有第一支撑杆和第二支撑杆,且第一支撑杆和第二支撑杆的上下两端均开设有凹槽,所述第一支撑杆的内部预留有孔槽,且孔槽的内壁上设置有复位弹簧,所述卡块通过引线与握把相互连接,且握把轴承安装于第一支撑杆内,所述第二支撑杆的边侧安装有第二连接块,所述第一支撑杆和第二支撑杆通过凹槽与固定块相互连接。该便于拼接的强夯作业飞石用防护栏,方便对防护栏进行拆卸安装,在不使用防护栏时,可以对防护栏进行良好的收纳,可以将防护栏固定在土里,使得该防护栏对飞石的防护更加的稳定,保证了防护的有效性。

Figure 201921472151

The utility model discloses a flying stone guardrail for compaction operation that is easy to splice, comprising a protective net, a first support rod and a second support rod are respectively installed on the left and right sides of the protective net, and grooves are provided at the upper and lower ends of the first support rod and the second support rod, a hole groove is reserved inside the first support rod, and a reset spring is arranged on the inner wall of the hole groove, the clamping block is connected to the handle through a lead wire, and the handle bearing is installed in the first support rod, a second connecting block is installed on the side of the second support rod, and the first support rod and the second support rod are connected to the fixing block through the groove. The flying stone guardrail for compaction operation that is easy to splice is convenient for disassembly and installation of the guardrail, and when the guardrail is not in use, the guardrail can be well stored and fixed in the soil, so that the protection of the guardrail against flying stones is more stable, and the effectiveness of the protection is guaranteed.

Figure 201921472151

Description

一种便于拼接的强夯作业飞石用防护栏A kind of protective fence for flying stones in dynamic compaction operation which is convenient for splicing

技术领域technical field

本实用新型涉及防护栏技术领域,具体为一种便于拼接的强夯作业飞石用防护栏。The utility model relates to the technical field of protective fences, in particular to a protective fence for flying stones in a dynamic compaction operation which is convenient for splicing.

背景技术Background technique

在强夯作业时,重锤从高空落下对土地进行强力夯实,会出现砸到石头,使得石头飞溅的情况出现,需要利用防护栏进行维护,以阻挡飞石溅出对人造成危险。During the dynamic compaction operation, the heavy hammer falls from a high altitude to carry out strong compaction on the land, which may hit the stone and cause the stone to splash. It is necessary to use a protective fence for maintenance to prevent the splash of the flying stone from causing danger to people.

然而现有的强夯作业飞石用防护栏在使用时存在以下问题:However, there are the following problems in the use of the existing fly-rock guardrail for dynamic compaction:

1.不方便对防护栏进行拆卸安装,在不使用防护栏时,难以对防护栏进行良好的收纳;1. It is inconvenient to disassemble and install the guardrail. When the guardrail is not used, it is difficult to store the guardrail well;

2.难以将防护栏固定在土里,使得该防护栏对飞石的防护不够稳定,难以保证防护的有效性。2. It is difficult to fix the guardrail in the soil, so that the guardrail is not stable enough to protect the flying stones, and it is difficult to ensure the effectiveness of the protection.

针对上述问题,急需在原有的强夯作业飞石用防护栏基础上进行创新设计。In view of the above problems, it is urgent to carry out innovative design on the basis of the original protective fence for flying stones in dynamic compaction operations.

实用新型内容Utility model content

本实用新型的目的在于提供一种便于拼接的强夯作业飞石用防护栏,以解决上述背景技术提出现有的强夯作业飞石用防护栏不方便对防护栏进行拆卸安装,在不使用防护栏时,难以对防护栏进行良好的收纳,难以将防护栏固定在土里,使得该防护栏对飞石的防护不够稳定,难以保证防护的有效性的问题。The purpose of this utility model is to provide a kind of protective fence for flying stones in dynamic compaction operation which is convenient for splicing, in order to solve the problem of the above-mentioned background technology that the existing protective fence for flying stones in dynamic compaction operation is inconvenient to disassemble and install the protective fence, and when not using When installing a guardrail, it is difficult to store the guardrail well, and it is difficult to fix the guardrail in the soil, so that the guardrail is not stable enough to protect the flying stones, and it is difficult to ensure the effectiveness of the protection.

为实现上述目的,本实用新型提供如下技术方案:一种便于拼接的强夯作业飞石用防护栏,包括防护网,所述防护网的左右两侧分别安装有第一支撑杆和第二支撑杆,且第一支撑杆和第二支撑杆的上下两端均开设有凹槽,并且第一支撑杆和第二支撑杆的下端均连接有固定杆,所述第一支撑杆的内部预留有孔槽,且孔槽的内壁上设置有复位弹簧,并且复位弹簧的端部连接有卡块,所述卡块通过引线与握把相互连接,且握把轴承安装于第一支撑杆内,并且卡块的边侧固定有第一连接块,所述第二支撑杆的边侧安装有第二连接块,且第二连接块的表面贯穿有第一螺栓,所述第一支撑杆和第二支撑杆通过凹槽与固定块相互连接,且固定块之间通过第二螺栓相互连接。In order to achieve the above purpose, the present utility model provides the following technical solutions: a kind of protective fence for flying stones in dynamic compaction operation that is convenient for splicing, including a protective net, the left and right sides of the protective net are respectively installed with a first support rod and a second support The upper and lower ends of the first support rod and the second support rod are provided with grooves, and the lower ends of the first support rod and the second support rod are connected with fixed rods, and the interior of the first support rod is reserved. There is a hole groove, and the inner wall of the hole groove is provided with a return spring, and the end of the return spring is connected with a clamping block, the clamping block is connected with the handle through the lead wire, and the handle bearing is installed in the first support rod, And the side of the clamping block is fixed with a first connection block, the side of the second support rod is installed with a second connection block, and the surface of the second connection block penetrates the first bolt, the first support rod and the second connection block. The two support rods are connected to each other with the fixing block through the groove, and the fixing blocks are connected with each other through the second bolt.

优选的,所述第一支撑杆和第二支撑杆的下端均设置为螺纹状结构,且第一支撑杆和第二支撑杆均与固定杆构成拆卸安装结构。Preferably, the lower ends of the first support rod and the second support rod are both configured as threaded structures, and both the first support rod and the second support rod and the fixing rod form a detachable installation structure.

优选的,所述卡块通过复位弹簧与第一支撑杆构成滑动安装结构,且卡块的外壁与第一支撑杆的内壁相互贴合。Preferably, the clamping block forms a sliding installation structure with the first support rod through a return spring, and the outer wall of the clamping block and the inner wall of the first support rod are mutually abutted.

优选的,所述第一连接块关于第一支撑杆对称设置有2个,且2个第一连接块的方向相反,并且第一连接块与第一支撑杆构成升降结构。Preferably, two first connecting blocks are symmetrically arranged with respect to the first support rod, and the directions of the two first connecting blocks are opposite, and the first connecting block and the first support rod form a lifting structure.

优选的,所述第一连接块设置为“L”字型结构,且第一连接块与第二连接块构成卡合的拆卸安装结构。Preferably, the first connecting block is arranged in an "L"-shaped structure, and the first connecting block and the second connecting block form a snap-fit disassembly and installation structure.

优选的,所述固定块设置为内凹的弧形结构,且固定块通过凹槽与第一支撑杆和第二支撑杆之间卡合连接。Preferably, the fixing block is arranged in a concave arc structure, and the fixing block is connected to the first support rod and the second support rod by engaging with the groove.

与现有技术相比,本实用新型的有益效果是:该便于拼接的强夯作业飞石用防护栏,方便对防护栏进行拆卸安装,在不使用防护栏时,可以对防护栏进行良好的收纳,可以将防护栏固定在土里,使得该防护栏对飞石的防护更加的稳定,保证了防护的有效性;Compared with the prior art, the beneficial effect of the present utility model is that the protective fence for flying stones in dynamic compaction operation, which is convenient for splicing, is convenient to disassemble and install the protective fence, and when the protective fence is not used, the protective fence can be well maintained. Storage, the guardrail can be fixed in the soil, which makes the guardrail’s protection against flying stones more stable and ensures the effectiveness of the protection;

1.第一连接块与第二连接块构成卡合的拆卸安装结构,第一连接块与引线之间固定连接,引线通过引线与握把相互连接,且引线通过复位弹簧与第一支撑杆相互连接,所以第一连接块通过引线与第一支撑杆构成升降结构,方便第一连接块与第二连接块之间的卡合,方便防护栏之间的拼接;1. The first connecting block and the second connecting block form a snap-fit disassembly and installation structure. The first connecting block and the lead are fixedly connected, the lead is connected to the handle through the lead, and the lead is connected to the first support rod through the return spring. Therefore, the first connecting block forms a lifting structure through the lead wire and the first support rod, which facilitates the engagement between the first connecting block and the second connecting block, and facilitates the splicing between the guardrails;

2.第一支撑杆和第二支撑杆的下端均设置为螺纹状结构,且第一支撑杆和第二支撑杆均与固定杆之间螺纹连接,所以第一支撑杆和第二支撑杆可以通过固定杆插在土里,能够更加稳定的对飞石进行防护。2. The lower ends of the first support rod and the second support rod are all set to a threaded structure, and the first support rod and the second support rod are both threadedly connected with the fixed rod, so the first support rod and the second support rod can be By inserting the fixed rod into the soil, it can more stably protect the flying stones.

附图说明Description of drawings

图1为本实用新型整体正剖结构示意图;1 is a schematic diagram of the overall frontal cross-sectional structure of the present utility model;

图2为本实用新型第一连接块与第二连接块连接结构示意图;2 is a schematic diagram of the connection structure of the first connecting block and the second connecting block of the present invention;

图3为本实用新型固定块与第一支撑杆连接结构示意图;3 is a schematic diagram of the connection structure between the fixing block and the first support rod of the present invention;

图4为本实用新型固定块俯剖结构示意图。FIG. 4 is a schematic view of the top section of the fixing block of the present invention.

图中:1、防护网;2、第一支撑杆;3、第二支撑杆;4、凹槽;5、固定杆;6、孔槽;7、复位弹簧;8、卡块;9、引线;10、握把;11、第一连接块;12、第二连接块;13、第一螺栓;14、固定块;15、第二螺栓。In the figure: 1, protective net; 2, first support rod; 3, second support rod; 4, groove; 5, fixed rod; 6, hole groove; 7, return spring; 8, clamping block; 9, lead wire 10. Grip; 11. The first connecting block; 12. The second connecting block; 13. The first bolt; 14. The fixing block; 15. The second bolt.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

请参阅图1-4,本实用新型提供一种技术方案:一种便于拼接的强夯作业飞石用防护栏,包括防护网1、第一支撑杆2、第二支撑杆3、凹槽4、固定杆5、孔槽6、复位弹簧7、卡块8、引线9、握把10、第一连接块11、第二连接块12、第一螺栓13、固定块14和第二螺栓15,防护网1的左右两侧分别安装有第一支撑杆2和第二支撑杆3,且第一支撑杆2和第二支撑杆3的上下两端均开设有凹槽4,并且第一支撑杆2和第二支撑杆3的下端均连接有固定杆5,第一支撑杆2的内部预留有孔槽6,且孔槽6的内壁上设置有复位弹簧7,并且复位弹簧7的端部连接有卡块8,卡块8通过引线9与握把10相互连接,且握把10轴承安装于第一支撑杆2内,并且卡块8的边侧固定有第一连接块11,第二支撑杆3的边侧安装有第二连接块12,且第二连接块12的表面贯穿有第一螺栓13,第一支撑杆2和第二支撑杆3通过凹槽4与固定块14相互连接,且固定块14之间通过第二螺栓15相互连接。Please refer to FIGS. 1-4 , the present utility model provides a technical solution: a protective fence for flying stones in dynamic compaction operation, which is convenient for splicing, comprising a protective net 1 , a first support rod 2 , a second support rod 3 , and a groove 4 , fixing rod 5, hole groove 6, return spring 7, clamping block 8, lead 9, handle 10, first connecting block 11, second connecting block 12, first bolt 13, fixing block 14 and second bolt 15, The left and right sides of the protective net 1 are respectively installed with a first support rod 2 and a second support rod 3, and the upper and lower ends of the first support rod 2 and the second support rod 3 are provided with grooves 4, and the first support rod 2 and the lower end of the second support rod 3 are connected with a fixed rod 5, a hole slot 6 is reserved inside the first support rod 2, and the inner wall of the hole slot 6 is provided with a return spring 7, and the end of the return spring 7 The clamping block 8 is connected, the clamping block 8 is connected with the handle 10 through the lead wire 9, and the handle 10 is bearing mounted in the first support rod 2, and the side of the clamping block 8 is fixed with the first connecting block 11, the second A second connecting block 12 is installed on the side of the support rod 3, and the surface of the second connecting block 12 is penetrated with a first bolt 13. The first support rod 2 and the second support rod 3 are connected to each other with the fixing block 14 through the groove 4 , and the fixing blocks 14 are connected to each other by the second bolts 15 .

第一支撑杆2和第二支撑杆3的下端均设置为螺纹状结构,且第一支撑杆2和第二支撑杆3均与固定杆5构成拆卸安装结构,方便将该防护栏与固定在地面,并且能够稳定的进行固定,保证了对飞石防护的有效性。The lower ends of the first support rod 2 and the second support rod 3 are both provided with a threaded structure, and the first support rod 2 and the second support rod 3 and the fixing rod 5 form a disassembly and installation structure, which is convenient for the guardrail to be fixed on the The ground, and can be fixed stably, to ensure the effectiveness of the protection against flying stones.

卡块8通过复位弹簧7与第一支撑杆2构成滑动安装结构,且卡块8的外壁与第一支撑杆2的内壁相互贴合,方便防护栏之间的拼接。The clamping block 8 forms a sliding installation structure with the first support rod 2 through the return spring 7 , and the outer wall of the clamping block 8 and the inner wall of the first support rod 2 are attached to each other to facilitate the splicing of the guardrails.

第一连接块11关于第一支撑杆2对称设置有2个,且2个第一连接块11的方向相反,并且第一连接块11与第一支撑杆2构成升降结构,第一连接块11设置为“L”字型结构,且第一连接块11与第二连接块12构成卡合的拆卸安装结构,方便将防护栏之间拼接组合,便于将防护栏进行拆卸安装,同时可以在不使用该防护栏时,能够对该防护栏进行良好的收纳。Two first connecting blocks 11 are symmetrically arranged with respect to the first support rod 2 , and the two first connecting blocks 11 are in opposite directions, and the first connecting blocks 11 and the first support rod 2 form a lifting structure, and the first connecting block 11 It is set to an "L"-shaped structure, and the first connecting block 11 and the second connecting block 12 form a snap-fit disassembly and installation structure, which is convenient for splicing and assembling the guardrails, which is convenient for disassembling and installing the guardrails. When the guardrail is used, the guardrail can be accommodated well.

固定块14设置为内凹的弧形结构,且固定块14通过凹槽4与第一支撑杆2和第二支撑杆3之间卡合连接,方便对该防护栏进行高度的叠加,增加该防护栏的使用高度。The fixing block 14 is set as a concave arc structure, and the fixing block 14 is connected with the first support rod 2 and the second support rod 3 through the groove 4, which facilitates the superimposition of the guardrail in height and increases the The height of the guardrail.

工作原理:在使用该便于拼接的强夯作业飞石用防护栏时,根据图1-2,拼接防护栏时,如图1-2,由于握把10轴承安装于第一支撑杆2内,卡块8通过引线9与握把10相互连接,转动握把10可以拉动卡块8向第一支撑杆2的中心处移动,与卡块8固定连接的第一连接块11也向第一支撑杆2的中心处移动,当第一连接块11对齐第二连接块12时,停止旋转握把10并松手,在复位弹簧7的弹性作用下第一连接块11可以卡在第二连接块12内,将第一螺栓13旋转拧进第二连接块12和第一连接块11内进行固定,如图1所示,第一支撑杆2和第二支撑杆3的下端均设置为螺纹状结构,将固定杆5安装在第一支撑杆2和第二支撑杆3的下端,可以将固定杆5插进土里,对该防护栏进行位置的固定;Working principle: When using the fly-rock guardrail for dynamic compaction, which is convenient for splicing, according to Figure 1-2, when splicing the guardrail, as shown in Figure 1-2, since the bearing of the handle 10 is installed in the first support rod 2, The clamping block 8 is connected with the handle 10 through the lead wire 9. The handle 10 can be rotated to pull the clamping block 8 to move to the center of the first support rod 2. The first connecting block 11 fixedly connected with the clamping block 8 also supports the first support The center of the rod 2 moves, when the first connecting block 11 is aligned with the second connecting block 12, stop rotating the handle 10 and let go, the first connecting block 11 can be stuck on the second connecting block 12 under the elastic action of the return spring 7 Inside, the first bolt 13 is rotated and screwed into the second connecting block 12 and the first connecting block 11 for fixing, as shown in FIG. , the fixing rod 5 is installed on the lower ends of the first support rod 2 and the second support rod 3, and the fixing rod 5 can be inserted into the soil to fix the position of the guardrail;

根据图3-4,当需要增加防护栏的高度时,将2个防护栏叠加,如图3所示,固定块14通过凹槽4与第一支撑杆2和第二支撑杆3卡合连接,如图4所示,用第二螺栓15将固定块14卡合固定,可以增加防护栏的高度。According to Fig. 3-4, when it is necessary to increase the height of the guardrail, superimpose two guardrails. As shown in Fig. 3, the fixing block 14 is connected with the first support rod 2 and the second support rod 3 through the groove 4 by engaging , as shown in FIG. 4 , the fixing block 14 is snapped and fixed with the second bolt 15 , which can increase the height of the guardrail.

尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it is still possible to modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some of the technical features. Within the spirit and principle of the present utility model, any modifications, equivalent replacements, improvements, etc. made shall be included within the protection scope of the present utility model.

Claims (6)

1. The utility model provides a dynamic compaction operation rail guard for flying stone convenient to concatenation, includes protection network (1), its characterized in that: the left side and the right side of the protective net (1) are respectively provided with a first supporting rod (2) and a second supporting rod (3), the upper end and the lower end of each of the first supporting rod (2) and the second supporting rod (3) are respectively provided with a groove (4), the lower ends of the first supporting rod (2) and the second supporting rod (3) are respectively connected with a fixing rod (5), a hole groove (6) is reserved in the first supporting rod (2), a reset spring (7) is arranged on the inner wall of the hole groove (6), the end part of the reset spring (7) is connected with a clamping block (8), the clamping block (8) is connected with a handle (10) through a lead (9), the handle (10) is arranged in the first supporting rod (2) in a bearing mode, a first connecting block (11) is fixed on the side of the clamping block (8), a second connecting block (12) is arranged on the side of the second supporting rod (3), and the surface of the second connecting block (12) is penetrated by a first bolt (13), the first supporting rod (2) and the second supporting rod (3) are connected with the fixing block (14) through the groove (4), and the fixing blocks (14) are connected with each other through a second bolt (15).
2. The easy-to-splice guard rail for dynamic compaction operation flying stones of claim 1, which is characterized in that: the lower extreme of first bracing piece (2) and second bracing piece (3) all sets up to screw thread column structure, and just first bracing piece (2) and second bracing piece (3) all constitute with dead lever (5) and dismantle mounting structure.
3. The easy-to-splice guard rail for dynamic compaction operation flying stones of claim 1, which is characterized in that: the fixture block (8) and the first supporting rod (2) form a sliding installation structure through the return spring (7), and the outer wall of the fixture block (8) is attached to the inner wall of the first supporting rod (2) mutually.
4. The easy-to-splice guard rail for dynamic compaction operation flying stones of claim 1, which is characterized in that: the first connecting blocks (11) are symmetrically arranged with 2 relative to the first supporting rod (2), the directions of the 2 first connecting blocks (11) are opposite, and the first connecting blocks (11) and the first supporting rod (2) form a lifting structure.
5. The easy-to-splice guard rail for dynamic compaction operation flying stones of claim 1, which is characterized in that: the first connecting block (11) is arranged to be of an L-shaped structure, and the first connecting block (11) and the second connecting block (12) form a clamping disassembly and assembly structure.
6. The easy-to-splice guard rail for dynamic compaction operation flying stones of claim 1, which is characterized in that: the fixing block (14) is arranged to be of an inwards concave arc-shaped structure, and the fixing block (14) is connected with the first supporting rod (2) and the second supporting rod (3) in a clamping mode through the groove (4).
CN201921472151.1U 2019-09-05 2019-09-05 A kind of protective fence for flying stones in dynamic compaction operation which is convenient for splicing Active CN210828608U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921472151.1U CN210828608U (en) 2019-09-05 2019-09-05 A kind of protective fence for flying stones in dynamic compaction operation which is convenient for splicing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921472151.1U CN210828608U (en) 2019-09-05 2019-09-05 A kind of protective fence for flying stones in dynamic compaction operation which is convenient for splicing

Publications (1)

Publication Number Publication Date
CN210828608U true CN210828608U (en) 2020-06-23

Family

ID=71259613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921472151.1U Active CN210828608U (en) 2019-09-05 2019-09-05 A kind of protective fence for flying stones in dynamic compaction operation which is convenient for splicing

Country Status (1)

Country Link
CN (1) CN210828608U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112302419A (en) * 2020-08-10 2021-02-02 杭州开冠网络科技有限公司 Movable combined grassland fence equipment
CN114872004A (en) * 2022-04-25 2022-08-09 武汉博开建筑工程有限公司 Truss reinforcing steel bar storage rack

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112302419A (en) * 2020-08-10 2021-02-02 杭州开冠网络科技有限公司 Movable combined grassland fence equipment
CN114872004A (en) * 2022-04-25 2022-08-09 武汉博开建筑工程有限公司 Truss reinforcing steel bar storage rack
CN114872004B (en) * 2022-04-25 2024-05-28 武汉博开建筑工程有限公司 Truss steel bar storage rack

Similar Documents

Publication Publication Date Title
CN210828608U (en) A kind of protective fence for flying stones in dynamic compaction operation which is convenient for splicing
CN206112269U (en) Device is shored in installation of adjustable square steel
CN211775995U (en) Building engineering faces limit and can dismantle protection railing fixing device
CN218644025U (en) Adjustable tool type limb protective railing
CN205422154U (en) Detachable transformer substation's rail pole fixed bolster
CN207420009U (en) A kind of building intellectualization combines mounting bracket
CN216076614U (en) Protective railing
CN105863192B (en) A kind of balcony guardrail
CN218324024U (en) Steel pipe faces limit protection combination external member
CN221879070U (en) Portable temporary protective railing
CN211572896U (en) Multifunctional guardrail for economic building
CN211422025U (en) Assembling structure of power grid line iron tower
CN210459920U (en) Construction frame
CN222936466U (en) An assembled protective shed for high-rise building construction
CN220599435U (en) Highway maintenance rail with location structure
CN222936461U (en) A protective device for building construction
CN208105944U (en) Steel structure stairway
CN219365656U (en) A construction guardrail for civil engineering that is easy to assemble and disassemble
CN221825229U (en) A street lamp with a base connection structure
CN219471720U (en) Spliced municipal construction guardrail
CN222847205U (en) A cap beam telescopic guardrail
CN221703368U (en) Surface mine slope safety guard rail
CN223227032U (en) A lightweight safety cantilever bracket
CN210396068U (en) A cantilever beam scaffold
CN220848884U (en) Face limit protection installation component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant