CN210562698U - Balcony waterproof construction - Google Patents

Balcony waterproof construction Download PDF

Info

Publication number
CN210562698U
CN210562698U CN201921357157.4U CN201921357157U CN210562698U CN 210562698 U CN210562698 U CN 210562698U CN 201921357157 U CN201921357157 U CN 201921357157U CN 210562698 U CN210562698 U CN 210562698U
Authority
CN
China
Prior art keywords
water
balcony
permeable bed
pipe
permeable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921357157.4U
Other languages
Chinese (zh)
Inventor
樊丽琼
叶勇彬
叶茂财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Zhuojie Construction Engineering Co Ltd
Original Assignee
Guangzhou Zhuojie Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Zhuojie Construction Engineering Co Ltd filed Critical Guangzhou Zhuojie Construction Engineering Co Ltd
Priority to CN201921357157.4U priority Critical patent/CN210562698U/en
Application granted granted Critical
Publication of CN210562698U publication Critical patent/CN210562698U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a balcony waterproof construction belongs to interior decoration's technical field, including permeable bed, water-blocking layer and the cement base course that from the top set gradually, permeable bed upper surface level, bottom surface slope, the cement base course upper surface be with permeable bed bottom surface complex inclined plane, be provided with the infiltration pipe that is used for the drainage between the lower of permeable bed bottom surface and the lower of water-blocking layer upper surface. The utility model discloses the effect below having: the water on the balcony down permeates to water-blocking layer department through the permeable bed, because the permeable bed bottom surface slope, states cement-based layer upper surface for with permeable bed bottom surface complex inclined plane, water flows to water-blocking layer upper surface least significant end under the effect of gravity, then flows into the infiltration pipe in, discharge balcony in the infiltration pipe, balcony drainage performance and permeable bed upper surface shape do not have a problem, therefore balcony upper surface level need not the slope.

Description

Balcony waterproof construction
Technical Field
The utility model belongs to the technical field of interior decoration's technique and specifically relates to a balcony waterproof construction is related to.
Background
The balcony is the indoor extension of building, and along with the improvement of standard of living, everybody's quality of living pursuit also improves again, and people pursue comfortable, safety, practicality more to the detailed design theory in room, and the balcony in the traditional meaning that gives priority to sunning, laundry has now become viewing platform, sunshine room, gymnasium, storeroom, sunshine study etc. function various, the abundant nimble new generation balcony of space change.
The existing balcony water prevention is generally that a floor drain is arranged on a balcony, the floor drain is arranged for water prevention, the slope of the ground is ensured at first, and the floor drain is arranged on the lower side. Then, it is necessary to ensure that the balcony and the living room or the balcony and the living room have a height difference of at least 2-3 cm, and it is difficult to make the living room and the balcony have such a height difference, because the building itself may have a height difference of only about 1 cm.
The above prior art solutions have the following drawbacks: the ground gradient of balcony is not big, and the drainage effect just is not good enough, and water-proof effects is relatively poor, and the ground gradient of balcony is big, and the resident experience of resident is relatively poor.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a balcony waterproof construction that ground need not the slope.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides a balcony waterproof construction, includes permeable bed, water blocking layer and the cement base course that from the top set gradually, permeable bed upper surface level, bottom surface slope, the cement base course upper surface be with permeable bed bottom surface complex inclined plane, be provided with the infiltration pipe that is used for the drainage between permeable bed bottom surface lower extreme and the water blocking layer upper surface lower extreme.
Through adopting above-mentioned technical scheme, water on the balcony down permeates to water resisting layer department through the permeable bed, because the permeable bed bottom surface slope, states cement-based layer upper surface for with permeable bed bottom surface complex inclined plane, water flows to water resisting layer upper surface least significant end under the effect of gravity, then flows into the infiltration pipe in, discharge the balcony in the infiltration pipe, balcony drainage performance and permeable bed upper surface shape do not have a problem, therefore balcony upper surface level need not the slope.
The utility model discloses further set up to: the permeable layer is a permeable concrete layer.
By adopting the technical scheme, the pervious concrete is formed by coating a thin layer of cement slurry on the surface of coarse aggregate and mutually bonding to form a honeycomb structure with uniformly distributed pores, has high water permeability and higher bearing capacity than that of a common pervious brick, is superior to asphalt in durability and wear resistance and close to that of a common terrace, and avoids the defects of short service life, uneconomic performance and the like of the common pervious brick.
The utility model discloses further set up to: the water-resistant layer is a geomembrane.
By adopting the technical scheme, the geomembrane has excellent environmental stress cracking resistance and chemical corrosion resistance, and is strong in extensibility, high in adaptive deformability, mature in technology and convenient to operate.
The utility model discloses further set up to: the water seepage pipe is a single-wall corrugated water seepage pipe.
By adopting the technical scheme, the orifices of the single-wall corrugated water seepage pipe are positioned in the wave troughs, and the orifices are not easy to block due to the bidirectional action of the wave crests and the filter fabric, so that the smoothness of a water permeable system is ensured.
The utility model discloses further set up to: and a reinforcement cage is surrounded outside the water seepage pipe.
Through adopting above-mentioned technical scheme, before the infiltration pipe was laid, put into the steel reinforcement cage with the infiltration pipe, when the favourable permeable bed of avoiding laying, the infiltration pipe is by extrusion deformation and lead to the drainage effect variation.
The utility model discloses further set up to: the water seepage pipe is communicated with a water outlet pipe.
Through adopting above-mentioned technical scheme, infiltration pipe intercommunication outlet pipe, through the outlet pipe with the log raft play in the infiltration pipe, set up the outlet pipe, be convenient for switch on the drainage to the drainage system of building with water.
The utility model discloses further set up to: the infiltration pipe length direction slope sets up, the outlet pipe with the infiltration pipe least significant end is connected.
Through adopting above-mentioned technical scheme, the infiltration pipe slope sets up, and water flows to the least significant end of infiltration pipe under the effect of gravity, is favorable to rivers among the infiltration pipe to lead to in the outlet pipe.
To sum up, the utility model discloses a beneficial technological effect does:
1. water on the balcony penetrates downwards to the water-blocking layer through the water-permeable layer, the bottom surface of the water-permeable layer inclines, the upper surface of the cement base layer is an inclined surface matched with the bottom surface of the water-blocking layer, and the water flows to the lowest end of the upper surface of the water-blocking layer under the action of gravity, then flows into the water seepage pipe and is discharged out of the balcony;
2. before the water seepage pipe is laid, the water seepage pipe is placed in a reinforcement cage, so that the problem that the drainage effect is poor due to extrusion deformation of the water seepage pipe when a permeable layer is laid is avoided;
3. the infiltration pipe slope sets up, and water flows to the least significant end of infiltration pipe under the effect of gravity, is favorable to rivers among the infiltration pipe to lead to in the outlet pipe.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a cross-sectional view of the present invention;
FIG. 3 is a schematic view of the whole structure of the water seepage pipe of the present invention;
fig. 4 shows a front view of the infiltration pipe of the present invention.
In the figure, 1, a water permeable layer; 2. a water resistant layer; 3. a cement base layer; 4. a water seepage pipe; 41. a reinforcement cage; 42. and (5) discharging a water pipe.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a balcony waterproof construction, including permeable bed 1, water blocking layer 2 and the cement base layer 3 that from the top set gradually, permeable bed 1 is the concrete layer that permeates water, and water blocking layer 2 is the geomembrane.
Referring to fig. 2, the 1 upper surface level of permeable bed, the bottom surface slope, 3 upper surfaces of cement base layer be with 1 bottom surface complex inclined plane of permeable bed, be provided with between 1 bottom surface lower extreme of permeable bed and the 2 upper surface lower extreme of water-blocking layer and be used for the infiltration pipe 4 of drainage, infiltration pipe 4 is single wall ripple infiltration pipe, water on the balcony down permeates to 2 departments of water-blocking layer through permeable bed 1, because 1 bottom surface slope of permeable bed, state 3 upper surfaces of cement base layer be with 1 bottom surface complex inclined plane of permeable bed, water flows to 2 upper surface lower extremes of water-blocking layer under the effect of gravity, then flow in infiltration pipe 4.
Referring to fig. 3, a reinforcement cage 41 is surrounded outside the water seepage pipe 4, the water seepage pipe 4 is communicated with a water outlet pipe 42, and the water outlet pipe 42 is communicated with a drainage system of a building.
Referring to fig. 4, the length direction of the water seepage pipe 4 is obliquely arranged, the water outlet pipe 42 is connected with the lowest end of the water seepage pipe 4, the water seepage pipe 4 is obliquely arranged, and water flows to the lowest end of the water seepage pipe 4 under the action of gravity.
The implementation principle of the embodiment is as follows:
the water on the balcony passes through permeable bed 1 and down permeates to 2 departments of water blocking layer, because the slope of permeable bed 1 bottom surface, states 3 upper surfaces of cement-based layer for with permeable bed 1 bottom surface complex inclined plane, water flows to 2 upper surface least significant ends of water blocking layer under the effect of gravity, then flows into infiltration pipe 4, from the drainage pipe 4 discharge balcony in flowing into outlet pipe 42.
When the balcony is laid, the cement foundation layer and the water outlet pipe 42 are laid firstly, then the geomembrane water-blocking layer 2 is laid, the water seepage pipe 4 surrounding the reinforcement cage 41 is placed, the water seepage pipe 4 is communicated with the water outlet pipe 42, and finally the water-permeable layer 1 of the water-permeable concrete is laid.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (7)

1. The utility model provides a balcony waterproof construction which characterized in that: including permeable bed (1), water-blocking layer (2) and cement basic unit (3) that from the top set gradually, permeable bed (1) upper surface level, bottom surface slope, cement basic unit (3) upper surface be with permeable bed (1) bottom surface complex inclined plane, be provided with between permeable bed (1) bottom surface lower extreme and the water-blocking layer (2) upper surface lower extreme and be used for the infiltration pipe (4) of drainage.
2. The balcony waterproofing structure according to claim 1, wherein: the permeable layer (1) is a permeable concrete layer.
3. The balcony waterproofing structure according to claim 1, wherein: the water-resistant layer (2) is a geomembrane.
4. The balcony waterproofing structure according to claim 1, wherein: the water seepage pipe (4) is a single-wall corrugated water seepage pipe (4).
5. The balcony waterproofing structure according to claim 1, wherein: and a reinforcement cage (41) is surrounded outside the water seepage pipe (4).
6. The balcony waterproofing structure according to any one of claims 1 to 5, wherein: the water seepage pipe (4) is communicated with a water outlet pipe (42).
7. The balcony waterproofing structure according to claim 6, wherein: the length direction of the water seepage pipe (4) is obliquely arranged, and the water outlet pipe (42) is connected with the lowest end of the water seepage pipe (4).
CN201921357157.4U 2019-08-20 2019-08-20 Balcony waterproof construction Active CN210562698U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921357157.4U CN210562698U (en) 2019-08-20 2019-08-20 Balcony waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921357157.4U CN210562698U (en) 2019-08-20 2019-08-20 Balcony waterproof construction

Publications (1)

Publication Number Publication Date
CN210562698U true CN210562698U (en) 2020-05-19

Family

ID=70638318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921357157.4U Active CN210562698U (en) 2019-08-20 2019-08-20 Balcony waterproof construction

Country Status (1)

Country Link
CN (1) CN210562698U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267585A (en) * 2020-11-27 2021-01-26 四川生活家家居集团有限公司 A kind of kitchen and toilet door opening ground waterproof and moisture-proof system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267585A (en) * 2020-11-27 2021-01-26 四川生活家家居集团有限公司 A kind of kitchen and toilet door opening ground waterproof and moisture-proof system

Similar Documents

Publication Publication Date Title
CN207512545U (en) A kind of road surface drainage structure
CN208501802U (en) A kind of bathroom caisson internal drainage construction
CN105735406B (en) A kind of public building rain water on roof utilizes collection and storage device
CN104153521A (en) Roof waterproof structure and roof maintenance method
CN210562698U (en) Balcony waterproof construction
CN209958630U (en) Slope roof outer eaves gutter building structure
CN215105501U (en) Basement bottom plate terrace with rubble drainage layer
CN207376723U (en) A kind of subsided rest room
CN201212156Y (en) Basement engineering cut-off drainage system
CN202899569U (en) Water-proof and water draining floor structure for kitchen and toilet
CN205637107U (en) Sunken landscape balcony flower pond suitable for high-rise residential buildings
CN206903082U (en) Architectural design roof cornice waterproof structure
CN211848696U (en) Type bituminous paving structure permeates water
CN103510699B (en) It is easy to the construction method of the close rib building roof of rainwater utilization
CN216810647U (en) A waterproof structure based on the application of hydrophobic plate in architectural design
CN209251271U (en) Artificial turf water storage device for sponge city
CN208309326U (en) A kind of silica waste material brick
CN200949288Y (en) Biology water-proof planting roofing coexisting with building
CN221031182U (en) Waterproof structure of sinking type toilet
CN215830306U (en) Bathroom threshold stone waterproof construction
CN206245799U (en) A kind of indoor swimming pool structure
CN201158869Y (en) Sunken kitchen and toilet structure
CN214574428U (en) Drainage ground structure
CN210596887U (en) Road structure
CN216108659U (en) Basement side wall sluicing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant