CN210636767U - Scaffold for constructional engineering - Google Patents

Scaffold for constructional engineering Download PDF

Info

Publication number
CN210636767U
CN210636767U CN201921156548.XU CN201921156548U CN210636767U CN 210636767 U CN210636767 U CN 210636767U CN 201921156548 U CN201921156548 U CN 201921156548U CN 210636767 U CN210636767 U CN 210636767U
Authority
CN
China
Prior art keywords
pillar
horizontal pole
support column
fixed horizontal
work platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921156548.XU
Other languages
Chinese (zh)
Inventor
苏志松
原东坡
李记先
黄艳芹
李武林
王志和
张晓毅
王万里
刘永杰
刘艳艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921156548.XU priority Critical patent/CN210636767U/en
Application granted granted Critical
Publication of CN210636767U publication Critical patent/CN210636767U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction engineering scaffold, including first pillar, second pillar, third pillar and fourth pillar, the equal swing joint in middle part of first pillar and second pillar and third pillar and fourth pillar has first fixed horizontal pole, the middle part swing joint of first pillar and third pillar and second pillar and fourth pillar has the fixed horizontal pole of second, one side swing joint who keeps away from first fixed horizontal pole in third pillar and fourth pillar middle part has the fixed horizontal pole of third, the equal fixedly connected with base in bottom of first pillar, second pillar, third pillar and fourth pillar. This building engineering scaffold frame, through work platform's setting, the connecting block overlap joint of personnel accessible work platform both sides before the construction on the recess that first fixed horizontal pole both ends were seted up to make work platform more firm on the scaffold frame, simultaneously through the lapped setting, the constructor is also convenient for remove work platform.

Description

Scaffold for constructional engineering
Technical Field
The utility model relates to a building engineering equipment technical field specifically is a building engineering scaffold.
Background
Scaffold frame refers to the construction site and operates and solve perpendicular and horizontal transportation and various supports that set up for the workman, and the general term of building boundary refers to on the building site and is used in the place that outer wall, interior decoration or layer height are higher can't directly be under construction, mainly for constructor dry life from top to bottom or peripheral safety net enclosure and high altitude installation component etc. scaffold frame manufacturing material usually has: bamboo, wood, steel pipe or synthetic material etc. some projects also use the scaffold as the template and use in addition in departments such as advertising, municipal administration, traffic road bridge, mine also extensively, and current building engineering scaffold structure is comparatively simple, and safe performance is lower.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building engineering scaffold has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a construction engineering scaffold, includes first pillar, second pillar, third pillar and fourth pillar, the equal swing joint in middle part of first pillar and second pillar and third pillar and fourth pillar has first fixed horizontal pole, the middle part swing joint of first pillar and third pillar and second pillar and fourth pillar has the fixed horizontal pole of second, one side swing joint who keeps away from first fixed horizontal pole in third pillar and fourth pillar middle part has the fixed horizontal pole of third, the equal fixedly connected with base in bottom of first pillar, second pillar, third pillar and fourth pillar.
Optionally, one side of the upper parts of the first strut, the second strut, the third strut and the fourth strut is fixedly connected with a hook.
Optionally, the number of the bases is four, and holes are formed in the surfaces of the four bases.
Optionally, both sides of the first fixed cross rod are provided with grooves, and the surfaces of the grooves are provided with connecting blocks in an overlapping mode.
Optionally, one side of the connecting block, which is far away from the first fixed cross rod, is fixedly connected with a working platform, and the surface of the working platform is provided with anti-skid lines.
Optionally, one end of the third fixed cross rod, which is far away from the third support column and one end of the fourth support column, are fixedly connected with fixing seats.
(III) advantageous effects
The utility model provides a building engineering scaffold frame possesses following beneficial effect:
1. this building engineering scaffold frame, through work platform's setting, the connecting block overlap joint of personnel accessible work platform both sides before the construction on the recess that first fixed horizontal pole both ends were seted up to make work platform more firm on the scaffold frame, simultaneously through the lapped setting, the constructor is also convenient for remove work platform.
2. This building engineering scaffold frame through the setting of fixing base and base, can be fixed in the building main part with the base on, is fixed in ground to make the more firm of scaffold frame change, also can not rock because of fixed insecure when the scaffold frame bearing.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic front structural view of the present invention.
In the figure: 1. a first support; 2. a second support; 3. a third support; 4. a fourth strut; 5. a first fixed cross bar; 6. a second fixed cross bar; 7. a third fixed cross bar; 8. a base; 9. hooking; 10. a groove; 11. connecting blocks; 12. a working platform; 13. a fixed seat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 2, the present invention provides a technical solution: a scaffold for building engineering comprises a first support column 1, a second support column 2, a third support column 3 and a fourth support column 4, wherein the middle parts of the first support column 1, the second support column 2, the third support column 3 and the fourth support column 4 are movably connected with a first fixed cross rod 5, the middle parts of the first support column 1, the third support column 3, the second support column 2 and the fourth support column 4 are movably connected with a second fixed cross rod 6, one side of the middle parts of the third support column 3 and the fourth support column 4, which is far away from the first fixed cross rod 5, is movably connected with a third fixed cross rod 7, the bottom ends of the first support column 1, the second support column 2, the third support column 3 and the fourth support column 4 are fixedly connected with a base 8, one side of the upper parts of the first support column 1, the second support column 2, the third support column 3 and the fourth support column 4 are fixedly connected with a hook 9, through the arrangement of the hook 9, personnel can fixedly construct a protective net through the hooks, articles such as tools required for construction are placed through hooks 9 on the upper portions of a third support 3 and a fourth support 4, the number of bases 8 is four, holes are formed in the surfaces of the four bases 8, grooves 10 are formed in the two sides of a first fixed cross rod 5, connecting blocks 11 are lapped on the surfaces of the grooves 10, a working platform 12 is fixedly connected to one side, far away from the first fixed cross rod 5, of each connecting block 11, through the arrangement of the working platform 12, personnel can lap the grooves formed in the two ends of the first fixed cross rod 5 through the connecting blocks 11 on the two sides of the working platform 12 before construction, so that the working platform 12 is firmer on a scaffold, meanwhile, through the overlapped arrangement, the constructors can conveniently move the working platform 12, anti-skid lines are arranged on the surface of the working platform 12, and through the arrangement of the anti-skid lines, the constructors can effectively enhance friction force during construction on the working, avoid the appearance of the phenomenon of skidding, the equal fixedly connected with fixing base 13 of one end that third pillar 3 and fourth pillar 4 were kept away from to the fixed horizontal pole 7 of third, through the setting of fixing base 13 and base 8, can be fixed in the building subject with fixing base 13 on, be fixed in ground with base 8 to make the scaffold frame become more firm, also can not rock because of fixed insecurity when the scaffold frame bearing.
To sum up, this building engineering scaffold, during the use, through the setting of work platform 12, the connecting block 11 overlap joint of personnel accessible work platform 12 both sides is on the recess of seting up at 5 both ends of first fixed horizontal pole before the construction, thereby make work platform 12 more firm on the scaffold, simultaneously through the lapped setting, constructor also is convenient for remove work platform 12, through fixing base 13 and 8's setting, can be fixed in the building main part with fixing base 13 on, be fixed in base 8 on ground, thereby make the scaffold become more firm, also can not rock because of fixed insecure when the scaffold bearing.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A building engineering scaffold, includes first pillar (1), second pillar (2), third pillar (3) and fourth pillar (4), its characterized in that: first pillar (1) and second pillar (2) have first fixed horizontal pole (5) with the equal swing joint in middle part of third pillar (3) and fourth pillar (4), the middle part swing joint of first pillar (1) and third pillar (3) and second pillar (2) and fourth pillar (4) has second fixed horizontal pole (6), one side swing joint that first fixed horizontal pole (5) were kept away from in third pillar (3) and fourth pillar (4) middle part has third fixed horizontal pole (7), the equal fixedly connected with base (8) in bottom of first pillar (1), second pillar (2), third pillar (3) and fourth pillar (4).
2. A construction scaffolding according to claim 1, wherein: and one sides of the upper parts of the first support column (1), the second support column (2), the third support column (3) and the fourth support column (4) are fixedly connected with a hook (9).
3. A construction scaffolding according to claim 1, wherein: the number of the bases (8) is four, and holes are formed in the surfaces of the four bases (8).
4. A construction scaffolding according to claim 1, wherein: the two sides of the first fixed cross rod (5) are provided with grooves (10), and the surfaces of the grooves (10) are provided with connecting blocks (11) in an overlapping mode.
5. A scaffolding for construction engineering according to claim 4, wherein: one side fixedly connected with work platform (12) of first fixed horizontal pole (5) are kept away from in connecting block (11), work platform (12) surface is provided with anti-skidding line.
6. A construction scaffolding according to claim 1, wherein: the third fixing cross rod (7) is far away from one ends of the third support column (3) and the fourth support column (4) and is fixedly connected with a fixing seat (13).
CN201921156548.XU 2019-07-23 2019-07-23 Scaffold for constructional engineering Expired - Fee Related CN210636767U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921156548.XU CN210636767U (en) 2019-07-23 2019-07-23 Scaffold for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921156548.XU CN210636767U (en) 2019-07-23 2019-07-23 Scaffold for constructional engineering

Publications (1)

Publication Number Publication Date
CN210636767U true CN210636767U (en) 2020-05-29

Family

ID=70792624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921156548.XU Expired - Fee Related CN210636767U (en) 2019-07-23 2019-07-23 Scaffold for constructional engineering

Country Status (1)

Country Link
CN (1) CN210636767U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160606A (en) * 2020-09-04 2021-01-01 马传钊 Section bar lead screw combination reinforcing bar engineering construction equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160606A (en) * 2020-09-04 2021-01-01 马传钊 Section bar lead screw combination reinforcing bar engineering construction equipment

Similar Documents

Publication Publication Date Title
CN106013750A (en) Disc buckle direct insertion type support frame capable of being rapidly assembled and disassembled and construction method thereof
CN210636767U (en) Scaffold for constructional engineering
CN206667042U (en) Bridge expanssion joint installation and adjustment instrument
CN208363560U (en) A kind of suspension platform for skybridge construction
CN211037748U (en) Novel construction scaffold without fastener
CN205875168U (en) A prevent structure of falling for foundation ditch steel shotcrete
CN212176482U (en) Scaffold for building construction
CN210369827U (en) Scaffold for building external wall construction
CN211736279U (en) Scaffold for interior decoration
CN204780558U (en) Curved surface roof beam hoist and mount view bridge
CN204940824U (en) A kind of overhanging type mobile decorative finishing operating platform
CN212078621U (en) Civil engineering safety scaffold
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN208280636U (en) A kind of elevator well safety device
CN206308627U (en) A kind of portable beam body side operation frame
CN213868831U (en) Construction steel structure support
CN210659191U (en) Construction operation ladder
CN204174903U (en) Scaffold
CN210239097U (en) Operation frame for civil engineering construction
CN210976528U (en) Construction foot stand for transformation of dangerous building
CN207776410U (en) A kind of construction scaffold
CN218406331U (en) Anti-tilting scaffold
CN209443739U (en) A kind of architectural engineering scaffold
CN212534981U (en) Scaffold for building engineering
CN210263680U (en) Stair corner protector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200529

Termination date: 20210723

CF01 Termination of patent right due to non-payment of annual fee