CN210510507U - Pipeline embedding device for hydraulic engineering - Google Patents

Pipeline embedding device for hydraulic engineering Download PDF

Info

Publication number
CN210510507U
CN210510507U CN201921585715.2U CN201921585715U CN210510507U CN 210510507 U CN210510507 U CN 210510507U CN 201921585715 U CN201921585715 U CN 201921585715U CN 210510507 U CN210510507 U CN 210510507U
Authority
CN
China
Prior art keywords
plate
fixedly connected
lateral wall
threaded
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921585715.2U
Other languages
Chinese (zh)
Inventor
魏媛媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921585715.2U priority Critical patent/CN210510507U/en
Application granted granted Critical
Publication of CN210510507U publication Critical patent/CN210510507U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a device is buried underground to pipeline for hydraulic engineering, bottom plate including one side lateral wall fixed connection has the handle, the stand of the vertical setting of lateral wall fixedly connected with on the bottom plate, the shifting chute has been seted up to stand one side lateral wall, and stand upper end fixedly connected with motor, and the output of motor runs through to shifting chute interior and fixedly connected with threaded rod, and the threaded rod lower extreme rotates and inserts and establish at the shifting chute diapire, the screw thread has cup jointed the threading board on the threaded rod, and threading board one end extends to the shifting chute outside, the connecting rod that two symmetries of lateral wall fixedly connected with set up under the threading board. This device is buried underground to pipeline for hydraulic engineering, through setting up motor and centre gripping subassembly, the centre gripping subassembly can be convenient carry out the centre gripping with the pipeline, then actuating motor drives the mounting panel and goes up and down, realizes promoting or the function of placing, convenient operation.

Description

Pipeline embedding device for hydraulic engineering
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a device is buried underground to pipeline for hydraulic engineering.
Background
Hydraulic engineering is an engineering built for the elimination of water damage and the exploitation and utilization of water resources. The service objects are divided into flood control engineering, farmland hydraulic engineering, hydroelectric power engineering, channel and harbor engineering, water supply and drainage engineering, environmental hydraulic engineering, coastal reclamation engineering and the like. The hydraulic engineering which can serve multiple targets such as flood control, water supply, irrigation, power generation and the like at the same time is called comprehensive utilization hydraulic engineering.
Often need lay the pipeline when building hydraulic engineering and assist, current mode of burying underground buries underground through adopting artifical cooperation crane, and is bulky, consuming time and consuming labour, work efficiency is low.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a device is buried underground to pipeline for hydraulic engineering has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a pipeline burying device for water conservancy project comprises a bottom plate with a handle fixedly connected with one side wall, the side wall of the bottom plate is fixedly connected with a vertical upright post, a moving groove is arranged on the side wall of one side of the upright post, the upper end of the upright post is fixedly connected with a motor, the output end of the motor penetrates into the moving groove and is fixedly connected with a threaded rod, the lower end of the threaded rod is rotatably inserted into the bottom wall of the moving groove, a threaded plate is sleeved on the threaded rod through threads, one end of the thread plate extends to the outside of the moving groove, the lower side wall of the thread plate is fixedly connected with two connecting rods which are symmetrically arranged, the lower end of the connecting rod penetrates through the bottom plate and is fixedly connected with a mounting plate, the mounting plate is connected with a clamping assembly, the four corners of the lower side wall of the bottom plate are rotatably connected with supporting legs, and the lower extreme of supporting leg rotates and is connected with the gyro wheel, be equipped with the brake subassembly that corresponds with the gyro wheel on the supporting leg.
Optionally, the brake assembly includes the fixed strip, the supporting leg has seted up the rotation mouth down the lateral wall, the fixed strip with rotate mouthful roof fixed connection, the fixed strip lower extreme rotates and is connected with arc locking plate, and fixedly connected with torsion spring between arc locking plate and the fixed strip.
Optionally, a through hole is formed in the arc-shaped locking plate, a bolt is inserted into the supporting leg through threads, and one end of the bolt is inserted into the through hole through threads.
Optionally, the centre gripping subassembly includes the cylinder of fixed connection lateral wall on the mounting panel, and the upper end fixed connection of cylinder has the lifter plate that the level set up, the lateral wall rotates under the lifter plate and is connected with the supporting rod, the lateral wall rotates under the mounting panel and is connected with the grip block that two symmetries set up, the supporting rod lower extreme rotates with the grip block to be connected.
Optionally, the threaded plate is close to the one end lateral wall fixedly connected with stopper of shifting chute, and shifting chute one side lateral wall has seted up the spacing groove, stopper sliding connection is at the spacing inslot portion.
Optionally, two openings symmetrically arranged are formed in the mounting plate, the clamping rods penetrate through the openings, and the size of each opening is larger than that of each clamping rod.
(III) advantageous effects
The utility model provides a device is buried underground to pipeline for hydraulic engineering possesses following beneficial effect:
1. this device is buried underground to pipeline for hydraulic engineering, through setting up motor and centre gripping subassembly, the centre gripping subassembly can be convenient carry out the centre gripping with the pipeline, then actuating motor drives the mounting panel and goes up and down, realizes promoting or the function of placing, convenient operation.
2. This device is buried underground to pipeline for hydraulic engineering through setting up handle, gyro wheel and brake assembly, can realize the transfer of device, and brake assembly can fix the device subaerial, avoids the removal of during operation, avoids unexpected the emergence.
Drawings
Fig. 1 is a front structural view of a pipeline burying device for hydraulic engineering according to the present invention;
fig. 2 is a side structure view of a pipe burying device for hydraulic engineering according to the present invention;
fig. 3 is a structural view at a of fig. 1.
In the figure: 1. a base plate; 2. a thread plate; 3. an electric motor; 4. a clamping assembly; 41. a clamping rod; 42. a clamping plate; 43. a cylinder; 44. a lifting plate; 5. mounting a plate; 6. a column; 7. a handle; 8. a brake assembly; 81. a fixing strip; 82. a torsion spring; 83. an arc-shaped locking plate; 9. a limiting block; 10. a threaded rod; 11. a connecting rod; 12. supporting legs; 13. a roller; 14. and (4) bolts.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a pipeline embedding device for hydraulic engineering comprises a bottom plate 1, wherein a handle 7 is fixedly connected to one side wall of the bottom plate 1, a vertically arranged upright post 6 is fixedly connected to the side wall of the bottom plate 1, a moving groove is formed in one side wall of the upright post 6, a motor 3 is fixedly connected to the upper end of the upright post 6, the output end of the motor 3 penetrates into the moving groove and is fixedly connected with a threaded rod 10, the lower end of the threaded rod 10 is rotatably inserted into the bottom wall of the moving groove, a threaded plate 2 is sleeved on the threaded rod 10 in a threaded manner, a limiting block 9 is fixedly connected to the side wall of one end, close to the moving groove, of the threaded plate 2, a limiting groove is formed in the side wall of one side of the moving groove, the limiting block 9 is slidably connected to the inside of the limiting groove, one end of the threaded plate 2 extends to, threaded plate 2 is close to the one end lateral wall fixedly connected with stopper 9 of shifting chute, and shifting chute one side lateral wall has seted up the spacing groove, and stopper 9 sliding connection is inside the spacing groove, then with starter motor 3, drives threaded rod 10 and rotates for threaded plate 2 shifts up, drives mounting panel 5 through connecting rod 11 and goes up and down, thereby realizes the lift of pipeline.
And mounting panel 5 is connected with centre gripping subassembly 4, centre gripping subassembly 4 includes the cylinder 43 of fixed connection lateral wall on mounting panel 5, and the upper end fixed connection of cylinder 43 has the lifter plate 44 that the level set up, the lower lateral wall of lifter plate 44 rotates and is connected with supporting rod 41, the lower lateral wall of mounting panel 5 rotates and is connected with the grip block 42 that two symmetries set up, the lower extreme of supporting rod 41 rotates with grip block 42 to be connected, start cylinder 43, drive lifter plate 44 and descend, then drive grip block 42 through supporting rod 41 and rotate, live the pipeline centre gripping.
The four corners of the lower side wall of the bottom plate 1 are rotatably connected with supporting legs 12, the lower ends of the supporting legs 12 are rotatably connected with rollers 13, the supporting legs 12 are provided with brake assemblies 8 corresponding to the rollers 13, each brake assembly 8 comprises a fixing strip 81, the lower side wall of each supporting leg 12 is provided with a rotating port, each fixing strip 81 is fixedly connected with the top wall of each rotating port, the lower end of each fixing strip 81 is rotatably connected with an arc-shaped locking plate 83, a torsion spring 82 is fixedly connected between each arc-shaped locking plate 83 and each fixing strip 81, each arc-shaped locking plate 83 is provided with a through hole, each supporting leg 12 is provided with a bolt 14 in a threaded insertion mode, one end of each bolt 14 is in a threaded insertion mode in each through hole, each arc-shaped locking plate 83 is separated from each roller 13 by inserting each bolt 14 into each through hole, movement of the device is achieved, when each bolt 14 is moved out of, and realizing the braking work.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
To sum up, this device is buried underground to pipeline for hydraulic engineering, at first need a pipeline centre gripping, start cylinder 43, drive lifter plate 44 descends, then drive grip block 42 through supporting rod 41 and rotate, with the pipeline centre gripping, then with starter motor 3, drive threaded rod 10 rotates for threaded plate 2 moves up, finally make the pipeline break away from ground, then promote handle 7, remove the device to appointed position, restart motor 3, put into the slot with the pipeline, restart cylinder 43 loosens grip block 42, realize burying underground the work.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a device is buried underground to pipeline for hydraulic engineering, includes bottom plate (1) of one side lateral wall fixedly connected with handle (7), its characterized in that: the side wall of the bottom plate (1) is fixedly connected with a vertically arranged upright post (6), a moving groove is formed in one side wall of the upright post (6), the upper end of the upright post (6) is fixedly connected with a motor (3), the output end of the motor (3) penetrates into the moving groove and is fixedly connected with a threaded rod (10), the lower end of the threaded rod (10) is rotatably inserted into the bottom wall of the moving groove, a threaded plate (2) is sleeved on the upper thread of the threaded rod (10), one end of the threaded plate (2) extends to the outside of the moving groove, the side wall of the threaded plate (2) is fixedly connected with two symmetrically arranged connecting rods (11), the lower ends of the connecting rods (11) penetrate through the bottom plate (1) and are fixedly connected with a mounting plate (5), the mounting plate (5) is connected with a clamping assembly (4), and supporting legs (12, and the lower extreme of supporting leg (12) rotates and is connected with gyro wheel (13), be equipped with brake subassembly (8) that correspond with gyro wheel (13) on supporting leg (12).
2. The pipe burying device for the water conservancy project according to claim 1, wherein: brake subassembly (8) are including fixed strip (81), the mouth has been seted up in the rotation to the lateral wall under supporting leg (12), fixed strip (81) with rotate a mouthful roof fixed connection, fixed strip (81) lower extreme rotates and is connected with arc locking plate (83), and fixedly connected with torsion spring (82) between arc locking plate (83) and fixed strip (81).
3. The pipe burying device for the water conservancy project according to claim 2, wherein: a through hole is formed in the arc-shaped locking plate (83), a bolt (14) is inserted into the supporting leg (12) in a threaded mode, and one end of the bolt (14) is inserted into the through hole in a threaded mode.
4. The pipe burying device for the water conservancy project according to claim 1, wherein: centre gripping subassembly (4) are including cylinder (43) of fixed connection lateral wall on mounting panel (5), and the upper end fixed connection of cylinder (43) has lifter plate (44) that the level set up, the side wall rotates under lifter plate (44) and is connected with supporting rod (41), side wall rotates clamp plate (42) that is connected with two symmetries and sets up under mounting panel (5), supporting rod (41) lower extreme rotates with clamp plate (42) and is connected.
5. The pipe burying device for the water conservancy project according to claim 1, wherein: threaded plate (2) are close to one end lateral wall fixedly connected with stopper (9) of shifting chute, and shifting chute one side lateral wall has seted up the spacing groove, stopper (9) sliding connection is at the spacing inslot portion.
6. The pipe burying device for the water conservancy project according to claim 4, wherein: two openings symmetrically arranged are formed in the mounting plate (5), the clamping rods (41) penetrate through the openings, and the size of each opening is larger than that of each clamping rod (41).
CN201921585715.2U 2019-09-23 2019-09-23 Pipeline embedding device for hydraulic engineering Expired - Fee Related CN210510507U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921585715.2U CN210510507U (en) 2019-09-23 2019-09-23 Pipeline embedding device for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921585715.2U CN210510507U (en) 2019-09-23 2019-09-23 Pipeline embedding device for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN210510507U true CN210510507U (en) 2020-05-12

Family

ID=70572019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921585715.2U Expired - Fee Related CN210510507U (en) 2019-09-23 2019-09-23 Pipeline embedding device for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN210510507U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111795208A (en) * 2020-07-01 2020-10-20 滑伟 Hydraulic engineering construction is with pipeline device of burying underground
CN112178275A (en) * 2020-09-04 2021-01-05 陈佳 Transport embedding device for underground pipeline embedding
CN113026906A (en) * 2021-03-29 2021-06-25 安徽省宁合建筑工程有限公司 Sewage pipeline burying device for municipal engineering and use method thereof
CN113108122A (en) * 2021-03-03 2021-07-13 冯如意 Hang down structure and fill in formula auxiliary device for water conservancy pipeline installation
CN113356329A (en) * 2021-07-12 2021-09-07 日成(广东)水务建设股份有限公司 Pipe burying device for hydraulic engineering
CN114590307A (en) * 2022-03-12 2022-06-07 烟台市城市水源工程运行维护中心 A handling device for water conservancy pipelines
CN114789430A (en) * 2022-04-24 2022-07-26 五冶集团上海有限公司 Assembled water supply and drainage pipe device stable in installation

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111795208A (en) * 2020-07-01 2020-10-20 滑伟 Hydraulic engineering construction is with pipeline device of burying underground
CN112178275A (en) * 2020-09-04 2021-01-05 陈佳 Transport embedding device for underground pipeline embedding
CN113108122A (en) * 2021-03-03 2021-07-13 冯如意 Hang down structure and fill in formula auxiliary device for water conservancy pipeline installation
CN113026906A (en) * 2021-03-29 2021-06-25 安徽省宁合建筑工程有限公司 Sewage pipeline burying device for municipal engineering and use method thereof
CN113356329A (en) * 2021-07-12 2021-09-07 日成(广东)水务建设股份有限公司 Pipe burying device for hydraulic engineering
CN114590307A (en) * 2022-03-12 2022-06-07 烟台市城市水源工程运行维护中心 A handling device for water conservancy pipelines
CN114590307B (en) * 2022-03-12 2024-01-09 烟台市城市水源工程运行维护中心 A handling device for water conservancy pipelines
CN114789430A (en) * 2022-04-24 2022-07-26 五冶集团上海有限公司 Assembled water supply and drainage pipe device stable in installation

Similar Documents

Publication Publication Date Title
CN218088802U (en) Concrete pole hoist device
CN210289335U (en) Construction vehicle for pit making and erecting of telegraph pole
CN102097749B (en) Electrometric handcart tool
CN218440963U (en) Sewer construction device
CN210440669U (en) Pipeline embedding device for hydraulic engineering
CN216898657U (en) Safety drill rod inserting device for water and soil conservation monitoring
CN217215830U (en) Electromechanical junction box that uses of colliery ground
CN210744461U (en) Secondary equipment cabin
CN213602598U (en) Telescopic expansion type photovoltaic energy storage integrated device
CN211405291U (en) Threading construction device for building electrical engineering
CN212561524U (en) Pulling and installing machine for hydraulic engineering
CN216872696U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN216598752U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN212579914U (en) Buoy device for hydrology and water utilization
CN207767935U (en) It is a kind of to have bed of the bed board from open function
CN214177754U (en) Load cabinet with waterproof protection function
CN219535281U (en) Electric power automatic lifting sealing anti-theft electric power cabinet
CN211344227U (en) Pipe conveying and installing equipment for municipal water supply and drainage
CN217899724U (en) Convenient fast assembly's rotatory solar street lamp
CN215645607U (en) Intelligent power distribution grid structure of reliability
CN215405922U (en) Intelligent monitoring flood control hydraulic dam
CN216198672U (en) Fixing device for wind power generation base
CN118187554B (en) Autonomous dynamic-adjustment electric pole clamp and construction method thereof
CN211598506U (en) A combination formula perforating device for water conservancy construction
CN215760364U (en) A construction hanging basket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200512

Termination date: 20200923