CN210084813U - Auxiliary laying device for monorail crane track - Google Patents
Auxiliary laying device for monorail crane track Download PDFInfo
- Publication number
- CN210084813U CN210084813U CN201920893856.4U CN201920893856U CN210084813U CN 210084813 U CN210084813 U CN 210084813U CN 201920893856 U CN201920893856 U CN 201920893856U CN 210084813 U CN210084813 U CN 210084813U
- Authority
- CN
- China
- Prior art keywords
- monorail
- fixed pulley
- laying device
- telescopic rod
- track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
本实用新型公开了一种单轨吊轨道辅助铺设装置,包括:移动支架,所述移动支架包括支架本体以及分别设置在所述支架本体上部和下部的支撑面板和移动单元,所述支撑面板用于支撑单轨吊轨道;升降机构,所述升降机构与所述单轨吊轨道可拆卸连接,且可带动所述单轨吊轨道升降;驱动机构,所述驱动机构与所述移动支架连接,且可驱动所述移动支架通过所述移动单元沿着巷道进行往复移动。本实用新型提供一种单轨吊轨道辅助铺设装置,高效地铺设轨道,提高员工作业效率,降低作业强度,操作方便灵活,确保安全作业。
The utility model discloses an auxiliary laying device for a monorail hanging track, comprising: a moving bracket, the moving bracket comprises a bracket body, a support panel and a moving unit respectively arranged on the upper part and the lower part of the bracket body, and the support panel is used for Supporting the monorail hanging rail; a lifting mechanism, the lifting mechanism is detachably connected with the monorail hanging rail, and can drive the monorail hanging rail to rise and fall; a driving mechanism, the driving mechanism is connected with the moving bracket, and can drive all the The moving support is reciprocated along the roadway through the moving unit. The utility model provides an auxiliary laying device for a monorail hanging track, which can efficiently lay the track, improve the working efficiency of employees, reduce the working intensity, facilitate and flexibly operate, and ensure safe operation.
Description
技术领域technical field
本实用新型涉及轨道铺设装置,更具体地,涉及一种单轨吊轨道辅助铺设装置。The utility model relates to a track laying device, in particular to an auxiliary laying device for a monorail hanging track.
背景技术Background technique
随着科技的发展,在进行矿山井下作业时,涉及大量的电动设备。大部分器械的电能通过电缆传输,当器械移动时,电缆也要跟随器械同步移动。With the development of science and technology, a large number of electric equipment is involved in the underground operation of mines. Most of the electrical energy of the instrument is transmitted through the cable, and when the instrument is moved, the cable must also move synchronously with the instrument.
单轨吊是煤矿井下综采(放)工作面各种电缆、高压胶管的吊挂、移动及回收的专用运输装置,可以降低运输难度,节约调配时间。单轨吊可沿着预先铺设的轨道往复移动。现有的轨道铺设方法是:根据前一天工作面回采的距离,确定轨道拆卸数量,从胶带输送机机尾一侧拆卸相应数量的轨道,运输到预设位置,沿着预设路径进行安装。安装时,需要将回收的轨道放置在支撑架上,由于轨道比较重(每根单轨吊的轨道长约3.0m,重约102kg),移动不便,支撑架比较高(巷道高度在3.5m左右),需要多人协作。例如3个,一个人扶着支撑架,另外两个人在支撑架上面举升并安装轨道。按照上述方式安装轨道时,既浪费时间又浪费人力,登高作业期间还存在相关安全隐患。The monorail crane is a special transportation device for hanging, moving and recycling various cables and high-pressure hoses in the fully mechanized mining (caving) working face of the coal mine, which can reduce the difficulty of transportation and save the deployment time. Monorail cranes reciprocate along pre-laid tracks. The existing track laying method is as follows: according to the mining distance of the working face the previous day, determine the number of tracks to be removed, remove the corresponding number of tracks from the tail side of the belt conveyor, transport them to a preset position, and install them along a preset path. During installation, the recovered track needs to be placed on the support frame. Since the track is relatively heavy (the track length of each monorail crane is about 3.0m and the weight is about 102kg), it is inconvenient to move and the support frame is relatively high (the height of the roadway is about 3.5m) , requires multi-person collaboration. For example 3, one person holds the support frame, and the other two people lift and install the track on the support frame. When the track is installed in the above manner, it is a waste of time and manpower, and there are related safety hazards during the climbing operation.
因此,需要一种单轨吊轨道辅助铺设装置,来解决上述问题。Therefore, there is a need for an auxiliary laying device for a monorail hanging track to solve the above problems.
实用新型内容Utility model content
有鉴于此,本实用新型的目的在于提出一种单轨吊轨道辅助铺设装置,高效地铺设轨道,提高员工作业效率,降低作业强度,操作方便灵活,确保安全作业。In view of this, the purpose of the present utility model is to propose a monorail hanging track auxiliary laying device, which can efficiently lay the track, improve the working efficiency of employees, reduce the working intensity, facilitate and flexibly operate, and ensure safe operation.
基于上述目的本实用新型提供的一种单轨吊轨道辅助铺设装置,包括:Based on the above purpose, the utility model provides a monorail hanging track auxiliary laying device, comprising:
移动支架,所述移动支架包括支架本体以及分别设置在所述支架本体上部和下部的支撑面板和移动单元,所述支撑面板用于支撑单轨吊轨道;a moving bracket, the moving bracket includes a bracket body, a support panel and a moving unit respectively arranged on the upper and lower parts of the bracket body, and the support panel is used to support the monorail suspension rail;
升降机构,所述升降机构与所述单轨吊轨道可拆卸连接,且可带动所述单轨吊轨道升降;a lifting mechanism, the lifting mechanism is detachably connected with the monorail suspension rail, and can drive the monorail suspension rail to lift;
驱动机构,所述驱动机构与所述移动支架连接,且可驱动所述移动支架通过所述移动单元沿着巷道进行往复移动。a driving mechanism, which is connected with the moving support and can drive the moving support to reciprocate along the roadway through the moving unit.
优选地,所述支架本体上设置有容置箱,所述容置箱内设置有容置腔,所述容置箱上设置有开口,所述容置腔通过所述开口与外部连通。Preferably, an accommodating box is provided on the support body, a accommodating cavity is provided in the accommodating box, an opening is provided on the accommodating box, and the accommodating cavity communicates with the outside through the opening.
优选地,所述容置箱还包括:箱盖,所述箱盖可开合连接在所述容置箱的所述开口边沿上,且可控制所述开口开合。Preferably, the accommodating box further comprises: a box cover, the box cover can be opened and closed on the edge of the opening of the accommodating box, and the opening and closing of the opening can be controlled.
优选地,所述容置箱还包括:至少一个隔板,至少一个所述隔板设置在所述容置腔的内壁上,且用于将所述容置腔分隔为多个腔体,每个所述腔体均与开口连通。Preferably, the accommodating box further comprises: at least one partition plate, the at least one partition plate is arranged on the inner wall of the accommodating cavity and is used to divide the accommodating cavity into a plurality of cavities, each of which is Each of the cavities communicates with the opening.
优选地,所述驱动机构包括伸缩杆、第一制动小车和第二制动小车,所述伸缩杆包括相对设置的第一移动端和第一固定端,所述第一制动小车和所述第二制动小车分别连接在所述第一移动端和所述第一固定端上,所述第二制动小车可在与待安装的所述单轨吊轨道相邻且在使用单轨吊轨道上移动,所述伸缩杆可伸缩带动所述第一制动小车和所述第二制动小车相互靠近或远离,所述移动支架朝向所述伸缩杆一侧端面设置有第一连杆,所述移动支架可通过所述第一连杆与所述第一制动小车连接。Preferably, the drive mechanism includes a telescopic rod, a first brake trolley and a second brake trolley, the telescopic rod includes a first movable end and a first fixed end that are arranged opposite to each other, the first brake trolley and all the The second brake trolley is respectively connected to the first moving end and the first fixed end, and the second brake trolley can be adjacent to the monorail suspension track to be installed and use the monorail suspension rail Move up, the telescopic rod can telescopically drive the first brake trolley and the second brake trolley to approach or move away from each other. The moving bracket can be connected with the first brake trolley through the first link.
优选地,所述升降机构包括通过牵引绳依次传动连接的第一定滑轮、第二定滑轮和第三定滑轮,所述第一定滑轮设置在待安装的所述单轨吊轨道预安装位置对应的巷道顶板上,所述第二制动小车上设置有第二连杆,所述第二定滑轮和所述第三定滑轮分别设置在所述第二连杆所述和第一连杆上,所述牵引绳的第一端绕过所述第一定滑轮与待安装的所述单轨吊轨道连接,所述牵引绳的第二端经所述第二定滑轮绕过所述第三定滑轮后与所述第二定滑轮的转轴固定。Preferably, the lifting mechanism includes a first fixed pulley, a second fixed pulley and a third fixed pulley that are sequentially connected through a traction rope, and the first fixed pulley is arranged at the pre-installation position of the monorail suspension track to be installed corresponding to On the roof of the roadway, the second brake trolley is provided with a second connecting rod, and the second fixed pulley and the third fixed pulley are respectively arranged on the second connecting rod and the first connecting rod , the first end of the traction rope bypasses the first fixed pulley and is connected to the monorail suspension track to be installed, and the second end of the traction rope bypasses the third fixed pulley through the second fixed pulley. The pulley is then fixed with the rotating shaft of the second fixed pulley.
优选地,所述第一连杆和所述第二连杆相互平行,所述第一连杆和所述第二连杆两者位于同一平面内,且与所述伸缩杆所在平面相互平行。Preferably, the first link and the second link are parallel to each other, the first link and the second link are located in the same plane, and are parallel to the plane where the telescopic rod is located.
优选地,所述驱动机构还包括:液压泵和换向阀,所述液压泵通过管路与所述伸缩杆连接,所述液压泵用于向所述伸缩杆提供驱动介质,所述换向阀设置在所述管路上,且用于控制所述管路内驱动介质的流动方向,来驱动所述伸缩杆动作。Preferably, the driving mechanism further comprises: a hydraulic pump and a reversing valve, the hydraulic pump is connected to the telescopic rod through a pipeline, the hydraulic pump is used to provide a driving medium to the telescopic rod, and the reversing valve The valve is arranged on the pipeline and is used to control the flow direction of the driving medium in the pipeline to drive the telescopic rod to move.
优选地,所述移动支架靠近所述驱动机构一侧端面上设置有安装部,所述安装部用于支撑和限位所述换向阀。Preferably, a mounting portion is provided on one end surface of the moving bracket close to the driving mechanism, and the mounting portion is used to support and limit the reversing valve.
另外,优选地,所述第一制动小车和所述第二制动小车上均设置有自锁机构,所述自锁机构上设置有自锁开关。In addition, preferably, both the first brake trolley and the second brake trolley are provided with a self-locking mechanism, and a self-locking switch is provided on the self-locking mechanism.
从上面所述可以看出,本实用新型提供的单轨吊轨道辅助铺设装置,与现有技术相比,具有以下优点:采用单轨吊轨道辅助铺设装置可以移动、升降、定位单轨吊轨道,帮助作业人员高效地完成铺设轨道,提高员工作业效率,降低作业强度,操作方便灵活,确保安全作业。As can be seen from the above, the monorail hanging track auxiliary laying device provided by the present invention has the following advantages compared with the prior art: the monorail hanging track auxiliary laying device can be used to move, lift, and position the monorail hanging track, helping the operation. The personnel can efficiently complete the laying of the track, improve the work efficiency of the staff, reduce the work intensity, and operate conveniently and flexibly to ensure safe operation.
附图说明Description of drawings
通过下面结合附图对其实施例进行描述,本实用新型的上述特征和技术优点将会变得更加清楚和容易理解。The above-mentioned features and technical advantages of the present invention will become clearer and easier to understand by describing its embodiments below in conjunction with the accompanying drawings.
图1为本实用新型具体实施例中采用的单轨吊轨道辅助铺设装置的使用状态示意图。FIG. 1 is a schematic diagram of the use state of the auxiliary laying device for the monorail hanging track adopted in the specific embodiment of the present invention.
图2为图1所示的单轨吊轨道辅助铺设装置的移动支架的示意图。FIG. 2 is a schematic diagram of a moving bracket of the monorail hanging track auxiliary laying device shown in FIG. 1 .
其中附图标记:where the reference number:
1:支架本体;2:支撑面板;3:移动单元;4:容置箱;1: bracket body; 2: support panel; 3: mobile unit; 4: accommodating box;
5:第一连杆;6:第一制动车;7:第二制动车;8:伸缩杆;5: The first connecting rod; 6: The first brake car; 7: The second brake car; 8: The telescopic rod;
9:第一定滑轮;10:第二定滑轮;11:第三定滑轮;12:牵引绳;9: the first fixed pulley; 10: the second fixed pulley; 11: the third fixed pulley; 12: traction rope;
13:第二连杆;14:换向阀;15:安装部;16:单轨吊轨道;13: Second connecting rod; 14: Reversing valve; 15: Installation part; 16: Monorail hanging track;
17:已拆卸单轨吊轨道;18:在使用单轨吊轨道;19:巷道顶板;17: The monorail hanging track has been dismantled; 18: The monorail hanging track is in use; 19: The roof of the roadway;
20:巷道底板。20: Roadway floor.
具体实施方式Detailed ways
为使本实用新型的目的、技术方案和优点更加清楚明白,以下结合具体实施例,并参照附图,对本实用新型进一步详细说明。其中相同的零部件用相同的附图标记表示。需要说明的是,下面描述中使用的词语“前”、“后”、“左”、“右”、“上”和“下”指的是附图中的方向。使用的词语“内”和“外”分别指的是朝向或远离特定部件几何中心的方向。In order to make the purpose, technical solutions and advantages of the present utility model more clearly understood, the present utility model will be further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings. Wherein the same parts are denoted by the same reference numerals. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to directions in the drawings. The terms "inner" and "outer" are used to refer to directions toward or away from the geometric center of a particular component, respectively.
单轨吊包括多条依次连接的单轨吊轨道,使用过程中,将单轨吊后端的一根或多根单轨吊轨道拆卸下来,并移动到单轨吊的前端,进行依次安装。在安装过程中,多条单轨吊轨道根据使用状态分为三类:分别是:正在安装的单轨吊轨道为单轨吊轨道或待安装的单轨吊轨道,置于移动支架上方的单轨吊轨道为已拆卸单轨吊轨道,未拆卸的单轨吊轨道为在使用单轨吊轨道。通常,每个单轨吊轨道长约3m。The monorail crane includes a plurality of monorail crane rails connected in sequence. During use, one or more monorail crane rails at the rear end of the monorail crane are disassembled and moved to the front end of the monorail crane for sequential installation. During the installation process, the multiple monorail hoisting rails are divided into three categories according to their use status: they are: the monorail hoisting track being installed is either the monorail hoisting track or the monorail hoisting track to be installed, and the monorail hoisting track placed above the mobile bracket is the one that has been installed. Disassemble the monorail suspension rail, the monorail suspension rail that is not disassembled is the monorail suspension rail in use. Typically, each monorail hanger track is about 3m long.
图1为本实用新型具体实施例中采用的单轨吊轨道辅助铺设装置的使用状态示意图。如图1所示,单轨吊轨道辅助铺设装置包括:移动支架、升降机构和驱动机构。FIG. 1 is a schematic diagram of the use state of the auxiliary laying device for the monorail hanging track adopted in the specific embodiment of the present invention. As shown in Figure 1, the auxiliary laying device for monorail hanging track includes: a moving bracket, a lifting mechanism and a driving mechanism.
移动支架包括支架本体1以及分别设置在支架本体1上部和下部的支撑面板2和移动单元3,支撑面板2用于支撑单轨吊轨道(包括已拆卸单轨吊轨道17和待安装的单轨吊轨道16);The mobile bracket includes a bracket body 1, a support panel 2 and a mobile unit 3 arranged on the upper and lower parts of the bracket body 1, respectively, and the support panel 2 is used to support the monorail hanging rail (including the disassembled monorail hanging rail 17 and the monorail hanging rail 16 to be installed). );
升降机构与单轨吊轨道可拆卸连接,且可带动单轨吊轨道升降;The lifting mechanism is detachably connected to the monorail suspension rail, and can drive the monorail suspension rail to lift;
驱动机构与移动支架连接,且可驱动移动支架通过移动单元3沿着巷道(如巷道底板20)进行往复移动。The driving mechanism is connected with the moving support, and the moving support can be driven to reciprocate along the roadway (such as the roadway floor 20 ) through the moving unit 3 .
当单轨吊后端的一个单轨吊轨道被拆卸下来后,可通过升降机构依次携带下降,并释放在支撑面板2上;如需要多个单轨吊轨道,通过上述方式从后向前依次拆卸,多个单轨吊轨道沿着支撑面板2的宽度方向依次排列,也可以层叠放置;驱动机构驱动移动支架通过移动单元3沿着巷道底板20移动到单轨吊的前端,升降机构携带一个待安装的单轨吊轨道16上升到与在使用单轨吊轨道18相接近高度,作业人员对待安装的单轨吊轨道16进行定位,且连接在巷道顶板19或相应位置上。采用单轨吊轨道辅助铺设装置可以移动、升降、定位单轨吊轨道,帮助作业人员高效地完成铺设轨道,提高员工作业效率,降低作业强度,操作方便灵活,确保安全作业。When a monorail hanging rail at the rear end of the monorail crane is disassembled, it can be carried down by the lifting mechanism and released on the support panel 2; The monorail hanging rails are arranged in sequence along the width direction of the support panel 2, and can also be stacked; the driving mechanism drives the moving bracket to move to the front end of the monorail crane along the roadway floor 20 through the moving unit 3, and the lifting mechanism carries a monorail hanging rail to be installed. 16 rises to a height similar to the monorail hoisting track 18 in use, the operator positions the monorail hoisting track 16 to be installed, and connects it to the roadway roof 19 or a corresponding position. The monorail hanging track auxiliary laying device can move, lift, and position the monorail hanging track, helping operators to efficiently complete the laying of the track, improving the work efficiency of employees, reducing the work intensity, convenient and flexible operation, and ensuring safe operation.
在本实施例中,支架本体1可采用角钢焊接而成,多个角钢焊接成框架结构;角钢采用50×5mm,支架本体1的尺寸为2000×600×1500mm;支撑面板2可采用钢板制作而成,钢板的厚度不小于5mm。In this embodiment, the bracket body 1 can be welded with angle steel, and a plurality of angle steels are welded to form a frame structure; the angle steel is 50×5mm, and the size of the bracket body 1 is 2000×600×1500mm; the support panel 2 can be made of steel plate. The thickness of the steel plate shall not be less than 5mm.
在本实施例中,支撑面板2的长度可小于单轨吊轨道的长度,宽度通常大于单轨吊轨道的宽度,支撑面板2沿宽度方向的两端可设置有凸缘,以便在宽度上进行限位,避免移动支架移动过程中,单轨吊轨道从支撑面板2上滚落。In this embodiment, the length of the support panel 2 can be smaller than the length of the monorail hanging track, and the width is generally greater than the width of the monorail hanging track. The two ends of the support panel 2 along the width direction can be provided with flanges to limit the width. , to prevent the monorail suspension rail from rolling off the support panel 2 during the movement of the mobile bracket.
在本实施例中,移动单元3包括但不限于皮带托辊,皮带托辊的尺寸为φ150×530mm,多个(例如2个)皮带托辊沿着支架本体的底部间隔分布,位于两端的皮带托辊距离端部距离不小于200mm,当支架本体1受到驱动力时,皮带托辊转动,带动支架本体1移动。In this embodiment, the moving unit 3 includes, but is not limited to, a belt idler, the size of the belt idler is φ150×530mm, a plurality of (for example, 2) belt idlers are distributed along the bottom of the bracket body at intervals, and the belts located at both ends The distance between the idler and the end is not less than 200mm. When the bracket body 1 receives the driving force, the belt idler rotates to drive the bracket body 1 to move.
图2为图1所示的单轨吊轨道辅助铺设装置的移动支架的示意图。如图2所示,支架本体1还包括容置箱4。FIG. 2 is a schematic diagram of a moving bracket of the monorail hanging track auxiliary laying device shown in FIG. 1 . As shown in FIG. 2 , the bracket body 1 further includes an accommodating box 4 .
优选地,支架本体1上设置有容置箱4,容置箱4内设置有容置腔,容置箱4上设置有开口,容置腔通过开口与外部连通。容置箱可收纳花栏螺栓、链子等用于固定单轨吊轨道的部件,从开口放入到容置腔内,集中收集,避免丢失。Preferably, an accommodating box 4 is provided on the bracket body 1 , a accommodating cavity is provided in the accommodating box 4 , an opening is provided on the accommodating box 4 , and the accommodating cavity communicates with the outside through the opening. The accommodating box can accommodate components such as flower rail bolts and chains for fixing the monorail hanging track, and put them into the accommodating cavity from the opening for centralized collection to avoid loss.
优选地,容置箱4还包括:箱盖,箱盖可开合连接在容置箱4的开口边沿上,且可控制开口开合。通过设置箱盖,可在移动过程中对开口进行密封,避免因道路颠簸造成容置腔4内部件丢失。Preferably, the accommodating box 4 further includes: a box cover, which can be opened and closed on the edge of the opening of the accommodating box 4, and the opening and closing of the opening can be controlled. By arranging the box cover, the opening can be sealed during the moving process, so as to avoid the loss of the components in the accommodating cavity 4 due to road bumps.
在本实施例中,箱盖包括相对设置的第一箱门和第二箱门,第一箱门和第二箱门均与开口边沿通过合页连接。In this embodiment, the box cover includes a first box door and a second box door opposite to each other, and both the first box door and the second box door are connected with the edge of the opening through hinges.
优选地,容置箱4还包括:至少一个隔板,至少一个隔板设置在容置腔的内壁上,且用于将容置腔分隔为多个腔体,每个腔体均与开口连通。通过设置隔板,将容置腔分隔为多个腔体,每个腔体用于容置不同的部件,实现分类存放。Preferably, the accommodating box 4 further includes: at least one partition plate, which is arranged on the inner wall of the accommodating cavity and is used to divide the accommodating cavity into a plurality of cavities, each cavity communicating with the opening . By arranging partitions, the accommodating cavity is divided into a plurality of cavities, and each cavity is used for accommodating different components to realize classified storage.
在本实施例中,容置箱4内设置有一个隔板,隔板将容置腔分隔为上部腔体和下部腔体。In this embodiment, a partition is provided in the accommodating box 4, and the partition divides the accommodating cavity into an upper cavity and a lower cavity.
优选地,驱动机构包括伸缩杆8、第一制动小车6和第二制动小车7,伸缩杆8包括相对设置的第一移动端和第一固定端,第一制动小车6和第二制动小车7分别连接在第一移动端和第一固定端上,第二制动小车7可在与待安装的单轨吊轨道16相邻且在使用单轨吊轨道18上移动,伸缩杆8可伸缩带动第一制动小车6和第二制动小车7相互靠近或远离,移动支架朝向伸缩杆8一侧端面设置有第一连杆5,移动支架可通过第一连杆5与第一制动小车6连接。使用时,第一固定端连接于在使用单轨吊轨道上,伸缩杆8伸长时,第一固定端静置,第一移动端推动第一制动小车7前移,第一制动小车7通过第一连杆5推动移动支架同步前移;然后,伸缩杆8缩短时,第一移动端静置,第一制动小车7保持不动,第一固定端前移,带动第二制动小车7前移,以便为伸缩杆8再次伸长做准备;伸缩杆8往复伸缩,并通过第一制动小车6、第二制动小车7相互配合推动移动支架前移,来降低驱动难度,同时精确控制移动支架的移动行程。采用上述驱动机构,可以降低移动支架的移动难度,节约人力物力,减少安全隐患。Preferably, the driving mechanism includes a telescopic rod 8, a first brake trolley 6 and a second brake trolley 7, the telescopic rod 8 includes a first movable end and a first fixed end arranged oppositely, the first brake trolley 6 and the second brake trolley 7 The brake trolley 7 is respectively connected to the first movable end and the first fixed end. The second brake trolley 7 can move on the monorail suspension rail 18 adjacent to the monorail suspension track 16 to be installed, and the telescopic rod 8 can be moved. The telescopic drive drives the first brake trolley 6 and the second brake trolley 7 to approach or move away from each other. The end face of the moving bracket facing the telescopic rod 8 is provided with a first connecting rod 5. Connect the trolley 6. When in use, the first fixed end is connected to the monorail hoisting track in use, when the telescopic rod 8 is extended, the first fixed end rests, the first moving end pushes the first brake trolley 7 to move forward, and the first brake trolley 7 Push the movable bracket to move forward synchronously through the first link 5; then, when the telescopic rod 8 is shortened, the first movable end stands still, the first brake trolley 7 remains stationary, and the first fixed end moves forward to drive the second brake The trolley 7 moves forward to prepare for the extension of the telescopic rod 8 again; the telescopic rod 8 reciprocates and expands, and the first brake trolley 6 and the second brake trolley 7 cooperate to push the moving bracket forward to reduce the difficulty of driving. At the same time, the movement stroke of the mobile bracket is precisely controlled. The adoption of the above-mentioned driving mechanism can reduce the difficulty of moving the mobile bracket, save manpower and material resources, and reduce potential safety hazards.
优选地,升降机构包括通过牵引绳12依次传动连接的第一定滑轮9、第二定滑轮10和第三定滑轮11,第一定滑轮9设置在待安装的单轨吊轨16道预安装位置对应的巷道顶板19上,第二制动小车7上设置有第二连杆13,第二定滑轮10和第三定滑轮11分别设置在第二连杆13和第一连杆5上,牵引绳12的第一端绕过第一定滑轮9与待安装的单轨吊轨道16连接,牵引绳12的第二端经第二定滑轮10绕过第三定滑轮11后与第二定滑轮的转轴固定。使用时,第一定滑轮9、第二定滑轮10和第三定滑轮11依次安装后,将牵引绳12的第一端和第二端依次固定后,伸缩杆8伸长时,第一制动小车6推动第一连杆5向远离第二连杆13一侧移动,第二定滑轮10和第三定滑轮11之间距离增加,牵引绳12的第一端得到提升,带动待安装的单轨吊轨道16同步提升;伸缩杆8缩短时,第二制动小车7带动第二连杆13向靠近第一连杆5一侧移动,第二定滑轮10和第三定滑轮11之间距离减少,牵引绳12的第一端得到下降,带动待安装的单轨吊轨道16同步下降。上述升降机构的结构简单,方便操作,降低控制难度。Preferably, the lifting mechanism includes a first fixed pulley 9, a second fixed pulley 10, and a third fixed pulley 11 that are sequentially connected through a traction rope 12. The first fixed pulley 9 is set at the pre-installation position of the 16 monorail hanging rails to be installed. On the corresponding roadway roof 19, the second brake trolley 7 is provided with a second connecting rod 13, and the second fixed pulley 10 and the third fixed pulley 11 are respectively disposed on the second connecting rod 13 and the first connecting rod 5. The first end of the rope 12 bypasses the first fixed pulley 9 and is connected to the monorail hanging rail 16 to be installed, and the second end of the traction rope 12 passes through the second fixed pulley 10 after the third fixed pulley 11 and the second fixed pulley. The shaft is fixed. In use, after the first fixed pulley 9, the second fixed pulley 10 and the third fixed pulley 11 are installed in sequence, and the first and second ends of the traction rope 12 are fixed in sequence, when the telescopic rod 8 is extended, the first fixed pulley The moving trolley 6 pushes the first link 5 to move away from the second link 13, the distance between the second fixed pulley 10 and the third fixed pulley 11 increases, and the first end of the traction rope 12 is lifted, driving the to-be-installed The monorail suspension rail 16 is lifted synchronously; when the telescopic rod 8 is shortened, the second brake trolley 7 drives the second link 13 to move to the side close to the first link 5, and the distance between the second fixed pulley 10 and the third fixed pulley 11 When the reduction is reduced, the first end of the traction rope 12 is lowered, which drives the monorail hanging rail 16 to be installed to descend synchronously. The lifting mechanism has a simple structure, is convenient to operate, and reduces control difficulty.
在本实施例中,第一定滑轮9、第二定滑轮10和第三定滑轮11可采用相同的定滑轮结构,每个定滑轮结构上均设置有挂钩,以便勾挂在巷道顶板19、第一连杆5、第二连杆13上。In this embodiment, the first fixed pulley 9, the second fixed pulley 10 and the third fixed pulley 11 can adopt the same fixed pulley structure, and each fixed pulley structure is provided with a hook, so as to be hooked on the roadway roof 19, on the first connecting rod 5 and the second connecting rod 13 .
在本实施例中,牵引绳12包括但不限于钢丝绳,钢丝绳要充分考虑待安装的单轨吊轨道16的升降高度以及伸缩杆8的伸缩长度,例如15m。In this embodiment, the traction rope 12 includes but is not limited to a steel wire rope, and the steel wire rope should fully consider the lifting height of the monorail suspension rail 16 to be installed and the telescopic length of the telescopic rod 8, eg, 15m.
在本实施例中,第一连杆5和第二连杆13均可采用角钢制作而成,角钢的尺寸为φ60mm,第一连杆5的长度可根据待安装的单轨吊轨道16的安装高度确定,例如2350mm;第二连杆13的长度小于第一连杆5的长度,例如600mm。In this embodiment, both the first connecting rod 5 and the second connecting rod 13 can be made of angle steel, the size of the angle steel is φ60mm, and the length of the first connecting rod 5 can be determined according to the installation height of the monorail suspension rail 16 to be installed. Determine, for example, 2350mm; the length of the second link 13 is smaller than the length of the first link 5, for example, 600mm.
优选地,第一连杆5和第二连杆13相互平行,第一连杆5和第二连杆13两者位于同一平面内,且与伸缩杆8所在平面相互平行。当伸缩杆8伸缩时,第一连杆5或第二连杆13同步动作,当第一连杆5和第二连杆13两者所在平面与伸缩杆8所在平面相互平行时,可保持同步动作,进一步降低驱动难度。Preferably, the first link 5 and the second link 13 are parallel to each other, the first link 5 and the second link 13 are located in the same plane, and are parallel to the plane where the telescopic rod 8 is located. When the telescopic rod 8 is retracted, the first link 5 or the second link 13 act synchronously. When the planes where the first link 5 and the second link 13 are located are parallel to the plane where the telescopic rod 8 is located, the synchronization can be maintained. action to further reduce the difficulty of driving.
优选地,驱动机构还包括:液压泵和换向阀14,液压泵通过管路与伸缩杆8连接,液压泵用于向伸缩杆8提供驱动介质,换向阀14设置在管路上,且用于控制管路内驱动介质的流动方向,来驱动伸缩杆8动作。通过增加液压泵和换向阀14,可降低伸缩杆8的驱动难度,通过换向阀14控制伸缩杆8伸缩,操作方便且灵活,可提高伸缩精度。Preferably, the driving mechanism further includes: a hydraulic pump and a reversing valve 14, the hydraulic pump is connected to the telescopic rod 8 through a pipeline, the hydraulic pump is used to provide a driving medium to the telescopic rod 8, and the reversing valve 14 is arranged on the pipeline and used The telescopic rod 8 is driven to act by controlling the flow direction of the driving medium in the pipeline. By adding a hydraulic pump and a reversing valve 14, the driving difficulty of the telescopic rod 8 can be reduced, and the telescopic rod 8 can be controlled to extend and retract by the reversing valve 14, the operation is convenient and flexible, and the telescopic precision can be improved.
在本实施例中,管路可采用高压胶管,满足输送驱动介质的要求,灵活性好;驱动介质包括但不限于乳化液,防爆阻燃,安全性能好;在井下时,液压泵可借用综采工作面的乳化液泵站,不需要额外连接动力设备,使用方便;第一制动小车6和第二制动小车7均通过管路与换向阀14连通。In this embodiment, the pipeline can be made of high-pressure rubber hose, which can meet the requirements of conveying the driving medium, and has good flexibility; the driving medium includes but not limited to emulsion, which is explosion-proof and flame-retardant, and has good safety performance; when it is downhole, the hydraulic pump can use synthetic The emulsion pump station on the mining face does not require additional connection of power equipment and is easy to use; the first brake trolley 6 and the second brake trolley 7 are both connected to the reversing valve 14 through pipelines.
在本实施例中,伸缩杆8通过液压驱动,伸缩杆8包括但不限于φ100×1200mm液压缸,换向阀14包括但不限于三位四通手动换向阀。In this embodiment, the telescopic rod 8 is hydraulically driven, the telescopic rod 8 includes but is not limited to a φ100×1200 mm hydraulic cylinder, and the reversing valve 14 includes but is not limited to a three-position four-way manual reversing valve.
优选地,移动支架靠近驱动机构一侧端面上设置有安装部15,安装部15用于支撑和限位换向阀14。将换向阀14安装在安装部15内进行固定,方便作业人员进行实时操作。Preferably, a mounting portion 15 is provided on one end surface of the moving bracket close to the driving mechanism, and the mounting portion 15 is used to support and limit the reversing valve 14 . The reversing valve 14 is installed in the installation part 15 for fixing, which is convenient for the operator to operate in real time.
在本实施例中,移动支架上还设置有方凳,方凳靠近安装部设置,作业人员可坐在方凳上操作换向阀14,以便实时观察,避免管路或电缆混乱。In this embodiment, a square stool is also provided on the movable bracket, and the square stool is arranged near the installation part. The operator can sit on the square stool and operate the reversing valve 14 for real-time observation and avoid confusion of pipelines or cables.
另外,优选地,第一制动小车6和第二制动小车7上均设置有自锁机构,自锁机构上设置有自锁开关。当第一制动小车6或/和第二制动小车7需要静置/移动时,启动/关闭自锁机构的自锁开关,避免发生误操作。In addition, preferably, both the first brake trolley 6 and the second brake trolley 7 are provided with a self-locking mechanism, and a self-locking switch is provided on the self-locking mechanism. When the first brake trolley 6 or/and the second brake trolley 7 needs to be stationary/moved, the self-locking switch of the self-locking mechanism is turned on/off to avoid misoperation.
在本实施例中,自锁机构也可以与第一制动小车6或第二制动小车7可拆卸连接,需要锁定第一制动小车6或/和第二制动小车7时,安装自锁机构,需要解除锁定时取下即可。In this embodiment, the self-locking mechanism can also be detachably connected with the first brake trolley 6 or the second brake trolley 7. When the first brake trolley 6 or/and the second brake trolley 7 needs to be locked, a self-locking mechanism is installed. The lock mechanism can be removed when it needs to be unlocked.
下面进一步介绍单轨吊轨道辅助铺设装置的使用过程。The following further introduces the use process of the auxiliary laying device for the monorail suspended track.
当单轨吊后端(被拆卸一端)的一个或几个单轨吊轨道16被拆卸下来后,依次放置在支撑面板2上,花栏螺栓等可放置在支架本体1上的容置箱4内;通过操作安装部15上方控制阀14,来控制驱动介质在管路内流动方向,驱动伸缩杆8伸长,第一固定端静置,第一移动端推动第一制动小车7前移(待安装一端),第一制动小车7通过第一连杆5推动移动支架通过移动单元3同步前移;然后,通过控制阀14控制驱动介质在管路内反向流动,伸缩杆8缩短,第一移动端静置,第一制动小车7保持不动,第一固定端前移,带动第二制动小车7前移,以便为伸缩杆8再次伸长做准备;伸缩杆8往复伸缩驱动移动支架通过移动单元3沿着巷道底板20移动到单轨吊的前端;将牵引绳12的第一端绕过第一定滑轮9与待安装的单轨吊轨道16连接,第二端与第二定滑轮10的转轴固定,再次驱动伸缩杆8伸长,使得第一制动小车6推动第一连杆5向远离第二连杆13一侧移动,第二定滑轮10和第三定滑轮11之间距离增加,牵引绳12的第一端得到提升,带动待安装的单轨吊轨道16同步提升;移动至待安装位置,与在使用单轨吊轨道18进行衔接,然后安装锁具、花栏螺栓、链子等固定单轨吊轨道的部件,安装完成后,第一制动小车6可沿着该单轨吊轨道继续前移,以便提取其他已拆卸单轨吊17进行安装。When one or more monorail suspension rails 16 at the rear end (disassembled end) of the monorail suspension are disassembled, they are placed on the support panel 2 in turn, and the flower rail bolts and the like can be placed in the accommodating box 4 on the bracket body 1; By operating the control valve 14 above the mounting part 15, the flow direction of the driving medium in the pipeline is controlled, the telescopic rod 8 is driven to extend, the first fixed end is left standing, and the first moving end pushes the first brake trolley 7 to move forward (to be The first brake trolley 7 pushes the moving bracket to move forward synchronously through the moving unit 3 through the first connecting rod 5; then, the control valve 14 controls the reverse flow of the driving medium in the pipeline, the telescopic rod 8 is shortened, and the first When the moving end is stationary, the first brake trolley 7 remains stationary, the first fixed end moves forward, and drives the second brake trolley 7 to move forward, so as to prepare for the extension of the telescopic rod 8 again; The moving bracket moves to the front end of the monorail crane along the roadway floor 20 through the moving unit 3; the first end of the traction rope 12 is connected to the monorail hanging rail 16 to be installed around the first fixed pulley 9, and the second end is connected to the second fixed rail. The rotating shaft of the pulley 10 is fixed, and the telescopic rod 8 is driven to extend again, so that the first brake trolley 6 pushes the first connecting rod 5 to move away from the second connecting rod 13, and the second fixed pulley 10 and the third fixed pulley 11. The distance increases, the first end of the traction rope 12 is lifted, and the monorail hanging rail 16 to be installed is driven to lift synchronously; move to the position to be installed, connect with the monorail hanging rail 18 in use, and then install locks, flower rail bolts, chains After the components for fixing the monorail suspension track are installed, the first brake trolley 6 can continue to move forward along the monorail suspension rail, so as to extract other disassembled monorail cranes 17 for installation.
从上面的描述和实践可知,本实用新型提供的单轨吊轨道辅助铺设装置,与现有技术相比,具有以下优点:采用单轨吊轨道辅助铺设装置可以移动、升降、定位单轨吊轨道,帮助作业人员高效地完成铺设轨道,提高员工作业效率,降低作业强度,操作方便灵活,确保安全作业。As can be seen from the above description and practice, the monorail hanging rail auxiliary laying device provided by the present invention has the following advantages compared with the prior art: the monorail hanging rail auxiliary laying device can be used to move, lift, and position the monorail hanging rail, helping the operation. The personnel can efficiently complete the laying of the track, improve the work efficiency of the staff, reduce the work intensity, and operate conveniently and flexibly to ensure safe operation.
所属领域的普通技术人员应当理解:以上所述仅为本实用新型的具体实施例而已,并不用于限制本实用新型,凡在本实用新型的主旨之内,所做的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。It should be understood by those of ordinary skill in the art: the above are only specific embodiments of the present utility model, and are not intended to limit the present utility model. Any modification, equivalent replacement, Improvements, etc., should be included within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920893856.4U CN210084813U (en) | 2019-06-13 | 2019-06-13 | Auxiliary laying device for monorail crane track |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920893856.4U CN210084813U (en) | 2019-06-13 | 2019-06-13 | Auxiliary laying device for monorail crane track |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210084813U true CN210084813U (en) | 2020-02-18 |
Family
ID=69482801
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920893856.4U Active CN210084813U (en) | 2019-06-13 | 2019-06-13 | Auxiliary laying device for monorail crane track |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210084813U (en) |
-
2019
- 2019-06-13 CN CN201920893856.4U patent/CN210084813U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109681117B (en) | Hydraulic single-arm automatic anchor cable drill carriage for coal mine | |
| CN103726421B (en) | Height and span adjustable track paver for metro construction | |
| CN204984431U (en) | Tunnelling protects platform with single track cat | |
| CN204984463U (en) | Mine hydraulic support assembly platform | |
| CN105019930A (en) | Mining hydraulic support assembly platform | |
| CN206092012U (en) | Operation car is demolishd to subway deep tunnel reinforced concrete pipe piece | |
| CN111498482B (en) | Transfer robot and transfer apparatus | |
| CN218206699U (en) | Operating tunnel disease is restoreed and is used bow member installation device | |
| CN203684019U (en) | Height and span adjustable track laying machine for subway construction | |
| CN210084813U (en) | Auxiliary laying device for monorail crane track | |
| CN106368718A (en) | Metro deep-buried tunnel reinforced concrete duct piece dismounting operation vehicle | |
| CN115898429A (en) | Tool transport system for inclined shaft boring machine | |
| CN212712395U (en) | A kind of assembly type hanging rail gantry for subway tunnel loose-laying rail construction | |
| CN201843625U (en) | Dismounting platform for underground hydraulic bracket | |
| CN208814604U (en) | A kind of coal mine hydraulic supporting recovery system | |
| CN215758288U (en) | Transportation rail mounting device for mining rail | |
| CN217173136U (en) | Adjusting device for conveying equipment | |
| CN109944558A (en) | A kind of automatic lifting operation platform of well-drilling oil pipe | |
| CN104192731A (en) | Full-hydraulic underground crawler-type crane | |
| CN116607955A (en) | Coal mine underground roadway support operation construction method | |
| CN210682999U (en) | Hoisting and transferring device | |
| CN115676648A (en) | Multifunctional underground maintenance vehicle | |
| CN110984170B (en) | Semi-automatic foundation pit steel support installation method and steel support installation auxiliary device | |
| CN209838341U (en) | Automatic hoisting operation platform for drilling oil pipe | |
| CN209940288U (en) | Push-and-pull device and single track hoist and mount are put |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |
