CN210530295U - Suspended scaffold structure - Google Patents
Suspended scaffold structure Download PDFInfo
- Publication number
- CN210530295U CN210530295U CN201920952960.6U CN201920952960U CN210530295U CN 210530295 U CN210530295 U CN 210530295U CN 201920952960 U CN201920952960 U CN 201920952960U CN 210530295 U CN210530295 U CN 210530295U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- bolt
- scaffold
- wall
- support bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a scaffold puts up structure of suspension type belongs to construction assembly spare technical field, it is including the wall body, arrange first bolt and second bolt in the wall body, still including the support bar that the level was arranged, longitudinal arrangement's protecting strip and telescopic connecting rod, the screw thread portion of second bolt insert in support bar one end and with support bar threaded connection, the bottom fixed connection of protecting strip is served at the support bar one of keeping away from the second bolt, telescopic connecting rod's both ends are connected with the screw thread portion of first bolt and the top of protecting strip respectively, the scaffold board has been placed on the support bar. The utility model discloses an its screw thread section of edge vertical pre-buried several stretches out the pre-buried bolt outside the wall body in the wall body to make the scaffold frame can directly be connected with the wall body, in order to accelerate the speed of arranging of scaffold frame, improve project efficiency of construction. Meanwhile, the scaffold can be assembled with the prefabricated wall in advance, namely, the scaffold is assembled together with the prefabricated wall, so that precious field construction time is saved.
Description
Technical Field
The utility model relates to a construction assembly parts technical field especially relates to a scaffold puts up structure of suspension type.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. At present, scaffold structures used in China can be divided into floor type scaffolds and overhanging type scaffolds according to the difference of rooting positions, and buildings of higher floors mainly adopt overhanging type scaffolds so as to facilitate the implementation of high-rise construction procedures. And to encorbelmenting formula scaffold frame, it need follow the internal girder steel of choosing outward of building at the installation to set up buckle connection scaffold frame subassembly on the girder steel, form scaffold structure, the installation procedure is comparatively complicated, and it is comparatively inconvenient to use, therefore waits urgently for a neotype scaffold structure to appear, can effectively improve the installation rate of whole scaffold frame, thereby accelerates construction rate, improves the economic benefits of project.
SUMMERY OF THE UTILITY MODEL
To sum up, the utility model discloses the technical problem who solves is: the utility model provides a novel scaffold structure that can install fast to accelerate construction speed, improve the economic benefits of project.
The utility model discloses a solve the scheme that above-mentioned technical problem adopted and be: a suspended scaffold structure comprises a wall body, wherein two bolts with screw thread portions extending out of the wall body are pre-buried in the wall body from the outer side surface of the wall body and are respectively a first bolt and a second bolt, the first bolt and the second bolt are distributed from top to bottom along the longitudinal direction in sequence, the suspended scaffold structure also comprises a support bar arranged horizontally, a protection bar arranged longitudinally and a telescopic connecting rod, the screw thread portion of the second bolt is inserted into one end of the support bar and is in threaded connection with the support bar, the bottom end of the protection bar is fixedly connected to one end of the support bar far away from the second bolt, the telescopic connecting rod mainly comprises a first screw rod, a first sleeve, a second sleeve and a second screw rod which are sequentially arranged along the axial direction of the telescopic connecting rod, the first sleeve and the second sleeve are coaxially connected, the opening directions of inner holes of the first sleeve and the second sleeve are opposite, inner threads are arranged in the inner holes of the first sleeve and the second sleeve, first screw rod insert in first sleeve and with first sleeve threaded connection, and the second screw rod insert in the second sleeve and with second sleeve threaded connection, first sleeve one end is kept away from to first screw rod and the screw thread portion of first bolt is articulated, and the second screw rod is kept away from the top of second sleeve and protection strip and is articulated mutually, the scaffold board has been placed on the support bar, still including arranging the section of twisting between first sleeve and the second sleeve in, first sleeve and second sleeve link to each other through twisting the section, and twist section, first sleeve, the coaxial arrangement of second sleeve, twist transversal regular hexagon that personally submits the edgewise distance to be 27mm or 30mm or 34mm or 36mm of section.
Furthermore, the distance between the opposite sides of the cross section of the screwing section is 30 mm.
Further, the first sleeve, the second sleeve and the screwing section are integrally formed.
Furthermore, the wall body is a precast concrete wall body component.
The wall body is characterized by further comprising a third bolt which is embedded in the wall body and positioned below the second bolt, and an inclined strut which is obliquely arranged and can axially extend and retract along the inclined strut, wherein the thread section of the third bolt extends out of the wall body, the bottom end of the inclined strut is welded with the thread section of the third bolt, and the head end of the inclined strut is welded on the supporting bar.
Since the technical scheme is used, the beneficial effects of the utility model are that: the utility model discloses an its screw thread section of edge vertical pre-buried several stretches out the pre-buried bolt outside the wall body in the wall body, so that when scaffold structure installs, the scaffold can directly be connected with pre-buried bolt, thereby be connected with the wall body, save the arrangement of choosing the reinforcing bar, the speed of arranging of scaffold has been accelerated, effectively improve project efficiency of construction, under the partial condition, the scaffold can be in the same place with prefabricated wall body assembly in advance, the scaffold is assembled along with prefabricated wall body in the lump when prefabricated wall body assembly, thereby practice thrift valuable on-the-spot construction time.
Drawings
FIG. 1 is a schematic view of a front cross-sectional structure of the present invention;
fig. 2 is a schematic top view of the present invention.
[ Specification of symbols ]
1-wall body, 21-first bolt, 22-second bolt, 23-third bolt, 3-supporting strip, 4-protecting strip, 5-telescopic connecting rod, 51-first screw rod, 52-first sleeve, 53-second sleeve, 54-second screw rod, 55-screwing section, 6-scaffold plate and 7-diagonal brace.
Detailed Description
The present invention provides a suspended scaffold structure, which will be described in detail below with reference to the accompanying drawings.
As shown in fig. 1 to 2, the suspended scaffold structure provided in this embodiment includes a wall 1, two bolts having their screw thread portions extending out of the wall 1 from the outer side surface of the wall 1 are pre-embedded in the wall 1, and each bolt is a first bolt 21 and a second bolt 22, the first bolt 21 and the second bolt 22 are sequentially distributed from top to bottom along the longitudinal direction, the suspended scaffold structure further includes a support bar 3 horizontally arranged, a protection bar 4 longitudinally arranged, and a telescopic connecting rod 5, the screw thread portion of the second bolt 22 is inserted into one end of the support bar 3 and is in threaded connection with the support bar 3, the bottom end of the protection bar 4 is fixedly connected to one end of the support bar 3 away from the second bolt 22, the telescopic connecting rod 5 is mainly composed of a first screw 51, a first sleeve 52, a second sleeve 53, and a second screw 54 sequentially arranged along the axial direction thereof, the first sleeve 52 and the second sleeve 53 are coaxially connected, and the opening directions of the inner holes of the two sleeves are opposite, the inner bores of the first sleeve 52 and the second sleeve 53 are internally provided with internal threads with opposite thread directions, the first screw 51 is inserted into the first sleeve 52 and is in threaded connection with the first sleeve 52, and the second screw 54 is inserted into the second sleeve 53 and is in threaded connection with the second sleeve 53, the end of the first screw 51 far away from the first sleeve 52 is hinged with the threaded part of the first bolt 21, the end of the second screw rod 54 far away from the second sleeve 53 is hinged with the top end of the protective strip 4, the scaffold plate 6 is placed on the support bar 3, the second screw rod further comprises a screwing section 55 arranged between the first sleeve 52 and the second sleeve 53, the first sleeve 52 and the second sleeve 53 are connected through the screwing section 55, and the screwing section 55, the first sleeve 52 and the second sleeve 53 are coaxially arranged, and the cross section of the screwing section 55 is in a regular hexagon with the opposite side distance of 27mm or 30mm or 34mm or 36 mm.
When the scaffold structure is installed, an implementer inserts the second bolt 22 at the lower side into the support bar 3, enables the support bar 3 to be in threaded connection with the second bolt 22, then connects the protection bar 4 with a protection effect in a welding mode on one end, far away from the second bolt 22, of the support bar 3, enables the support bar 3 and the protection bar 4 to be in an L shape, and then sets up the telescopic connecting rod 5. When the first bolt 21 and the second bolt 22 are pre-embedded, a height difference between the two bolts may have a certain error from a preset value, which makes assembly difficult. For the convenience of connection, in the present embodiment, the first screw 51 and the first bolt 21, and the second screw 54 and the top end of the guard bar 4 are hinged, and the telescopic link 5 can adjust its axial length in a targeted manner to adapt to different height differences between the first bolt 21 and the second bolt 22. When adjusting the axial length of the telescopic link 5, an implementer only needs to screw the first sleeve 52 and the second sleeve 53 in the same rotation direction, and then the first screw 51 and the second screw 54 respectively extend out of the inner hole of the first sleeve 52 and the inner hole of the second sleeve 53, so that the whole telescopic link 5 is extended in the axial direction. After the axial length of the telescopic connecting rod 5 is adjusted adaptively and the two ends of the telescopic connecting rod are connected, the frame of a single scaffold structure is built, and then the scaffold plates 6 for constructors to walk are placed on the supporting bars 3, and the arrangement of the walkway is completed. Finally, as shown in fig. 2, other scaffold structures are repeatedly erected at the same height, and the scaffold boards 6 of the scaffold structures are connected, thereby completing the erection work of the whole building scaffold. The suspended scaffold structure saves the erection of a cantilever steel beam in the erection process, so that the construction rhythm is accelerated, and the project economic benefit is improved.
Meanwhile, as mentioned above, since the inner holes of the first sleeve 52 and the second sleeve 53 are provided with the inner threads with opposite thread turning directions, when adjusting the axial length of the telescopic link 5, an implementer only needs to screw the first sleeve 52 and the second sleeve 53 along the same rotating direction, and then the first screw 51 and the second screw 54 respectively extend out of the inner hole of the first sleeve 52 and the inner hole of the second sleeve 53, so as to extend the whole telescopic link 5 along the axial direction. In the present embodiment, in order to facilitate the operator to adjust the length of the telescopic link 5, the cross section of the screwing section 55 is a regular hexagon with an opposite edge distance of 27mm or 30mm or 34mm or 36mm, that is, the shape of the screwing section 55 is substantially consistent with that of a standard bolt head, so that the operator can rotate the screwing section 55 with a wrench during a specific screwing process to extend and retract the whole telescopic link 5. The wrench is used as auxiliary work to perform twisting operation, so that the adjusting speed is obviously improved, the adjusting speed of the axial length of the whole telescopic connecting rod 5 can be obviously accelerated, and the telescopic connecting rod has high practicability.
More specifically, in the present embodiment, the distance between opposite sides of the cross section of the screwing segment 55 is 30mm, that is, the screwing segment conforms to the shape of the head of the M20 bolt.
It should be noted that the wall 1 may be a cast-in-place member that has been cast, or a precast concrete member. In the present embodiment, the wall 1 is a precast concrete wall member. For the precast concrete wall body component, the scaffold can be assembled with the precast concrete wall body component on the ground in advance, and when the precast concrete wall body component is assembled, the scaffold can be assembled and molded together with the precast concrete wall body component, so that precious field construction time is saved, and the construction efficiency of the whole project is greatly improved.
Meanwhile, in order to reduce the force transmission link, the connection point of the first sleeve 52, the second sleeve 53 and the screwing section 55 is prevented from cracking during screwing, and as a preferred embodiment, in the present embodiment, the first sleeve 52, the second sleeve 53 and the screwing section 55 are integrally formed.
As a preferred embodiment, in order to improve the supporting reliability of the supporting bar 3, in this embodiment, as shown in fig. 1 and fig. 2, the supporting bar further includes a third bolt 23 embedded in the wall 1 and located below the second bolt 22, and a diagonal bar 7 obliquely arranged below the supporting bar 3 and capable of extending and retracting along its own axial direction, a threaded section of the third bolt 23 extends out of the wall 1, a bottom end of the diagonal bar 7 is welded to a threaded section of the third bolt 23, and a head end thereof is welded to the supporting bar 3. Wherein, wall body 1, support bar 3 and diagonal brace 7 constitute the triangle-shaped structure, can effectively improve the support effect of support bar 3 to scaffold board 6, effectively improve the security performance of whole structure.
In addition, in the present embodiment, the threaded portion of the second bolt 22 and the top end of the protection bar 4 are provided with ear seats for hinging with the first screw 51 and the second screw 54.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920952960.6U CN210530295U (en) | 2019-06-24 | 2019-06-24 | Suspended scaffold structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920952960.6U CN210530295U (en) | 2019-06-24 | 2019-06-24 | Suspended scaffold structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210530295U true CN210530295U (en) | 2020-05-15 |
Family
ID=70595586
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920952960.6U Active CN210530295U (en) | 2019-06-24 | 2019-06-24 | Suspended scaffold structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210530295U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110359693A (en) * | 2019-06-24 | 2019-10-22 | 中国五冶集团有限公司 | A kind of boat scaffold structure |
-
2019
- 2019-06-24 CN CN201920952960.6U patent/CN210530295U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110359693A (en) * | 2019-06-24 | 2019-10-22 | 中国五冶集团有限公司 | A kind of boat scaffold structure |
| CN110359693B (en) * | 2019-06-24 | 2024-04-09 | 中国五冶集团有限公司 | A suspended scaffolding structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101839070B (en) | Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column | |
| CN114856287B (en) | Construction method of thin-wall steel cylinder hollow tower column | |
| CN205133081U (en) | Novel hanging flower basket system | |
| CN208869129U (en) | Telescopic building hoist day beam is set in elevator traction | |
| CN115369748A (en) | Construction method of template system for integrally pouring pier and tie beam | |
| CN102022123B (en) | Integral lining method for tunnel with altered diameter by model board trolley | |
| KR101922047B1 (en) | bracing removing apparatus of tower crane | |
| CN110359693B (en) | A suspended scaffolding structure | |
| CN209891690U (en) | Scaffold for outer wall construction | |
| CN105781131A (en) | Assembled building wall plate mounting support system and construction method thereof | |
| CN111705747A (en) | Sliding template assembly for river retaining wall | |
| CN109898820B (en) | Outer protective frame of assembled building and assembled building construction method | |
| CN211038675U (en) | Quickly-assembled supporting shed frame | |
| CN117868693A (en) | Water discharge hole forming construction method | |
| CN214834866U (en) | Elevator shaft mounting structure of concrete spreader | |
| CN210289072U (en) | Adjustable instrument formula elevartor shaft protection operation platform and operation are strutted | |
| CN107313597A (en) | Modularization ready-package discharging platform for assembled architecture | |
| CN208534009U (en) | A kind of fixation device of builder's jack | |
| CN216042602U (en) | Reinforced diagonal brace of aluminum alloy template pulling-on piece system | |
| CN105804417A (en) | Sway brace for installation of assembly type building wallboard and using method thereof | |
| CN111021701A (en) | Lifting system for building | |
| CN217173061U (en) | Tower crane attaches wall spare | |
| CN113931431B (en) | Construction hanging basket for outdoor operation | |
| CN117627368A (en) | Hoisting, positioning and installing method for large-size thin-wall prefabricated bay window external wall panel | |
| CN214401375U (en) | Temporary support of prefabricated box girder |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |