CN210827525U - Structure is built to template of pouring of open caisson wall of a well - Google Patents

Structure is built to template of pouring of open caisson wall of a well Download PDF

Info

Publication number
CN210827525U
CN210827525U CN201921132277.4U CN201921132277U CN210827525U CN 210827525 U CN210827525 U CN 210827525U CN 201921132277 U CN201921132277 U CN 201921132277U CN 210827525 U CN210827525 U CN 210827525U
Authority
CN
China
Prior art keywords
steel
template
wall
substrate layer
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921132277.4U
Other languages
Chinese (zh)
Inventor
黄芷敏
刘均
黄挺
孙斌
曾一哲
刘丰泽
翁楚平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Original Assignee
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd filed Critical Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority to CN201921132277.4U priority Critical patent/CN210827525U/en
Application granted granted Critical
Publication of CN210827525U publication Critical patent/CN210827525U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a structure is built to template of pouring of open caisson wall of a well. The building structure comprises a substrate layer (1) and a steel template (2); a plurality of steel templates (2) are tightly and continuously spliced and distributed along the inner side and the outer side of the substrate layer (1); the steel template (2) is fixedly positioned at the top of the substrate layer (1), and the bottom end of the steel template (2) is lower than the top end of the substrate layer (1); and the steel templates (2) distributed on the inner side of the basal layer (1) and the steel templates (2) distributed on the outer side of the basal layer (1) are connected and fixed through steel bars. The building structure adopts the steel template as the template, has stronger texture, good bearing performance and convenient use and turnover; the steel templates are provided with through holes for the penetration of the steel bars for splicing and fixing the plurality of steel templates, no additional reinforcement is needed, and the whole spliced template is firm and is uniformly stressed; still carry out the outrigger through setting up U shaped steel muscle, reduce the potential safety hazard of high centre form.

Description

Structure is built to template of pouring of open caisson wall of a well
Technical Field
The utility model relates to an open caisson construction technical field, concretely relates to open caisson wall of a well's template of pouring builds structure.
Background
The open caisson construction is a construction process that a shaft-shaped structure made of reinforced concrete on the ground in advance is used as a support of a pit wall of a foundation pit, earth is dug in the pit by machinery and manpower under the protection of the wall of the pit, and the pit is sunk into the earth under the action of the dead weight of the pit. The open caisson construction has the advantages of stable and reliable technology, small soil excavation amount, small influence on adjacent buildings, deep foundation embedment of the open caisson, good stability and capability of supporting larger load.
In the traditional open caisson construction and open caisson manufacturing process, a wood template is used as a template for open caisson construction. The plank sheathing needs to be processed, and the template can't carry out effective connection fixed, has the local bearing uneven easily and the danger that damages or drop, needs to consolidate with the steel pipe, and the process is troublesome. Moreover, the wood template is weak in texture and poor in bearing performance, and when the open caisson is high in height, the inner mold is installed, so that great potential safety hazards exist; meanwhile, when the open caisson is constructed by adopting the wood template, the template is inconvenient to turn over.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a structure is built to template of pouring of open caisson wall of a well to the defect or not enough that exist among the prior art. The building structure adopts the steel template as the template, has stronger texture, good bearing performance, convenient use and turnover and high use benefit of the whole structure; the steel templates are provided with through holes for the steel bars to penetrate through so as to splice and fix the steel templates through the steel bars, additional reinforcement is not needed, and the whole spliced template is firm and is uniformly stressed; and still carry out the stable stay through setting up U shaped steel muscle, further reduced the potential safety hazard of higher centre form.
The purpose of the utility model is realized through the following technical scheme.
A pouring template building structure for a caisson wall comprises a basal layer and a steel template; a plurality of steel templates are tightly and continuously spliced and distributed along the inner side and the outer side of the substrate layer; the steel template is fixedly positioned at the top of the substrate layer, and the bottom end of the steel template is lower than the top end of the substrate layer;
and the steel templates distributed on the inner side of the basal layer and the steel templates distributed on the outer side of the basal layer are connected and fixed through steel bars.
Preferably, the substrate layer comprises a cutting edge or a cast-in well wall.
Preferably, the inner side and the outer side of the top of the substrate layer are both provided with U-shaped steel bars for supporting the steel formwork.
More preferably, the U-shaped steel bar is perpendicular to the wall surface of the base layer, and both U-shaped ends of the U-shaped steel bar are fixed to the avoiding surface of the base layer.
Preferably, the steel templates positioned on the inner side of the basal layer and the steel templates correspondingly positioned on the outer side of the basal layer are fixedly connected through a fastener.
Preferably, the steel template is a frame steel template; pressing close to of steel form the one side of stratum basale is straight face, deviating from of steel form have perpendicular bellied lateral wall on the one side of stratum basale.
More preferably, the side wall is provided with a through hole for the steel bar to pass through.
Still further preferably, the through holes are distributed including a bottom end near the side wall and a top end near the side wall.
Compared with the prior art, the utility model has the advantages of as follows and beneficial effect:
(1) the utility model discloses a structure is built to pouring template of open caisson wall of a well adopts the steel form as the template, because the texture of steel form is stronger, bearing capacity is good to make the bearing capacity of whole template better; and the modularized steel template does not need to be processed, so that the steel template is convenient to use and turnover, the use cost is effectively saved, and the use benefit of the integral building structure is improved.
(2) The utility model discloses an in the structure is built to template of pouring of the open caisson wall of a well, it is fixed with the concatenation that carries out a plurality of steel form through the reinforcing bar to be provided with the through-hole that supplies the reinforcing bar to run through on the steel form of adoption, need not additionally to consolidate, and the concatenation construction time spent is lower, effectively improves the efficiency of construction to it is even to make whole concatenation template firm and atress.
(3) The utility model discloses an in the structure is built to template of pouring of the open caisson wall of a well, still carry out the outrigger to the steel form through setting up U shaped steel muscle, further reduced the potential safety hazard of higher centre form, application scope is wider, is favorable to further improving the open caisson construction operation height.
Drawings
Fig. 1 is a schematic view of an overall construction cross-sectional structure of a pouring template construction structure of a well wall of an open caisson according to the present invention in a specific embodiment;
fig. 2 is a schematic view of an overlooking structure of an annular basal layer provided with U-shaped steel bars in a pouring template building structure of the open caisson wall of the utility model in the specific embodiment;
fig. 3 is a schematic view of a cross-sectional structure of a steel formwork built on a U-shaped steel bar in the structure for building a pouring formwork for a well wall of an open caisson according to the present invention;
fig. 4a is a schematic front view structure diagram of a steel formwork in a pouring formwork building structure of the open caisson wall of the invention in the concrete embodiment;
fig. 4b is a schematic top view of a steel formwork in a pouring formwork building structure for the wall of the open caisson according to the present invention;
fig. 4c is a schematic left-view structural diagram of a steel formwork in a pouring formwork building structure for the caisson wall of the invention in the specific embodiment;
the attached drawings are marked as follows: the steel plate comprises 1-an annular base layer, 2-a steel template, 20-a side wall, 201-a through hole, 3-U-shaped steel bars, 4-a fastener and 5-a well wall steel bar frame.
Detailed Description
The technical solution of the present invention will be described in further detail with reference to the following specific embodiments and accompanying drawings, but the scope of protection and the implementation of the present invention are not limited thereto. In the description of the embodiments of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top", "bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, or orientations or positional relationships that are conventionally placed when the structure of the present invention is used, or are used only for distinguishing the description, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the present invention is directed must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as limiting the present invention, nor indicating or implying relative importance.
Example 1
Refer to fig. 1 and show, for the utility model discloses a structural schematic is built to template of pouring of the open caisson wall of a well. The building structure comprises a substrate layer 1 and a steel template 2; in this embodiment, the base layer 1 is an annular base layer, specifically, the base layer 1 includes a blade or a well wall that has been cast, that is, the wall of the open caisson is formed or heightened by continuously casting upwards through the building structure of this embodiment on the basis of the base layer 1.
Wherein, along the inboard and the outside of stratum basale 1, all have a plurality of steel form 2 closely splice in succession and distribute, form centre form and external mold respectively. The steel template 2 is fixedly arranged at the top of the substrate layer 1, and the bottom end of the steel template 2 is lower than the top end of the substrate layer 1. And the steel templates 2 distributed on the inner side of the basal layer 1 and the steel templates 2 distributed on the outer side of the basal layer 1 are connected and fixed through steel bars.
And a well wall reinforcing steel frame 5 is fixedly connected and bound between the inner die and the outer die spliced by the steel template 2 and the top of the basal layer 1. In the pouring process, concrete is poured on the top of the substrate layer 1 and is positioned between the inner die and the outer die which are spliced by the steel templates 2, and the concrete is combined with the well wall reinforcing steel frame 5 and is solidified to form the open caisson well wall.
The steel template 2 is adopted as a template of a pouring template building structure, and the steel template 2 has stronger texture and good bearing performance, so that the bearing performance of the whole template is better; and the modularized steel form 2 does not need to be processed, so that the steel form 2 is convenient to use and turnover, the use cost is effectively saved, and the use benefit of the integral building structure is improved.
Referring to fig. 2, U-shaped steel bars 3 are disposed on both the inner side and the outer side of the top of the substrate layer 1 to support the steel form 2. Carry out the outrigger to steel form 2 through setting up U shaped steel muscle 3, reduced the potential safety hazard of higher centre form, application scope is wider, is favorable to further improving open caisson construction operation height.
Referring to fig. 3, the steel form 2 is supported by the U-shaped steel bar 3 and disposed on the substrate layer 1. Along the inboard and the outside of stratum basale 1, all there is 3 inseparable distributions of U shaped steel muscle to the steel form 2 homoenergetic that makes to be located stratum basale 1 inboard and outside can effectively be supported.
The U-shaped steel bar 3 is perpendicular to the wall surface of the base layer 1, and both U-shaped ends of the U-shaped steel bar 3 are fixed on the avoiding surface of the base layer 1, that is, the U-shaped portion of the U-shaped steel bar 3 located outside the base layer 1 is radially outward along the center away from the base layer 1, and the U-shaped portion of the U-shaped steel bar 3 located inside the base layer 1 is radially inward along the center close to the base layer 1. Specifically, when being in the initial set state in stratum basale 1 forming process, insert U type tip of U shaped steel muscle 3 to stratum basale 1 in from top to bottom, and solidify with stratum basale 1 and form integratively together, make U shaped steel muscle 3 stabilize and combine the setting on stratum basale 1, then bend downwards to perpendicular to stratum basale 1's the face of keeping away through the crow bar with U type portion of U shaped steel muscle 3, thereby make the setting that U shaped steel muscle 3 can stabilize on stratum basale 1, and U type portion can be used for carrying out effective bearing to steel form 2.
In the preferred embodiment, the radial width along stratum basale 1 of U type reinforcing bar 3's U type portion is greater than steel form 2 along the radial width of stratum basale 1 to make U type portion of U type reinforcing bar 3 can effectively support steel form 2, and prevent that steel form 2 from slipping because of the atress in the concreting process.
In this embodiment, the steel form 2 is a frame-type steel form. Referring to fig. 4a to 4c, a plane of the steel form 2 close to the substrate layer 1 is a flat plane, and a side wall 20 protruding vertically is provided on a plane of the steel form 2 away from the substrate layer 1.
Specifically, the sidewall 20 is provided with a through hole 201 for the steel bar to pass through. So, through set up through-hole 201 on steel form 2 for the reinforcing bar of fixed usefulness can run through-hole 201 and carry out the concatenation of a plurality of steel forms 2 fixed, need not additionally to consolidate, and the concatenation construction time spent is lower, effectively improves the efficiency of construction, and makes whole concatenation template firm and the atress even.
In this embodiment, the through holes 201 are distributed including a bottom end near the sidewall 20 and a top end near the sidewall 20. Thereby, when a plurality of steel form 2 splice, can follow being close to the top position of steel form 2 and being close to the bottom position and splice fixedly through the reinforcing bar respectively, make the steel form 2 of concatenation can keep higher stability, effectively prevent that the bearing capacity of the top of single steel form 2 and bottom is inhomogeneous, improved the atress degree of consistency and the stability of whole template to realize that good wall of a well is pour.
Further, be located 2 steel form inboard of stratum basale and correspond and be located between 2 steel form in the stratum basale 1 outside, fastener 4 fixed connection is passed through at the top, and 4 buckles are passed through at the steel form 2 of centre form and the top of 2 steel form of the external mold that correspond promptly. Through the fixed connection lock of fastener 4 for at the concreting in-process, concrete tension can effectively be overcome to the steel form 2 of centre form and the steel form 2 of the external mold that corresponds and not strutted and alternate segregation, remains relative stable fixed state throughout, thereby is favorable to guaranteeing the completion of normally pouring of open caisson wall of a well.
In this embodiment, the two ends of the fastener 4 are respectively provided with a bending portion extending axially and bending inwards towards the middle position of the fastener, and in the using process of the fastener 4, the bending portions at the two ends are respectively buckled on the two steel templates 2 corresponding to the inner mold and the outer mold. The steel moulding plate 2 is a frame-shaped steel moulding plate, one surface with the side wall 20 is buckled with the bent part of the fastener 4, and the bent part of the fastener 4 is buckled on the transverse side wall at the top of the steel moulding plate 2, so that two steel moulding plates 2 corresponding to the inner mould and the outer mould can be effectively buckled and fixed, and are prevented from loosening and falling; and when the dismouting, only need the top of centre form and two steel form 2 that the external mold corresponds each other to draw close the motion each other, can easily lift off fastener 4 or buckle fastener 4, easy dismounting, when can effectively practice thrift overall structure build, improves and builds efficiency, and need not to borrow instrument application of force in fastener 4, improves fastener 4's life. When concrete is poured, because the bent parts at the two ends of the fastener 4 are buckled on the transverse side wall at the top of the steel formwork 2, when the two steel formworks 2 corresponding to the inner formwork and the outer formwork are tensioned under the action of the concrete and have the tendency of mutual separation, the bent parts at the two ends of the fastener 4 can tightly buckle the transverse side wall at the top of the steel formwork 2 in time, and therefore the mutual separation of the two steel formworks 2 corresponding to the inner formwork and the outer formwork is effectively prevented.
The above embodiments are merely preferred embodiments of the present invention, and only lie in further detailed description of the technical solutions of the present invention, but the protection scope and the implementation manner of the present invention are not limited thereto, and any changes, combinations, deletions, replacements, or modifications that do not depart from the spirit and principles of the present invention will be included in the protection scope of the present invention.

Claims (8)

1. A pouring template building structure for a caisson wall is characterized by comprising a substrate layer (1) and a steel template (2); a plurality of steel templates (2) are tightly and continuously spliced and distributed along the inner side and the outer side of the substrate layer (1); the steel template (2) is fixedly positioned at the top of the substrate layer (1), and the bottom end of the steel template (2) is lower than the top end of the substrate layer (1);
and the steel templates (2) distributed on the inner side of the basal layer (1) and the steel templates (2) distributed on the outer side of the basal layer (1) are connected and fixed through steel bars.
2. A casting template construction structure for a caisson wall according to claim 1, characterised in that the substrate layer (1) comprises the cutting edges or the finished cast wall.
3. The pouring formwork building structure for the caisson wall of the well according to claim 1, wherein U-shaped steel bars (3) are arranged on the inner side and the outer side of the top of the base layer (1) and used for supporting the steel formwork (2).
4. The pouring formwork building structure for the wall of the open caisson according to claim 3, characterized in that the U-shaped steel bars (3) are perpendicular to the wall surface of the base layer (1), and the U-shaped two ends of the U-shaped steel bars (3) are fixed on the avoiding surface of the base layer (1).
5. The pouring template building structure for the caisson wall of the well according to claim 1, wherein the top of the steel template (2) located on the inner side of the substrate layer (1) is fixedly connected with the steel template (2) correspondingly located on the outer side of the substrate layer (1) through a fastener (4).
6. The pouring template building structure for the caisson wall of any one of claims 1 to 5, wherein the steel template (2) is a frame-type steel template; pressing close to of steel form (2) the one side of stratum basale (1) is straight face, deviating from of steel form (2) have perpendicular bellied lateral wall (20) on the one side of stratum basale (1).
7. The pouring template building structure for the wall of the open caisson according to claim 6, wherein the side wall (20) is provided with through holes (201) for the steel bars to pass through.
8. The caisson wall pouring template building structure of claim 7, wherein the through holes (201) are distributed and located at positions including the bottom end near the side wall (20) and the top end near the side wall (20).
CN201921132277.4U 2019-07-18 2019-07-18 Structure is built to template of pouring of open caisson wall of a well Active CN210827525U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921132277.4U CN210827525U (en) 2019-07-18 2019-07-18 Structure is built to template of pouring of open caisson wall of a well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921132277.4U CN210827525U (en) 2019-07-18 2019-07-18 Structure is built to template of pouring of open caisson wall of a well

Publications (1)

Publication Number Publication Date
CN210827525U true CN210827525U (en) 2020-06-23

Family

ID=71255360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921132277.4U Active CN210827525U (en) 2019-07-18 2019-07-18 Structure is built to template of pouring of open caisson wall of a well

Country Status (1)

Country Link
CN (1) CN210827525U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117385915A (en) * 2023-12-04 2024-01-12 中交一公局第二工程有限公司 A modular caisson steel frame and caisson construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117385915A (en) * 2023-12-04 2024-01-12 中交一公局第二工程有限公司 A modular caisson steel frame and caisson construction method

Similar Documents

Publication Publication Date Title
CN102677675A (en) Tower crane foundation in building basement and manufacturing method of tower crane foundation
CN114622546A (en) Space truss support platform, system and method for ultra-deep underground diaphragm walls
CN105952154B (en) A kind of concrete-pouring template stent
CN215969285U (en) Mould for manufacturing concrete fence plate
CN106988319A (en) A kind of rapid constructing method of large deep foundation pit agent structure side wall
CN210315505U (en) A connection device for the overfilled part of the underground diaphragm wall
CN113652969A (en) A prefabricated construction method for tie beams between piers of highway bridges of various grades
CN211113137U (en) Assembled reinforced concrete pier
CN220789766U (en) Prefabricated bearing platform template and construction structure with same
CN215801075U (en) Pier column template for prefabricated assembly type construction of tie beam between piers of highway bridge of each grade
CN215857728U (en) Prestressed reinforced concrete beam type structure
CN212707306U (en) Concrete prefabricated component bottom formwork convenient to assemble and hoist
CN216587669U (en) Self-stabilizing bearing platform die
CN211201150U (en) Shear wall template structure
CN223824224U (en) Middle floor slab with bracing structure
CN221645573U (en) A multi-span continuous frame bridge template
CN211257813U (en) Novel combined mold box
CN113529729A (en) Prestressed reinforced concrete beam type structure
CN223330002U (en) A construction structure for installing embedded plates in steel bars
CN223577156U (en) Turnover formula terrace pile cap structure
CN219690578U (en) Independent column pier type double-layer plate construction elevator concrete foundation structure
CN214136618U (en) Movable type pedestal
CN120443596B (en) Integrated steel slip lifting die for pond slope protection and construction method
CN222701178U (en) A connection structure of precast concrete secondary beam and cast-in-place reinforced concrete corbel
CN218699897U (en) Prefabricated T roof beam of highway post-tensioning method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant