CN210222596U - High-voltage two-way hanging bridge for substation at lower part of mining area - Google Patents

High-voltage two-way hanging bridge for substation at lower part of mining area Download PDF

Info

Publication number
CN210222596U
CN210222596U CN201921396434.2U CN201921396434U CN210222596U CN 210222596 U CN210222596 U CN 210222596U CN 201921396434 U CN201921396434 U CN 201921396434U CN 210222596 U CN210222596 U CN 210222596U
Authority
CN
China
Prior art keywords
hanging
hook
bridge
mining area
substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921396434.2U
Other languages
Chinese (zh)
Inventor
Xiaojun Liu
刘晓军
Yuanqing Li
李元清
Baogang Wang
王宝刚
Haigang Li
李海港
Yu Bai
白玉
Lizeng Sun
孙立增
Yabin Chen
陈亚彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longkou Mining Group Co Ltd
Original Assignee
Longkou Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longkou Mining Group Co Ltd filed Critical Longkou Mining Group Co Ltd
Priority to CN201921396434.2U priority Critical patent/CN210222596U/en
Application granted granted Critical
Publication of CN210222596U publication Critical patent/CN210222596U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Hooks, Suction Cups, And Attachment By Adhesive Means (AREA)

Abstract

The utility model discloses a high-pressure two-way hanging bridge of a mining area lower part substation in the technical field of construction equipment, which comprises a cross beam and two hanging hooks, wherein the insides of the two ends of the cross beam are respectively provided with a mounting hole, the two hanging hooks are welded and fixed on the bottom of the cross beam, the front side wall of each hanging hook is welded and fixed with a connecting hook, the inside of each hanging hook is provided with a through hole, the hook head position of each hanging hook is wound with a connecting rope, the other end of the connecting rope penetrates through the through hole, and the connecting rope is connected with the connecting hook; this setting of bridge is hung to two logical high pressure of mining area lower part electric substation, structural design is reasonable, and the cooperation of the device crossbeam, hanging hook and connection rope can use between two crane span structure supports or lane group fixed point, for two connection horn mouths of two logical terminal boxes of high pressure provide the point of hanging, guarantee the stability that horn mouth hung.

Description

High-voltage two-way hanging bridge for substation at lower part of mining area
Technical Field
The utility model relates to a construction equipment technical field specifically is a bridge is hung to high pressure two-way of mining area lower part electric substation.
Background
The loads of a main transport 2# adhesive tape machine head, a 1308 working surface and the like of the underground power supply chamber are fed out by a high-voltage two-way junction box at the position, part of high-voltage two-way junction boxes are connected due to improper length of a feeding line of the high-voltage two-way junction box, and a substation is wrapped by a flame-retardant endurance plate due to early decoration transformation. The existing hanging bridge has a serious problem that the connecting horn mouth cannot be effectively hung when the hanging bridge is used, so that the hanging stability of the horn mouth can be influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bridge is hung to high pressure two-way of mining area lower part electric substation to the bridge of hanging that proposes in solving above-mentioned background art can not effectual butt joint line horn mouth hang when using, thereby can influence the problem of the stability that horn mouth hung.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a bridge is hung to two logical high pressure of mining area lower part electric substation, includes crossbeam and two and hangs the couple, the inside at the both ends of crossbeam is opened respectively has a mounting hole, two it welded fastening to hang the couple the bottom of crossbeam, it has the coupling hook to hang the preceding lateral wall welded fastening of couple, it has the through-hole to open the inside of hanging the couple, the gib head position of hanging the couple has the connection rope, the other end of connecting the rope runs through the through-hole to connect the rope with the coupling hook is connected.
Preferably, the two hanging hooks are symmetrically distributed along the central axis of the cross beam.
Preferably, the outer side wall of the connecting hook and the hook head of the hanging hook are both provided with annular concave grooves.
Preferably, the bottom of the cross beam is provided with a screw hole, the top of the hanging hook is integrally formed with a stud, and the stud is connected with the screw hole at the bottom of the cross beam through threads.
Compared with the prior art, the beneficial effects of the utility model are that: this setting of bridge is hung to two logical high pressure of mining area lower part electric substation, structural design is reasonable, and the cooperation of the device crossbeam, hanging hook and connection rope can use between two crane span structure supports or lane group fixed point, for two connection horn mouths of two logical terminal boxes of high pressure provide the point of hanging, guarantee the stability that horn mouth hung.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a right side schematic view of the present invention.
In the figure: the beam 100, the mounting hole 110, the hanging hook 200, the connecting hook 210, the through hole 220, the stud 230 and the connecting rope 240.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a bridge is hung to two logical high pressure of mining area lower part electric substation for two connection horn mouths for two logical terminal boxes of high pressure provide the point of hanging, please refer to fig. 1-2, including crossbeam 100 and two couple 200 that hang.
Referring to fig. 1 again, the inner parts of the two ends of the beam 100 are respectively provided with a mounting hole 110, the beam 100 is used for providing a supporting point, and the mounting hole 110 is used for connecting the beam 100 with the bridge support and the roadway side.
Referring to fig. 1-2 again, two hanging hooks 200 are welded and fixed at the bottom of the beam 100, a connecting hook 210 is welded and fixed on the front side wall of the hanging hook 200, a through hole 220 is opened inside the hanging hook 200, a connecting rope 240 is wound at the hook head position of the hanging hook 200, the other end of the connecting rope 240 penetrates through the through hole 220, the connecting rope 240 is connected with the connecting hook 210, the hanging hook 200 is used for hanging a horn mouth, and the connecting rope 240 is used for improving the installation firmness of the horn mouth.
Referring to fig. 1 again, in order to improve the installation stability of the connection bell-mouth, two hanging hooks 200 are symmetrically distributed along the central axis of the beam 100.
Referring to fig. 2, for the stability of the connection, the outer side wall of the connection hook 210 and the hook head of the hook 200 are formed with annular concave grooves for preventing the connection rope 240 from being separated from the connection hook 210 and the hook 200.
Referring to fig. 2, in order to improve the connection strength between the hanger 200 and the beam 100, the bottom of the beam 100 is provided with a screw hole, the top of the hanger 200 is integrally formed with a stud 230, the stud 230 is connected with the screw hole at the bottom of the beam 100 through a thread, and the stud 230 is used for connecting the beam 100 and the hanger 200 and then is welded and fixed.
The working principle is as follows: the beam 100 and the hanging hook 200 are welded by using anchor rods or other materials as supporting materials, the beam 100 is placed between two bridge support or roadway side fixing points, the beam 100 is connected with a bridge or roadway side by using bolts or bolts, the hanging hook 200 is used for hanging two wiring horn mouths of a high-voltage two-way junction box, then the high-voltage two-way junction box is hung on a wall, the maintenance is convenient, one end of a connecting rope 240 penetrates through a through hole 220 and winds outside the connecting hook 210, and the mounting stability of the wiring horn mouths is improved.
While the invention has been described above with reference to an embodiment, various modifications may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention. In particular, as long as there is no structural conflict, the various features of the disclosed embodiments of the present invention can be used in any combination with each other, and the description of such combinations is not exhaustive in the present specification only for the sake of brevity and resource conservation. Therefore, it is intended that the invention not be limited to the particular embodiments disclosed, but that the invention will include all embodiments falling within the scope of the appended claims.

Claims (4)

1. The utility model provides a bridge is hung to two logical high pressure of mining area lower part electric substation which characterized in that: including crossbeam (100) and two couple (200) of hanging, the inside at the both ends of crossbeam (100) is opened respectively has a mounting hole (110), two hang couple (200) welded fastening in the bottom of crossbeam (100), the preceding lateral wall welded fastening of hanging couple (200) has coupling hook (210), open the inside of hanging couple (200) has through-hole (220), the gib head position wiring of hanging couple (200) has connection rope (240), the other end of connecting rope (240) runs through-hole (220) to connect rope (240) with coupling hook (210) are connected.
2. The high-voltage two-way hanging bridge for the substation at the lower part of the mining area according to claim 1 is characterized in that: the two hanging hooks (200) are symmetrically distributed along the central axis of the cross beam (100).
3. The high-voltage two-way hanging bridge for the substation at the lower part of the mining area according to claim 1 is characterized in that: annular concave grooves are formed in the outer side wall of the connecting hook (210) and the hook head of the hanging hook (200).
4. The high-voltage two-way hanging bridge for the substation at the lower part of the mining area according to claim 1 is characterized in that: the bottom of the cross beam (100) is provided with a screw hole, the top of the hanging hook (200) is integrally formed with a stud (230), and the stud (230) is connected with the screw hole at the bottom of the cross beam (100) through threads.
CN201921396434.2U 2019-08-27 2019-08-27 High-voltage two-way hanging bridge for substation at lower part of mining area Expired - Fee Related CN210222596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921396434.2U CN210222596U (en) 2019-08-27 2019-08-27 High-voltage two-way hanging bridge for substation at lower part of mining area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921396434.2U CN210222596U (en) 2019-08-27 2019-08-27 High-voltage two-way hanging bridge for substation at lower part of mining area

Publications (1)

Publication Number Publication Date
CN210222596U true CN210222596U (en) 2020-03-31

Family

ID=69920093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921396434.2U Expired - Fee Related CN210222596U (en) 2019-08-27 2019-08-27 High-voltage two-way hanging bridge for substation at lower part of mining area

Country Status (1)

Country Link
CN (1) CN210222596U (en)

Similar Documents

Publication Publication Date Title
CN205476394U (en) A pull -up formula I -steel cantilever beam structure for coiling detain scaffold
CN105226568A (en) Power transmission line composite insulator overhauling support and operating method thereof
CN210222596U (en) High-voltage two-way hanging bridge for substation at lower part of mining area
CN105126272A (en) Safety belt suspension device
CN205029274U (en) Fixed bolster that faces cable
CN207687489U (en) A kind of cantilever bracket
CN211372293U (en) Lamp elevator for steel structure
CN205399783U (en) Mineral wool board ceiling hanging strengthens device in middle part
CN203475318U (en) Cable-clamp-free hanging appliance used for anchoring stay cable at tower end in cable bent tower steel anchor beam area
CN207052957U (en) A kind of power distribution cabinet of convenient lifting
CN204030460U (en) A kind of supporter for LWD transmission line and stringing system
CN218375131U (en) Hanging basket hanging and fixing support with large cantilever structure
CN212166351U (en) A safety belt fixing structure for transformer
CN210041240U (en) Combined bus duct hanger
CN223471973U (en) Binding bridge cable hook
CN209540194U (en) A kind of fixed hanger of hanging spool
CN208608673U (en) A kind of pipelining device
CN207200195U (en) A kind of terminal box base and its terminal box
CN207878917U (en) A kind of construction scaffold
CN205141588U (en) Three -way lodge support
CN218216484U (en) Hot-dip galvanized sheet cable testing bridge with anticorrosive function
CN212659933U (en) Insulating fill cable linkage
CN205361761U (en) Anchor chain mounted frame
CN205960520U (en) First fixing tool of live working bowl
CN219974567U (en) Cable hanging bracket for roof of coal mine tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200331