CN210758648U - Material guiding structure for preparing decorative floor protective film - Google Patents
Material guiding structure for preparing decorative floor protective film Download PDFInfo
- Publication number
- CN210758648U CN210758648U CN201921489817.4U CN201921489817U CN210758648U CN 210758648 U CN210758648 U CN 210758648U CN 201921489817 U CN201921489817 U CN 201921489817U CN 210758648 U CN210758648 U CN 210758648U
- Authority
- CN
- China
- Prior art keywords
- group
- screw rod
- positioning screw
- holes
- rotating shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 title claims abstract description 16
- 230000001681 protective effect Effects 0.000 title claims abstract description 16
- 229910001220 stainless steel Inorganic materials 0.000 claims abstract description 18
- 239000010935 stainless steel Substances 0.000 claims abstract description 18
- 230000000149 penetrating effect Effects 0.000 claims description 8
- 239000011265 semifinished product Substances 0.000 abstract description 12
- 238000004519 manufacturing process Methods 0.000 abstract description 11
- 229920000742 Cotton Polymers 0.000 abstract description 9
- 239000000047 product Substances 0.000 abstract description 7
- 238000000034 method Methods 0.000 abstract description 6
- 239000012535 impurity Substances 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000005034 decoration Methods 0.000 description 10
- 238000002360 preparation method Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 1
- 238000006748 scratching Methods 0.000 description 1
- 230000002393 scratching effect Effects 0.000 description 1
Images
Landscapes
- Floor Finish (AREA)
Abstract
The utility model belongs to the technical field of fitment floor protection film is used, specifically disclose guide structure that fitment floor protection film was prepared, including operation panel, a set of backup pad of erecting, a set of through-hole, fixed stay screw rod, two sets of first lock nut, a set of second through-hole, positioning screw, stainless steel guide pin bushing, a set of second lock nut, a set of bearing mounting hole, a set of bearing, pivot, spacing adjusting nut and pivot stainless steel guide pin bushing. The beneficial effects of the utility model reside in that: the prepared semi-finished product PVC + needle cotton, the semi-finished product EVA sponge and the like can be subjected to accurate and stable material guiding operation in the processing procedure of production equipment, so that the production efficiency of the decorative floor protective film and the quality of finished products are improved; the structure such as first L shape fixed plate, second L shape fixed plate, first bolt, second bolt, third through-hole, auxiliary positioning screw, supplementary lock nut and triangle-shaped scraper blade can get rid of the impurity of surface probably adhesion such as semi-manufactured goods PVC + needle cotton, semi-manufactured goods EVA sponge, improves product quality.
Description
Technical Field
The utility model belongs to the technical field of fitment floor protection film is used, concretely relates to guide structure of fitment floor protection film preparation.
Background
In the decoration operation, if the links involved in home decoration are numerous, unnecessary troubles and losses can be caused to subsequent construction and use if finished product protection is not made in the previous construction, the unnecessary troubles and losses are shown in the entrance of various decoration materials and the cleaning of various building decoration wastes, the objects can pass through the entrance door, and the probability of collision and friction between the objects and the entrance door in the carrying process is greatly increased.
The method for solving the problem is to use a finished protective film to wrap the exposed part such as a door, cover tiles or floors and the like before finishing and starting up until furniture enters a field, so as to avoid the phenomenon of scratching. Generally, in the processing procedure of production equipment, for example, semi-finished product of PVC + needle cotton, semi-finished product of EVA sponge and the like, the adopted decoration ground protection film needs to be subjected to accurate and stable material guiding operation so as to perform the production of the next procedure, and the reasonability of the material guiding operation design directly affects the product quality and the production efficiency of the whole decoration ground protection film.
Therefore, based on the above problem, the utility model provides a guide structure of fitment floor protecting film preparation.
SUMMERY OF THE UTILITY MODEL
Utility model purpose: the utility model aims at providing a guide structure that fitment floor protection film was prepared, its structural design is reasonable, can carry out accurate, stable guide operation to the semi-manufactured goods PVC + needle cotton of preparation, semi-manufactured goods EVA sponge etc. in the manufacturing procedure of production facility, improves the production efficiency and the finished product quality of fitment floor protection film.
The technical scheme is as follows: the utility model provides a material guiding structure for preparing a decoration floor protective film, which comprises an operation table, a group of vertical support plates symmetrically arranged at two ends of the operation table, a group of through holes respectively arranged in the top ends of the group of vertical support plates, a fixed support screw rod with two ends respectively penetrating through the group of first through holes, two groups of first locking nuts arranged at two ends of the fixed support screw rod and respectively matched with the group of vertical support plates, a group of second through holes respectively arranged in the top ends of the group of vertical support plates and positioned below the group of first through holes, a positioning screw rod with two ends respectively penetrating through the group of second through holes, a stainless steel guide sleeve arranged on the positioning screw rod, a group of second locking nuts arranged at two ends of the positioning screw rod, a group of bearing mounting holes respectively arranged in the bottom ends of the group of vertical support plates, and a group of bearings respectively arranged in the group of bearing mounting holes, and the two ends of the rotating shaft respectively penetrate through the group of bearings, the limiting adjusting nuts arranged at the two ends of the rotating shaft, and the rotating shaft stainless steel guide sleeve arranged on the rotating shaft.
According to the technical scheme, the diameter sizes of the positioning screw rod, the stainless steel guide sleeve, the rotating shaft and the rotating shaft stainless steel guide sleeve are sequentially increased.
This technical scheme, the guide structure of fitment floor protective film preparation still includes fixed setting on a set of perpendicular backup pad and is located a set of second through-hole, first L shape fixed plate between a set of bearing mounting hole, second L shape fixed plate, wherein, first L shape fixed plate, second L shape fixed plate are installed on a set of perpendicular backup pad through first bolt, second bolt respectively, and set up the circular spacing recess in first L shape fixed plate one side, and set up the third through-hole in second L shape fixed plate, and one end is located circular spacing recess, the other end runs through the assistance-localization real screw of third through-hole, and set up the supplementary lock nut in assistance-localization real screw one end, and set up the triangle-shaped scraper blade on assistance-localization real screw, wherein, assistance-localization real screw and the face welded fastening of triangle-shaped scraper blade.
Compared with the prior art, the utility model discloses a guide structure of fitment floor protection film preparation's beneficial effect lies in: 1. the structure is reasonable in design, accurate and stable material guiding operation can be carried out on the prepared semi-finished product PVC + needle cotton, the semi-finished product EVA sponge and the like in the processing procedure of production equipment, and the production efficiency and the finished product quality of the decorative floor protection film are improved; 2. first L shape fixed plate, second L shape fixed plate, first bolt, second bolt, circular spacing recess, third through-hole, auxiliary positioning screw, supplementary lock nut and triangle-shaped scraper blade etc. can get rid of the impurity of the surperficial probably adhesion such as semi-manufactured goods PVC + needle cotton, semi-manufactured goods EVA sponge, improve product quality.
Drawings
Fig. 1 is a schematic structural view of a material guiding structure for preparing a decorative floor protective film of the present invention;
FIG. 2 is a schematic left-side view of the material guiding structure made of the decoration floor protective film of the present invention;
FIG. 3 is a schematic side view of the auxiliary positioning screw and the triangular scraper of the material guiding structure for manufacturing the decorative floor protective film of the present invention;
fig. 4 is a schematic view of the auxiliary positioning screw and the triangular scraper of the material guiding structure prepared by the decoration floor protective film of the present invention.
Detailed Description
The invention will be further elucidated with reference to the drawings and the specific embodiments.
Examples
Referring to fig. 1, 2, 3 and 4, the material guiding structure for preparing a decorative floor protective film comprises an operation table 1, a set of vertical support plates 2 symmetrically arranged at two ends of the operation table 1, a set of through holes 3 respectively arranged in the top ends of the set of vertical support plates 2, a fixed support screw 4 with two ends respectively penetrating through the set of first through holes 3, two sets of first lock nuts 5 arranged at two ends of the fixed support screw 4 and respectively used with the set of vertical support plates 2, a set of second through holes 6 respectively arranged in the top ends of the set of vertical support plates 2 and positioned below the set of first through holes 3, a set screw 7 with two ends respectively penetrating through the set of second through holes 6, a stainless steel guide sleeve 9 arranged on the set screw 7, a set of second lock nuts 8 arranged at two ends of the set screw 7, and a set of bearing mounting holes 17 respectively arranged in the bottom ends of the set of vertical support plates 2, and a set of bearings 18 respectively arranged in the set of bearing mounting holes 17, a rotating shaft 19 with two ends respectively penetrating through the set of bearings 18, limit adjusting nuts 20 arranged at two ends of the rotating shaft 19, and a rotating shaft stainless steel guide sleeve 21 arranged on the rotating shaft 19.
Further preferably, the diameter sizes of the positioning screw 7, the stainless steel guide sleeve 9, the rotating shaft 19 and the rotating shaft stainless steel guide sleeve 21 are sequentially increased.
The material guiding structure for preparing the decoration floor protective film also comprises a first L-shaped fixing plate 10 and a second L-shaped fixing plate 14 which are fixedly arranged on a group of vertical supporting plates 2 and are positioned between a group of second through holes 6 and a group of bearing mounting holes 17, wherein the first L-shaped fixing plate 10 and the second L-shaped fixing plate 14 are respectively arranged on the group of vertical supporting plates 2 through a first bolt 11 and a second bolt 12 (the inner screw holes matched with the first bolt 11 and the second bolt 12 are not marked in the figure 2), a circular limiting groove 12-1 arranged in one surface of the first L-shaped fixing plate 10, a third through hole 13 arranged in the second L-shaped fixing plate 14, an auxiliary positioning screw rod 16 with one end positioned in the circular limiting groove 12-1 and the other end penetrating through the third through hole 13, and an auxiliary locking nut 15 arranged at one end of the auxiliary positioning screw rod 16, and the triangular scraper 22 is arranged on the auxiliary positioning screw 16, wherein the connecting surface of the auxiliary positioning screw 16 and the triangular scraper 22 is welded and fixed.
Specifically, the semi-finished product of PVC + needle cotton, the semi-finished product of EVA sponge, etc. is introduced from the upper part of the stainless steel guide sleeve 9 (the stainless steel guide sleeve 9 performs a contact branch operation), and then the semi-finished product of PVC + needle cotton, the semi-finished product of EVA sponge, etc. is introduced below the rotating shaft stainless steel guide sleeve 21 (the rotating shaft stainless steel guide sleeve 21 performs a tensioning function), and the triangular scraper 22 on the auxiliary positioning screw 16 scrapes off impurities or residual materials on the contact surface of the semi-finished product of PVC + needle cotton, the semi-finished product of EVA sponge, etc.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications can be made without departing from the principle of the present invention, and these modifications should also be regarded as the protection scope of the present invention.
Claims (3)
1. Guide structure that fitment floor protective film prepared, its characterized in that: comprises an operation table (1), a group of vertical supporting plates (2) which are symmetrically arranged at two ends of the operation table (1), a group of through holes (3) which are respectively arranged in the top ends of the group of vertical supporting plates (2), a fixed supporting screw rod (4) of which two ends respectively penetrate through the group of first through holes (3), two groups of first locking nuts (5) which are arranged at two ends of the fixed supporting screw rod (4) and are respectively matched with the group of vertical supporting plates (2), a group of second through holes (6) which are respectively arranged in the top ends of the group of vertical supporting plates (2) and are positioned below the group of first through holes (3), a positioning screw rod (7) of which two ends respectively penetrate through the group of second through holes (6), a stainless steel guide sleeve (9) which is arranged on the positioning screw rod (7), a group of second locking nuts (8) which are arranged at two ends of the positioning screw rod (7), and a group of bearing mounting holes (17) which are respectively arranged in the bottom, and a group of bearings (18) respectively arranged in the group of bearing mounting holes (17), a rotating shaft (19) with two ends respectively penetrating through the group of bearings (18), limit adjusting nuts (20) arranged at two ends of the rotating shaft (19), and a rotating shaft stainless steel guide sleeve (21) arranged on the rotating shaft (19).
2. A guide structure prepared from a finishing floor protective film according to claim 1, wherein: the diameter sizes of the positioning screw rod (7), the stainless steel guide sleeve (9), the rotating shaft (19) and the rotating shaft stainless steel guide sleeve (21) are sequentially increased.
3. A guide structure prepared from a finishing floor protective film according to claim 1, wherein: the material guiding structure for preparing the decorative floor protective film also comprises a first L-shaped fixing plate (10) and a second L-shaped fixing plate (14) which are fixedly arranged on a group of vertical supporting plates (2) and are positioned between a group of second through holes (6) and a group of bearing mounting holes (17), wherein the first L-shaped fixing plate (10) and the second L-shaped fixing plate (14) are respectively arranged on the group of vertical supporting plates (2) through a first bolt (11) and a second bolt (12), a circular limiting groove (12-1) is arranged in one surface of the first L-shaped fixing plate (10), a third through hole (13) is arranged in the second L-shaped fixing plate (14), an auxiliary positioning screw rod (16) with one end positioned in the circular limiting groove (12-1) and the other end penetrating through the third through hole (13), and an auxiliary locking nut (15) arranged at one end of the auxiliary positioning screw rod (16), and the triangular scraper blade (22) is arranged on the auxiliary positioning screw rod (16), wherein the connecting surface of the auxiliary positioning screw rod (16) and the triangular scraper blade (22) is welded and fixed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921489817.4U CN210758648U (en) | 2019-09-09 | 2019-09-09 | Material guiding structure for preparing decorative floor protective film |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921489817.4U CN210758648U (en) | 2019-09-09 | 2019-09-09 | Material guiding structure for preparing decorative floor protective film |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210758648U true CN210758648U (en) | 2020-06-16 |
Family
ID=71034826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921489817.4U Expired - Fee Related CN210758648U (en) | 2019-09-09 | 2019-09-09 | Material guiding structure for preparing decorative floor protective film |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210758648U (en) |
-
2019
- 2019-09-09 CN CN201921489817.4U patent/CN210758648U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205650494U (en) | Two -sided cleaning device of panel | |
CN210758648U (en) | Material guiding structure for preparing decorative floor protective film | |
CN216266917U (en) | Polycrystalline silicon rod cutting machine | |
CN111760939A (en) | Steel plate bending device convenient to move for engineering | |
CN214568831U (en) | Intermittent material turning structure for edge cutting processing of stone-plastic plate | |
CN210366127U (en) | A semi-manufactured goods processing feeding structure for fitment floor protection film | |
CN206336747U (en) | A kind of metal bar stock blanking collection device | |
CN204805318U (en) | Can realize quick assembly disassembly's roller device | |
CN210480382U (en) | Discharging supporting device applied to decoration floor protection film | |
CN204624716U (en) | Band steel side's bag gathering-device | |
CN210619227U (en) | Convenient carriage of reinforcing bar processing | |
CN106225905A (en) | A kind of repacking platform balance | |
CN215091889U (en) | Frock is used in assembly, welding of piston rod and earrings | |
CN208775995U (en) | Generate heat mat automated production delivery roller structure | |
CN105345207A (en) | Tin paste brushing equipment | |
CN214827895U (en) | Portable roller bearing for electric power construction | |
CN205414644U (en) | Brush tin cream equipment | |
CN219601698U (en) | Stoving tectorial membrane level casting die | |
CN213185961U (en) | Solar cell panel support | |
CN214826773U (en) | Material loading frame for machining and carrying | |
CN211225136U (en) | Improved plate feeding device | |
CN211803497U (en) | Automatic feeding device for pipe machining and pushing machine | |
CN216182763U (en) | High-efficient pipeline corrosion prevention device | |
CN220197636U (en) | Metal product pretreatment tooling | |
CN215754950U (en) | Log turns to conveyor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200616 |