CN210032147U - Prefabricated device for temporarily sealing post-cast strip of basement outer wall - Google Patents

Prefabricated device for temporarily sealing post-cast strip of basement outer wall Download PDF

Info

Publication number
CN210032147U
CN210032147U CN201920507483.2U CN201920507483U CN210032147U CN 210032147 U CN210032147 U CN 210032147U CN 201920507483 U CN201920507483 U CN 201920507483U CN 210032147 U CN210032147 U CN 210032147U
Authority
CN
China
Prior art keywords
prefabricated
post
cast strip
wall
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920507483.2U
Other languages
Chinese (zh)
Inventor
赵幸
于建兵
杨杰
邸书茵
代小玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Construction Engineering Co ltd
Original Assignee
China Gezhouba Group No 6 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 6 Engineering Co Ltd filed Critical China Gezhouba Group No 6 Engineering Co Ltd
Priority to CN201920507483.2U priority Critical patent/CN210032147U/en
Application granted granted Critical
Publication of CN210032147U publication Critical patent/CN210032147U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model provides a prefabricated device of temporarily closed basement outer wall post-cast strip, includes concrete component, first built-in fitting, second built-in fitting, first built-in fitting is the L type, and first built-in fitting one end elbow bend part is pre-buried in the concrete component, and the vertical part in first built-in fitting other end is connected with basement outer wall structure owner muscle when the installation. And one part of the second embedded part is embedded in the concrete member, and the other part of the second embedded part leaks outside. The concrete member is provided with a preformed hole. And the second embedded part and the preformed hole form a set of fixed bolt structure together. The utility model relates to a prefabricated device for temporarily sealing a basement exterior wall post-cast strip, which is a reinforced concrete prefabricated cover plate, the prefabricated cover plate can temporarily seal the basement post-cast strip, and other engineering constructions such as basement exterior wall waterproofing engineering, backfill and the like are not affected; the prefabricated cover plate can be manufactured in batches, is convenient to construct, is economical and applicable, and can be repeatedly used for many times because the template for manufacturing the prefabricated part is a shaping template.

Description

Prefabricated device for temporarily sealing post-cast strip of basement outer wall
Technical Field
The utility model relates to a temporarily seal prefabricated device in basement outer wall post-cast strip relates to the house and builds engineering basement construction field.
Background
The design specification of the existing concrete structure makes clear requirements, and the maximum distance between expansion joints of the concrete structure is strictly designed and calculated. This requires the designer to carefully handle the adverse effects on the structure due to the overlength in the design of the structure. When the space between the expansion joints of the structure is increased or the expansion joints are not designed, practical measures must be taken to prevent the structure from cracking. Among measures for properly increasing the maximum distance of the expansion joint, an anti-cracking measure is adopted in the structural construction stage, and the method is an effective method for reducing adverse effects of concrete shrinkage at home and abroad. The common practice in China is to set a post-construction casting strip. When the structure has a large height difference but the structural design can not be provided with a permanent deformation joint, a structural post-cast strip is also often used to solve the problem of uneven settlement. The multi-storey and high-rise building construction project designed with the basement or other construction projects with underground projects are all provided with post-settlement casting belts so as to solve the problem of structural difference settlement in the construction stage.
In the construction of the basement outer wall post-cast strip structure, the concrete post-cast time of the post-cast strip is not uniform due to design and structure differences, but most of the post-cast strip is closed by post-casting 42 days after concrete of structures on two sides of the post-cast strip is cast. According to the traditional process, after the required time for concrete sealing reaches the design requirement, chiseling and cleaning, erecting a template, pouring concrete, removing the template, curing, waterproof construction and backfilling are carried out, so that the construction period is long, the backfilling of earthwork can not generate great influence on a construction site and a construction road, and the construction operation of outdoor engineering is also influenced.
Disclosure of Invention
In order to solve the technical problem, the utility model provides a prefabricating device for temporarily sealing a basement outer wall post-cast strip, which is a reinforced concrete prefabricated cover plate, the prefabricated cover plate can temporarily seal the basement post-cast strip, and other engineering constructions such as basement outer wall waterproofing engineering and backfill are not affected; the prefabricated cover plate can be manufactured in batches, is convenient to construct, is economical and applicable, and can be repeatedly used for many times because the template for manufacturing the prefabricated part is a shaping template.
The utility model discloses the technical scheme who takes does:
a prefabricating device for temporarily sealing a post-cast strip of an outer wall of a basement comprises a concrete member, a first embedded part and a second embedded part, wherein the first embedded part is L-shaped, a right-angled elbow part at one end of the first embedded part is embedded in the concrete member, and a vertical part at the other end of the first embedded part is connected with a main rib of the structure of the outer wall of the basement when the vertical part is installed;
one part of the second embedded part is embedded in the concrete member, and the other part of the second embedded part is exposed;
the concrete member is provided with a preformed hole;
and the second embedded part and the preformed hole form a set of fixed bolt structure together.
The first embedded part is phi mm12 steel bars.
The second embedded parts are multiple, the length of each embedded part is 200mm, the second embedded parts are embedded in the upper end of the concrete member, the width of the second embedded parts from the edges of the two sides of the concrete member is 300mm, the position of the lower end of the concrete member is provided with a preformed hole 4, and the prefabricated cover plate is formed through form removal and maintenance.
The prefabricated apron of polylith is installed at basement outer wall post-cast strip upstream face from supreme down, and every prefabricated apron of installation just uses welding mode to be connected fixedly with first built-in fitting and post-cast strip structure owner muscle, and the second built-in fitting of two adjacent prefabricated apron, preformed hole form one set of fixed bolt structure, and the prefabricated apron of polylith finally forms holistic post-cast strip closing means.
And waterproof mortar chamfers are arranged at the joint of the prefabricated cover plate and the outer wall and the joint of the two prefabricated cover plates.
The second embedded part is phi mm10 steel bars.
The prepared hole is phi mm12 hole.
The concrete member is formed by pouring C25 waterproof fine-stone concrete by a plurality of bound phi mm6 steel bars.
The prefabricating device is of a [ "type.
The utility model discloses the device is one kind can not pour immediately and can make its earlier interim confined prefabricated equipment to basement outer wall post-cast strip, and the device is cast in situ reinforced concrete prefabricated component, and the shape is "[" type. The prefabricated cover plate can be manufactured in batches, after the prefabricated cover plate is formed to reach the strength, the prefabricated cover plate is installed on the upstream surface of the rear pouring belt of the outer wall of the basement in a partitioning mode, and when the prefabricated cover plate is installed, the reserved first embedded part is welded with the structural steel bars of the rear pouring belt, so that the prefabricated cover plate is firmly installed. After the installation is finished, the waterproof surface treatment and the waterproof construction of the outer wall can be directly carried out, and the construction period of outdoor backfill soil is shortened.
The prefabricated cover plate is used as an outer side template for later-stage outer wall post-cast strip concrete pouring, and does not need to be dismantled after installation.
Drawings
FIG. 1 is a schematic view of the structure of the device of the present invention;
FIG. 2 is a cross-sectional view taken along line A-A of FIG. 1;
fig. 3 is a sectional view taken along line B-B of fig. 1.
Fig. 4 is a schematic structural view of the outer facade of the basement outer wall.
FIG. 5 is a partial structure diagram of a post-cast strip of an outer wall of a basement.
Wherein: the method comprises the following steps of 1-concrete member, 2-first embedded part, 3-second embedded part, 4-preformed hole, 5-reinforcing steel bar, 6-post-pouring belt, 7-basement outer wall, 8-basement bottom plate, 9-waterproof mortar chamfer, 10-waterproof protective layer and 11-polyurethane waterproof layer.
Detailed Description
As shown in fig. 1 to 3, a prefabricating device for temporarily sealing a post-cast strip of an outer wall of a basement comprises a concrete member 1, a first embedded part 2 and a second embedded part 3.
The first embedded part 2 is L-shaped, a right-angled elbow part at one end of the first embedded part 2 is embedded in the concrete member 1, and a vertical part at the other end of the first embedded part 2 is connected with a main reinforcement of a basement outer wall structure during installation;
the second embedded part 3 is phi mm10 steel bars and is 200mm in length. One part of the second embedded part 3 is embedded in the concrete member 1 and has the length of 100mm, and the other part of the second embedded part is exposed and has the length of 100 mm.
The concrete member 1 is provided with a preformed hole 4, and the preformed hole 4 is phi mm12 holes.
In advance, the prefabricated cover plate size is designed according to the width and the length of the post-cast strip, and the prefabricated cover plate size is designed to be width multiplied by height multiplied by thickness =1200 multiplied by 500 multiplied by 50mm by taking the height of the basement 44000mm and the width of the post-cast strip as an example.
The method is characterized in that a fixed steel/wood template is manufactured according to the size requirement, prefabricated phi mm6 steel bars 5 are bound according to a scheme, a plastic film is used on the flat ground to be isolated from the concrete ground surface to serve as a bottom template, and the using amount of the template is saved. And after the binding is finished, fixing the template, and pouring C25 waterproof fine aggregate concrete to form the concrete member 1. The first embedded parts 2 are embedded in the concrete member 1, the length of each second embedded part 3 is 200mm, the second embedded parts are embedded in the upper end of the concrete member 1, the width of the second embedded parts is 300mm from the edges of the two sides of the concrete member 1, holes of 12mm are reserved in situ at the lower end of the concrete member 1, and a prefabricated cover plate is formed after demolding and curing.
The prefabricated apron is from supreme installation in basement outer wall post-cast strip down, and every prefabricated apron of installation just uses the welding mode to be connected fixedly with the post-cast strip structure owner muscle with the first built-in fitting 2 of reserving, and the second built-in fitting 3 of two adjacent prefabricated apron, preformed hole 4 form one set of fixed bolt structure, improve prefabricated component's stability and wholeness, and the polylith prefabricated apron finally forms holistic post-cast strip closing means.
After the installation is finished, waterproof mortar base grouting treatment needs to be carried out on the joint of the prefabricated cover plate and the outer wall and the joint of the two prefabricated cover plates, a chamfer is formed at the joint, as shown in fig. 5, then construction of projects such as waterproofing and the like is carried out, and the basement outer wall post-cast strip is temporarily sealed. And (3) after the sealing time of the post-cast strip of the structure is reached in the later period, pouring concrete of the post-cast strip is carried out, wherein the prefabricated cover plate is used as a permanent outer mold for pouring the post-cast strip without being disassembled.
Note that:
①, the C25 waterproof fine aggregate concrete is selected according to design requirements and on site, the post-cast concrete is wide, and when the size of the concrete member 1 is larger, the strength grade of the concrete is increased.
②, the steel bar 5 is preferably selected from phi mm6 steel bar, the length and width of the subsection should be less than 200mm, the post-cast bandwidth is wide, and when the size of the concrete member 1 is large, the steel bar specification should be improved or the steel bar distribution interval should be reduced.
③, when the precast concrete member 1 is demolded, the concrete must meet the requirement of demolded strength, and the structure of the precast concrete member 1 must not be damaged.
④ after the concrete member 1 is poured, the maintenance work of the concrete member 1 must be strengthened to prevent the concrete member 1 from cracking.
⑤, the concrete members 1 are installed to be tightly connected with the wall bodies on two sides of the basement post-cast strip, gaps among the concrete members 1 are reduced, and the joints are filled with waterproof mortar.

Claims (9)

1. The utility model provides a prefabricated device of temporarily closed basement outer wall post-cast strip, includes concrete member (1), first built-in fitting (2), second built-in fitting (3), its characterized in that:
the first embedded part (2) is L-shaped, a right-angled elbow part at one end of the first embedded part (2) is embedded in the concrete member (1), and a vertical part at the other end of the first embedded part (2) is connected with a main reinforcement of a basement outer wall structure when being installed;
one part of the second embedded part (3) is embedded in the concrete member (1), and the other part of the second embedded part is exposed;
the concrete member (1) is provided with a preformed hole (4);
and the second embedded part (3) and the preformed hole (4) form a set of fixing bolt assembly type structure together.
2. The prefabricated device for temporarily closing the post-cast strip of the outer wall of the basement according to claim 1, characterized in that: the first embedded part (2) is a phi mm12 steel bar.
3. The prefabricated device for temporarily closing the post-cast strip of the outer wall of the basement according to claim 1, characterized in that: the second embedded parts (3) are multiple, the length of each embedded part is 200mm, the embedded parts are embedded in the upper end of the concrete member (1), the width of the embedded parts from the edges of the two sides of the concrete member (1) is 300mm, a preformed hole (4) is formed in the position of the lower end of the concrete member (1), and the prefabricated cover plate is formed through form removal and maintenance.
4. The prefabricated device for temporarily closing the post-cast strip of the outer wall of the basement according to claim 3, wherein: the prefabricated apron of polylith is installed at basement outer wall post-cast strip upstream face from supreme down, and every prefabricated apron of installation is connected fixedly first built-in fitting (2) and post-cast strip structure owner muscle, and second built-in fitting (3), preformed hole (4) of two adjacent prefabricated apron form one set of fixed bolt structure, and the prefabricated apron of polylith finally forms holistic post-cast strip closing means.
5. The prefabricated device for temporarily closing the post-cast strip of the outer wall of the basement according to claim 3, wherein: and waterproof mortar chamfers are arranged at the joint of the prefabricated cover plate and the outer wall and the joint of the two prefabricated cover plates.
6. The prefabricated device for temporarily closing the post-cast strip of the outer wall of the basement according to claim 1, characterized in that: the second embedded part (3) is a phi mm10 steel bar.
7. The prefabricated device for temporarily closing the post-cast strip of the outer wall of the basement according to claim 1, characterized in that: the prepared hole (4) is a phi mm12 hole.
8. The prefabricated device for temporarily closing the post-cast strip of the outer wall of the basement according to claim 1, characterized in that: the concrete member (1) is formed by pouring C25 waterproof fine-stone concrete by a plurality of bound steel bars.
9. The prefabricated device for temporarily closing the post-cast strip of the outer wall of the basement according to claim 1, characterized in that: the prefabricating device is of a [ "type.
CN201920507483.2U 2019-04-15 2019-04-15 Prefabricated device for temporarily sealing post-cast strip of basement outer wall Active CN210032147U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920507483.2U CN210032147U (en) 2019-04-15 2019-04-15 Prefabricated device for temporarily sealing post-cast strip of basement outer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920507483.2U CN210032147U (en) 2019-04-15 2019-04-15 Prefabricated device for temporarily sealing post-cast strip of basement outer wall

Publications (1)

Publication Number Publication Date
CN210032147U true CN210032147U (en) 2020-02-07

Family

ID=69359509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920507483.2U Active CN210032147U (en) 2019-04-15 2019-04-15 Prefabricated device for temporarily sealing post-cast strip of basement outer wall

Country Status (1)

Country Link
CN (1) CN210032147U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115559357A (en) * 2021-07-02 2023-01-03 振中建设集团有限公司 Advanced sealing construction method for vertical post-cast strip of basement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115559357A (en) * 2021-07-02 2023-01-03 振中建设集团有限公司 Advanced sealing construction method for vertical post-cast strip of basement

Similar Documents

Publication Publication Date Title
KR101506782B1 (en) In-Site Molding Apparatus for manufacturing In-site Concrete Culverts with assembled Partial Precast Concrete
CN202000380U (en) Basement outer wall post-pouring belt backfill protective plate
CN107059917B (en) Split component prefabricated comprehensive pipe gallery and construction method thereof
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN210066671U (en) Novel rectangular gallery structure
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN110872869A (en) Waterproof construction method for joints of external wall panels
CN208023601U (en) A kind of prefabricated pile foundation support table side form of mutual buckle type
CN115387393A (en) Quick construction method of post-pouring belt pre-sealing
CN111173198A (en) Construction method of wall-attached constructional column for constructional engineering
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN110821256A (en) Prefabricated assembled biochemical pool of sewage plant and installation method thereof
CN111535208A (en) Construction process of foam concrete and steel corrugated pipe composite culvert
CN218148527U (en) Subside post-cast strip structure sealed in advance
CN210288465U (en) Assembled retaining wall post-cast strip plugging member
CN210032147U (en) Prefabricated device for temporarily sealing post-cast strip of basement outer wall
CN109853803B (en) Assembled integral floor slab and manufacturing and installing method
CN217053814U (en) A post-casting belt prefabricated cover plate fixing device
CN215106098U (en) Prefabricated post connection structure
CN221399113U (en) Impervious structure of basement outer wall post-cast strip of sealed in advance
CN210507502U (en) Prefabricated assembled concrete slab bed structure
CN117144976A (en) Advanced construction method for post-pouring belt of top plate of underground garage
CN216949733U (en) Novel reinforced concrete structure inverted cone and molding device
CN107471424B (en) Canal engineering system and construction method
CN111576658B (en) Construction method of post-cast strip protection wall of assembled basement outer wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 650217 Building 2, class E industrial building, International Jewelry City (No. 31, Shuntong Avenue), Kunming Export Processing Zone, Kunming Economic and Technological Development Zone, Yunnan Province

Patentee after: China Gezhouba Group Construction Engineering Co.,Ltd.

Address before: 650217 Building 2, class E industrial building, International Jewelry City (No. 31, Shuntong Avenue), Kunming Export Processing Zone, Kunming Economic and Technological Development Zone, Yunnan Province

Patentee before: CHINA GEZHOUBA GROUP NO.6 ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder