CN210530295U - Suspended scaffold structure - Google Patents

Suspended scaffold structure Download PDF

Info

Publication number
CN210530295U
CN210530295U CN201920952960.6U CN201920952960U CN210530295U CN 210530295 U CN210530295 U CN 210530295U CN 201920952960 U CN201920952960 U CN 201920952960U CN 210530295 U CN210530295 U CN 210530295U
Authority
CN
China
Prior art keywords
sleeve
bolt
scaffold
wall
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920952960.6U
Other languages
Chinese (zh)
Inventor
刘胜豪
杨绍政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201920952960.6U priority Critical patent/CN210530295U/en
Application granted granted Critical
Publication of CN210530295U publication Critical patent/CN210530295U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold puts up structure of suspension type belongs to construction assembly spare technical field, it is including the wall body, arrange first bolt and second bolt in the wall body, still including the support bar that the level was arranged, longitudinal arrangement's protecting strip and telescopic connecting rod, the screw thread portion of second bolt insert in support bar one end and with support bar threaded connection, the bottom fixed connection of protecting strip is served at the support bar one of keeping away from the second bolt, telescopic connecting rod's both ends are connected with the screw thread portion of first bolt and the top of protecting strip respectively, the scaffold board has been placed on the support bar. The utility model discloses an its screw thread section of edge vertical pre-buried several stretches out the pre-buried bolt outside the wall body in the wall body to make the scaffold frame can directly be connected with the wall body, in order to accelerate the speed of arranging of scaffold frame, improve project efficiency of construction. Meanwhile, the scaffold can be assembled with the prefabricated wall in advance, namely, the scaffold is assembled together with the prefabricated wall, so that precious field construction time is saved.

Description

Suspended scaffold structure
Technical Field
The utility model relates to a construction assembly parts technical field especially relates to a scaffold puts up structure of suspension type.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. At present, scaffold structures used in China can be divided into floor type scaffolds and overhanging type scaffolds according to the difference of rooting positions, and buildings of higher floors mainly adopt overhanging type scaffolds so as to facilitate the implementation of high-rise construction procedures. And to encorbelmenting formula scaffold frame, it need follow the internal girder steel of choosing outward of building at the installation to set up buckle connection scaffold frame subassembly on the girder steel, form scaffold structure, the installation procedure is comparatively complicated, and it is comparatively inconvenient to use, therefore waits urgently for a neotype scaffold structure to appear, can effectively improve the installation rate of whole scaffold frame, thereby accelerates construction rate, improves the economic benefits of project.
SUMMERY OF THE UTILITY MODEL
To sum up, the utility model discloses the technical problem who solves is: the utility model provides a novel scaffold structure that can install fast to accelerate construction speed, improve the economic benefits of project.
The utility model discloses a solve the scheme that above-mentioned technical problem adopted and be: a suspended scaffold structure comprises a wall body, wherein two bolts with screw thread portions extending out of the wall body are pre-buried in the wall body from the outer side surface of the wall body and are respectively a first bolt and a second bolt, the first bolt and the second bolt are distributed from top to bottom along the longitudinal direction in sequence, the suspended scaffold structure also comprises a support bar arranged horizontally, a protection bar arranged longitudinally and a telescopic connecting rod, the screw thread portion of the second bolt is inserted into one end of the support bar and is in threaded connection with the support bar, the bottom end of the protection bar is fixedly connected to one end of the support bar far away from the second bolt, the telescopic connecting rod mainly comprises a first screw rod, a first sleeve, a second sleeve and a second screw rod which are sequentially arranged along the axial direction of the telescopic connecting rod, the first sleeve and the second sleeve are coaxially connected, the opening directions of inner holes of the first sleeve and the second sleeve are opposite, inner threads are arranged in the inner holes of the first sleeve and the second sleeve, first screw rod insert in first sleeve and with first sleeve threaded connection, and the second screw rod insert in the second sleeve and with second sleeve threaded connection, first sleeve one end is kept away from to first screw rod and the screw thread portion of first bolt is articulated, and the second screw rod is kept away from the top of second sleeve and protection strip and is articulated mutually, the scaffold board has been placed on the support bar, still including arranging the section of twisting between first sleeve and the second sleeve in, first sleeve and second sleeve link to each other through twisting the section, and twist section, first sleeve, the coaxial arrangement of second sleeve, twist transversal regular hexagon that personally submits the edgewise distance to be 27mm or 30mm or 34mm or 36mm of section.
Furthermore, the distance between the opposite sides of the cross section of the screwing section is 30 mm.
Further, the first sleeve, the second sleeve and the screwing section are integrally formed.
Furthermore, the wall body is a precast concrete wall body component.
The wall body is characterized by further comprising a third bolt which is embedded in the wall body and positioned below the second bolt, and an inclined strut which is obliquely arranged and can axially extend and retract along the inclined strut, wherein the thread section of the third bolt extends out of the wall body, the bottom end of the inclined strut is welded with the thread section of the third bolt, and the head end of the inclined strut is welded on the supporting bar.
Since the technical scheme is used, the beneficial effects of the utility model are that: the utility model discloses an its screw thread section of edge vertical pre-buried several stretches out the pre-buried bolt outside the wall body in the wall body, so that when scaffold structure installs, the scaffold can directly be connected with pre-buried bolt, thereby be connected with the wall body, save the arrangement of choosing the reinforcing bar, the speed of arranging of scaffold has been accelerated, effectively improve project efficiency of construction, under the partial condition, the scaffold can be in the same place with prefabricated wall body assembly in advance, the scaffold is assembled along with prefabricated wall body in the lump when prefabricated wall body assembly, thereby practice thrift valuable on-the-spot construction time.
Drawings
FIG. 1 is a schematic view of a front cross-sectional structure of the present invention;
fig. 2 is a schematic top view of the present invention.
[ Specification of symbols ]
1-wall body, 21-first bolt, 22-second bolt, 23-third bolt, 3-supporting strip, 4-protecting strip, 5-telescopic connecting rod, 51-first screw rod, 52-first sleeve, 53-second sleeve, 54-second screw rod, 55-screwing section, 6-scaffold plate and 7-diagonal brace.
Detailed Description
The present invention provides a suspended scaffold structure, which will be described in detail below with reference to the accompanying drawings.
As shown in fig. 1 to 2, the suspended scaffold structure provided in this embodiment includes a wall 1, two bolts having their screw thread portions extending out of the wall 1 from the outer side surface of the wall 1 are pre-embedded in the wall 1, and each bolt is a first bolt 21 and a second bolt 22, the first bolt 21 and the second bolt 22 are sequentially distributed from top to bottom along the longitudinal direction, the suspended scaffold structure further includes a support bar 3 horizontally arranged, a protection bar 4 longitudinally arranged, and a telescopic connecting rod 5, the screw thread portion of the second bolt 22 is inserted into one end of the support bar 3 and is in threaded connection with the support bar 3, the bottom end of the protection bar 4 is fixedly connected to one end of the support bar 3 away from the second bolt 22, the telescopic connecting rod 5 is mainly composed of a first screw 51, a first sleeve 52, a second sleeve 53, and a second screw 54 sequentially arranged along the axial direction thereof, the first sleeve 52 and the second sleeve 53 are coaxially connected, and the opening directions of the inner holes of the two sleeves are opposite, the inner bores of the first sleeve 52 and the second sleeve 53 are internally provided with internal threads with opposite thread directions, the first screw 51 is inserted into the first sleeve 52 and is in threaded connection with the first sleeve 52, and the second screw 54 is inserted into the second sleeve 53 and is in threaded connection with the second sleeve 53, the end of the first screw 51 far away from the first sleeve 52 is hinged with the threaded part of the first bolt 21, the end of the second screw rod 54 far away from the second sleeve 53 is hinged with the top end of the protective strip 4, the scaffold plate 6 is placed on the support bar 3, the second screw rod further comprises a screwing section 55 arranged between the first sleeve 52 and the second sleeve 53, the first sleeve 52 and the second sleeve 53 are connected through the screwing section 55, and the screwing section 55, the first sleeve 52 and the second sleeve 53 are coaxially arranged, and the cross section of the screwing section 55 is in a regular hexagon with the opposite side distance of 27mm or 30mm or 34mm or 36 mm.
When the scaffold structure is installed, an implementer inserts the second bolt 22 at the lower side into the support bar 3, enables the support bar 3 to be in threaded connection with the second bolt 22, then connects the protection bar 4 with a protection effect in a welding mode on one end, far away from the second bolt 22, of the support bar 3, enables the support bar 3 and the protection bar 4 to be in an L shape, and then sets up the telescopic connecting rod 5. When the first bolt 21 and the second bolt 22 are pre-embedded, a height difference between the two bolts may have a certain error from a preset value, which makes assembly difficult. For the convenience of connection, in the present embodiment, the first screw 51 and the first bolt 21, and the second screw 54 and the top end of the guard bar 4 are hinged, and the telescopic link 5 can adjust its axial length in a targeted manner to adapt to different height differences between the first bolt 21 and the second bolt 22. When adjusting the axial length of the telescopic link 5, an implementer only needs to screw the first sleeve 52 and the second sleeve 53 in the same rotation direction, and then the first screw 51 and the second screw 54 respectively extend out of the inner hole of the first sleeve 52 and the inner hole of the second sleeve 53, so that the whole telescopic link 5 is extended in the axial direction. After the axial length of the telescopic connecting rod 5 is adjusted adaptively and the two ends of the telescopic connecting rod are connected, the frame of a single scaffold structure is built, and then the scaffold plates 6 for constructors to walk are placed on the supporting bars 3, and the arrangement of the walkway is completed. Finally, as shown in fig. 2, other scaffold structures are repeatedly erected at the same height, and the scaffold boards 6 of the scaffold structures are connected, thereby completing the erection work of the whole building scaffold. The suspended scaffold structure saves the erection of a cantilever steel beam in the erection process, so that the construction rhythm is accelerated, and the project economic benefit is improved.
Meanwhile, as mentioned above, since the inner holes of the first sleeve 52 and the second sleeve 53 are provided with the inner threads with opposite thread turning directions, when adjusting the axial length of the telescopic link 5, an implementer only needs to screw the first sleeve 52 and the second sleeve 53 along the same rotating direction, and then the first screw 51 and the second screw 54 respectively extend out of the inner hole of the first sleeve 52 and the inner hole of the second sleeve 53, so as to extend the whole telescopic link 5 along the axial direction. In the present embodiment, in order to facilitate the operator to adjust the length of the telescopic link 5, the cross section of the screwing section 55 is a regular hexagon with an opposite edge distance of 27mm or 30mm or 34mm or 36mm, that is, the shape of the screwing section 55 is substantially consistent with that of a standard bolt head, so that the operator can rotate the screwing section 55 with a wrench during a specific screwing process to extend and retract the whole telescopic link 5. The wrench is used as auxiliary work to perform twisting operation, so that the adjusting speed is obviously improved, the adjusting speed of the axial length of the whole telescopic connecting rod 5 can be obviously accelerated, and the telescopic connecting rod has high practicability.
More specifically, in the present embodiment, the distance between opposite sides of the cross section of the screwing segment 55 is 30mm, that is, the screwing segment conforms to the shape of the head of the M20 bolt.
It should be noted that the wall 1 may be a cast-in-place member that has been cast, or a precast concrete member. In the present embodiment, the wall 1 is a precast concrete wall member. For the precast concrete wall body component, the scaffold can be assembled with the precast concrete wall body component on the ground in advance, and when the precast concrete wall body component is assembled, the scaffold can be assembled and molded together with the precast concrete wall body component, so that precious field construction time is saved, and the construction efficiency of the whole project is greatly improved.
Meanwhile, in order to reduce the force transmission link, the connection point of the first sleeve 52, the second sleeve 53 and the screwing section 55 is prevented from cracking during screwing, and as a preferred embodiment, in the present embodiment, the first sleeve 52, the second sleeve 53 and the screwing section 55 are integrally formed.
As a preferred embodiment, in order to improve the supporting reliability of the supporting bar 3, in this embodiment, as shown in fig. 1 and fig. 2, the supporting bar further includes a third bolt 23 embedded in the wall 1 and located below the second bolt 22, and a diagonal bar 7 obliquely arranged below the supporting bar 3 and capable of extending and retracting along its own axial direction, a threaded section of the third bolt 23 extends out of the wall 1, a bottom end of the diagonal bar 7 is welded to a threaded section of the third bolt 23, and a head end thereof is welded to the supporting bar 3. Wherein, wall body 1, support bar 3 and diagonal brace 7 constitute the triangle-shaped structure, can effectively improve the support effect of support bar 3 to scaffold board 6, effectively improve the security performance of whole structure.
In addition, in the present embodiment, the threaded portion of the second bolt 22 and the top end of the protection bar 4 are provided with ear seats for hinging with the first screw 51 and the second screw 54.

Claims (5)

1.一种悬挂式的脚手架结构,其特征在于,包括有墙体(1),所述墙体(1)内预埋有2个其螺纹部于墙体(1)外侧面伸出于墙体(1)之外的螺栓,分别为第一螺栓(21)和第二螺栓(22),所述第一螺栓(21)和第二螺栓(22)沿纵向从上至下依次分布,还包括有水平布置的支撑条(3)、纵向布置的防护条(4)以及伸缩连杆(5),所述第二螺栓(22)的螺纹部插入至支撑条(3)一端内且与支撑条(3)螺纹连接,所述防护条(4)的底端固定连接在支撑条(3)远离第二螺栓(22)的一端上,所述伸缩连杆(5)主要由沿其轴向依次设置的第一螺杆(51)、第一套筒(52)、第二套筒(53)和第二螺杆(54)所构成,第一套筒(52)和第二套筒(53)同轴相连且两者的内孔的开口方向相背设置,所述第一套筒(52)和第二套筒(53)的内孔内布置有螺纹旋向相反的内螺纹,所述第一螺杆(51)插入至第一套筒(52)内且与第一套筒(52)螺纹连接,而第二螺杆(54)插入至第二套筒(53)内且与第二套筒(53)螺纹连接,所述第一螺杆(51)远离第一套筒(52)的一端与第一螺栓(21)的螺纹部相铰接,而第二螺杆(54)远离第二套筒(53)的一端与防护条(4)的顶端相铰接,所述支撑条(3)上放置有脚手架板(6),还包括有置于第一套筒(52)和第二套筒(53)之间的拧动段(55),所述第一套筒(52)和第二套筒(53)通过拧动段(55)相连,且拧动段(55)、第一套筒(52)、第二套筒(53)同轴布置,所述拧动段(55)的横截面呈对边距离为27mm或30mm或34mm或36mm的正六边形。1. A hanging scaffolding structure is characterized in that, it comprises a wall (1), and in the wall (1), 2 of its threaded parts are pre-buried and protrude from the wall on the outer side of the wall (1). The bolts outside the body (1) are respectively a first bolt (21) and a second bolt (22), the first bolts (21) and the second bolts (22) are sequentially distributed from top to bottom in the longitudinal direction, and also It comprises a horizontally arranged support bar (3), a longitudinally arranged protection bar (4) and a telescopic link (5). The strip (3) is threadedly connected, the bottom end of the protection strip (4) is fixedly connected to the end of the support strip (3) away from the second bolt (22), and the telescopic link (5) is mainly driven by the shaft along its axial direction. A first screw (51), a first sleeve (52), a second sleeve (53) and a second screw (54) are arranged in sequence, the first sleeve (52) and the second sleeve (53) They are connected coaxially and the opening directions of the inner holes of the two are opposite to each other. The inner holes of the first sleeve (52) and the second sleeve (53) are arranged with inner threads with opposite screw threads. A screw (51) is inserted into the first sleeve (52) and is threadedly connected to the first sleeve (52), while a second screw (54) is inserted into the second sleeve (53) and is connected to the second sleeve (53) screw connection, one end of the first screw rod (51) away from the first sleeve (52) is hinged with the threaded part of the first bolt (21), and the second screw rod (54) is away from the second sleeve ( One end of 53) is hinged with the top end of the protection strip (4), a scaffold board (6) is placed on the support strip (3), and a first sleeve (52) and a second sleeve (53) are placed on the support strip (3). ), the first sleeve (52) and the second sleeve (53) are connected through the twisting segment (55), and the twisting segment (55), the first sleeve ( 52) The second sleeve (53) is coaxially arranged, and the cross section of the twisting section (55) is a regular hexagon with a distance between opposite sides of 27mm or 30mm or 34mm or 36mm. 2.如权利要求1所述的一种悬挂式的脚手架结构,其特征在于:所述拧动段(55)的横截面的对边距离为30mm。2 . The suspended scaffolding structure according to claim 1 , characterized in that: the distance between the opposite sides of the cross section of the twisting section ( 55 ) is 30 mm. 3.如权利要求2所述的一种悬挂式的脚手架结构,其特征在于:所述第一套筒(52)、第二套筒(53)和拧动段(55)一体成型。3 . The suspended scaffold structure according to claim 2 , wherein the first sleeve ( 52 ), the second sleeve ( 53 ) and the screwing section ( 55 ) are integrally formed. 4 . 4.如权利要求1所述的一种悬挂式的脚手架结构,其特征在于:还包括有预埋在墙体(1)中并位于第二螺栓(22)下方的第三螺栓(23),以及倾斜布置于支撑条(3)下方且可沿自身轴向伸缩的斜撑杆(7),所述第三螺栓(23)的螺纹段伸出于墙体(1)之外,所述斜撑杆(7)的底端与第三螺栓(23)的螺纹段相焊接,而其首端则焊接在支撑条(3)上。4. A kind of suspended scaffolding structure as claimed in claim 1 is characterized in that: also comprises the third bolt (23) which is embedded in the wall (1) and is located below the second bolt (22), and a diagonal strut (7) which is obliquely arranged below the support bar (3) and can be extended and retracted along its own axis, the threaded section of the third bolt (23) protrudes out of the wall (1), and the diagonal The bottom end of the strut (7) is welded with the threaded section of the third bolt (23), and the head end thereof is welded on the support bar (3). 5.如权利要求1所述的一种悬挂式的脚手架结构,其特征在于:所述墙体(1)为预制混凝土墙体构件。5. A hanging scaffolding structure according to claim 1, wherein the wall (1) is a prefabricated concrete wall member.
CN201920952960.6U 2019-06-24 2019-06-24 Suspended scaffold structure Active CN210530295U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920952960.6U CN210530295U (en) 2019-06-24 2019-06-24 Suspended scaffold structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920952960.6U CN210530295U (en) 2019-06-24 2019-06-24 Suspended scaffold structure

Publications (1)

Publication Number Publication Date
CN210530295U true CN210530295U (en) 2020-05-15

Family

ID=70595586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920952960.6U Active CN210530295U (en) 2019-06-24 2019-06-24 Suspended scaffold structure

Country Status (1)

Country Link
CN (1) CN210530295U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359693A (en) * 2019-06-24 2019-10-22 中国五冶集团有限公司 A kind of boat scaffold structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359693A (en) * 2019-06-24 2019-10-22 中国五冶集团有限公司 A kind of boat scaffold structure
CN110359693B (en) * 2019-06-24 2024-04-09 中国五冶集团有限公司 A suspended scaffolding structure

Similar Documents

Publication Publication Date Title
CN101839070B (en) Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column
CN114856287B (en) Construction method of thin-wall steel cylinder hollow tower column
CN205133081U (en) Novel hanging flower basket system
CN208869129U (en) Telescopic building hoist day beam is set in elevator traction
CN115369748A (en) Construction method of template system for integrally pouring pier and tie beam
CN102022123B (en) Integral lining method for tunnel with altered diameter by model board trolley
KR101922047B1 (en) bracing removing apparatus of tower crane
CN110359693B (en) A suspended scaffolding structure
CN209891690U (en) Scaffold for outer wall construction
CN105781131A (en) Assembled building wall plate mounting support system and construction method thereof
CN111705747A (en) Sliding template assembly for river retaining wall
CN109898820B (en) Outer protective frame of assembled building and assembled building construction method
CN211038675U (en) Quickly-assembled supporting shed frame
CN117868693A (en) Water discharge hole forming construction method
CN214834866U (en) Elevator shaft mounting structure of concrete spreader
CN210289072U (en) Adjustable instrument formula elevartor shaft protection operation platform and operation are strutted
CN107313597A (en) Modularization ready-package discharging platform for assembled architecture
CN208534009U (en) A kind of fixation device of builder's jack
CN216042602U (en) Reinforced diagonal brace of aluminum alloy template pulling-on piece system
CN105804417A (en) Sway brace for installation of assembly type building wallboard and using method thereof
CN111021701A (en) Lifting system for building
CN217173061U (en) Tower crane attaches wall spare
CN113931431B (en) Construction hanging basket for outdoor operation
CN117627368A (en) Hoisting, positioning and installing method for large-size thin-wall prefabricated bay window external wall panel
CN214401375U (en) Temporary support of prefabricated box girder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant