CN210053094U - Tool for shortening 10 KV live pole removing time - Google Patents

Tool for shortening 10 KV live pole removing time Download PDF

Info

Publication number
CN210053094U
CN210053094U CN201920435381.4U CN201920435381U CN210053094U CN 210053094 U CN210053094 U CN 210053094U CN 201920435381 U CN201920435381 U CN 201920435381U CN 210053094 U CN210053094 U CN 210053094U
Authority
CN
China
Prior art keywords
screw
screw rod
insulating
limiting plate
install
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920435381.4U
Other languages
Chinese (zh)
Inventor
程林
倪金峰
黄超
姚荣华
陈华刚
罗烨洪
李立岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Tonglu Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Tonglu Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Tonglu Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201920435381.4U priority Critical patent/CN210053094U/en
Application granted granted Critical
Publication of CN210053094U publication Critical patent/CN210053094U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a shorten 10 kilovolts and remove multiplexer utensil of pole setting time with electricity, be connected with first screw rod and first screw rod mount pad between first insulation vaulting pole and the second insulation vaulting pole, the one end fixed connection of first screw rod and first insulation vaulting pole, the slip axle sleeve has been cup jointed to the periphery of first insulation vaulting pole, install the fourth screw rod on the third screw rod mount pad, install the installation axle on the fifth screw rod, install the second limiting plate on the installation axle, install the fifth screw rod through the fourth screw rod mount pad on the installation axle, install the third limiting plate on the fifth screw rod, install the second screw rod mount pad through the second screw rod on the third insulation vaulting pole, install first mounting panel through the third screw rod on the second screw rod mount pad, install a pair of hinge on the first mounting panel, all install first limiting plate on the hinge. The utility model discloses simple structure, support stability is good, and it is convenient to adjust, and applicable not interval cable's in the actual operation props the demand immediately, has improved the flexibility when using.

Description

Tool for shortening 10 KV live pole removing time
Technical Field
The utility model relates to a power equipment's technical field especially relates to a shorten 10 kilovolts and remove multiplexer utensil of pole setting time with electricity.
Background
The traditional electrified pole erecting and withdrawing mainly has 2 pole erecting modes. One is a hanging method and the other is a crosswalk translation method. Due to different construction procedures, the crosswalk translation method is greatly influenced by environmental factors. Therefore, in the current live pole-erecting and pole-withdrawing work project, the hanging method is generally adopted for work. When the pole is removed immediately with electricity in the hanging method, the control rope is very difficult to be banded to the pole body (electrified circuit influences control rope position), when carrying and carrying the pole, the pole amplitude of rocking is great, shields the apparatus to lead to the fact irreversible damage, destruction to the thread insulation, presses the main line absolutely even, causes the incident. A large amount of time is consumed to adjust the position of the electric pole in the operation process.
Disclosure of Invention
An object of the utility model is to provide a shorten 10 kilovolts and remove multiplexer utensil of pole setting time with electricity, simple structure, support stability is good, and it is convenient to adjust, and applicable not the requirement of standing of propping of interval cable in actual operation has improved the flexibility when using, can shorten greatly.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a tool for shortening 10 kV charged pole removing time comprises a first insulating support rod, a second insulating support rod and a third insulating support rod, wherein a first screw and a first screw mounting seat are connected between the first insulating support rod and the second insulating support rod, the first screw is fixedly connected with one end of the first insulating support rod, the first screw mounting seat is fixedly connected with the second insulating support rod, a threaded hole matched with the first screw is formed in the first screw mounting seat, a sliding shaft sleeve is sleeved on the periphery of the first insulating support rod, the third insulating support rod is mounted on the sliding shaft sleeve, a third screw mounting seat is mounted at one end of each of the first insulating support rod and the second insulating support rod, a fourth screw is mounted on the third screw mounting seat, a mounting shaft is mounted at one end, far away from the third screw mounting seat, of the fifth screw, and a second limiting plate is mounted on the mounting shaft, the second limiting plate is arranged perpendicular to the installation shaft, a fourth screw mounting seat is installed at one end, away from the fourth screw, of the installation shaft, a fifth screw is installed on the fourth screw mounting seat, a third limiting plate is installed on the fifth screw, the third limiting plate is arranged perpendicular to the installation shaft, a second screw is installed at one side, away from the sliding shaft sleeve, of the third insulating support rod, a second screw mounting seat is installed at one side, away from the third insulating support rod, of the second screw, a third screw is installed at one side, away from the second screw, of the second screw mounting seat, a first mounting plate is installed at one side, away from the second screw mounting seat, of the third screw, a pair of hinges are installed on the first mounting plate in a symmetrical mode relative to the center of the first mounting plate, first limiting plates are installed on the hinges, and the first limiting plates are enclosed to form.
Further, first piston is all installed to the installation intracavity and the one side that is located first limiting plate relatively, first piston is kept away from one side of first limiting plate and is installed first piston axle, the deflector is installed to one side that first piston was kept away from to first piston axle, be equipped with first spring between first piston and the deflector, first spring cup joints the periphery at first piston axle.
Furthermore, one side of the guide plate, which is far away from the first piston shaft, is provided with a plurality of anti-skid protrusions.
Furthermore, a supporting rod is installed on the third insulating supporting rod, a second installation plate is installed on one side, away from the third insulating supporting rod, of the supporting rod, a first rotating shaft is installed on the second installation plate, a first roller is installed on the first rotating shaft, a first guide groove is formed in the first insulating supporting rod, and the first roller is located in the first guide groove.
Furthermore, a second guide groove is formed between the first insulation support rod and the sliding shaft sleeve, a third mounting plate is mounted on one side, close to the second guide groove, of the sliding shaft sleeve, a second rotating shaft is mounted on the third mounting plate, a second roller is mounted on the second rotating shaft, and the second roller is arranged in contact with the outer wall of the first insulation support rod.
After the technical scheme is adopted, the utility model has the advantages of as follows:
1. when the tool is used, the first screw rod can stretch in the first screw rod mounting seat, so that the adjustment of the distance between the first insulating support rod and the second insulating support rod is realized, the requirements of cables with different lengths on the distance in the process of opening are met, the flexibility of the tool in use is improved, meanwhile, the third insulating support rod can move in the horizontal direction by sliding the sliding shaft sleeve on the first insulating support rod, the requirements of cable support at different positions in actual operation are met, the flexibility of the tool in use is improved, the first limiting plate can rotate around the hinge, the first limiting plate realizes the limiting support of the cables, the second screw rod can be screwed in the second screw rod mounting seat to stretch the length of the third insulating support rod, the requirements of the different cable distances on the distance in the process of opening are met, and meanwhile, the third screw rod is screwed in the second screw rod mounting seat to realize that the first mounting plate can be detachably mounted on the third screw rod, can replace the first limiting plate of different specifications to the demand of strutting to not unidimensional cable when satisfying the in-service use, the flexibility that multiplexer utensil used has been improved, and the fourth screw rod revolves soon in the third screw rod mount pad, the regulation of first insulation vaulting pole and second insulation vaulting pole length has been realized, it is rotatory around the fifth screw rod by the third limiting plate, it is spacing to the cable to realize by the combination of third limiting plate and second limiting plate, the device simple structure, support stability is good, it is convenient to adjust, applicable bracing demand of not equidistance cable in the actual operation, flexibility when having improved the use.
2. Through just being located the first piston of the relative side-mounting of first limiting plate in the installation cavity, install first piston axle on the first piston, install the deflector on the first piston axle, be equipped with first spring between deflector and the first piston, first piston axle is flexible in first piston to under the flexible effect of first spring, realized the support of deflector to the cable, improved the stability of supporting, avoid the cable to rock in the installation cavity.
3. Through keep away from a plurality of non-slip raised of one side installation of first piston axle at the deflector, non-slip raised can improve the stability that the cable supported.
4. The supporting rod is installed on the third insulating supporting rod, the second installation plate is installed on one side, away from the third insulating supporting rod, of the supporting rod, the first rotating shaft is installed on the second installation plate, the first rotating shaft rotates to drive the first idler wheel to rotate, the first idler wheel slides in the first guide groove, the third insulating supporting rod is guaranteed to move more stably by the movement of the first idler wheel when the third insulating supporting rod is moved, and the supporting stability of the third insulating supporting rod is further improved by the supporting rod.
5. Through establishing the second guide way between first insulation vaulting pole and slip axle sleeve to at the side-mounting third mounting panel of slip axle sleeve near first insulation vaulting pole, install the second gyro wheel through the second pivot on the third mounting panel, the second gyro wheel has not only realized the guide effect when removing the slip axle sleeve, improves the stability of removal, simultaneously owing to set up the second gyro wheel and made the slip axle sleeve remove more smoothly, has made things convenient for the removal operation of third insulation vaulting pole.
Drawings
The present invention will be further explained with reference to the accompanying drawings:
fig. 1 is a schematic structural diagram of a tool for shortening a pole-removing time of 10 kv in an electrified state, which is provided in embodiment 1 of the present invention;
FIG. 2 is an enlarged view of a portion of FIG. 1 at A;
FIG. 3 is an enlarged view of a portion of FIG. 1 at B;
fig. 4 is a schematic structural diagram of a tool for shortening the time for removing a pole of 10 kv in an electrified state, according to embodiment 2 of the present invention;
FIG. 5 is an enlarged view of a portion of FIG. 4 at C;
fig. 6 is a schematic structural view for shortening the time for removing the pole in an electrified state of 10 kv according to embodiment 3 of the present invention;
FIG. 7 is an enlarged partial schematic view of FIG. 6 at D;
fig. 8 is a partially enlarged schematic view at E in fig. 6.
Detailed Description
The invention will be further explained with reference to the drawings and the specific embodiments. It is to be understood that the following terms "upper," "lower," "left," "right," "longitudinal," "lateral," "inner," "outer," "vertical," "horizontal," "top," "bottom," and the like are used in an orientation or positional relationship relative to one another only as illustrated in the accompanying drawings and are used merely for convenience in describing and simplifying the invention, and do not indicate or imply that the device/component so referred to must have a particular orientation or be constructed and operated in a particular orientation and therefore should not be considered as limiting the invention.
Example 1
As shown in fig. 1-3, the utility model provides a tool for shortening 10 kv live-line pole-removing time, which comprises a first insulating stay bar 1, a second insulating stay bar 2 and a third insulating stay bar 3, wherein a first screw 5 and a first screw mounting seat 6 are connected between the first insulating stay bar 1 and the second insulating stay bar 2, the first screw 5 is fixedly connected with one end of the first insulating stay bar 1, the first screw mounting seat 6 is fixedly connected with the second insulating stay bar 2, a threaded hole matched with the first screw 5 is arranged in the first screw mounting seat 6, a sliding shaft sleeve 4 is sleeved on the periphery of the first insulating stay bar 1, the third insulating stay bar 3 is mounted on the sliding shaft sleeve 4, a third screw mounting seat 14 is mounted at one end of the first insulating stay bar 1 and one end of the second insulating stay bar 2, a fourth screw 15 is mounted on the third screw mounting seat 14, a mounting shaft 16 is mounted at one end of the fifth screw 15 far from the third screw mounting seat 14, install the second limiting plate 17 on the installation axle 16, second limiting plate 17 arranges with installation axle 16 is perpendicular, install the one end that fourth screw 15 was kept away from to installation axle 16 and install fourth screw rod mount pad 19, install fifth screw rod 20 on the fourth screw rod mount pad 19, install third limiting plate 18 on the fifth screw rod 20, third limiting plate 18 arranges with installation axle 16 is perpendicular, third insulating vaulting pole 3 is kept away from one side of sliding shaft sleeve 4 and is installed second screw rod 7, second screw rod 7 is kept away from one side of third insulating vaulting pole 3 and is installed second screw rod mount pad 8, second screw rod mount pad 8 is kept away from one side of second screw rod 7 and is installed third screw rod 9, third screw rod 9 is kept away from one side of second screw rod mount pad 8 and is installed first mounting panel 10, install a pair of hinge 11 on the first mounting panel 10 relative to its central symmetry, all install first limiting plate 12 on the hinge 11, first limiting plate 12 encloses and closes and forms installation cavity 13. When the tool is used, the first screw 5 can stretch in the first screw mounting seat 6, so that the adjustment of the distance between the first insulating support rod 1 and the second insulating support rod 2 is realized, the requirements of cables with different lengths during stretching are met, the use flexibility of the tool is improved, meanwhile, the sliding shaft sleeve 4 slides on the first insulating support rod 1 to realize the movement of the third insulating support rod 3 in the horizontal direction, the requirements of cable support at different positions in actual operation are met, the use flexibility of the tool is improved, the first limit plate 12 can rotate around the hinge 11, the first limit plate 12 realizes the limit support of the cables, the second screw 7 can stretch the length of the third insulating support rod 3 by screwing in the second screw mounting seat 8, the requirements of the different cable distances during stretching are met, and the third screw 9 screws in the second screw mounting seat 8, realized first mounting panel 10 demountable installation on third screw 9, can replace the first limiting plate 12 of different specifications, to the demand of strutting of unidimensional cable when satisfying the in-service use, the flexibility that the multiplexer utensil used has been improved, and fourth screw 15 revolves soon in third screw mount pad 14, the regulation of first insulation vaulting pole 1 and the 2 lengths of second insulation vaulting pole has been realized, it is rotatory around fifth screw 20 by third limiting plate 18, it is spacing to the cable to realize by the combination of third limiting plate 18 and second limiting plate 17, the device simple structure, support stability is good, it is convenient to adjust, applicable not equidistance cable's in the actual operation prop the demand of founding, flexibility when having improved the use.
Example 2
Referring to fig. 4 to 5, embodiment 2 is different from embodiment 1 in that a first piston 21 is installed on both sides of the installation cavity 13 opposite to the first limit plate 12, a first piston shaft 22 is installed on one side of the first piston 21 away from the first limit plate 12, a guide plate 24 is installed on one side of the first piston shaft 22 away from the first piston 21, a first spring 23 is arranged between the first piston 21 and the guide plate 24, and the first spring 23 is sleeved on the periphery of the first piston shaft 22. Through in installation cavity 13 and be located the first piston 21 of the relative side-mounting of first limiting plate 12, install first piston shaft 22 on the first piston 21, install deflector 24 on the first piston shaft 22, be equipped with first spring 23 between deflector 24 and the first piston 21, first piston shaft 22 is flexible in first piston 21, and under the concertina action of first spring 23, the support of deflector 24 to the cable has been realized, the stability of support has been improved, avoid the cable to rock in installation cavity 13.
In the present embodiment 2, the guide plate 24 is provided with a plurality of anti-slip projections 25 on the side away from the first piston shaft 22. By mounting a plurality of cleats 25 on the side of the guide plate 24 remote from the first piston shaft 22, the cleats 25 can improve the stability of the cable support.
Example 3
Referring to fig. 6 to 8, embodiment 3 differs from embodiment 1 in that a support rod 26 is mounted on a third insulating support rod 3, a second mounting plate 28 is mounted on a side of the support rod 26 away from the third insulating support rod 3, a first rotating shaft 29 is mounted on the second mounting plate 28, a first roller 30 is mounted on the first rotating shaft 29, a first guide groove 27 is formed in the first insulating support rod 1, and the first roller 30 is located in the first guide groove 27. By installing the supporting rod 26 on the third insulating supporting rod 3, installing the second mounting plate 28 on the side of the supporting rod 26 away from the third insulating supporting rod 3, installing the first rotating shaft 29 on the second mounting plate 28, rotating the first rotating shaft 29 to drive the first roller 30 to rotate, sliding the first roller 30 in the first guide groove 27, when the third insulating supporting rod 3 is moved, the movement of the first roller 30 ensures that the third insulating supporting rod 3 is moved more stably, and the supporting rod 26 further improves the supporting stability of the third insulating supporting rod 3.
In this embodiment 3, a second guide groove 31 is provided between the first insulating strut 1 and the sliding sleeve 4, a third mounting plate 32 is mounted on one side of the sliding sleeve 4 close to the second guide groove 31, a second rotating shaft 33 is mounted on the third mounting plate 32, a second roller 34 is mounted on the second rotating shaft 33, and the second roller 34 is arranged in contact with the outer wall of the first insulating strut 1. Through establishing second guide way 31 between first insulating stay 1 and sliding shaft sleeve 4 to at sliding shaft sleeve 4 one side installation third mounting panel 32 that is close to first insulating stay 1, install second gyro wheel 34 through second pivot 33 on the third mounting panel 32, second gyro wheel 34 has not only realized the guide effect when moving sliding shaft sleeve 4, improves the stability of removal, simultaneously because set up second gyro wheel 34 and make sliding shaft sleeve 4 remove more smoothly, has made things convenient for the removal operation of third insulating stay 3.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions, and the terms "comprise", "include", or any other variation thereof are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the spirit and scope of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. A tool for shortening 10 kV pole removing time in an electrified way is characterized by comprising a first insulating stay bar, a second insulating stay bar and a third insulating stay bar, wherein a first screw and a first screw mounting seat are connected between the first insulating stay bar and the second insulating stay bar, the first screw is fixedly connected with one end of the first insulating stay bar, the first screw mounting seat is fixedly connected with the second insulating stay bar, a threaded hole matched with the first screw is formed in the first screw mounting seat, a sliding shaft sleeve is sleeved on the periphery of the first insulating stay bar, the third insulating stay bar is mounted on the sliding shaft sleeve, a third screw mounting seat is mounted at one end of each of the first insulating stay bar and the second insulating stay bar, a fourth screw is mounted on the third screw mounting seat, a fifth screw is mounted on the fourth screw mounting seat, and a mounting shaft is mounted at one end, far away from the third screw mounting seat, of the fifth screw, the installation epaxial second limiting plate of installing, the second limiting plate is arranged with the installation axle is perpendicular, the installation axle is kept away from the one end of fourth screw rod and is installed the fourth screw rod mount pad, install the third limiting plate on the fifth screw rod, the third limiting plate is arranged with the installation axle is perpendicular, the third insulating vaulting pole is kept away from one side of slip axle sleeve and is installed the second screw rod, the second screw rod is kept away from one side of third insulating vaulting pole and is installed the second screw rod mount pad, the second screw rod mount pad is kept away from one side of second screw rod and is installed the third screw rod, the third screw rod is kept away from one side of second screw rod mount pad and is installed first mounting panel, a pair of hinge is installed to relative central symmetry on the first mounting panel, all install first limiting plate on the hinge, first limiting plate encloses to close and.
2. The tool for shortening the time for pulling up 10 kv of power supply voltage is recited in claim 1, wherein a first piston is installed at one side of the installation cavity opposite to the first limiting plate, a first piston shaft is installed at one side of the first piston far away from the first limiting plate, a guide plate is installed at one side of the first piston shaft far away from the first piston, a first spring is arranged between the first piston and the guide plate, and the first spring is sleeved on the periphery of the first piston shaft.
3. The tool for shortening the time for removing a pole of 10 kv with power according to claim 2, wherein the side of the guide plate away from the first piston shaft is provided with a plurality of anti-slip protrusions.
4. The tool for shortening the time for removing a 10 kv pole with electricity as claimed in claim 1, wherein a support rod is mounted on the third insulating support rod, a second mounting plate is mounted on a side of the support rod away from the third insulating support rod, a first rotating shaft is mounted on the second mounting plate, a first roller is mounted on the first rotating shaft, a first guide groove is formed in the first insulating support rod, and the first roller is located in the first guide groove.
5. The tool for shortening the time for removing a 10 kv charged pole as claimed in claim 1, wherein a second guide slot is provided between the first insulating support rod and the sliding sleeve, a third mounting plate is mounted on one side of the sliding sleeve close to the second guide slot, a second rotating shaft is mounted on the third mounting plate, a second roller is mounted on the second rotating shaft, and the second roller is arranged in contact with the outer wall of the first insulating support rod.
CN201920435381.4U 2019-04-02 2019-04-02 Tool for shortening 10 KV live pole removing time Active CN210053094U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920435381.4U CN210053094U (en) 2019-04-02 2019-04-02 Tool for shortening 10 KV live pole removing time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920435381.4U CN210053094U (en) 2019-04-02 2019-04-02 Tool for shortening 10 KV live pole removing time

Publications (1)

Publication Number Publication Date
CN210053094U true CN210053094U (en) 2020-02-11

Family

ID=69378227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920435381.4U Active CN210053094U (en) 2019-04-02 2019-04-02 Tool for shortening 10 KV live pole removing time

Country Status (1)

Country Link
CN (1) CN210053094U (en)

Similar Documents

Publication Publication Date Title
KR101335928B1 (en) Apparatus for adjusting position of power transmission cable in electric pole
CN209403388U (en) Bird-scaring unit
CN202004372U (en) Tool for live-line replacing large disc diameter and deadweight dead end insulator string
CN108331427A (en) A kind of flexible temporary cross arm device of 10kV distribution lines livewire work hand-rail type
CN107947059B (en) Rising mechanism of communication cable bracing piece
CN204758682U (en) Transformer substation is with high -pressure electroscope of angularly adjustable
CN210053094U (en) Tool for shortening 10 KV live pole removing time
CN201766276U (en) Power supply device for glass fiber reinforced plastic anchor rod forming device
CN207398704U (en) A kind of transmission line antivibration hammer installs resetting apparatus
CN107290352B (en) Overhead transmission line wireless monitor and two-place wireless monitoring system
CN203491604U (en) High-voltage tension resistant insulator string auxiliary installation device
CN211407424U (en) Bird repelling device for high-altitude cable
CN109495060B (en) Solar panel supporting structure
CN208088950U (en) A kind of flexible temporary cross arm device of 10kV distribution lines livewire work hand-rail type
CN110523681B (en) Post insulator cleaning device of transformer substation
CN103762519B (en) A kind of dual-purpose wing type clamp apparatus of self-mountable & dismountuble
CN208955596U (en) A kind of angle steel tower adjustable cable holder
CN105914085A (en) Switching-off device
CN111075166A (en) Automatic wall plastering machine and plastering method
CN206020766U (en) A kind of power transmission line column draws lower securing member with OPGW insulation
CN204144803U (en) A kind of device of charged for replacement cross arm insulator
CN212435195U (en) Operation joint capable of being installed on insulating rod
CN110071456A (en) A kind of Work tool for shortening 10 kv electriferous and removing the upright bar time
CN215902281U (en) Wiping device for insulator
CN213339876U (en) Post insulator convenient to be connected with high-voltage wire connecting tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant