CN210636767U - Scaffold for constructional engineering - Google Patents
Scaffold for constructional engineering Download PDFInfo
- Publication number
- CN210636767U CN210636767U CN201921156548.XU CN201921156548U CN210636767U CN 210636767 U CN210636767 U CN 210636767U CN 201921156548 U CN201921156548 U CN 201921156548U CN 210636767 U CN210636767 U CN 210636767U
- Authority
- CN
- China
- Prior art keywords
- pillar
- horizontal pole
- support column
- fixed horizontal
- work platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 15
- 239000011435 rock Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 240000003917 Bambusa tulda Species 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000002708 enhancing Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002093 peripheral Effects 0.000 description 1
- 230000001681 protective Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
- 238000004642 transportation engineering Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Abstract
The utility model discloses a construction engineering scaffold, including first pillar, second pillar, third pillar and fourth pillar, the equal swing joint in middle part of first pillar and second pillar and third pillar and fourth pillar has first fixed horizontal pole, the middle part swing joint of first pillar and third pillar and second pillar and fourth pillar has the fixed horizontal pole of second, one side swing joint who keeps away from first fixed horizontal pole in third pillar and fourth pillar middle part has the fixed horizontal pole of third, the equal fixedly connected with base in bottom of first pillar, second pillar, third pillar and fourth pillar. This building engineering scaffold frame, through work platform's setting, the connecting block overlap joint of personnel accessible work platform both sides before the construction on the recess that first fixed horizontal pole both ends were seted up to make work platform more firm on the scaffold frame, simultaneously through the lapped setting, the constructor is also convenient for remove work platform.
Description
Technical Field
The utility model relates to a building engineering equipment technical field specifically is a building engineering scaffold.
Background
Scaffold frame refers to the construction site and operates and solve perpendicular and horizontal transportation and various supports that set up for the workman, and the general term of building boundary refers to on the building site and is used in the place that outer wall, interior decoration or layer height are higher can't directly be under construction, mainly for constructor dry life from top to bottom or peripheral safety net enclosure and high altitude installation component etc. scaffold frame manufacturing material usually has: bamboo, wood, steel pipe or synthetic material etc. some projects also use the scaffold as the template and use in addition in departments such as advertising, municipal administration, traffic road bridge, mine also extensively, and current building engineering scaffold structure is comparatively simple, and safe performance is lower.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building engineering scaffold has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a construction engineering scaffold, includes first pillar, second pillar, third pillar and fourth pillar, the equal swing joint in middle part of first pillar and second pillar and third pillar and fourth pillar has first fixed horizontal pole, the middle part swing joint of first pillar and third pillar and second pillar and fourth pillar has the fixed horizontal pole of second, one side swing joint who keeps away from first fixed horizontal pole in third pillar and fourth pillar middle part has the fixed horizontal pole of third, the equal fixedly connected with base in bottom of first pillar, second pillar, third pillar and fourth pillar.
Optionally, one side of the upper parts of the first strut, the second strut, the third strut and the fourth strut is fixedly connected with a hook.
Optionally, the number of the bases is four, and holes are formed in the surfaces of the four bases.
Optionally, both sides of the first fixed cross rod are provided with grooves, and the surfaces of the grooves are provided with connecting blocks in an overlapping mode.
Optionally, one side of the connecting block, which is far away from the first fixed cross rod, is fixedly connected with a working platform, and the surface of the working platform is provided with anti-skid lines.
Optionally, one end of the third fixed cross rod, which is far away from the third support column and one end of the fourth support column, are fixedly connected with fixing seats.
(III) advantageous effects
The utility model provides a building engineering scaffold frame possesses following beneficial effect:
1. this building engineering scaffold frame, through work platform's setting, the connecting block overlap joint of personnel accessible work platform both sides before the construction on the recess that first fixed horizontal pole both ends were seted up to make work platform more firm on the scaffold frame, simultaneously through the lapped setting, the constructor is also convenient for remove work platform.
2. This building engineering scaffold frame through the setting of fixing base and base, can be fixed in the building main part with the base on, is fixed in ground to make the more firm of scaffold frame change, also can not rock because of fixed insecure when the scaffold frame bearing.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic front structural view of the present invention.
In the figure: 1. a first support; 2. a second support; 3. a third support; 4. a fourth strut; 5. a first fixed cross bar; 6. a second fixed cross bar; 7. a third fixed cross bar; 8. a base; 9. hooking; 10. a groove; 11. connecting blocks; 12. a working platform; 13. a fixed seat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 2, the present invention provides a technical solution: a scaffold for building engineering comprises a first support column 1, a second support column 2, a third support column 3 and a fourth support column 4, wherein the middle parts of the first support column 1, the second support column 2, the third support column 3 and the fourth support column 4 are movably connected with a first fixed cross rod 5, the middle parts of the first support column 1, the third support column 3, the second support column 2 and the fourth support column 4 are movably connected with a second fixed cross rod 6, one side of the middle parts of the third support column 3 and the fourth support column 4, which is far away from the first fixed cross rod 5, is movably connected with a third fixed cross rod 7, the bottom ends of the first support column 1, the second support column 2, the third support column 3 and the fourth support column 4 are fixedly connected with a base 8, one side of the upper parts of the first support column 1, the second support column 2, the third support column 3 and the fourth support column 4 are fixedly connected with a hook 9, through the arrangement of the hook 9, personnel can fixedly construct a protective net through the hooks, articles such as tools required for construction are placed through hooks 9 on the upper portions of a third support 3 and a fourth support 4, the number of bases 8 is four, holes are formed in the surfaces of the four bases 8, grooves 10 are formed in the two sides of a first fixed cross rod 5, connecting blocks 11 are lapped on the surfaces of the grooves 10, a working platform 12 is fixedly connected to one side, far away from the first fixed cross rod 5, of each connecting block 11, through the arrangement of the working platform 12, personnel can lap the grooves formed in the two ends of the first fixed cross rod 5 through the connecting blocks 11 on the two sides of the working platform 12 before construction, so that the working platform 12 is firmer on a scaffold, meanwhile, through the overlapped arrangement, the constructors can conveniently move the working platform 12, anti-skid lines are arranged on the surface of the working platform 12, and through the arrangement of the anti-skid lines, the constructors can effectively enhance friction force during construction on the working, avoid the appearance of the phenomenon of skidding, the equal fixedly connected with fixing base 13 of one end that third pillar 3 and fourth pillar 4 were kept away from to the fixed horizontal pole 7 of third, through the setting of fixing base 13 and base 8, can be fixed in the building subject with fixing base 13 on, be fixed in ground with base 8 to make the scaffold frame become more firm, also can not rock because of fixed insecurity when the scaffold frame bearing.
To sum up, this building engineering scaffold, during the use, through the setting of work platform 12, the connecting block 11 overlap joint of personnel accessible work platform 12 both sides is on the recess of seting up at 5 both ends of first fixed horizontal pole before the construction, thereby make work platform 12 more firm on the scaffold, simultaneously through the lapped setting, constructor also is convenient for remove work platform 12, through fixing base 13 and 8's setting, can be fixed in the building main part with fixing base 13 on, be fixed in base 8 on ground, thereby make the scaffold become more firm, also can not rock because of fixed insecure when the scaffold bearing.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. A building engineering scaffold, includes first pillar (1), second pillar (2), third pillar (3) and fourth pillar (4), its characterized in that: first pillar (1) and second pillar (2) have first fixed horizontal pole (5) with the equal swing joint in middle part of third pillar (3) and fourth pillar (4), the middle part swing joint of first pillar (1) and third pillar (3) and second pillar (2) and fourth pillar (4) has second fixed horizontal pole (6), one side swing joint that first fixed horizontal pole (5) were kept away from in third pillar (3) and fourth pillar (4) middle part has third fixed horizontal pole (7), the equal fixedly connected with base (8) in bottom of first pillar (1), second pillar (2), third pillar (3) and fourth pillar (4).
2. A construction scaffolding according to claim 1, wherein: and one sides of the upper parts of the first support column (1), the second support column (2), the third support column (3) and the fourth support column (4) are fixedly connected with a hook (9).
3. A construction scaffolding according to claim 1, wherein: the number of the bases (8) is four, and holes are formed in the surfaces of the four bases (8).
4. A construction scaffolding according to claim 1, wherein: the two sides of the first fixed cross rod (5) are provided with grooves (10), and the surfaces of the grooves (10) are provided with connecting blocks (11) in an overlapping mode.
5. A scaffolding for construction engineering according to claim 4, wherein: one side fixedly connected with work platform (12) of first fixed horizontal pole (5) are kept away from in connecting block (11), work platform (12) surface is provided with anti-skidding line.
6. A construction scaffolding according to claim 1, wherein: the third fixing cross rod (7) is far away from one ends of the third support column (3) and the fourth support column (4) and is fixedly connected with a fixing seat (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921156548.XU CN210636767U (en) | 2019-07-23 | 2019-07-23 | Scaffold for constructional engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921156548.XU CN210636767U (en) | 2019-07-23 | 2019-07-23 | Scaffold for constructional engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210636767U true CN210636767U (en) | 2020-05-29 |
Family
ID=70792624
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921156548.XU Expired - Fee Related CN210636767U (en) | 2019-07-23 | 2019-07-23 | Scaffold for constructional engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210636767U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112160606A (en) * | 2020-09-04 | 2021-01-01 | 马传钊 | Section bar lead screw combination reinforcing bar engineering construction equipment |
-
2019
- 2019-07-23 CN CN201921156548.XU patent/CN210636767U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112160606A (en) * | 2020-09-04 | 2021-01-01 | 马传钊 | Section bar lead screw combination reinforcing bar engineering construction equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210636767U (en) | Scaffold for constructional engineering | |
CN106013750A (en) | Disc buckle direct insertion type support frame capable of being rapidly assembled and disassembled and construction method thereof | |
CN208363560U (en) | A kind of suspension platform for skybridge construction | |
CN210152199U (en) | Scaffold for civil and industrial building construction | |
CN211037748U (en) | Novel construction scaffold without fastener | |
CN205742975U (en) | A kind of direct plugging type scaffold | |
CN210369827U (en) | Scaffold for building external wall construction | |
CN211736279U (en) | Scaffold for interior decoration | |
CN204940824U (en) | A kind of overhanging type mobile decorative finishing operating platform | |
CN212078621U (en) | Civil engineering safety scaffold | |
CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
CN208280636U (en) | A kind of elevator well safety device | |
CN203514813U (en) | Novel overhanging discharging platform | |
CN205875168U (en) | A prevent structure of falling for foundation ditch steel shotcrete | |
CN204174903U (en) | Scaffold | |
CN213868831U (en) | Construction steel structure support | |
CN210659191U (en) | Construction operation ladder | |
CN210239097U (en) | Operation frame for civil engineering construction | |
CN212078600U (en) | Support for building engineering | |
CN204780558U (en) | Curved surface roof beam hoist and mount view bridge | |
CN210976528U (en) | Construction foot stand for transformation of dangerous building | |
CN207776410U (en) | A kind of construction scaffold | |
CN213391102U (en) | Civil engineering construction support | |
CN203160725U (en) | Shaped type protective barrier | |
CN218406331U (en) | Anti-tilting scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200529 Termination date: 20210723 |
|