CN210716283U - Special pipeline gallows of trench connecting tube - Google Patents

Special pipeline gallows of trench connecting tube Download PDF

Info

Publication number
CN210716283U
CN210716283U CN201921349315.1U CN201921349315U CN210716283U CN 210716283 U CN210716283 U CN 210716283U CN 201921349315 U CN201921349315 U CN 201921349315U CN 210716283 U CN210716283 U CN 210716283U
Authority
CN
China
Prior art keywords
boom
wall
pipeline
pipe
tail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921349315.1U
Other languages
Chinese (zh)
Inventor
李春凯
申晋忠
何雷
焦自天
李红霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING MECHANICAL AND ELECTRICAL ENGINEERING GROUP CO LTD
Original Assignee
BEIJING MECHANICAL AND ELECTRICAL ENGINEERING GROUP CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING MECHANICAL AND ELECTRICAL ENGINEERING GROUP CO LTD filed Critical BEIJING MECHANICAL AND ELECTRICAL ENGINEERING GROUP CO LTD
Priority to CN201921349315.1U priority Critical patent/CN210716283U/en
Application granted granted Critical
Publication of CN210716283U publication Critical patent/CN210716283U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a special pipeline gallows of trench connecting tube, including two davits first davits and second davits promptly, connecting elements, stull, two pipelines embrace the card promptly first pipeline embrace the card and the card is embraced to the second pipeline, wherein: the heads of the two suspension arms are respectively connected to the connecting member, two ends of the cross brace are respectively connected with the first suspension arm and the second suspension arm, the tail of the first suspension arm is connected with the upper end of the first pipeline clamp, and the tail of the second suspension arm is connected with the upper end of the second pipeline clamp; the lower annular parts of the first pipeline clamp and the second pipeline clamp are used for hanging and clamping the pipeline respectively. Through the utility model discloses, can reduce the quantity of pipeline gallows when providing fixed for the pipeline.

Description

一种沟槽连接管道专用管道吊架A special pipe hanger for grooved connection pipes

技术领域technical field

本实用新型涉及一种管道安装用构件,尤其涉及一种沟槽连接管道专用管道吊架。The utility model relates to a pipe installation component, in particular to a special pipe hanger for grooved connection pipes.

背景技术Background technique

根据《沟槽式连接管道工程技术规程》的规定,横管吊架(托架) 应设置在接头(刚性接头、挠性接头,支管接头)两侧和三通、四通、弯头、异径管等管件上下游连接接头的两侧,这导致管道安装时吊架数量众多,成本较高,且安装繁琐。According to the "Technical Regulations for Groove Connection Pipeline Engineering", the horizontal pipe hangers (brackets) should be set on both sides of the joints (rigid joints, flexible joints, branch joints) and on both sides of the tee, cross, elbow, different The upstream and downstream of pipe fittings such as diameter pipes are connected to both sides of the joint, which leads to a large number of hangers during pipe installation, high cost and cumbersome installation.

为了减少吊架的数量,本实用新型提供了一种沟槽连接管道专用管道吊架,能够有效的减少吊架数量,且安装方便。In order to reduce the number of hangers, the utility model provides a special pipe hanger for grooved connection pipes, which can effectively reduce the number of hangers and is convenient to install.

实用新型内容Utility model content

为实现本实用新型之目的,采用以下技术方案予以实现:In order to realize the purpose of the present utility model, the following technical solutions are adopted to realize:

一种沟槽连接管道专用管道吊架,包括两个吊臂即第一吊臂和第二吊臂、连接构件、横撑、两个管道抱卡即第一管道抱卡和第二管道抱卡,其中:两个吊臂的头部分别连接在所述连接构件上,横撑两端分别与第一吊臂和第二吊臂连接,第一吊臂的尾部与第一管道抱卡的上端连接,第二吊臂的尾部与第二管道抱卡的上端连接;第一管道抱卡和第二管道抱卡的下部环形部分别用于悬挂并抱紧管道。A special pipeline hanger for grooved-connected pipelines comprises two hoisting arms, namely a first hoisting arm and a second hoisting arm, a connecting member, a cross brace, and two pipeline holding clips, namely a first pipeline holding clip and a second pipeline holding clip , wherein: the heads of the two booms are respectively connected to the connecting member, the two ends of the cross brace are respectively connected to the first boom and the second boom, and the tail of the first boom is connected to the upper end of the first pipe clamp The tail part of the second boom is connected with the upper end of the second pipeline holding clip; the lower annular parts of the first pipeline holding clip and the second pipeline holding clip are respectively used to hang and hold the pipeline.

所述的吊架,其中:第一吊臂和第二吊臂呈八字型分布。The hanger, wherein: the first boom and the second boom are distributed in a figure-eight shape.

所述的吊架,其中:第一管道抱卡和第二管道抱卡分别设置在管道接头的两侧。The hanger, wherein: the first pipeline holding clip and the second pipeline holding clip are respectively arranged on both sides of the pipeline joint.

所述的吊架,其中:吊臂主体由一块钢板翻折而成,整体为长条形,截面呈“∏”型,包括相对设置的第一壁和第二壁,第一壁和第二壁在吊臂头部各设有一个相对的安装孔;第一壁和第二壁在吊臂尾部各设有一个相对的安装孔,第一壁和第二壁在头部和尾部的安装孔之间的位置设有横撑滑槽,滑槽底部设有一排卡沟。The hanger, wherein: the main body of the boom is formed by folding a piece of steel plate, the whole is elongated, and the cross-section is "∏" shape, including a first wall and a second wall arranged oppositely, the first wall and the second wall. The wall is provided with a relative mounting hole at the head of the boom; the first wall and the second wall are respectively provided with a relative mounting hole at the tail of the boom, and the first wall and the second wall are provided with mounting holes at the head and tail There is a horizontal strut chute at the position between them, and a row of card grooves is arranged at the bottom of the chute.

所述的吊架,其中:连接构件包括底板和底板两侧平行设置的两个侧板,两个侧板上左右两侧各开有一个销轴孔,左侧的两个销轴孔中插有一个销轴,右侧的两个销轴孔中插有一个销轴,第一吊臂和第二吊臂分别通过头部的安装孔挂在一个销轴上;底板上开有一个安装孔,吊杆一端插入该安装孔后由螺母锁紧。The hanger, wherein: the connecting member comprises a bottom plate and two side plates arranged in parallel on both sides of the bottom plate, a pin shaft hole is opened on each of the left and right sides of the two side plates, and the two pin shaft holes on the left side are inserted into the two side plates. There is a pin shaft, a pin shaft is inserted into the two pin shaft holes on the right side, the first boom and the second boom arm are respectively hung on a pin shaft through the mounting holes of the head; a mounting hole is opened on the bottom plate , one end of the boom is inserted into the mounting hole and then locked by the nut.

所述的吊架,其中:横撑为长条形空心方管,前后两端的两个相对的管壁各开有一个安装孔,前后两端各有一个双头铆栓插在两个安装孔中。The hanger, wherein: the horizontal support is a long hollow square tube, two opposite tube walls at the front and rear ends are each provided with an installation hole, and each of the front and rear ends has a double-headed rivet bolt inserted in the two installation holes. middle.

所述的吊架,其中:所述抱卡包括环形部分,环形部分的两端分别向上延伸有互相平行的连接片,两个连接片各开有一个螺栓孔;第一抱卡的环形部分套在管道上,第一吊臂的第一壁和第二壁上的在吊臂尾部的安装孔分别与第一抱卡的两个连接片的螺栓孔对齐,插入螺栓后用螺母锁紧;第二抱卡的环形部分套在管道上,第二吊臂的第一壁和第二壁上的在吊臂尾部的安装孔分别与第二抱卡的两个连接片的螺栓孔对齐,插入螺栓后用螺母锁紧。The hanger, wherein: the holding clip includes an annular part, two ends of the annular part are respectively extended upward with connecting pieces parallel to each other, and each of the two connecting pieces has a bolt hole; the annular part of the first holding clip is sleeved. On the pipeline, the mounting holes at the tail of the boom on the first wall and the second wall of the first boom are respectively aligned with the bolt holes of the two connecting pieces of the first clamp, and the bolts are inserted and locked with nuts; The annular part of the second holding card is sleeved on the pipeline, and the mounting holes on the first wall and the second wall of the second boom at the tail of the boom are respectively aligned with the bolt holes of the two connecting pieces of the second holding card, and the bolts are inserted. Then lock it with a nut.

所述的吊架,其中:双头铆栓的两端突出部分分别安装在吊臂的第一壁和第二壁的横撑滑槽中,并通过卡沟固定双头铆栓的位置。In the hanger, the protruding parts at both ends of the double-headed rivet bolt are respectively installed in the transverse strut chute of the first wall and the second wall of the boom, and the position of the double-headed rivet bolt is fixed by the clamping groove.

附图说明Description of drawings

图1为专用管道吊架连接管道结构示意图;Fig. 1 is a schematic diagram of the structure of the connecting pipe of the special pipe hanger;

图2为专用管道吊架结构示意图;Figure 2 is a schematic diagram of the structure of a special pipeline hanger;

图3为吊臂主视图;Figure 3 is a front view of the boom;

图4为吊臂侧视图;Figure 4 is a side view of the boom;

图5为连接构件主视图;Figure 5 is a front view of the connecting member;

图6为连接构件侧视图;Figure 6 is a side view of the connecting member;

图7为横撑主视图;Figure 7 is a front view of a cross brace;

图8为横撑侧视图;Figure 8 is a side view of the cross brace;

图9管道抱卡结构示意图。Figure 9 is a schematic diagram of the structure of the pipeline holding card.

具体实施方式Detailed ways

下面结合附图对本实用新型的具体实施方式进行详细描述。The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

如图1、2所示,沟槽连接管道专用管道吊架1包括两个吊臂即第一吊臂11和第二吊臂12,连接构件14,横撑13,两个管道抱卡即第一管道抱卡15和第二管道抱卡16。沟槽连接管道专用管道吊架由钢材制成。As shown in Figures 1 and 2, the special pipe hanger 1 for grooved pipes includes two booms, namely a first boom 11 and a second boom 12, a connecting member 14, a cross brace 13, and two pipe clamps, namely the first boom 11 and the second boom 12. A pipeline holder 15 and a second pipeline holder 16 . The special pipe hanger for grooved connection pipes is made of steel.

第一吊臂11和第二吊臂12的大小和形状完全相同,两个吊臂的头部分别连接在所述连接构件14上,第一吊臂11和第二吊臂12呈八字型分布,横撑13两端分别与第一吊臂11和第二吊臂12连接,且横撑13两端与第一吊臂11和第二吊臂12的连接位置可调,以控制第一吊臂11和第二吊臂12的夹角;第一吊臂11的尾部与第一管道抱卡15的上端连接,第二吊臂12的尾部与第二管道抱卡16的上端连接;第一管道抱卡15和第二管道抱卡16的下部环形部分别用于悬挂并抱紧管道3,且第一管道抱卡15和第二管道抱卡16分别设置在管道接头的两侧。第一管道抱卡15和第二管道抱卡16形状大小完全相同。The size and shape of the first boom 11 and the second boom 12 are exactly the same, the heads of the two booms are respectively connected to the connecting member 14, and the first boom 11 and the second boom 12 are distributed in a figure-eight shape , the two ends of the cross brace 13 are respectively connected with the first boom 11 and the second boom 12, and the connection positions of the two ends of the cross brace 13 with the first boom 11 and the second boom 12 can be adjusted to control the first boom 11 and the second boom 12. The angle between the arm 11 and the second boom 12; the tail of the first boom 11 is connected to the upper end of the first pipe holder 15, and the tail of the second boom 12 is connected to the upper end of the second pipe holder 16; the first The lower annular portions of the pipe clamp 15 and the second pipe clamp 16 are used to hang and hold the pipe 3 respectively, and the first pipe clamp 15 and the second pipe clamp 16 are respectively arranged on both sides of the pipe joint. The shape and size of the first pipe holder 15 and the second pipe holder 16 are exactly the same.

吊臂的结构如图3、4所示,吊臂由主体由一块钢板翻折而成,整体为长条形,截面呈“”型,包括相对设置的第一壁115和第二壁116,第一壁115和第二壁116在吊臂头部各设有一个相对的安装孔112;第一壁115和第二壁116在吊臂尾部各设有一个相对的安装孔111,第一壁115和第二壁116在头部和尾部的安装孔之间的位置设有横撑滑槽113,滑槽底部设有一排卡沟114。The structure of the boom is shown in Figures 3 and 4. The boom is formed by the main body being folded from a piece of steel plate. , the first wall 115 and the second wall 116 are each provided with a relative mounting hole 112 at the boom head; the first wall 115 and the second wall 116 are each provided with a relative mounting hole 111 at the boom tail, the first The wall 115 and the second wall 116 are provided with a cross brace chute 113 at the position between the mounting holes of the head and the tail, and a row of clamping grooves 114 are provided at the bottom of the chute.

连接构件14的结构如图5、6所示,连接构件14包括底板和底板两侧平行设置的两个侧板,两个侧板上左右两侧各开有一个销轴孔 141,两个销轴142分别插入在左侧的两个销轴孔中和右侧的两个销轴孔中,第一吊臂11和第二吊臂12分别通过头部的安装孔112挂在两个销轴142上,且可环绕销轴142旋转;底板上开有一个安装孔,吊杆2的螺纹端143插入该安装孔后由螺母144锁紧,吊杆2的另一端安装在顶板5上。The structure of the connecting member 14 is shown in Figs. 5 and 6. The connecting member 14 includes a bottom plate and two side plates arranged in parallel on both sides of the bottom plate. The shaft 142 is inserted into the two pin holes on the left and the two pin holes on the right, respectively. The first boom 11 and the second boom 12 are respectively hung on the two pins through the mounting holes 112 in the head. 142, and can rotate around the pin 142; a mounting hole is opened on the bottom plate, the threaded end 143 of the boom 2 is inserted into the mounting hole and locked by the nut 144, and the other end of the boom 2 is installed on the top plate 5.

横撑13的结构如图7、8所示,横撑13为长条形空心方管,两端的两个相对的管壁各开有一个安装孔151,两端各有一个双头铆栓 152插在两个安装孔151中,双头铆栓152的两端突出部分分别安装在吊臂的第一壁115和第二壁116的横撑滑槽113中,能够在滑槽中灵活滑动,选择适合的位置,并通过卡沟114来固定双头铆栓152的位置。The structure of the cross brace 13 is shown in Figures 7 and 8. The cross brace 13 is a long hollow square tube, two opposite pipe walls at both ends have a mounting hole 151, and each end has a double-headed rivet 152. Inserted into the two mounting holes 151, the protruding parts at both ends of the double-headed rivet bolts 152 are respectively installed in the cross-bracing chute 113 of the first wall 115 and the second wall 116 of the boom, and can slide flexibly in the chute, Select a suitable position, and fix the position of the double-headed rivet bolt 152 through the card groove 114 .

抱卡结构如图9所示,所述抱卡包括环形部分151,环形部分151 的两端分别向上延伸有互相平行的连接片152和153,连接片152和 153上各开有一个螺栓孔,用于供螺栓154插在两个螺栓孔中。第一抱卡15的环形部分151套在管道3上,将第一吊臂的第一壁115和第二壁116的吊臂尾部的安装孔分别与第一抱卡15的两个连接片的螺栓孔对齐,插入螺栓154,用螺母锁紧,即可实现对管道的抱紧和悬挂固定。第一抱卡16的连接方式与第一抱卡15相同。The holding card structure is shown in Figure 9, the holding card includes an annular portion 151, and two ends of the annular portion 151 are respectively provided with mutually parallel connecting pieces 152 and 153, and the connecting pieces 152 and 153 are respectively provided with a bolt hole, For the bolts 154 to be inserted in the two bolt holes. The annular part 151 of the first holding clip 15 is sleeved on the pipeline 3, and the mounting holes of the boom tail of the first wall 115 and the second wall 116 of the first hanging arm are respectively connected with the two connecting pieces of the first holding clip 15. Align the bolt holes, insert the bolt 154, and lock it with a nut, so as to realize the tightening and hanging of the pipeline. The connection method of the first holding card 16 is the same as that of the first holding card 15 .

通过本实用新型,能够在为管道提供固定的同时降低管道吊架的数量。By means of the utility model, the number of the pipe hangers can be reduced while the pipe is fixed.

Claims (8)

1.一种沟槽连接管道专用管道吊架,包括两个吊臂即第一吊臂和第二吊臂、连接构件、横撑、两个管道抱卡即第一管道抱卡和第二管道抱卡,其特征在于:两个吊臂的头部分别连接在所述连接构件上,横撑两端分别与第一吊臂和第二吊臂连接,第一吊臂的尾部与第一管道抱卡的上端连接,第二吊臂的尾部与第二管道抱卡的上端连接;第一管道抱卡和第二管道抱卡的下部环形部分别用于悬挂并抱紧管道。1. A special-purpose pipeline hanger for grooved-connected pipelines, comprising two booms, namely a first boom and a second boom, a connecting member, a cross brace, and two pipe clamps, namely a first pipe clamp and a second pipe The holding card is characterized in that: the heads of the two booms are respectively connected to the connecting member, the two ends of the cross brace are respectively connected to the first boom and the second boom, and the tail of the first boom is connected to the first pipe The upper end of the holding clip is connected, and the tail of the second boom is connected with the upper end of the second pipeline holding clip; the lower annular parts of the first pipeline holding clip and the second pipeline holding clip are respectively used to hang and hold the pipeline. 2.根据权利要求1所述的吊架,其特征在于:第一吊臂和第二吊臂呈八字型分布。2 . The hanger according to claim 1 , wherein the first boom and the second boom are distributed in a figure-eight shape. 3 . 3.根据权利要求1所述的吊架,其特征在于:第一管道抱卡和第二管道抱卡分别设置在管道接头的两侧。3 . The hanger according to claim 1 , wherein the first pipe holding clip and the second pipe holding clip are respectively arranged on both sides of the pipe joint. 4 . 4.根据权利要求1所述的吊架,其特征在于:吊臂主体由一块钢板翻折而成,整体为长条形,截面呈“∏”型,包括相对设置的第一壁和第二壁,第一壁和第二壁在吊臂头部各设有一个相对的安装孔;第一壁和第二壁在吊臂尾部各设有一个相对的安装孔,第一壁和第二壁在头部和尾部的安装孔之间的位置设有横撑滑槽,滑槽底部设有一排卡沟。4. The hanger according to claim 1 is characterized in that: the main body of the boom is formed by folding a piece of steel plate, the whole is elongated, and the cross section is in the "∏" shape, including the first wall and the second oppositely arranged. wall, the first wall and the second wall are each provided with a relative mounting hole at the boom head; the first wall and the second wall are each provided with a relative mounting hole at the boom tail, the first wall and the second wall A cross brace chute is arranged between the mounting holes of the head and the tail, and a row of card grooves is arranged at the bottom of the chute. 5.根据权利要求1所述的吊架,其特征在于:连接构件包括底板和底板两侧平行设置的两个侧板,两个侧板上左右两侧各开有一个销轴孔,左侧的两个销轴孔中插有一个销轴,右侧的两个销轴孔中插有一个销轴,第一吊臂和第二吊臂分别通过头部的安装孔挂在一个销轴上;底板上开有一个安装孔,吊杆一端插入该安装孔后由螺母锁紧。5. The hanger according to claim 1, characterized in that: the connecting member comprises a bottom plate and two side plates arranged in parallel on both sides of the bottom plate, and a pin shaft hole is opened on each of the left and right sides of the two side plates, and the left A pin is inserted into the two pin holes on the right side, a pin is inserted into the two pin holes on the right side, and the first boom and the second boom are respectively hung on a pin through the mounting holes of the head ; There is a mounting hole on the bottom plate, and one end of the boom is inserted into the mounting hole and locked by a nut. 6.根据权利要求4所述的吊架,其特征在于:横撑为长条形空心方管,前后两端的两个相对的管壁各开有一个安装孔,前后两端各有一个双头铆栓插在两个安装孔中。6. The hanger according to claim 4 is characterized in that: the cross brace is a long hollow square tube, the two opposite tube walls at the front and rear ends are each provided with a mounting hole, and the front and rear ends are each provided with a double head The rivets are inserted into the two mounting holes. 7.根据权利要求1所述的吊架,其特征在于:所述抱卡包括环形部分,环形部分的两端分别向上延伸有互相平行的连接片,两个连接片各开有一个螺栓孔;第一抱卡的环形部分套在管道上,第一吊臂的第一壁和第二壁上的在吊臂尾部的安装孔分别与第一抱卡的两个连接片的螺栓孔对齐,插入螺栓后用螺母锁紧;第二抱卡的环形部分套在管道上,第二吊臂的第一壁和第二壁上的在吊臂尾部的安装孔分别与第二抱卡的两个连接片的螺栓孔对齐,插入螺栓后用螺母锁紧。7. The hanger according to claim 1, characterized in that: the holding clip comprises an annular portion, two ends of the annular portion are respectively provided with connecting pieces that are parallel to each other, and each of the two connecting pieces is provided with a bolt hole; The annular part of the first holding card is sleeved on the pipeline, and the mounting holes at the tail of the boom on the first wall and the second wall of the first hanging arm are respectively aligned with the bolt holes of the two connecting pieces of the first holding card, and inserted into the pipe. After the bolts are locked with nuts; the annular part of the second holding card is sleeved on the pipeline, and the mounting holes at the tail of the boom on the first wall and the second wall of the second boom are respectively connected with the two second holding cards. Align the bolt holes of the plate, and lock them with nuts after inserting the bolts. 8.根据权利要求6所述的吊架,其特征在于:双头铆栓的两端突出部分分别安装在吊臂的第一壁和第二壁的横撑滑槽中,并通过卡沟固定双头铆栓的位置。8 . The hanger according to claim 6 , wherein the protruding parts at both ends of the double-headed rivet bolt are respectively installed in the cross brace chute of the first wall and the second wall of the boom, and fixed by the clamping groove. 9 . The location of the double-headed rivet.
CN201921349315.1U 2019-08-20 2019-08-20 Special pipeline gallows of trench connecting tube Active CN210716283U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921349315.1U CN210716283U (en) 2019-08-20 2019-08-20 Special pipeline gallows of trench connecting tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921349315.1U CN210716283U (en) 2019-08-20 2019-08-20 Special pipeline gallows of trench connecting tube

Publications (1)

Publication Number Publication Date
CN210716283U true CN210716283U (en) 2020-06-09

Family

ID=70933462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921349315.1U Active CN210716283U (en) 2019-08-20 2019-08-20 Special pipeline gallows of trench connecting tube

Country Status (1)

Country Link
CN (1) CN210716283U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115289262A (en) * 2022-04-14 2022-11-04 海洋石油工程(青岛)有限公司 A fixing method of large-sized pipeline branch relief valve

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115289262A (en) * 2022-04-14 2022-11-04 海洋石油工程(青岛)有限公司 A fixing method of large-sized pipeline branch relief valve

Similar Documents

Publication Publication Date Title
CN105317208B (en) A kind of adjustable angle socket joint type key slot type scaffolding steel pipe
CN210716283U (en) Special pipeline gallows of trench connecting tube
CN205129725U (en) Pipe disassembly tensioner
CN106989212A (en) A multi-bundle pipe positioning device
CN206958045U (en) A kind of aluminium section bar double-pipe joint structure
CN211219462U (en) A welding fixture for the upper body of a swirl three-way pipe
CN206054945U (en) A kind of low cost list branch pipe(tube) antidetonation crane system
CN114055071B (en) Clamp for welding iron pipe
CN105317207A (en) Multi-angle adjustable scaffold steel tube and steel tube scaffold
CN117052986A (en) A pipe clamping device
CN117052987A (en) A pipe clamping device
CN210391888U (en) A vehicle-mounted pipeline rack
CN103757682A (en) Fixing tool for vehicle-mounted electrophoresis of test board
CN206786138U (en) A multi-layer pipeline positioning device
CN108081199A (en) Rubber water pipe connector Quick installation equipment
CN209652916U (en) Reinforcement cage opening split sleeve installation device
CN207648048U (en) Counter weight device and air conditioner
CN214314306U (en) Cable fixing structure on large transport ship
CN208311710U (en) A kind of air-conditioning duct attachment device
CN105136568A (en) General corrugated pipe stretching test clamp
CN204372339U (en) A kind of tube bank integrated device
CN217559210U (en) Groove type clamping type anti-seismic connecting support combined structure
CN205855808U (en) A kind of tubing lifting clamp device
CN207898414U (en) A kind of bath towel holder
CN221958344U (en) Pipeline suitable for connecting different pipeline sizes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20250811

Granted publication date: 20200609