CN210262739U - Bridge drainage pipe installation trolley system - Google Patents

Bridge drainage pipe installation trolley system Download PDF

Info

Publication number
CN210262739U
CN210262739U CN201920860257.2U CN201920860257U CN210262739U CN 210262739 U CN210262739 U CN 210262739U CN 201920860257 U CN201920860257 U CN 201920860257U CN 210262739 U CN210262739 U CN 210262739U
Authority
CN
China
Prior art keywords
hanging basket
main hanging
trolley frame
pipe installation
platform truck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920860257.2U
Other languages
Chinese (zh)
Inventor
吕玉泉
金峰
马世权
李建朋
王宁
杨洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHEC Third Highway Engineering Co Ltd
Original Assignee
CCCC SHEC Third Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHEC Third Highway Engineering Co Ltd filed Critical CCCC SHEC Third Highway Engineering Co Ltd
Priority to CN201920860257.2U priority Critical patent/CN210262739U/en
Application granted granted Critical
Publication of CN210262739U publication Critical patent/CN210262739U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge drainage pipe installation platform truck system, including main hanging flower basket and pneumatic cylinder, the pedestrian's cat ladder is installed to the top of main hanging flower basket, and the left and right sides of pedestrian's cat ladder all is provided with the cat ladder side and encloses the fender, the top of pedestrian's cat ladder is connected with the platform truck frame, and the middle part of platform truck frame is connected with horizontal spacing wheel, the rear of platform truck frame is provided with the counter weight platform, and the downside of platform truck frame installs the walking wheel, the pneumatic cylinder is installed in the inside of main hanging flower basket below, and the left of pneumatic cylinder is connected with vice hanging flower basket, the spout has all been seted up to the downside of main hanging flower basket and vice. This bridge drain pipe installation platform truck system, construction convenient operation, efficiency is higher, and vice hanging flower basket can transversely stretch out and draw back, has further expanded operating space, and compares with the drain pipe mounting means in the past, practices thrift the mechanical use cost of partial car hoist and mount, multiple safety guarantee, and the security performance is high, the guarantee of very big degree constructor's safety.

Description

Bridge drainage pipe installation trolley system
Technical Field
The utility model relates to a bridge drain pipe installation technical field specifically is a bridge drain pipe installation platform truck system.
Background
The bridge spans rivers, lakes and seas, is a traffic building which is constructed by vehicles and pedestrians smoothly passing through the water surface, enables roads, railways or sidewalks to span rivers, lakes, valleys, canyons or other roads, facilitates the passing of people and reduces the passing time of people. When the bridge is built, a drainage pipeline is required to be installed on the bridge, accumulated water on the bridge is drained through the drainage pipeline, and the accumulated water is prevented from corroding bridge members.
The traditional bridge drainage pipe installation method usually adopts a crane hanging basket as an installation platform under a bridge, but the method has some defects that the limitation of bridge elevation is large in the installation process, the installation quality of the drainage pipe is poor due to the fact that the crane hanging basket is unstable when the installation height is high, great potential safety hazards exist, and the construction efficiency is low.
Therefore, we have proposed a bridge drain pipe installation trolley system in order to solve the above-mentioned proposed problems.
Disclosure of Invention
An object of the utility model is to provide a bridge drain pipe installation platform truck system to solve among the present engineering construction that above-mentioned background art provided traditional bridge drain pipe installation method easily receive the restriction of bridge elevation in the installation, crane hanging flower basket unstability when mounting height is higher leads to the drain pipe installation quality relatively poor, has great potential safety hazard, and the problem that the efficiency of construction is low.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a bridge drainage pipe installation platform truck system, includes main hanging flower basket and pneumatic cylinder, the pedestrian's cat ladder is installed to the top of main hanging flower basket, and the left and right sides of pedestrian's cat ladder all is provided with the cat ladder side and encloses the fender, the top of pedestrian's cat ladder is connected with the platform truck frame, and the middle part of platform truck frame is connected with horizontal spacing wheel, the rear of platform truck frame is provided with the counter weight platform, and the downside of platform truck frame installs the walking wheel, the pneumatic cylinder is installed in the inside of main hanging flower basket below, and the left of pneumatic cylinder is connected with vice hanging flower basket, the spout has all been seted up to the downside of main hanging flower basket and vice hanging flower basket, and the inside of spout is provided with the slider, the backup pad is installed.
Preferably, the upper end and the lower end of the pedestrian ladder are respectively in welded connection with the trolley frame and the main hanging basket, and the upper end of the main hanging basket is fixed with the trolley frame through high-strength bolts.
Preferably, the trolley frame and the transverse limiting wheel are fixed through high-strength bolts, and the trolley frame and the transverse limiting wheel are perpendicular to each other.
Preferably, the counterweight platform and the trolley frame are of an integral structure, and the lowest point of the counterweight platform and the lowest point of the trolley frame are located on the same horizontal plane.
Preferably, the left end and the right end of the supporting plate are respectively in sliding connection with the auxiliary hanging basket and the main hanging basket, the auxiliary hanging basket and the main hanging basket are arranged in parallel, and 2 supporting plates are symmetrically arranged relative to the center line of the main hanging basket.
Compared with the prior art, the beneficial effects of the utility model are that: the bridge drainage pipe mounting trolley system has the advantages that (1) the whole bridge drainage pipe mounting trolley system is convenient to construct and operate and high in efficiency, the auxiliary hanging basket can be transversely stretched and contracted, the operation space is further expanded, and compared with the conventional drainage pipe mounting mode, part of mechanical use cost of automobile hoisting is saved, multiple safety guarantees are realized, the safety performance is high, and the safety of constructors is greatly guaranteed;
(2) be provided with the counter weight platform, the moment that constructor produced in the operation area is balanced by the counter weight platform, keeps the balance of whole device through the counter weight platform, ensures constructor's construction safety, and the walking gyro wheel of platform truck frame bottom side realizes that the platform truck system is whole steady nimble to be removed, installs and uses the guardrail as the fulcrum when the platform truck vertically walks at the horizontal spacing wheel in platform truck frame middle part, strengthens platform truck overall stability, effectively prevents that the platform truck from toppling.
Drawings
FIG. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic top view of the present invention;
FIG. 3 is a schematic view of the main basket in a bottom view;
figure 4 is the utility model discloses main hanging flower basket and slider junction side cut open structure schematic diagram.
In the figure: 1. a main hanging basket; 2. climbing a ladder by people; 3. a trolley frame; 4. a counterweight platform; 5. a traveling wheel; 6. a transverse limiting wheel; 7. the side surface of the ladder stand is surrounded with a baffle; 8. an auxiliary hanging basket; 9. a high-strength bolt; 10. a chute; 11. a slider; 12. a support plate; 13. and a hydraulic cylinder.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a bridge drainage pipe installation trolley system comprises a main hanging basket 1, a pedestrian ladder 2, a trolley frame 3, a counterweight platform 4, walking wheels 5, a transverse limiting wheel 6, a ladder side baffle 7, an auxiliary hanging basket 8, a high-strength bolt 9, a sliding groove 10, a sliding block 11, a supporting plate 12 and a hydraulic cylinder 13, wherein the pedestrian ladder 2 is installed above the main hanging basket 1, the ladder side baffle 7 is arranged on the left side and the right side of the pedestrian ladder 2, the trolley frame 3 is connected above the pedestrian ladder 2, the transverse limiting wheel 6 is connected in the middle of the trolley frame 3, the counterweight platform 4 is arranged behind the trolley frame 3, the walking wheels 5 are installed on the lower side of the trolley frame 3, the hydraulic cylinder 13 is installed inside the lower portion of the main hanging basket 1, the auxiliary hanging basket 8 is connected to the left side of the hydraulic cylinder 13, the sliding grooves 10 are formed in the lower side surfaces of the main hanging basket 1 and the auxiliary hanging basket 8, and the sliding block 11, a supporting plate 12 is arranged at the lower side of the sliding block 11, and a high-strength bolt 9 is arranged at the upper end of the pedestrian ladder 2.
In the embodiment, the upper end and the lower end of the pedestrian ladder 2 are respectively welded with the trolley frame 3 and the main hanging basket 1, the upper end of the main hanging basket 1 is fixed with the trolley frame 3 through a high-strength bolt 9, the fixing stability of the whole device can be enhanced, and workers can conveniently pass between the trolley frame 3 and the main hanging basket 1 through the pedestrian ladder 2;
the trolley frame 3 and the transverse limiting wheel 6 are fixed through the high-strength bolt 9, the trolley frame 3 and the transverse limiting wheel 6 are arranged perpendicular to each other, the trolley frame 3 can move longitudinally conveniently through the transverse limiting wheel 6, the stability of the longitudinal movement of the trolley frame 3 is guaranteed, and the trolley is effectively prevented from overturning;
the counterweight platform 4 and the trolley frame 3 are of an integral structure, the lowest point of the counterweight platform 4 and the lowest point of the trolley frame 3 are positioned on the same horizontal plane, and a counterweight is placed on the counterweight platform 4, so that the balance of the whole device can be kept;
the left end and the right end of the supporting plate 12 are respectively in sliding connection with the auxiliary hanging basket 8 and the main hanging basket 1, the auxiliary hanging basket 8 and the main hanging basket 1 are arranged in parallel, 2 supporting plates 12 are symmetrically arranged relative to the center line of the main hanging basket 1, the position of the auxiliary hanging basket 8 can be adjusted in a telescopic mode, and the operation area of workers is enlarged.
The working principle is as follows: when the bridge drainage pipe is used for installing a trolley system, firstly, a user moves the whole device into a working area, places a trolley frame 3 above a beam body according to the attached drawing 1-2, places a main hanging basket 1 and an auxiliary hanging basket 8 below the beam body, and ensures that a transverse limiting wheel 6 is attached to a guardrail body, at the moment, a walking wheel 5 with a locking function is used for locking the trolley frame 3 in the working area, the whole trolley frame 3 is designed by adopting a lever principle, and is fixed at the joint of each supporting piece through a high-strength bolt 9, so that the use safety of the device is improved, and then a balance weight which is larger than or equal to 2t is placed in a balance weight platform 4, so that when a worker works on the main hanging basket 1 and the auxiliary hanging basket 8, the balance weight platform 4 can keep the balance of the whole device; after the balance weight is finished, a worker can move to the main hanging basket 1 through the pedestrian ladder 2 and work on the working platform of the main hanging basket 1; and 2 sides of the crawling ladder that set up of people's bank of china's cat ladder enclose fender 7, can protect the staff, all install walking wheel 5 in the four corners department of 3 downside of platform truck frame, can realize the whole steady nimble removal of platform truck system, and install and can laminate with the guardrail body at the horizontal spacing wheel 6 at 3 middle parts of platform truck frame, and platform truck frame 3 can roll and remove on the guardrail body when vertically walking, strengthens the stability of whole device, prevents effectively that the platform truck from toppling.
3-4 show with the accompanying drawings, the staff can move to the vice hanging flower basket 8, if need fine adjustment installation region, can open pneumatic cylinder 13, pneumatic cylinder 13 promotes vice hanging flower basket 8 and moves to the left, and "T" shape slider 11 of backup pad 12 left and right sides installation slides in the spout 10 that vice hanging flower basket 8 and main hanging flower basket 1 downside were seted up respectively simultaneously, guarantees the stable slip of vice hanging flower basket 8, and supports vice hanging flower basket 8, through the removal of vice hanging flower basket 8, can expand staff's operating range, and the staff is convenient for install the drain pipe, just so is the working process of whole device, and the content that does not describe in detail in this specification belongs to the prior art that skilled person in the art is known.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a bridge drain pipe installation platform truck system, includes main hanging flower basket (1) and pneumatic cylinder (13), its characterized in that: a pedestrian ladder (2) is arranged above the main hanging basket (1), ladder side enclosing barriers (7) are arranged on the left side and the right side of the pedestrian ladder (2), a trolley frame (3) is connected above the pedestrian ladder (2), the middle part of the trolley frame (3) is connected with a transverse limiting wheel (6), a counterweight platform (4) is arranged behind the trolley frame (3), and the lower side of the trolley frame (3) is provided with a walking wheel (5), the hydraulic cylinder (13) is arranged in the lower part of the main hanging basket (1), an auxiliary hanging basket (8) is connected on the left side of the hydraulic cylinder (13), sliding grooves (10) are respectively arranged on the lower side surfaces of the main hanging basket (1) and the auxiliary hanging basket (8), and the inside of spout (10) is provided with slider (11), backup pad (12) are installed to the downside of slider (11), high strength bolt (9) are installed to the upper end of people's bank of china cat ladder (2).
2. A bridge drain pipe installation trolley system as claimed in claim 1, wherein: the upper end and the lower end of the pedestrian ladder (2) are respectively in welded connection with the trolley frame (3) and the main hanging basket (1), and the upper end of the main hanging basket (1) is fixed with the trolley frame (3) through high-strength bolts (9).
3. A bridge drain pipe installation trolley system as claimed in claim 1, wherein: the trolley frame (3) and the transverse limiting wheel (6) are fixed through a high-strength bolt (9), and the trolley frame (3) and the transverse limiting wheel (6) are perpendicular to each other.
4. A bridge drain pipe installation trolley system as claimed in claim 1, wherein: the balance weight platform (4) and the trolley frame (3) are of an integral structure, and the lowest point of the balance weight platform (4) and the lowest point of the trolley frame (3) are located on the same horizontal plane.
5. A bridge drain pipe installation trolley system as claimed in claim 1, wherein: the left end and the right end of the supporting plate (12) are respectively in sliding connection with the auxiliary hanging basket (8) and the main hanging basket (1), the auxiliary hanging basket (8) and the main hanging basket (1) are arranged in parallel, and the supporting plate (12) is symmetrically provided with 2 pieces of supporting plates relative to the central line of the main hanging basket (1).
CN201920860257.2U 2019-06-10 2019-06-10 Bridge drainage pipe installation trolley system Active CN210262739U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920860257.2U CN210262739U (en) 2019-06-10 2019-06-10 Bridge drainage pipe installation trolley system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920860257.2U CN210262739U (en) 2019-06-10 2019-06-10 Bridge drainage pipe installation trolley system

Publications (1)

Publication Number Publication Date
CN210262739U true CN210262739U (en) 2020-04-07

Family

ID=70041634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920860257.2U Active CN210262739U (en) 2019-06-10 2019-06-10 Bridge drainage pipe installation trolley system

Country Status (1)

Country Link
CN (1) CN210262739U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111691293A (en) * 2020-05-21 2020-09-22 株洲时代新材料科技股份有限公司 Bridge beam supports inspection device
CN112095462A (en) * 2020-08-31 2020-12-18 王世孝 But pay-off formula bridge drain pipe installation hanging flower basket
CN112900283A (en) * 2021-02-07 2021-06-04 中铁四局集团有限公司 Liftable formula construction platform suitable for beam arch integrated configuration
CN114086471A (en) * 2021-10-25 2022-02-25 中国五冶集团有限公司 Simple and easy mobile device of bridge annex installation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111691293A (en) * 2020-05-21 2020-09-22 株洲时代新材料科技股份有限公司 Bridge beam supports inspection device
CN112095462A (en) * 2020-08-31 2020-12-18 王世孝 But pay-off formula bridge drain pipe installation hanging flower basket
CN112900283A (en) * 2021-02-07 2021-06-04 中铁四局集团有限公司 Liftable formula construction platform suitable for beam arch integrated configuration
CN114086471A (en) * 2021-10-25 2022-02-25 中国五冶集团有限公司 Simple and easy mobile device of bridge annex installation

Similar Documents

Publication Publication Date Title
CN210262739U (en) Bridge drainage pipe installation trolley system
CN106012824A (en) Movable bridge anti-collision guardrail construction operation trolley
CN210886963U (en) Simple and easy integral T roof beam hogging moment construction platform
CN204626252U (en) Hanging basket device of movable assembly vehicle for bridge guardrail
CN211815642U (en) Swift support of bridge engineering bent cap construction
CN205857026U (en) A kind of movable type bridge anticollision barrier construction operation chassis
CN202090287U (en) Moving device for installing cantilever arm of steel box girder
CN211256545U (en) Hollow reinforcing steel bar bearing plate for temporary construction of road
CN210049105U (en) Self-propelled bridge formwork operation trolley
CN209039985U (en) A kind of highway bridge construction Support bracket
CN218090562U (en) Cantilever casting hanging basket with pocket bottom protection process
CN210684458U (en) Bridge auxiliary inspection device with help of bridge guardrail
CN213538695U (en) Bridge anticollision wall template trolley
CN213173413U (en) Municipal administration public works construction warning structure
CN211472166U (en) Simple movable hanging basket vehicle for highway bridge construction
CN210194435U (en) Movable trolley for transverse prestress construction of continuous beam
CN213772931U (en) Stretching-in type viaduct side construction crawling ladder
CN209053016U (en) A kind of construction equipment for extending overpass
CN203511611U (en) Vehicle lifter
CN209397481U (en) Pier cap beam mobile maintenance platform
CN207749426U (en) A kind of bridge side guardrail template construction device
CN105839533A (en) Repairing trolley for anti-collision wall
CN211646006U (en) Guardrail installation trolley
CN217710360U (en) Anticollision wall formworking jumbo counter weight fixing device
CN218580464U (en) Suspension type bridge floor drainage construction work platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant