CN210368586U - Steel bearing seat - Google Patents

Steel bearing seat Download PDF

Info

Publication number
CN210368586U
CN210368586U CN201921038823.8U CN201921038823U CN210368586U CN 210368586 U CN210368586 U CN 210368586U CN 201921038823 U CN201921038823 U CN 201921038823U CN 210368586 U CN210368586 U CN 210368586U
Authority
CN
China
Prior art keywords
steel
girder steel
bearing seat
steel beam
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921038823.8U
Other languages
Chinese (zh)
Inventor
曾令武
李喻
郭佳希
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Changzheng Construction Co.,Ltd.
Original Assignee
Zhuhai Gree Municipal Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Gree Municipal Engineering Co ltd filed Critical Zhuhai Gree Municipal Engineering Co ltd
Priority to CN201921038823.8U priority Critical patent/CN210368586U/en
Application granted granted Critical
Publication of CN210368586U publication Critical patent/CN210368586U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a steel bearing seat, including last girder steel and girder steel down, it is fixed mutually through the support frame to go up between girder steel and the lower girder steel, goes up the both ends difference fixedly connected with girder steel fixing base of girder steel and lower girder steel, goes up the left and right sides of girder steel and lower girder steel and is equipped with bearing seat respectively, has seted up logical groove in the bearing seat, the girder steel fixing base is located logical inslot, and the bottom position is equipped with the hydraulic stem in leading to the groove, the top of hydraulic stem and the girder steel fixing base butt that leads to the inslot, keeps away from on the bearing seat of the left and right sides and goes up girder steel one end and install the slope steelframe respectively, is. The utility model provides a steel bearing seat, the structure sets up ingeniously, will go up the girder steel through setting up bearing seat and erect unsettledly with girder steel down, when the concrete is pour in tunnel ground construction, with bearing seat setting at both ends, pour the concrete from built on stilts position, all pass through from the girder steel pouring of personnel's operation equipment after pouring the completion, has avoided causing the destruction to the concrete of pouring.

Description

Steel bearing seat
Technical Field
The utility model relates to a tunnel construction equipment technical field specifically is a steel bearing seat.
Background
Tunnels are engineering structures buried in the ground and are a form of human use of underground space. The tunnel can be divided into a traffic tunnel, a hydraulic tunnel, a municipal tunnel and a mine tunnel. The structure of the tunnel comprises two parts, namely a main building and accessory equipment. The main building is composed of a tunnel body and a tunnel door, the auxiliary equipment comprises a car-avoiding tunnel, fire-fighting equipment, emergency communication and water-proof and drainage equipment, and the long and large tunnel is also provided with special ventilation and lighting equipment.
After the tunnel is excavated, when ground concrete is poured, due to the limitation of the space of the tunnel, normal operation of personnel and equipment around the tunnel is guaranteed while the poured concrete is prevented from being damaged by construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel bearing seat to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a steel bearing seat, includes girder steel and girder steel down, it is fixed mutually through the support frame to go up between girder steel and the girder steel down, goes up the both ends difference fixedly connected with girder steel fixing base of girder steel and girder steel down, goes up the left and right sides of girder steel and girder steel down and is equipped with bearing seat respectively, has seted up logical groove in the bearing seat, the logical inslot is located to the girder steel fixing base, and logical inslot bottom position is equipped with the hydraulic stem, the top of hydraulic stem and the girder steel fixing base butt that leads to the inslot, keep away from on the bearing seat of the left and right sides and go up girder steel one end and install the slope steelframe respectively.
As a further aspect of the present invention: the upper bottom of the slope steel frame is provided with a sleeve joint seat, a hollow groove is formed in the sleeve joint seat, and the bottom of the slope steel frame is movably sleeved in the hollow groove.
As a further aspect of the present invention: first through holes are uniformly formed in the sleeving seat, second through holes are uniformly formed in the positions, corresponding to the first through holes, of the upper bottom of the slope steel frame, and bolts penetrate through the first through holes and the second through holes.
As a further aspect of the present invention: the upper bottom of the sleeve joint seat is evenly provided with bevel teeth.
As a further aspect of the present invention: and a settlement monitoring device is arranged at the right side position on the steel beam fixing seat on the right side.
As a further aspect of the present invention: the settlement monitoring device comprises a graduated scale arranged on the right bearing seat, a fixed block is connected to the position, close to the bottom, of the steel beam fixing seat on the right side, a connecting rod is installed on the fixed block, a pointer is installed on the connecting rod, and the pointer is opposite to the graduated scale.
Compared with the prior art, the utility model has the advantages of following several aspects:
the utility model discloses in, will go up the girder steel through setting up the bearing seat and erect unsettledly with girder steel down, when tunnel ground construction concreting, with the bearing seat setting at both ends, pour concrete from built on stilts position, personnel's operation equipment all passes through from the girder steel after pouring the completion, has avoided causing destruction to the concrete of pouring, and simultaneously when the ground clearance of girder steel is adjusted to needs, the hydraulic stem realize the lift of girder steel fixing base can, promote the use flexibility ratio.
The utility model discloses in, when appearing that ground is harder or be stained with water and easily slide, will cup joint the seat and install the awl tooth that cup joints the seat bottom in slope steelframe bottom and tightly imbed ground, increase frictional force, promote stability through the bolt.
The utility model discloses in, through setting up settlement monitoring device on the girder steel, adopt the cooperation of pointer and scale, simple structure easily observes the use, judges subsiding of girder steel through observing the displacement of pointer on the scale to this judges whether hydraulic stem work is normal, needs the maintenance to change, avoids the chronic reduction of hydraulic stem hydraulic pressure ability and can not in time discover, and the condition that influences the operation safety takes place.
Drawings
Figure 1 is a side view of a steel bearing block.
Figure 2 is a cross-sectional view of a steel beam mounting in a steel bearing block.
Fig. 3 is a schematic view of a socket in a steel socket.
Fig. 4 is a schematic structural view of a settlement monitoring device in a steel holder.
In the figure: 1. mounting a steel beam; 2. a steel beam fixing seat; 3. a bearing seat; 4. a slope steel frame; 5. an oblique bracket; 6. a socket joint seat; 7. a first through hole; 8. a bolt; 9. a lower steel beam; 10. a support frame; 11. a settlement monitoring device; 12. a graduated scale; 13. a hydraulic lever; 14. a through groove; 15. an empty groove; 16. a second through hole; 17. conical teeth; 18. a fixed block; 19. a connecting rod; 20. a pointer.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance; furthermore, unless expressly stated or limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, as they may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, a steel bearing seat comprises an upper steel beam 1 and a lower steel beam 9, the upper steel beam 1 and the lower steel beam 9 are fixed by a support frame 10, two ends of the upper steel beam 1 and the lower steel beam 9 are respectively and fixedly connected with a steel beam fixing seat 2, the left and right sides of the upper steel beam 1 and the lower steel beam 9 are respectively provided with a bearing seat 3, the bearing seat 3 is internally provided with a through groove 14, the steel beam fixing seat 2 is arranged in the through groove 14, the bottom of the through groove 14 is provided with a hydraulic rod 13, the top end of the hydraulic rod 13 is abutted against the steel beam fixing seat 2 in the through groove 14, one end of the bearing seat 3 at the left and right sides, far from the upper steel beam 1, is respectively provided with a slope 4, the slope steel frame 4 is provided with an inclined strut 5 for supporting, the upper bottom of the slope steel frame 4 is provided with a sleeve seat, the bottom position activity of 4 steel frame slopes embolias dead slots 15 in, and second through-hole 16 has evenly been seted up corresponding first through-hole 7 position in the bottom on the steel frame slopes 4, has worn bolt 8 between first through-hole 7 and the second through-hole 16, the bottom position evenly installs awl tooth 17 on the seat 6 that cup joints, and right side position is equipped with settlement monitoring device 11 on the girder steel fixing base 2 on right side, and settlement monitoring device 11 is including setting up scale 12 on right bearing seat 3, and the girder steel fixing base 2 on right side is close to the bottom position and is connected with fixed block 18, installs connecting rod 19 on the fixed block 18, installs pointer 20 on the connecting rod 19, and pointer 20 is just to scale 12.
The utility model discloses a theory of operation is: the utility model provides a steel bearing seat, the structure sets up ingeniously, and it is rationally distributed, set up bearing seat 3 at both ends during the use, then erect the girder steel in the centre, guarantee that girder steel fixing base 2 is located bearing seat 3's logical groove 14, then adopt hydraulic stem 13 to go up and down, with this ground clearance control who realizes the girder steel, personnel and construction equipment pass on the girder steel, avoided pouring the below and accomplished to make into destruction for the concrete that fully condenses, subside monitoring devices 11 through setting up simultaneously, through observing the displacement of pointer 20 on scale 12, can know subsiding of girder steel, in time discover the power decline of hydraulic stem 13, change or maintain, avoid taking place the incident.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.

Claims (6)

1. A steel bearing bracket comprises an upper steel beam (1) and a lower steel beam (9), and is characterized in that, the upper steel beam (1) and the lower steel beam (9) are fixed through a support frame (10), two ends of the upper steel beam (1) and the lower steel beam (9) are respectively and fixedly connected with a steel beam fixing seat (2), the left side and the right side of the upper steel beam (1) and the lower steel beam (9) are respectively provided with a bearing seat (3), a through groove (14) is arranged in each bearing seat (3), girder steel fixing base (2) are located logical groove (14) in, and the bottom position is equipped with hydraulic stem (13) in logical groove (14), the top of hydraulic stem (13) and girder steel fixing base (2) butt in logical groove (14), keep away from on the bearing seat (3) of the left and right sides and go up girder steel (1) one end and install slope steelframe (4) respectively, are equipped with bracing frame (5) of supporting role on slope steelframe (4).
2. The steel bearing seat according to claim 1, wherein the slope steel frame (4) is provided with a socket seat (6) at the bottom position, an empty groove (15) is formed in the socket seat (6), and the slope steel frame (4) is movably sleeved in the empty groove (15) at the bottom position.
3. The steel bearing seat according to claim 2, wherein the socket seat (6) is uniformly provided with first through holes (7), the bottom of the slope steel frame (4) is uniformly provided with second through holes (16) corresponding to the positions of the first through holes (7), and the bolt (8) penetrates between the first through holes (7) and the second through holes (16).
4. A steel socket according to claim 2, wherein the socket (6) is provided with conical teeth (17) at the bottom thereof.
5. A steel bearing bracket according to any of claims 1 to 4, characterised in that a settlement monitoring device (11) is provided on the right side of the right steel beam mounting bracket (2).
6. A steel bearing block according to claim 5, characterized in that the settlement monitoring device (11) comprises a graduated scale (12) arranged on the right bearing block (3), a fixed block (18) is connected to the steel beam fixing seat (2) on the right side near the bottom, a connecting rod (19) is arranged on the fixed block (18), a pointer (20) is arranged on the connecting rod (19), and the pointer (20) is opposite to the graduated scale (12).
CN201921038823.8U 2019-07-04 2019-07-04 Steel bearing seat Active CN210368586U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921038823.8U CN210368586U (en) 2019-07-04 2019-07-04 Steel bearing seat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921038823.8U CN210368586U (en) 2019-07-04 2019-07-04 Steel bearing seat

Publications (1)

Publication Number Publication Date
CN210368586U true CN210368586U (en) 2020-04-21

Family

ID=70269452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921038823.8U Active CN210368586U (en) 2019-07-04 2019-07-04 Steel bearing seat

Country Status (1)

Country Link
CN (1) CN210368586U (en)

Similar Documents

Publication Publication Date Title
CN102322269A (en) Super early receiving supporting structure of shield machine and super early receiving method
CN108035546B (en) Template fixing device is pour to shear force wall for building
CN210368586U (en) Steel bearing seat
CN210827152U (en) Bridge reinforced structure
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
WO2016195364A1 (en) Vertical shaft module and vertical shaft construction method using same
CN210917388U (en) Easy dismouting formula underground structure
CN107013046B (en) A kind of antidote of big section steel pipe concrete combination column
CN113123811B (en) Rock mass cavity protective structure suitable for high-altitude area based on tunnel engineering
CN210031811U (en) Building pile foundation
CN213202284U (en) Device and system for hoisting beam body tensioning equipment
CN211006683U (en) Foundation pit supporting structure and foundation pit supporting assembly
CN217581392U (en) But building structure reinforcing apparatus of length compensation
CN214247367U (en) Loess tunnel excavation preliminary bracing structure
CN209397615U (en) A kind of bridge foundation ground fixed frame
CN211571713U (en) Pile breaking device
CN211597995U (en) Building construction safety device
CN213837859U (en) Civil engineering construction support
CN215215039U (en) Miniature pipe jacking machine laying structure
CN208087094U (en) A kind of inclined-plane cell cube Lift-on/Lift-off System
CN211371492U (en) Formula antidetonation pipeline bracket sways
CN210620165U (en) Platform lifting device for shaft
CN213419769U (en) Shockproof base for civil engineering machinery
CN210713178U (en) Vestibule
CN212836781U (en) Hoisting column for reverse construction of steel pipe column and primary-secondary column hoisting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 217, 2 / F, building 3, science and Technology Innovation Park, No.1 harbor, No.1 Jintang Road, Tangjiawan Town, Zhuhai City, Guangdong Province

Patentee after: Guangdong Changzheng Construction Co.,Ltd.

Address before: Room 105-39996, No. 6 Baohua Road, Hengqin New District, Zhuhai City, Guangdong Province

Patentee before: Zhuhai Gree Municipal Engineering Co.,Ltd.

CP03 Change of name, title or address