CN210334131U - Pile head major diameter bending steel bar straightening tool - Google Patents
Pile head major diameter bending steel bar straightening tool Download PDFInfo
- Publication number
- CN210334131U CN210334131U CN201920681873.1U CN201920681873U CN210334131U CN 210334131 U CN210334131 U CN 210334131U CN 201920681873 U CN201920681873 U CN 201920681873U CN 210334131 U CN210334131 U CN 210334131U
- Authority
- CN
- China
- Prior art keywords
- steel bar
- rear seat
- bar fixing
- jacking force
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a bar straightening equipment field discloses a pile head major diameter crooked bar straightening instrument, include: a jacking force rear seat; two U-shaped steel bar fixing rings which are arranged in parallel from top to bottom; the opening sides of the two reinforcing steel bar fixing rings are fixed with the same side of the jacking force rear seat; a radian matched with the shape of the steel bar is arranged on one side of the steel bar fixing ring opposite to the jacking force rear seat; the jack is arranged between the jacking force rear seat and the reinforcing steel bar fixing ring; the bottom of the cylinder body of the jack is fixed with the jacking force rear seat; the jack is arranged between the two reinforcing steel bar fixing rings in the vertical direction. The periphery of the side wall of the cylinder body of the jack is provided with connecting ribs; the end part of the connecting rib is welded and fixed with the reinforcing steel bar fixing ring. The jacking force rear seat is made of a high-strength steel plate with the thickness of 2 cm. The utility model discloses simple structure, the manufacturing of being convenient for can form at job site temporary welding equipment, and it is also comparatively convenient to use, can solve at the artifical unable alignment of pile head major diameter bending steel bar and the big problem of labour consumption.
Description
Technical Field
The utility model relates to a bar straightening equipment field, concretely relates to pile head major diameter crooked bar straightening instrument.
Background
At present, with the rapid development of a reinforced concrete structure, particularly during the construction of an underground concrete structure, the application of a deep foundation pit is more and more common, and the enclosure structure plays a role in temporary support and safety in the construction of the deep foundation pit. After the construction of the cast-in-situ bored pile or the underground diaphragm wall is completed, pile head concrete needs to be further broken, and next-step crown beam supporting construction is carried out. And the pile head reserved steel bars need to be straightened before the top beam steel bars are bound according to the specification and design requirements so as to better meet the stress requirement of the connecting part.
During actual construction, the alignment of pile head reinforcing steel bars directly relates to the construction efficiency and quality. The current steel bar straightening commonly adopts the mode: the steel bar is fixed by using a spanner or a steel pipe, and the straightening of the bent part of the steel bar is finished manually. This kind of crooked reinforcing bar alignment mode has that artifical physical demands consumes greatly, and the alignment can't be accomplished by human power alone to some great reinforcing bars of diameter even, consequently, accomplishes the alignment of crooked reinforcing bar through crooked reinforcing bar alignment instrument and can improve the efficiency of construction and practice thrift the cost.
SUMMERY OF THE UTILITY MODEL
The utility model provides an above-mentioned technical problem to exist among the prior art provides a pile head major diameter crooked reinforcing bar alignment instrument.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a pile head major diameter bend bar straightening tool, includes:
a jacking force rear seat;
two U-shaped steel bar fixing rings which are arranged in parallel from top to bottom; the opening sides of the two reinforcing steel bar fixing rings are fixed with the same side of the jacking force rear seat; a radian matched with the shape of the steel bar is arranged on one side of the steel bar fixing ring opposite to the jacking force rear seat;
the jack is arranged between the jacking force rear seat and the reinforcing steel bar fixing ring; the jack comprises a small oil cylinder and a controller; the bottom of the cylinder body of the oil cylinder is fixed with the jacking force rear seat; during straightening, the oil cylinder piston extends out towards the side where the reinforcing steel bar fixing ring is located; after straightening, the oil cylinder piston retracts to the original position.
Further, the jack is arranged between the two reinforcing steel bar fixing rings in the vertical direction.
Furthermore, connecting ribs are arranged on the periphery of the side wall of the cylinder body of the jack; the end part of the connecting rib is welded and fixed with the reinforcing steel bar fixing ring.
Further, the jacking force backseat is made of a high-strength steel plate having a thickness of 2 cm.
The utility model has the advantages and positive effects that:
1) the utility model discloses simple structure, the manufacturing of being convenient for can form at job site temporary welding equipment, and it is also comparatively convenient to use, can solve at the artifical unable alignment of pile head major diameter bending steel bar and the big problem of labour consumption. The steel bar fixing ring with the U-shaped structure can enable the whole tool to be more stable, and the bent steel bar has better stress points, so that the stability of the whole tool and the bent steel bar is improved;
2) the jack is arranged between the two reinforcing steel bar fixing rings in the vertical direction, so that the reinforcing steel bars are uniformly stressed during straightening;
3) the setting of splice bar can make the solid fixed ring of reinforcing bar and be connected more firmly with the jack.
4) The jacking force rear seat is made of a high-strength steel plate with the thickness of 2cm, and can meet the requirement of straightening and stressing of the reinforcing steel bar when the jack jacks in.
Description of the drawings:
fig. 1 is a front view (straightened state) of the straightening tool in the preferred embodiment of the present invention;
fig. 2 is a top view of fig. 1 (not straightened or with straightening completed).
Wherein: 1. a jacking rear seat; 2. a reinforcing steel bar fixing ring; 3. a jack; 31. an oil cylinder; 311. a cylinder piston; 312. a cylinder body of the oil cylinder; 32. a controller; 4. connecting ribs; 5. and (5) reinforcing steel bars.
Detailed Description
For further understanding of the contents, features and functions of the present invention, the following embodiments will be exemplified in conjunction with the accompanying drawings as follows:
as shown in fig. 1 to 2, the utility model discloses a pile head large diameter bending reinforcing bar straightening tool, which comprises a square-shaped jacking force rear seat 1; one side of the jacking force rear seat 1 is connected with two parallel arc-shaped reinforcing steel bar fixing rings 2 from top to bottom; the steel bar fixing ring 2 is of a U-shaped structure, and particularly, the opening end of the upper steel bar fixing ring 2 is fixed with the upper part of the jacking force rear seat 1; the open end of the lower steel bar fixing ring 2 is fixed with the lower part of the jacking force rear seat 1; a radian matched with the shape of the steel bar 5 is arranged on one side of the steel bar fixing ring 2 opposite to the jacking force rear seat 1; this structure can make whole instrument more firm to bent steel 5 has better stress point, has increased whole instrument and bent steel 5's stability.
A jack 3 is arranged between the jacking force rear seat 1 and the reinforcing steel bar fixing ring 2; preferably, the jack 3 comprises a small oil cylinder 31 and a controller 32, a control switch of the controller 32 is provided with two forward and backward gears, and an operator can control the oil cylinder piston 311 to extend and retract as required; the bottom of the cylinder body 312 is fixed with the jacking force rear seat 1; when the bent steel bar 5 is straightened, the oil cylinder piston 311 extends out towards the side of the steel bar fixing ring 2; after straightening, the cylinder piston 311 retracts to the home position. Preferably, the jack 3 is arranged between the two reinforcing steel bar fixing rings 2 in the vertical direction, so that the reinforcing steel bars 5 are stressed uniformly during straightening;
in order to strengthen the fixation of the jack 3, the periphery of the side wall of the cylinder body 31 of the jack 3 is provided with connecting ribs 4; the end part of the connecting rib 4 is welded and fixed with the reinforcing steel bar fixing ring 2.
Preferably, the jacking force rear seat 1 is made of a high-strength steel plate with the thickness of 2cm, and the straightening stress requirement of the steel bar 5 during jacking of the jack 3 can be met.
The working principle is as follows:
when the large-diameter bent steel bar 5 is straightened, the bent part of the steel bar 5 can be fixed on the inner side of the steel bar fixing ring 2 along the vertical direction, and the oil cylinder piston 311 is aligned with the bent part of the steel bar 5; then, a forward switch of the jack 3 is started, so that the oil cylinder piston 311 extends to the bending part of the jacking reinforcing steel bar 5; after the reinforcement bar 5 is aligned, the cylinder piston 311 is retracted by controlling the controller of the jack 3 and is ready for the next operation.
The utility model discloses simple structure, the manufacturing of being convenient for can form at job site temporary welding equipment, and it is also comparatively convenient to use, can solve at the artifical unable alignment of pile head major diameter bending steel bar and the big problem of labour consumption.
The embodiments of the present invention have been described in detail, but the above description is only for the preferred embodiments of the present invention, and should not be construed as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.
Claims (4)
1. The utility model provides a pile head major diameter crooked reinforcing bar alignment instrument which characterized in that: comprises that
A jacking rear seat;
two U-shaped steel bar fixing rings arranged in parallel from top to bottom; the opening sides of the two reinforcing steel bar fixing rings are fixed with the same side of the jacking force rear seat; a radian matched with the shape of the steel bar is arranged on one side of the steel bar fixing ring opposite to the jacking force rear seat;
the jack is arranged between the jacking force rear seat and the reinforcing steel bar fixing ring; the jack comprises an oil cylinder and a controller; the bottom of the cylinder body of the oil cylinder is fixed with the jacking force rear seat; during straightening, the oil cylinder piston extends out towards the side where the reinforcing steel bar fixing ring is located; after straightening, the oil cylinder piston retracts to the original position.
2. The pile head large-diameter bent steel bar straightening tool according to claim 1, characterized in that: the jack is arranged between the two reinforcing steel bar fixing rings in the vertical direction.
3. The pile head large-diameter bent steel bar straightening tool according to claim 1, characterized in that: the periphery of the side wall of the cylinder body of the jack is provided with connecting ribs; the end part of the connecting rib is welded and fixed with the reinforcing steel bar fixing ring.
4. The pile head large diameter bend rebar straightening tool of any one of claims 1 to 3, wherein: the jacking force rear seat is made of a high-strength steel plate with the thickness of 2 cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920681873.1U CN210334131U (en) | 2019-05-13 | 2019-05-13 | Pile head major diameter bending steel bar straightening tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920681873.1U CN210334131U (en) | 2019-05-13 | 2019-05-13 | Pile head major diameter bending steel bar straightening tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210334131U true CN210334131U (en) | 2020-04-17 |
Family
ID=70181963
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920681873.1U Active CN210334131U (en) | 2019-05-13 | 2019-05-13 | Pile head major diameter bending steel bar straightening tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210334131U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112412050A (en) * | 2020-11-27 | 2021-02-26 | 唐子一 | Reinforcing bar horizontal stress application deviation correcting device |
CN112431359A (en) * | 2020-11-27 | 2021-03-02 | 湖南大学 | Reinforcing steel bar horizontal stress application deviation rectifying method |
-
2019
- 2019-05-13 CN CN201920681873.1U patent/CN210334131U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112412050A (en) * | 2020-11-27 | 2021-02-26 | 唐子一 | Reinforcing bar horizontal stress application deviation correcting device |
CN112431359A (en) * | 2020-11-27 | 2021-03-02 | 湖南大学 | Reinforcing steel bar horizontal stress application deviation rectifying method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210334131U (en) | Pile head major diameter bending steel bar straightening tool | |
CN101560768B (en) | Overall process construction method for hammering pile, special device therefor and application thereof | |
CN108797573B (en) | Steel pipe pile with extending arms and construction method thereof | |
CN108797575B (en) | Extending arm type steel pipe pile and construction method thereof | |
CN104959491B (en) | The quick straightener of reinforcing bar and the method using its straightening reinforcing bar | |
CN214993789U (en) | Novel hollow pile connecting component | |
CN106703023B (en) | A kind of four wing prefabricated pile of hydraulic paddle type mill and its construction method | |
CN205369221U (en) | Precast pile with radical location connection structure | |
CN206591540U (en) | Basement bottom board cushion cap and engineering pile attachment structure | |
CN109056815A (en) | Pipe gallery construction method | |
CN201148617Y (en) | Wrapping opening-shaped pile tip | |
CN205444929U (en) | Prestressing force stretch -draw auxiliary assembly | |
CN101974902B (en) | Construction process for planting reinforcement bars into cement piles | |
CN210280482U (en) | Simple reinforcing steel bar bending device | |
RU12149U1 (en) | FOUNDATION OF BUILDING, STRUCTURES | |
CN205369227U (en) | Precast pile with snap ring connection structure | |
CN201943071U (en) | Implantable steel tube anchor rod with stabs | |
CN203547215U (en) | Telegraph pole straightener | |
CN203878575U (en) | Pile tube structure of tubular pile | |
CN109837889A (en) | A kind of electric welding connection prestressed concrete abnormal shape tubular pole | |
CN218990157U (en) | Pile driver suitable for pile core reinforced pipe pile | |
CN217812328U (en) | Construction supports formula hydraulic template | |
CN205205812U (en) | Steel pipe is connected to tubular pile | |
CN214466564U (en) | Prefabricated assembled push pipe is with back structure | |
CN204212173U (en) | Miniature pile foundation for power transmission tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |