CN210242479U - Cooling tower component and cooling tower - Google Patents

Cooling tower component and cooling tower Download PDF

Info

Publication number
CN210242479U
CN210242479U CN201921213157.7U CN201921213157U CN210242479U CN 210242479 U CN210242479 U CN 210242479U CN 201921213157 U CN201921213157 U CN 201921213157U CN 210242479 U CN210242479 U CN 210242479U
Authority
CN
China
Prior art keywords
rod
cooling tower
connecting rod
tower component
connection structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921213157.7U
Other languages
Chinese (zh)
Inventor
Ming Ma
马明
Qiang Zhang
张强
Yilong Li
李义龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Research Technology Co ltd
Shuangliang Eco Energy Systems Co Ltd
Original Assignee
Shuangliang Eco Energy Systems Co Ltd
CABR Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shuangliang Eco Energy Systems Co Ltd, CABR Technology Co Ltd filed Critical Shuangliang Eco Energy Systems Co Ltd
Priority to CN201921213157.7U priority Critical patent/CN210242479U/en
Application granted granted Critical
Publication of CN210242479U publication Critical patent/CN210242479U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model provides a cooling tower component and cooling tower. This cooling tower component includes horizontal pole (1), first down tube (2) and second down tube (3), the first end in horizontal pole (1) is connected in first down tube (2), the second end in horizontal pole (1) is connected in second down tube (3), the one end fixed connection that horizontal pole (1) were kept away from in first down tube (2) and second down tube (3) is in the same place, form triangle-shaped installation unit, be connected with first connection structure between the first end of horizontal pole (1) and first down tube (2), be connected with second connection structure between the second end of horizontal pole (1) and second down tube (3), first connection structure can and the second connection structure between realize butt joint fixed connection. According to the utility model discloses a cooling tower component, simple structure, it is convenient to connect, can reduce on-the-spot welding work load, improves installation accuracy and installation effectiveness.

Description

Cooling tower component and cooling tower
Technical Field
The utility model relates to a large-scale cooling tower technical field of power plant, concretely relates to cooling tower component and cooling tower.
Background
The cooling tower of the traditional thermal power plant is usually of a reinforced concrete structure, and the cooling tower of the structure has larger weight and obvious earthquake action. A large amount of concrete structures are adopted in the tower body, which is not in accordance with the national development concept of green and environmental protection. In recent years, with the development of air cooling technology, the cooling system of a power plant starts to adopt an indirect air cooling system with zero water resource loss, and when the indirect air cooling system works normally, the inside of a cooling tower is in a dry environment, so that corrosion prevention of a steel structure is facilitated. Compared with a reinforced concrete structure tower, the steel structure cooling tower has the advantages of environmental protection, good economy, good anti-seismic performance, high reliability, short construction period and the like, and has better application prospect. Along with the adjustment of national industrial policies, the steel structure cooling tower of green environmental protection is gradually used in each power plant.
At present, steel structure air cooling towers which are finished in China mostly adopt angle steel lattice type components, joint joints adopt a large number of gusset plates, the gusset plates are connected through welding, and the field welding workload is very large. When the plate is installed in the air, the positioning difficulty of the plate is high.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a cooling tower component and cooling tower, simple structure, it is convenient to connect, can reduce on-the-spot welding work load, improves installation accuracy and installation effectiveness.
For solving the technical problem, as an aspect of the utility model provides a cooling tower component, including horizontal pole, first down tube and second down tube, first one end at the horizontal pole is connected to first down tube, and the second end at the horizontal pole is connected to the second down tube, and the one end fixed connection that the horizontal pole was kept away from to first down tube and second down tube forms triangle-shaped installation unit together, is connected with first connection structure between the first end of horizontal pole and the first down tube, is connected with second connection structure between the second end of horizontal pole and the second down tube, first connection structure can with realize butt joint fixed connection between the second connection structure.
Preferably, the first connecting structure comprises an upper connecting rod and a mechanical connecting rod, the upper connecting rod is connected between the first end of the cross rod and the first inclined rod, the mechanical connecting rod is arranged at the outer end of the upper connecting rod, the connecting end of the mechanical connecting rod is provided with a connecting plate, and the connecting plate is provided with a bolt connecting hole; the second connecting structure comprises a mechanical connecting rod, the mechanical connecting rod is connected to the second end of the cross rod and the second inclined rod, and a connecting plate is arranged at the connecting end of the mechanical connecting rod and the second inclined rod.
Preferably, the upper connecting rod forms a rectangular frame, and the upper connecting rod, the cross rod, the first inclined rod and the mechanical connecting rod are welded and fixed together through the welding hollow balls; the mechanical connecting rod and the cross rod are welded and fixed together through the welding hollow ball.
Preferably, an installation auxiliary rod is connected between the cross rod and the first inclined rod; and/or an installation auxiliary rod is connected between the cross rod and the second inclined rod.
Preferably, the first diagonal rod and the second diagonal rod are fixedly connected through a lower connecting rod.
Preferably, the cross bar, the first diagonal bar and the second diagonal bar are all made of steel pipes to form a lattice member.
Preferably, the cross-section of the cross-bar, the first diagonal bar and the second diagonal bar is rectangular or trapezoidal.
Preferably, the diameter of the hollow welding ball between the upper connecting rod and the mechanical connecting rod is larger than that of the hollow welding ball between the mechanical connecting rod and the cross rod.
According to another aspect of the present application, there is provided a cooling tower comprising the above-described cooling tower member, a plurality of the cooling tower members being combined with each other to form an annular cooling tower.
Preferably, the first connecting structure of the cooling tower component is fixedly connected with the second connecting structure of the adjacent cooling tower component through bolts, the second connecting structure of the cooling tower component is fixedly connected with the first connecting structure of the adjacent cooling tower component through bolts, and the bottom of the cooling tower component is welded and fixed with the cooling tower component below.
Compared with the prior art, the technical scheme of the application has the following advantages:
compare with traditional angle steel lattice formula cooling tower, the steel pipe lattice formula cooling tower that this application adopted has adopted steel tubular construction, adopts the welding clean shot to carry out being connected between the steel pipe, has reduced the connected node board in node district, has reduced the steel volume. The steel pipe lattice type cooling tower assembly type assembly connection technology adopts an assembly method to ensure the installation requirements of ground assembly and space hoisting, and the connection method of bolt connection and welding combination adopted by the steel pipe lattice type cooling tower assembly type assembly connection technology improves the installation precision and the construction speed and ensures the structure installation precision.
Drawings
Fig. 1 is a schematic perspective view of a cooling tower according to an embodiment of the present invention;
FIG. 2 is a perspective view of a diagonal member of a cooling tower according to an embodiment of the present invention;
FIG. 3 is a first structural schematic diagram of a cross-section of a rod member of a cooling tower structure according to an embodiment of the present invention;
FIG. 4 is a second structural schematic diagram of a cross-section of a rod member of a cooling tower structure according to an embodiment of the present invention;
FIG. 5 is a schematic structural view of a cooling tower component according to an embodiment of the present invention;
fig. 6 is a schematic diagram of a splicing node structure of a cooling tower member according to an embodiment of the present invention.
Reference numbers in the figures: 1. a cross bar; 2. a first diagonal member; 3. a second diagonal member; 4. an upper connecting rod; 5. a mechanical connecting rod; 6. a connecting plate; 7. a lower connecting rod; 8. welding the hollow spheres; 9. installing an auxiliary rod; 10. a cooling tower member; 11. a lower layer field connecting rod; 12. a node field connecting rod; 13. and (4) bolts.
Detailed Description
The embodiments of the invention are described in detail below, but the invention can be implemented in many different ways, which are defined and covered by the claims.
Please refer to fig. 1 to 6, according to an embodiment of the present invention, the cooling tower component includes a cross rod 1, a first slanting rod 2 and a second slanting rod 3, the first slanting rod 2 is connected to a first end of the cross rod 1, the second slanting rod 3 is connected to a second end of the cross rod 1, one ends of the first slanting rod 2 and the second slanting rod 3, which are far away from the cross rod 1, are fixedly connected together to form a triangle-shaped installation unit, a first connection structure is connected between the first end of the cross rod 1 and the first slanting rod 2, a second connection structure is connected between the second end of the cross rod 1 and the second slanting rod 3, and the first connection structure and the second connection structure can be connected in a butt joint manner.
The utility model provides a cooling tower component, both ends at horizontal pole 1 are formed with first connection structure and second connection structure respectively, and can realize butt joint fixed connection between first connection structure and the second connection structure, consequently can make up each other and form the cooling tower between a plurality of cooling tower components, packaging structure is simple, can accomplish the production and processing of cooling tower component on ground, then be in the same place cooling tower component erection joint at the scene, thereby realize partial welding, the connected mode that partial mechanical connection combined together, on-the-spot welding work load can be reduced, improve the installation accuracy of cooling tower component, accelerate the construction speed, reduce the construction degree of difficulty, reduce engineering cost.
The first connecting structure comprises an upper connecting rod 4 and a mechanical connecting rod 5, the upper connecting rod 4 is connected between the first end of the cross rod 1 and the first inclined rod 2, the mechanical connecting rod 5 is arranged at the outer end of the upper connecting rod 4, a connecting plate 6 is arranged at the connecting end of the mechanical connecting rod 5, and a bolt connecting hole is formed in the connecting plate 6; the second connection structure comprises a mechanical connection rod 5, the mechanical connection rod 5 is connected to the second end of the cross rod 1 and the second inclined rod 3, and a connection plate 6 is arranged at the connection end of the mechanical connection rod 5 and the second inclined rod 3. This connecting plate 6 can make things convenient for the concatenation location between the cooling jacket component, improves the installation accuracy, reduces the installation degree of difficulty, conveniently sets up bolted connection hole simultaneously on connecting plate 6 to be convenient for realize the bolted connection between the cooling tower component, connection structure is simple and convenient, can effectively improve the construction speed.
The upper connecting rod 4 forms a rectangular frame, and the upper connecting rod 4, the cross rod 1, the first inclined rod 2 and the mechanical connecting rod 5 are welded and fixed together through a welding hollow ball 8; the mechanical connecting rod 5 and the cross rod 1 are welded and fixed together through a welding hollow ball 8. Adopt welding hollow ball 8 to weld, can conveniently lead to a plurality of rod structure welding and same node position not real with a plurality of rod structure welding when having avoided a plurality of rod structure welding and same node position simultaneously easily, the relatively poor problem of welding quality has guaranteed the connection reliability between a plurality of rod structure effectively through welding hollow ball 8. In this embodiment, the upper connecting rod 4 and the cross rod 1, the first diagonal rod 2 and the mechanical connecting rod 5 meet at the center of the welded hollow sphere 8.
The stiffening plate can be additionally arranged on the welding hollow ball, or the stiffening plate is not arranged on the welding hollow ball, and the welding hollow ball can be selected according to actual needs.
The rectangle frame that upper portion connecting rod 4 formed can also add extra upper portion connecting rod 4 on the diagonal to further strengthen the joint strength between upper portion connecting rod 4, improve connection structure's steadiness and reliability.
An installation auxiliary rod 9 is connected between the cross rod 1 and the first inclined rod 2; and/or an auxiliary mounting rod 9 is connected between the cross rod 1 and the second inclined rod 3. Through add installation auxiliary rod 9 between horizontal pole 1 and first down tube 2 or horizontal pole 1 and second down tube 3, can utilize installation auxiliary rod 9 to improve the steadiness of the connection structure between horizontal pole 1 and the down tube to keep the hoist and mount stability of cooling tower component, effectively strengthen the structural strength of cooling tower component.
The first diagonal rod 2 and the second diagonal rod 3 are fixedly connected through a lower connecting rod 7. In this embodiment, the lower connecting rod 7 fixedly connects the first diagonal rod 2 and the second diagonal rod 3 together by welding, so that a stable triangular mounting unit can be formed among the cross rod 1, the first diagonal rod 2 and the second diagonal rod 3, and the structural stability and reliability of the cooling tower component are ensured.
The cross rod 1, the first inclined rod 2 and the second inclined rod 3 are all made of steel pipes to form a lattice type component. This application divides the limb as component batten strip and component with the circular steel tube, and every cooling tower component all adopts steel pipe lattice formula component, and batten strip and branch limb adopt to pass through welded connecing mutually and connect to reduced the gusset quantity of current angle steel lattice component in the node area, reduced welding work volume, reduced the assembly degree of difficulty, improved assembly efficiency.
The cross section of the cross bar 1, the first inclined bar 2 and the second inclined bar 3 is rectangular or trapezoidal.
And the diameter of the welding hollow ball 8 between the upper connecting rod 4 and the mechanical connecting rod 5 is larger than that of the welding hollow ball 8 between the mechanical connecting rod 5 and the cross rod 1. The purpose of design so lies in, when combining the cooling tower component together, because the characteristic of down tube structure, the protrusion height of the body of rod in the first down tube 2 and the 3 outside of second down tube is the protrusion height that is less than its inboard body of rod, consequently when welding the cooling tower component with below and fix, when the outside body of rod contacted with the welding clean ball 8 of below cooling tower component, because the protrusion length of the inboard body of rod is less, therefore the inboard body of rod can't fully contact with welding clean ball 8, can lead to the inboard body of rod can't fully weld with welding clean ball 8. The diameter of two welded hollow spheres 8 corresponding to the inner side rod body is designed to be larger than the diameter of other welded hollow spheres 8, so that the inner side rod body and the outer side rod body below the cooling tower component can be fully contacted with the corresponding welded hollow spheres 8, and the welding quality between the cooling tower component and the cooling tower component below the cooling tower component is ensured.
According to the embodiment of the application, the cooling tower comprises the cooling tower component 10, and a plurality of cooling tower components 10 are combined with one another to form the annular cooling tower.
The cooling tower of this application is rotational symmetry's cylinder casing, and the down tube of steel pipe lattice formula component arranges along steel construction cooling tower outer wall slant, and the horizontal pole 1 of steel pipe lattice formula component arranges along the cooling tower hoop. The cross sections of the inclined rod and the cross rod are rectangular or isosceles trapezoid, and the inner surface and the outer surface of the rod piece are parallel.
The first connecting structure of the cooling tower component 10 is fixedly connected with the second connecting structure of the adjacent cooling tower component 10 by bolts, the second connecting structure of the cooling tower component 10 is fixedly connected with the first connecting structure of the adjacent cooling tower component 10 by bolts, and the bottom of the cooling tower component 10 is welded and fixed with the cooling tower component 10 below.
When the structure is installed, 2 inclined rods and 1 transverse rod are taken as an assembly unit, namely the cooling tower component. The inclined rod and the cross rod 1 are connected with the upper connecting rod 4 into a whole through a welded hollow ball joint, the inclined rod and the inclined rod are connected into a whole through the lower connecting rod 7 to form an assembly unit, and the assembly unit can be used for hoisting a cooling tower.
The adjacent assembly units are firstly connected with the mechanical connecting rod 5 through the bolt 13 to play a positioning role, then the inclined rod of the upper assembly unit is connected with the cross rod of the lower assembly unit through welding, and finally the lower on-site connecting rod 11 is welded. Between the assembly units of the same height, after the adjacent mechanical connection rods 5 are in butt connection, the node field connection rod 12 may be welded between the welded hollow spheres belonging to different assembly units, thereby further enhancing the connection strength between the adjacent assembly units. Through partial mechanical connection and partial welding, the unit installation precision can be improved, the field welding workload is reduced, and the labor intensity of operators in the installation process is reduced.
Compared with the traditional angle steel lattice type cooling tower, the steel tube lattice type cooling tower adopts a steel tube structure with large domestic use amount, the steel tubes are connected by adopting the welded hollow spheres, and the joint plates in the joint areas are connected, so that the steel consumption is reduced. The steel tube lattice type cooling tower assembly type assembly connection technology adopts an assembly method to ensure the installation requirements of ground assembly and space hoisting, and the connection method of bolt connection and welding combination adopted by the steel tube lattice type cooling tower assembly type assembly connection technology improves the installation precision and the construction speed and ensures the structure installation precision.
When the cooling tower is assembled, firstly, structures required for assembling cooling tower components, such as the cross rod 1, the first inclined rod 2, the second inclined rod 3 and the like, are machined on the ground according to a design scheme, then the machined structures are assembled into the cooling tower components, and the cooling tower components are assembled and welded into an assembly unit.
Then hoisting the assembly unit on the construction site, positioning the assembly unit through the mechanical connecting rod 5, positioning and fixing the assembly unit through the mechanical connecting rod 5 by using a high-strength bolt, welding the diagonal rod limbs and the welding hollow spheres 8 of the lower-layer assembly unit into a whole, finally welding the lower-layer on-site connecting rod 11 and the node on-site connecting rod 12, and repeating the processes until all the assemblies are completely installed.
In the installation process, the cooling tower components are all processed in a factory, the assembly units are assembled on the ground of a construction site, and when the assembly units are hoisted, the mode of mechanical connection positioning and partial welding installation is adopted, so that the construction and installation speed is increased, the installation precision is ensured, a large amount of manpower and material resources are saved, and better social benefits and economic benefits can be obtained.
The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes will occur to those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1.一种冷却塔构件,其特征在于,包括横杆(1)、第一斜杆(2)和第二斜杆(3),所述第一斜杆(2)连接在所述横杆(1)的第一端,所述第二斜杆(3)连接在所述横杆(1)的第二端,所述第一斜杆(2)和所述第二斜杆(3)远离所述横杆(1)的一端固定连接在一起,形成三角形安装单元,所述横杆(1)的第一端与所述第一斜杆(2)之间连接有第一连接结构,所述横杆(1)的第二端与所述第二斜杆(3)之间连接有第二连接结构,所述第一连接结构能够与所述第二连接结构之间实现对接固定连接。1. A cooling tower component, characterized in that it comprises a cross bar (1), a first inclined bar (2) and a second inclined bar (3), and the first inclined bar (2) is connected to the cross bar The first end of (1), the second inclined rod (3) is connected to the second end of the transverse rod (1), the first inclined rod (2) and the second inclined rod (3) One ends away from the cross bar (1) are fixedly connected together to form a triangular mounting unit, and a first connection structure is connected between the first end of the cross bar (1) and the first inclined bar (2), A second connection structure is connected between the second end of the cross bar (1) and the second inclined bar (3), and the first connection structure can realize a butt fixed connection with the second connection structure . 2.根据权利要求1所述的冷却塔构件,其特征在于,所述第一连接结构包括上部连接杆(4)和机械连接杆(5),所述上部连接杆(4)连接在所述横杆(1)的第一端和所述第一斜杆(2)之间,所述机械连接杆(5)设置在所述上部连接杆(4)的外端,所述机械连接杆(5)的连接端设置有连接板(6),所述连接板(6)上设置有螺栓连接孔;所述第二连接结构包括机械连接杆(5),所述机械连接杆(5)连接在所述横杆(1)的第二端和所述第二斜杆(3)上,所述机械连接杆(5)和所述第二斜杆(3)的连接端设置有连接板(6)。2. The cooling tower component according to claim 1, wherein the first connecting structure comprises an upper connecting rod (4) and a mechanical connecting rod (5), and the upper connecting rod (4) is connected to the Between the first end of the cross bar (1) and the first inclined bar (2), the mechanical connecting rod (5) is arranged at the outer end of the upper connecting rod (4), and the mechanical connecting rod ( 5) The connecting end is provided with a connecting plate (6), and the connecting plate (6) is provided with a bolt connection hole; the second connecting structure includes a mechanical connecting rod (5), and the mechanical connecting rod (5) is connected On the second end of the transverse rod (1) and the second inclined rod (3), a connecting plate ( 6). 3.根据权利要求2所述的冷却塔构件,其特征在于,所述上部连接杆(4)形成矩形框,所述上部连接杆(4)和所述横杆(1)、所述第一斜杆(2)以及所述机械连接杆(5)之间均通过焊接空心球(8)焊接固定在一起;所述机械连接杆(5)和所述横杆(1)之间通过焊接空心球(8)焊接固定在一起。3. The cooling tower component according to claim 2, characterized in that, the upper connecting rod (4) forms a rectangular frame, the upper connecting rod (4) and the transverse rod (1), the first The oblique rod (2) and the mechanical connecting rod (5) are welded and fixed together by welding hollow balls (8); the mechanical connecting rod (5) and the transverse rod (1) are welded together by hollow welding The balls (8) are welded together. 4.根据权利要求1所述的冷却塔构件,其特征在于,所述横杆(1)和所述第一斜杆(2)之间连接有安装辅助杆(9);和/或,所述横杆(1)和所述第二斜杆(3)之间连接有安装辅助杆(9)。4. The cooling tower component according to claim 1, wherein an auxiliary installation rod (9) is connected between the transverse rod (1) and the first inclined rod (2); and/or, the An auxiliary installation rod (9) is connected between the transverse rod (1) and the second inclined rod (3). 5.根据权利要求1所述的冷却塔构件,其特征在于,所述第一斜杆(2)和所述第二斜杆(3)之间通过下部连接杆(7)固定连接。5. The cooling tower component according to claim 1, wherein the first inclined rod (2) and the second inclined rod (3) are fixedly connected by a lower connecting rod (7). 6.根据权利要求1所述的冷却塔构件,其特征在于,所述横杆(1)、所述第一斜杆(2)和所述第二斜杆(3)均采用钢管形成格构式构件。6. The cooling tower component according to claim 1, characterized in that, the transverse rod (1), the first inclined rod (2) and the second inclined rod (3) are all made of steel pipes to form a lattice formula component. 7.根据权利要求6所述的冷却塔构件,其特征在于,所述横杆(1)、所述第一斜杆(2)和所述第二斜杆(3)的截面为矩形或梯形。7. The cooling tower component according to claim 6, characterized in that the cross-sections of the transverse rod (1), the first inclined rod (2) and the second inclined rod (3) are rectangular or trapezoidal . 8.根据权利要求3所述的冷却塔构件,其特征在于,位于所述上部连接杆(4)和所述机械连接杆(5)之间的所述焊接空心球(8),其直径大于位于所述机械连接杆(5)与所述横杆(1)之间的所述焊接空心球(8)的直径。8. The cooling tower component according to claim 3, wherein the welded hollow sphere (8) located between the upper connecting rod (4) and the mechanical connecting rod (5) has a diameter greater than The diameter of the welded hollow sphere (8) between the mechanical connecting rod (5) and the cross rod (1). 9.一种冷却塔,其特征在于,包括权利要求1至8中任一项所述的冷却塔构件(10),多个所述冷却塔构件(10)相互组合,形成环形的所述冷却塔。9. A cooling tower, characterized in that it comprises the cooling tower component (10) according to any one of claims 1 to 8, and a plurality of the cooling tower components (10) are combined with each other to form an annular cooling tower tower. 10.根据权利要求9所述的冷却塔,其特征在于,所述冷却塔构件(10)的第一连接结构与相邻的所述冷却塔构件(10)的第二连接结构螺栓固定连接,所述冷却塔构件(10)的第二连接结构与相邻的所述冷却塔构件(10)的第一连接结构螺栓固定连接,所述冷却塔构件(10)的底部与下方的所述冷却塔构件(10)焊接固定。10. The cooling tower according to claim 9, characterized in that the first connection structure of the cooling tower component (10) is fixedly connected with the second connection structure of the adjacent cooling tower component (10) by bolts, The second connection structure of the cooling tower component (10) is bolted to the first connection structure of the adjacent cooling tower component (10), and the bottom of the cooling tower component (10) is connected to the cooling tower component (10) below. The tower member (10) is welded and fixed.
CN201921213157.7U 2019-07-30 2019-07-30 Cooling tower component and cooling tower Active CN210242479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921213157.7U CN210242479U (en) 2019-07-30 2019-07-30 Cooling tower component and cooling tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921213157.7U CN210242479U (en) 2019-07-30 2019-07-30 Cooling tower component and cooling tower

Publications (1)

Publication Number Publication Date
CN210242479U true CN210242479U (en) 2020-04-03

Family

ID=69993313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921213157.7U Active CN210242479U (en) 2019-07-30 2019-07-30 Cooling tower component and cooling tower

Country Status (1)

Country Link
CN (1) CN210242479U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282442A (en) * 2020-11-12 2021-01-29 华电重工股份有限公司 Cooling Tower

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282442A (en) * 2020-11-12 2021-01-29 华电重工股份有限公司 Cooling Tower
CN112282442B (en) * 2020-11-12 2024-09-24 华电重工股份有限公司 Cooling tower

Similar Documents

Publication Publication Date Title
CN105064739B (en) A kind of hyperbola Double-level Reticulated Shell steel structure cooling tower
CN103590488B (en) Bolts assemblies double-layer aluminium alloy latticed shell structure
CN104847015A (en) Assembled joint applicable to monolayer triangular space grid structure
CN109339250A (en) Node-reinforced concrete-filled steel tubular connection structure and its construction method
CN110439018A (en) A kind of new plug-in steel cylinder wind power foundation
CN111877557A (en) Basalt fiber bionic honeycomb plate single-layer aluminum alloy combined latticed shell and construction method thereof
CN205531511U (en) Hyperbola appearance lattice frame adds bracing steel construction cooling tower
CN108331164A (en) A kind of attachment device and installation method of Steel Truss Beam and lattice type steel column node
CN110388119A (en) A modular assembled steel structure grid tower
CN205822858U (en) A kind of assembling type steel structure cooling tower being made up of six bar tetrahedron elements
CN116201232B (en) Prefabricated tiered energy dissipation combination nodes and their installation methods
CN107620500B (en) H-C type assembled node applied to single-layer steel structure cooling tower
CN208329155U (en) A kind of assembled hollow hub node applied to grid shell
CN205025156U (en) Hyperbola double layer reticulated shell steel construction cooling tower
CN111894133B (en) An assembled steel, bamboo and wood single-layer spherical shell structure system
CN207228330U (en) A kind of prefabricated assembled frame combined using steel core concrete column and girder steel
CN201437613U (en) Steel beam integral feed-through type concrete-filled tubular column and steel beam connecting node
CN107620501B (en) A prefabricated node applied to double-layer steel structure cooling tower
CN104153630A (en) Transition connection method of hybrid wind power towers
CN111287503A (en) A modular building structural unit and building
CN113123609B (en) Method for mounting steel structure dome net rack with two low ends and high middle
CN115523098A (en) Fan foundation structure
CN110258770B (en) A fully assembled house structure system
CN205476662U (en) Four tubs of lattice bevel net steel construction cooling towers of hyperbola
CN223256212U (en) A rectangular tube single-layer lattice shell structure with mixed connection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 100013 Beijing, North Third Ring Road, No. 30 East Road, Chaoyang District

Patentee after: China Construction Research Technology Co.,Ltd.

Country or region after: China

Patentee after: Shuangliang Eco-Energy Systems Co.,Ltd.

Address before: 100013 Beijing, North Third Ring Road, No. 30 East Road, Chaoyang District

Patentee before: CABR TECHNOLOGY Co.,Ltd.

Country or region before: China

Patentee before: Shuangliang Eco-Energy Systems Co.,Ltd.

CP03 Change of name, title or address