CN210066880U - Green water system of job site - Google Patents

Green water system of job site Download PDF

Info

Publication number
CN210066880U
CN210066880U CN201920838424.3U CN201920838424U CN210066880U CN 210066880 U CN210066880 U CN 210066880U CN 201920838424 U CN201920838424 U CN 201920838424U CN 210066880 U CN210066880 U CN 210066880U
Authority
CN
China
Prior art keywords
water
delivery pipe
pipe
tank
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920838424.3U
Other languages
Chinese (zh)
Inventor
黄锐智
黄斐达
吴秋梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Dianhanhao Construction Engineering Co Ltd
Original Assignee
Shenzhen Dianhanhao Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Dianhanhao Construction Engineering Co Ltd filed Critical Shenzhen Dianhanhao Construction Engineering Co Ltd
Priority to CN201920838424.3U priority Critical patent/CN210066880U/en
Application granted granted Critical
Publication of CN210066880U publication Critical patent/CN210066880U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

本实用新型公开了一种施工现场绿色用水系统,包括储水箱、雾化喷头和沉淀箱,雾化喷头的进水口连通连接有连接管,雾化喷头至少设置有三个,且雾化喷头上连接的连接管均连通连接在第一出水总管上,第一出水总管的两端为封闭设置,且该输水管的另一端与第三水泵的出水口密封连接,第三水泵的进水口密封连接有另一段输水管,且该输水管的另一端连通连接在储水箱的一侧下端位置上,雾化喷头的下方设置有集水箱,集水箱的底部一侧连通连接有输水管。本实用新型通过设置太阳能电池板、蓄电池、集水箱、沉淀箱和过滤罐,解决了现有的施工现场用水系统中存在水资源大量浪费和现有的施工现场用水系统中不可再生电力资源浪费的问题。

Figure 201920838424

The utility model discloses a construction site green water system, which comprises a water storage tank, an atomizing nozzle and a sedimentation tank. A water inlet of the atomizing nozzle is connected with a connecting pipe, at least three atomizing nozzles are arranged, and the atomizing nozzles are connected with each other. The connecting pipes are all connected to the first water outlet main pipe, the two ends of the first water outlet main pipe are closed, and the other end of the water delivery pipe is tightly connected with the water outlet of the third water pump, and the water inlet of the third water pump is sealed and connected with a Another section of water delivery pipe, and the other end of the water delivery pipe is connected to the lower end of one side of the water storage tank, a water collection tank is arranged below the atomizing nozzle, and a water delivery pipe is connected to the bottom side of the water collection tank. The utility model solves the problem of large waste of water resources in the existing construction site water system and waste of non-renewable power resources in the existing construction site water system by arranging solar panels, storage batteries, a water collecting tank, a sedimentation tank and a filter tank. question.

Figure 201920838424

Description

一种施工现场绿色用水系统A construction site green water system

技术领域technical field

本实用新型涉及建筑施工用水系统技术领域,具体为一种施工现场绿色用水系统。The utility model relates to the technical field of building construction water systems, in particular to a construction site green water system.

背景技术Background technique

目前,施工现场需要使用大量的水资源,用水部位包括现场生活用水,道路冲洗及降尘,混凝土养护,桩基泥浆配备,消防用水等,施工现场所使用的水均来自市政网所提供的自来水。At present, the construction site needs to use a large amount of water resources, including on-site domestic water, road flushing and dust reduction, concrete maintenance, pile foundation mud equipment, fire water, etc. The water used at the construction site comes from the tap water provided by the municipal network.

但是现有的技术存在以下的不足:However, the existing technology has the following shortcomings:

1.现有的施工现场用水系统存在水资源大量浪费的情况,在施工现场中清洗道路、降尘和生活用水等等过程中,水资源都得不到回收再利用,导致了水资源的大量浪费;1. The existing construction site water system has a lot of waste of water resources. In the process of road cleaning, dust reduction and domestic water use, etc. on the construction site, water resources cannot be recycled and reused, resulting in a large amount of water waste. ;

2.现有的施工现场用水系统中伴随着水资源的使用,必然需要大量的电力来配套提供工作,但是先用的电力都是不可生的火烧电,造成了电力的大量浪费。2. Along with the use of water resources in the existing construction site water system, a large amount of electricity must be required to provide work, but the electricity used first is unburnable fire electricity, resulting in a lot of waste of electricity.

实用新型内容Utility model content

(一)解决的技术问题(1) Technical problems solved

针对现有技术的不足,本实用新型提供了一种施工现场绿色用水系统,解决了现有的施工现场用水系统中存在水资源大量浪费和现有的施工现场用水系统中不可再生电力资源浪费的问题。Aiming at the deficiencies of the prior art, the utility model provides a construction site green water system, which solves the problems of massive waste of water resources in the existing construction site water system and waste of non-renewable power resources in the existing construction site water system. question.

(二)技术方案(2) Technical solutions

为实现上述目的,本实用新型提供如下技术方案:一种施工现场绿色用水系统,包括储水箱、雾化喷头和沉淀箱,所述雾化喷头的进水口连通连接有连接管,所述雾化喷头至少设置有三个,且雾化喷头上连接的连接管均连通连接在第一出水总管上,所述第一出水总管的两端为封闭设置,且第一出水总管上连通连接有输水管,且该输水管的另一端与第三水泵的出水口密封连接,所述第三水泵的进水口密封连接有另一段输水管,且该输水管的另一端连通连接在储水箱的一侧下端位置上,所述雾化喷头的下方设置有集水箱,所述集水箱的底部一侧连通连接有输水管,且该输水管的另一端连通连接在沉淀箱的顶部一侧,所述沉淀箱的下端一侧侧面上连通连接有一段输水管,且该输水管的另一端密封连接在第一水泵的进水口上,所述第一水泵的出水口上密封连接有另一段输水管,且输水管的另一端密封连接在过滤罐的底部,所述过滤罐的顶部通过输水管与储水箱的顶部连通连接,所述储水箱一侧侧面的下端位置上连通连接有一段输水管,且该输水管的另一端与第二水泵的进水口密封连接,所述第二水泵的出水口与另一段输水管密封连接,且该输水管的另一端与第二出水总管连通连接,所述第二出水总管的一端为封闭设置,另一端与加热器的进水口密封连接,且第二出水总管靠近封闭端的一侧连通连接有冷水管。In order to achieve the above purpose, the present invention provides the following technical solutions: a construction site green water system, comprising a water storage tank, an atomizing nozzle and a sedimentation tank, the water inlet of the atomizing nozzle is connected with a connecting pipe, and the atomizing nozzle is connected with a connecting pipe. There are at least three nozzles, and the connecting pipes connected to the atomizing nozzles are all connected to the first water outlet main pipe. And the other end of the water delivery pipe is sealingly connected with the water outlet of the third water pump, the water inlet of the third water pump is sealingly connected with another section of water delivery pipe, and the other end of the water delivery pipe is connected to the lower end of one side of the water storage tank. Above, a water collecting tank is arranged below the atomizing nozzle, and a water delivery pipe is connected to the bottom side of the water collecting tank, and the other end of the water delivery pipe is connected to the top side of the sedimentation tank. A section of water delivery pipe is communicated and connected on one side of the lower end, and the other end of the water delivery pipe is sealed and connected to the water inlet of the first water pump, and another section of water delivery pipe is sealed and connected to the water outlet of the first water pump, and the water delivery pipe The other end of the filter tank is sealed and connected to the bottom of the filter tank. The top of the filter tank is connected to the top of the water storage tank through a water delivery pipe. The other end of the water pump is sealed and connected to the water inlet of the second water pump, the water outlet of the second water pump is sealed and connected to another section of the water pipe, and the other end of the water pipe is connected to the second water outlet main pipe, the second water outlet main pipe One end of the water outlet is closed, the other end is sealingly connected with the water inlet of the heater, and the side of the second water outlet main pipe close to the closed end is connected with a cold water pipe.

优选的,所述集水箱的顶部均匀设置有拦截槽。Preferably, the top of the water collecting tank is evenly provided with intercepting grooves.

优选的,所述沉淀箱的顶部一侧盖合有箱盖,所述沉淀箱的内部顶面中心位置安装有压力传感器,且压力传感器的正下方设置有气囊,所述气囊通过牵引线固定连接在沉淀箱的内部底面上。Preferably, one side of the top of the sedimentation tank is covered with a box cover, a pressure sensor is installed in the center of the inner top surface of the sedimentation tank, and an air bag is arranged directly below the pressure sensor, and the air bag is fixedly connected by a traction wire On the inner bottom surface of the sedimentation tank.

优选的,所述储水箱靠近过滤罐一侧内壁下端中心位置安装有水位传感器。Preferably, a water level sensor is installed at the center of the lower end of the inner wall of one side of the water storage tank close to the filter tank.

优选的,所述储水箱前端面的下端中心位置连通连接有进水管,所述进水管上安装有电磁阀。Preferably, a water inlet pipe is connected to the central position of the lower end of the front end surface of the water storage tank, and a solenoid valve is installed on the water inlet pipe.

优选的,所述加热器的输入端通过传导线与蓄电池电性连接,所述加热器的出水口密封连接有热水管,所述蓄电池通过传导线分别与太阳能电池板和PLC控制器电性连接。Preferably, the input end of the heater is electrically connected to the battery through a conductive wire, the water outlet of the heater is sealed with a hot water pipe, and the battery is electrically connected to the solar panel and the PLC controller respectively through the conductive wire connect.

优选的,所述PLC控制器通过传导线分别与电磁阀、水位传感器、压力传感器、第一水泵、第二水泵和第三水泵电性连接。Preferably, the PLC controller is electrically connected to the solenoid valve, the water level sensor, the pressure sensor, the first water pump, the second water pump and the third water pump respectively through conductive wires.

(三)有益效果(3) Beneficial effects

本实用新型提供了一种施工现场绿色用水系统,具备以下有益效果:The utility model provides a construction site green water system, which has the following beneficial effects:

(1)本实用新型通过设置集水箱、沉淀箱和过滤罐,使用中,通过雾化喷头喷出的降尘用水以及冷水管和热水管流出的施工现场用水最终都会通过集水箱进行收集,集水箱中收集的废水最终会通过输水管流入沉淀箱中,流入沉淀箱中的废水经过沉淀之后,最后通过第一水泵输送到过滤罐中,通过过滤罐中的活性炭等吸附层的吸附处理之后,再流入储水箱中供施工现场的二次使用,该设置可以实现废水的再循环,解决了现有的施工现场用水系统存在水资源大量浪费的情况,在施工现场中清洗道路、降尘和生活用水等等过程中,水资源都得不到回收再利用,导致了水资源的大量浪费。(1) The utility model is provided with a water collecting tank, a sedimentation tank and a filter tank. During use, the dust-reducing water sprayed by the atomizing nozzle and the construction site water flowing out of the cold water pipe and the hot water pipe will eventually be collected by the water collecting tank. The wastewater collected in the water tank will eventually flow into the sedimentation tank through the water delivery pipe. After the wastewater flowing into the sedimentation tank is precipitated, it is finally transported to the filter tank through the first water pump, and after adsorption treatment by the adsorption layer such as activated carbon in the filter tank, Then it flows into the water storage tank for the secondary use of the construction site. This setting can realize the recycling of waste water, which solves the problem of a large amount of water waste in the existing construction site water system, and cleans roads, dust and domestic water in the construction site. In the process of waiting, the water resources cannot be recycled and reused, resulting in a large amount of waste of water resources.

(2)本实用新型通过设置太阳能电池板和蓄电池,使用中,通过太阳能电池板的设置可以对太阳能进行很好的转化,转化之后的电能最终被储存在蓄电池中,供整个施工现场用水系统的使用,该设置除了在火烧电提供电力的基础上还采用太阳能来提供电力,绿色、环保,解决了现有的施工现场用水系统中伴随着水资源的使用,必然需要大量的电力来配套提供工作,但是先用的电力都是不可生的火烧电,造成了电力的大量浪费的问题。(2) The utility model is provided with solar panels and batteries. During use, the solar energy can be converted well by the installation of solar panels, and the converted electric energy is finally stored in the batteries for the water supply of the entire construction site. In addition to the use of thermal power to provide electricity, this setting also uses solar energy to provide electricity, which is green and environmentally friendly, and solves the problem of the existing construction site water system. Along with the use of water resources, a large amount of electricity must be required to provide work. , but the electricity used first is unburnable fire electricity, resulting in the problem of a lot of waste of electricity.

附图说明Description of drawings

图1为本实用新型整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present utility model;

图2为本实用新型左视图;Fig. 2 is the left side view of the utility model;

图3为本实用新型俯视图;Fig. 3 is the top view of the utility model;

图4为本实用新型右视图;Fig. 4 is the right side view of the utility model;

图5为本实用新型中沉淀箱的内部结构示意图;5 is a schematic diagram of the internal structure of the sedimentation tank in the utility model;

图6为本实用新型中储水箱的内部结构示意图;6 is a schematic diagram of the internal structure of the water storage tank in the utility model;

图7为本实用新型的流程图。FIG. 7 is a flow chart of the utility model.

图中附图标记为:1、太阳能电池板;2、蓄电池;3、传导线;4、热水管;5、加热器;6、第二出水总管;7、冷水管;8、储水箱;9、电磁阀;10、进水管;11、箱盖;12、输水管;13、PLC控制器;14、连接管;15、雾化喷头;16、拦截槽;17、集水箱;18、沉淀箱;19、第一出水总管;20、第三水泵;21、第一水泵;22、过滤罐;23、第二水泵;24、压力传感器;25、气囊;26、牵引线;27、水位传感器。The reference signs in the figure are: 1, solar panel; 2, battery; 3, conductive wire; 4, hot water pipe; 5, heater; 6, second water outlet pipe; 7, cold water pipe; 8, water storage tank; 9. Solenoid valve; 10. Water inlet pipe; 11. Tank cover; 12. Water delivery pipe; 13. PLC controller; 14. Connecting pipe; 15. Atomizing nozzle; 16. Intercept tank; 17. Water collecting tank; 18. Precipitation tank; 19, the first water outlet pipe; 20, the third water pump; 21, the first water pump; 22, the filter tank; 23, the second water pump; 24, the pressure sensor; 25, the air bag; 26, the traction wire; 27, the water level sensor .

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

请参阅图1-7所示,本实用新型提供的一种实施例;一种施工现场绿色用水系统,包括储水箱8、雾化喷头15和沉淀箱18,雾化喷头15的进水口连通连接有连接管14,雾化喷头15至少设置有三个,且雾化喷头15上连接的连接管14均连通连接在第一出水总管19上,雾化喷头15可以对整个系统提供降尘,第一出水总管19的两端为封闭设置,且第一出水总管19上连通连接有输水管12,且该输水管12的另一端与第三水泵20的出水口密封连接,第三水泵20的进水口密封连接有另一段输水管12,且该输水管12的另一端连通连接在储水箱8的一侧下端位置上,雾化喷头15的下方设置有集水箱17,集水箱17的顶部均匀设置有拦截槽16,拦截槽16用于对杂质进行拦截,使用中集水箱17分别位于雾化喷头15的下方、道路的两侧以及日常用水等地方,集水箱17的底部一侧连通连接有输水管12,且该输水管12的另一端连通连接在沉淀箱18的顶部一侧,沉淀箱18的下端一侧侧面上连通连接有一段输水管12,且该输水管12的另一端密封连接在第一水泵21的进水口上,沉淀箱18的顶部一侧盖合有箱盖11,箱盖11的设置可以方便工作人员对沉淀箱18中的泥土进行定期的处理,沉淀箱18的内部顶面中心位置安装有压力传感器24,且压力传感器24的正下方设置有气囊25,所选用的压力传感器24的型号为CYYZ11,气囊25通过牵引线26固定连接在沉淀箱18的内部底面上,气囊25的设置可以在沉淀箱18中水收集满时,挤压压力传感器24,压力传感器24在接收到挤压之后,会将该信息传输给PLC控制器13,PLC控制器13在接收到信息之后会控制第一水泵21启动将沉淀箱18中的水输送到储水箱8,所选用的PLC控制器的型号为S7-400,第一水泵21的出水口上密封连接有另一段输水管12,且输水管12的另一端密封连接在过滤罐22的底部,过滤罐22的顶部通过输水管12与储水箱8的顶部连通连接,过滤罐22中设置有活性炭等吸附层,储水箱8靠近过滤罐22一侧内壁下端中心位置安装有水位传感器27,水位传感器27的设置可以对储水箱8中的水位做实时的检测,所选用的水位传感器27的型号为WMB-FS,储水箱8一侧侧面的下端位置上连通连接有一段输水管12,且该输水管12的另一端与第二水泵23的进水口密封连接,储水箱8前端面的下端中心位置连通连接有进水管10,进水管10上安装有电磁阀9,所选用的电磁阀9的型号为SLDF-25,进水管10外接市政用水,第二水泵23的出水口与另一段输水管12密封连接,且该输水管12的另一端与第二出水总管6连通连接,第二出水总管6的一端为封闭设置,另一端与加热器5的进水口密封连接,且第二出水总管6靠近封闭端的一侧连通连接有冷水管7,加热器5的输入端通过传导线3与蓄电池2电性连接,加热器5的出水口密封连接有热水管4,蓄电池2通过传导线3分别与太阳能电池板1和PLC控制器13电性连接,PLC控制器13通过传导线3分别与电磁阀9、水位传感器27、压力传感器24、第一水泵21、第二水泵23和第三水泵20电性连接。Please refer to Figures 1-7, an embodiment provided by the present utility model; a green water system on a construction site, including a water storage tank 8, an atomizing nozzle 15 and a sedimentation tank 18, and the water inlet of the atomizing nozzle 15 is communicated and connected There are connecting pipes 14, at least three atomizing nozzles 15 are provided, and the connecting pipes 14 connected on the atomizing nozzles 15 are all connected to the first water outlet main pipe 19. The atomizing nozzles 15 can provide dust reduction for the entire system, and the first water outlet Both ends of the main pipe 19 are closed, and the first water outlet main pipe 19 is connected with a water delivery pipe 12, and the other end of the water delivery pipe 12 is sealed with the water outlet of the third water pump 20, and the water inlet of the third water pump 20 is sealed There is another section of water delivery pipe 12 connected, and the other end of the water delivery pipe 12 is connected to the lower end position of one side of the water storage tank 8, a water collection tank 17 is provided below the atomizing nozzle 15, and the top of the water collection tank 17 is evenly provided with interception The tank 16, the interception tank 16 is used to intercept impurities. In use, the water collecting tank 17 is located below the atomizing nozzle 15, on both sides of the road, and in places such as daily water. The bottom side of the water collecting tank 17 is connected with a water delivery pipe 12. , and the other end of the water delivery pipe 12 is connected to the top side of the sedimentation tank 18, a section of water delivery pipe 12 is connected to the side of the lower end of the sedimentation tank 18, and the other end of the water delivery pipe 12 is sealed and connected to the first On the water inlet of the water pump 21, the top side of the sedimentation tank 18 is covered with a tank cover 11. The setting of the tank cover 11 can facilitate the staff to regularly process the soil in the sedimentation tank 18. The center of the inner top surface of the sedimentation tank 18 A pressure sensor 24 is installed at the position, and an air bag 25 is arranged directly below the pressure sensor 24. The model of the selected pressure sensor 24 is CYYZ11. The setting can squeeze the pressure sensor 24 when the water in the sedimentation tank 18 is full. After the pressure sensor 24 receives the squeeze, it will transmit the information to the PLC controller 13, and the PLC controller 13 will control after receiving the information. The first water pump 21 starts to transport the water in the sedimentation tank 18 to the water storage tank 8. The model of the selected PLC controller is S7-400. The water outlet of the first water pump 21 is sealed and connected with another section of water delivery pipe 12, and the The other end of the water pipe 12 is sealed and connected to the bottom of the filter tank 22, and the top of the filter tank 22 is connected to the top of the water storage tank 8 through the water delivery pipe 12. The filter tank 22 is provided with an adsorption layer such as activated carbon, and the water storage tank 8 is close to the filter tank 22. A water level sensor 27 is installed at the center of the lower end of one side of the inner wall. The setting of the water level sensor 27 can perform real-time detection on the water level in the water storage tank 8. The model of the selected water level sensor 27 is WMB-FS. A section of water delivery pipe 12 is communicated and connected at the lower end position, and the other end of the water delivery pipe 12 is sealedly connected with the water inlet of the second water pump 23, and the central position of the lower end of the front end of the water storage tank 8 is connected with a water inlet pipe 10. Solenoid valve 9 is installed, the selected The model of the solenoid valve 9 is SLDF-25, the water inlet pipe 10 is externally connected with municipal water, the water outlet of the second water pump 23 is sealedly connected with another section of the water delivery pipe 12, and the other end of the water delivery pipe 12 is connected to the second water outlet main pipe 6. One end of the second water outlet main pipe 6 is closed, and the other end is sealed with the water inlet of the heater 5, and the side of the second water outlet main pipe 6 close to the closed end is connected with a cold water pipe 7, and the input end of the heater 5 is connected by a conducting wire. 3 is electrically connected with the battery 2, the water outlet of the heater 5 is sealed and connected with a hot water pipe 4, the battery 2 is electrically connected with the solar panel 1 and the PLC controller 13 through the conductive wire 3, and the PLC controller 13 is electrically connected through the conductive wire 3 are respectively electrically connected to the solenoid valve 9, the water level sensor 27, the pressure sensor 24, the first water pump 21, the second water pump 23 and the third water pump 20.

工作原理:使用中,通过雾化喷头15喷出的降尘用水以及冷水管7和热水管4流出的施工现场用水最终都会通过集水箱17进行收集,集水箱17中收集的废水最终会通过输水管12流入沉淀箱18中,流入沉淀箱18中的废水经过沉淀之后,最后通过第一水泵21输送到过滤罐22中,通过过滤罐22中的活性炭等吸附层的吸附处理之后,再流入储水箱8中供施工现场的二次使用,该设置可以实现废水的再循环,通过太阳能电池板1的设置可以对太阳能进行很好的转化,转化之后的电能最终被储存在蓄电池2中,供整个施工现场用水系统的使用,该设置除了在火烧电提供电力的基础上还采用太阳能来提供电力,绿色、环保。Working principle: During use, the dust-reducing water sprayed by the atomizing nozzle 15 and the construction site water flowing out of the cold water pipe 7 and the hot water pipe 4 will eventually be collected by the water collecting tank 17, and the waste water collected in the water collecting tank 17 will eventually be collected through the transport. The water pipe 12 flows into the sedimentation tank 18, and the wastewater flowing into the sedimentation tank 18 is finally transported to the filter tank 22 through the first water pump 21 after sedimentation. The water tank 8 is for secondary use on the construction site, this setting can realize the recycling of waste water, and the solar energy can be well converted by the setting of the solar panel 1, and the converted electric energy is finally stored in the battery 2 for the whole The use of the water system on the construction site, in addition to the electricity provided by the fire, also uses solar energy to provide electricity, which is green and environmentally friendly.

综上可得,本实用新型通过设置太阳能电池板1、蓄电池2、集水箱17、沉淀箱18和过滤罐22,解决了现有的施工现场用水系统中存在水资源大量浪费和现有的施工现场用水系统中不可再生电力资源浪费的问题。To sum up, the utility model solves the problem of a large amount of waste of water resources in the existing construction site water system and the existing construction The problem of waste of non-renewable power resources in on-site water systems.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, in this document, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any relationship between these entities or operations. any such actual relationship or sequence exists. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device that includes a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (7)

1.一种施工现场绿色用水系统,包括储水箱(8)、雾化喷头(15)和沉淀箱(18),其特征在于:所述雾化喷头(15)的进水口连通连接有连接管(14),所述雾化喷头(15)至少设置有三个,且雾化喷头(15)上连接的连接管(14)均连通连接在第一出水总管(19)上,所述第一出水总管(19)的两端为封闭设置,且第一出水总管(19)上连通连接有输水管(12),且该输水管(12)的另一端与第三水泵(20)的出水口密封连接,所述第三水泵(20)的进水口密封连接有另一段输水管(12),且该输水管(12)的另一端连通连接在储水箱(8)的一侧下端位置上,所述雾化喷头(15)的下方设置有集水箱(17),所述集水箱(17)的底部一侧连通连接有输水管(12),且该输水管(12)的另一端连通连接在沉淀箱(18)的顶部一侧,所述沉淀箱(18)的下端一侧侧面上连通连接有一段输水管(12),且该输水管(12)的另一端密封连接在第一水泵(21)的进水口上,所述第一水泵(21)的出水口上密封连接有另一段输水管(12),且输水管(12)的另一端密封连接在过滤罐(22)的底部,所述过滤罐(22)的顶部通过输水管(12)与储水箱(8)的顶部连通连接,所述储水箱(8)一侧侧面的下端位置上连通连接有一段输水管(12),且该输水管(12)的另一端与第二水泵(23)的进水口密封连接,所述第二水泵(23)的出水口与另一段输水管(12)密封连接,且该输水管(12)的另一端与第二出水总管(6)连通连接,所述第二出水总管(6)的一端为封闭设置,另一端与加热器(5)的进水口密封连接,且第二出水总管(6)靠近封闭端的一侧连通连接有冷水管(7)。1. A construction site green water system, comprising a water storage tank (8), an atomizing nozzle (15) and a sedimentation tank (18), characterized in that: the water inlet of the atomizing nozzle (15) is communicated and connected with a connecting pipe (14), at least three atomizing nozzles (15) are provided, and the connecting pipes (14) connected to the atomizing nozzles (15) are all connected to the first water outlet main pipe (19), the first water outlet Both ends of the main pipe (19) are closed, and the first water outlet main pipe (19) is connected with a water delivery pipe (12), and the other end of the water delivery pipe (12) is sealed with the water outlet of the third water pump (20). connection, the water inlet of the third water pump (20) is sealed and connected with another section of water delivery pipe (12), and the other end of the water delivery pipe (12) is connected to the lower end position of one side of the water storage tank (8), so A water collecting tank (17) is provided below the atomizing nozzle (15), and a water delivery pipe (12) is connected to the bottom side of the water collecting tank (17), and the other end of the water delivery pipe (12) is connected to the On the top side of the sedimentation tank (18), a section of water delivery pipe (12) is communicated on the side of the lower end of the sedimentation tank (18), and the other end of the water delivery pipe (12) is sealed and connected to the first water pump (12). 21) on the water inlet, the water outlet of the first water pump (21) is sealed and connected with another section of water delivery pipe (12), and the other end of the water delivery pipe (12) is sealed and connected to the bottom of the filter tank (22), The top of the filter tank (22) is communicated and connected with the top of the water storage tank (8) through a water delivery pipe (12), and a section of water delivery pipe (12) is connected to the lower end position of one side of the water storage tank (8), And the other end of the water delivery pipe (12) is sealedly connected with the water inlet of the second water pump (23), the water outlet of the second water pump (23) is sealed with another section of the water delivery pipe (12), and the water delivery pipe ( The other end of 12) is in communication with the second water outlet main pipe (6), one end of the second water outlet main pipe (6) is closed and the other end is sealed with the water inlet of the heater (5), and the second water outlet main pipe (6) is sealed. (6) A cold water pipe (7) is communicated and connected to the side close to the closed end. 2.根据权利要求1所述的一种施工现场绿色用水系统,其特征在于:所述集水箱(17)的顶部均匀设置有拦截槽(16)。2 . A construction site green water system according to claim 1 , characterized in that: the top of the water collecting tank ( 17 ) is evenly provided with intercepting grooves ( 16 ). 3 . 3.根据权利要求1所述的一种施工现场绿色用水系统,其特征在于:所述沉淀箱(18)的顶部一侧盖合有箱盖(11),所述沉淀箱(18)的内部顶面中心位置安装有压力传感器(24),且压力传感器(24)的正下方设置有气囊(25),所述气囊(25)通过牵引线(26)固定连接在沉淀箱(18)的内部底面上。3. A construction site green water system according to claim 1, characterized in that: the top side of the sedimentation tank (18) is covered with a box cover (11), and the interior of the sedimentation tank (18) A pressure sensor (24) is installed at the central position of the top surface, and an air bag (25) is arranged directly below the pressure sensor (24), and the air bag (25) is fixedly connected to the interior of the sedimentation tank (18) through a pulling wire (26). on the underside. 4.根据权利要求1所述的一种施工现场绿色用水系统,其特征在于:所述储水箱(8)靠近过滤罐(22)一侧内壁下端中心位置安装有水位传感器(27)。4. A construction site green water system according to claim 1, characterized in that: a water level sensor (27) is installed at the center of the lower end of the inner wall of the water storage tank (8) close to one side of the filter tank (22). 5.根据权利要求1所述的一种施工现场绿色用水系统,其特征在于:所述储水箱(8)前端面的下端中心位置连通连接有进水管(10),所述进水管(10)上安装有电磁阀(9)。5. A construction site green water system according to claim 1, characterized in that: a water inlet pipe (10) is connected to the central position of the lower end of the front end of the water storage tank (8), and the water inlet pipe (10) A solenoid valve (9) is installed on it. 6.根据权利要求1所述的一种施工现场绿色用水系统,其特征在于:所述加热器(5)的输入端通过传导线(3)与蓄电池(2)电性连接,所述加热器(5)的出水口密封连接有热水管(4),所述蓄电池(2)通过传导线(3)分别与太阳能电池板(1)和PLC控制器(13)电性连接。6. A construction site green water system according to claim 1, characterized in that: the input end of the heater (5) is electrically connected to the battery (2) through a conducting wire (3), and the heater (5) is electrically connected to the battery (2). The water outlet of (5) is sealed and connected with a hot water pipe (4), and the storage battery (2) is electrically connected to the solar cell panel (1) and the PLC controller (13) respectively through the conducting wire (3). 7.根据权利要求6所述的一种施工现场绿色用水系统,其特征在于:所述PLC控制器(13)通过传导线(3)分别与电磁阀(9)、水位传感器(27)、压力传感器(24)、第一水泵(21)、第二水泵(23)和第三水泵(20)电性连接。7. A construction site green water system according to claim 6, characterized in that: the PLC controller (13) is connected to the solenoid valve (9), the water level sensor (27), the pressure The sensor (24), the first water pump (21), the second water pump (23) and the third water pump (20) are electrically connected.
CN201920838424.3U 2019-06-04 2019-06-04 Green water system of job site Expired - Fee Related CN210066880U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920838424.3U CN210066880U (en) 2019-06-04 2019-06-04 Green water system of job site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920838424.3U CN210066880U (en) 2019-06-04 2019-06-04 Green water system of job site

Publications (1)

Publication Number Publication Date
CN210066880U true CN210066880U (en) 2020-02-14

Family

ID=69456484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920838424.3U Expired - Fee Related CN210066880U (en) 2019-06-04 2019-06-04 Green water system of job site

Country Status (1)

Country Link
CN (1) CN210066880U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114772771A (en) * 2022-05-10 2022-07-22 四川先舟建设工程有限公司 Highway engineering environment-friendly construction device and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114772771A (en) * 2022-05-10 2022-07-22 四川先舟建设工程有限公司 Highway engineering environment-friendly construction device and construction method

Similar Documents

Publication Publication Date Title
CN202028569U (en) Photovoltaic water pump cleaning device
CN103046655B (en) Building exterior wall pre-embedded type heat pipe energy-saving device
CN101067352A (en) Convenient environment protection energy-saving public bathing device
CN206110517U (en) Air conditioner waste water and roof catchment and retrieve clean system
CN201053214Y (en) Environmental protection energy-saving public bathing device
CN204185899U (en) Green energy-saving buildings rainwater collecting and treating system
CN202380515U (en) Multi-purpose rainwater utilization system
CN206467751U (en) A kind of pumping equipment in construction of modern city
CN211435531U (en) Green energy-concerving and environment-protective sprinkler for construction
CN211532208U (en) An automatic control farmland runoff collection and irrigation device
CN205975261U (en) Multipurpose underground piping
CN204787428U (en) Utilize dirty water source heat pump system of waste water
CN207228278U (en) A kind of intelligent city builds rain recycling system
CN112081312A (en) Energy-saving drainage system for house building
CN207095059U (en) A kind of solar energy heat distribution system being combined with city integrated piping lane
CN201053215Y (en) Floating environmental protection energy-saving public bathing device
CN206069599U (en) A kind for the treatment of of dyeing wastewater equipment
CN211935706U (en) Rainwater wastewater collecting and recycling device
CN206681080U (en) A kind of secondary recovery water roofing cooling integrated system
CN210975946U (en) A roof rainwater collection and reuse system
CN203546819U (en) Fully-automatic comprehensive rainwater utilization combination system
CN102155036A (en) Engineering rainfall or rainwater recycling system
CN209227739U (en) A kind of ground water permeable device based on sponge urban construction
CN209763366U (en) Wet curtain cooling system based on rainwater is collected
CN206495259U (en) A kind of cell generates electricity and water supply system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200214