CN210022338U - An environmentally friendly construction waste treatment equipment - Google Patents

An environmentally friendly construction waste treatment equipment Download PDF

Info

Publication number
CN210022338U
CN210022338U CN201920745361.7U CN201920745361U CN210022338U CN 210022338 U CN210022338 U CN 210022338U CN 201920745361 U CN201920745361 U CN 201920745361U CN 210022338 U CN210022338 U CN 210022338U
Authority
CN
China
Prior art keywords
construction waste
filter tower
water
pipe
crushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920745361.7U
Other languages
Chinese (zh)
Inventor
陈晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sea Ring Technology Group Ltd By Share Ltd
Original Assignee
Sea Ring Technology Group Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sea Ring Technology Group Ltd By Share Ltd filed Critical Sea Ring Technology Group Ltd By Share Ltd
Priority to CN201920745361.7U priority Critical patent/CN210022338U/en
Application granted granted Critical
Publication of CN210022338U publication Critical patent/CN210022338U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Separation Of Particles Using Liquids (AREA)

Abstract

本实用新型公开了一种环保型建筑垃圾处理设备,包括搅碎机体、水喷淋式过滤塔和风机,所述搅碎机体的上部内设置有搅碎室,所述灰尘管道的右端口连接在水喷淋式过滤塔的环面左部中部,除雾层的下方设置有第二喷淋管结构。该环保型建筑垃圾处理设备,结构设置更加合理,分别设置有搅碎机体、水喷淋式过滤塔和风机,将搅碎过程中会产生大量的灰尘,通过灰尘管道导入水喷淋式过滤塔内设置,在水喷淋式过滤塔内进行喷淋、吸附,去除空气当中大颗粒的灰尘以及异味,使得空气更加洁净,方便建筑垃圾回收再利用时有效使用,吸收含灰尘空气,并及时进行清洁处理,避免污染周边环境的空气,保障工作人员健康的工作环境,提高整体工作效率。

Figure 201920745361

The utility model discloses an environment-friendly construction waste treatment equipment, which comprises a crushing body, a water spray filter tower and a fan. A crushing chamber is arranged in the upper part of the crushing body, and the right port of the dust pipe is connected to In the middle of the left part of the annular surface of the water spray filter tower, a second spray pipe structure is arranged below the mist removal layer. The environmental protection construction waste treatment equipment has a more reasonable structure, and is equipped with a crushing body, a water spray filter tower and a fan. It is installed in the water spray filter tower for spraying and adsorption to remove large particles of dust and peculiar smell in the air, making the air cleaner, convenient for the effective use of construction waste recycling and reuse, absorbing dust-containing air, and carrying out timely Clean treatment, avoid polluting the air in the surrounding environment, ensure a healthy working environment for staff, and improve overall work efficiency.

Figure 201920745361

Description

一种环保型建筑垃圾处理设备An environmentally friendly construction waste treatment equipment

技术领域technical field

本实用新型涉及建筑垃圾处理设备技术领域,具体为一种环保型建筑垃圾处理设备。The utility model relates to the technical field of construction waste treatment equipment, in particular to an environment-friendly construction waste treatment equipment.

背景技术Background technique

建筑垃圾是指建设、施工单位或个人对各类建筑物、构筑物、管网等进行建设、铺设或拆除、修缮过程中所产生的渣土、弃土、弃料、余泥及其他废弃物,通常情况下,建筑垃圾是以破碎废砖和混凝土块为主,随着现代城市化发展进程的加快,城市建设过程中,产生的建筑垃圾越来越多,建筑垃圾一般常见的处理方式为运送到垃圾场填埋,来不及运送或者垃圾场处理不下的就只能露天堆积,导致占据土地面积且造成污染,使得建筑垃圾一度被认为是城市发展中的负担,有很多城市均有过垃圾围城的局面,不但污染环境,而且给人们的正常生活带来巨大困扰,现有技术中大都是采用破碎装置对建筑垃圾进行破碎处理,然后再对破碎完成后的建筑垃圾进行回收,但是现有的建筑垃圾处理装置结构复杂,操作繁琐,工作场所灰尘满天,对工作人员的身体健康危害大。Construction waste refers to the muck, spoil, waste material, residual mud and other wastes generated during the construction, laying or dismantling, and repairing of various buildings, structures, pipe networks, etc. by construction units or individuals. Usually, construction waste is mainly broken bricks and concrete blocks. With the acceleration of the development of modern urbanization, more and more construction waste is generated in the process of urban construction. The common treatment method of construction waste is transportation. When it is landfilled in the landfill, it can only be accumulated in the open air if it is not transported or disposed of in the landfill, which will occupy the land area and cause pollution. As a result, construction waste was once considered a burden in urban development. Many cities have been surrounded by garbage. The situation not only pollutes the environment, but also brings great trouble to people's normal life. In the existing technology, most of the construction waste is crushed by using crushing devices, and then the construction waste after crushing is recycled. However, the existing construction waste The structure of the garbage disposal device is complex, the operation is cumbersome, and the workplace is full of dust, which is a great harm to the health of the staff.

为了解决以上所提出的建筑垃圾处理设备所存在的缺陷和不足,急需改善建筑垃圾处理设备的技术,该环保型建筑垃圾处理设备,结构设置更加合理,分别设置有搅碎机体、水喷淋式过滤塔和风机,将搅碎过程中会产生大量的灰尘,通过灰尘管道导入水喷淋式过滤塔内设置,在水喷淋式过滤塔内进行喷淋、吸附,去除空气当中大颗粒的灰尘以及异味,使得空气更加洁净,方便建筑垃圾回收再利用时有效使用,吸收含灰尘空气,并及时进行清洁处理,避免污染周边环境的空气,保障工作人员健康的工作环境,提高整体工作效率,从而提供一种环保型建筑垃圾处理设备。In order to solve the defects and deficiencies of the construction waste treatment equipment proposed above, it is urgent to improve the technology of construction waste treatment equipment. The environmental protection construction waste treatment equipment has a more reasonable structure, and is equipped with a crushing body and a water spray type. The filter tower and fan will produce a large amount of dust during the crushing process, which will be introduced into the water spray filter tower through the dust pipe, and sprayed and adsorbed in the water spray filter tower to remove large particles of dust in the air. And peculiar smell, make the air cleaner, facilitate the effective use of construction waste recycling and reuse, absorb dust-containing air, and clean it in time to avoid polluting the surrounding air, ensure a healthy working environment for staff, and improve overall work efficiency. Provided is an environment-friendly construction waste treatment equipment.

实用新型内容Utility model content

本实用新型解决的技术问题在于克服现有技术的的建筑垃圾处理装置结构复杂,操作繁琐,工作场所灰尘满天,对工作人员的身体健康危害大的缺陷,提供一种环保型建筑垃圾处理设备。所述一种环保型建筑垃圾处理设备具有结构设置更加合理,分别设置有搅碎机体、水喷淋式过滤塔和风机,将搅碎过程中会产生大量的灰尘,通过灰尘管道导入水喷淋式过滤塔内设置,在水喷淋式过滤塔内进行喷淋、吸附,去除空气当中大颗粒的灰尘以及异味,使得空气更加洁净,方便建筑垃圾回收再利用时有效使用,吸收含灰尘空气,并及时进行清洁处理,避免污染周边环境的空气,保障工作人员健康的工作环境,提高整体工作效率等特点。The technical problem solved by the utility model is to overcome the defects of the prior art construction waste treatment device with complex structure, cumbersome operation, dusty workplace, and great harm to the health of staff, and to provide an environmentally friendly construction waste treatment device . The environment-friendly construction waste treatment equipment has a more reasonable structure, and is provided with a crushing body, a water-spraying filter tower and a fan, and a large amount of dust will be generated during the crushing process, and the water spray is introduced through the dust pipe. It is installed in the water spray filter tower, and sprayed and adsorbed in the water spray filter tower to remove large particles of dust and peculiar smell in the air, making the air cleaner, convenient for the effective use of construction waste recycling and recycling, absorbing dust-containing air, And clean it in time to avoid polluting the air in the surrounding environment, ensure a healthy working environment for staff, and improve overall work efficiency.

为实现上述目的,本实用新型提供如下技术方案:一种环保型建筑垃圾处理设备,包括搅碎机体、水喷淋式过滤塔和风机,所述搅碎机体的上部内设置有搅碎室,且搅碎室内前后并排设置有两组搅碎轮,每组搅碎轮的中心均套置有转轴,转轴的左端均安装有第二皮带轮,且第二皮带轮上传动连接有皮带,并且搅碎室的右侧设置有灰尘管道,同时搅碎室的上部空间与灰尘管道相连通设置;In order to achieve the above purpose, the utility model provides the following technical solutions: an environmentally friendly construction waste treatment equipment, comprising a crushing body, a water spray filter tower and a fan, and a crushing chamber is arranged in the upper part of the crushing body, In addition, two sets of crushing wheels are arranged side by side in the crushing chamber. The center of each set of crushing wheels is sleeved with a rotating shaft. The left end of the rotating shaft is equipped with a second pulley, and the second pulley is connected with a belt. A dust pipe is arranged on the right side of the chamber, and the upper space of the crushing chamber is connected with the dust pipe;

所述灰尘管道的右端口连接在水喷淋式过滤塔的环面左部中部,且水喷淋式过滤塔的内部上方设置有填充层和除雾层,并且填充层的下方设置有第一喷淋管结构,除雾层的下方设置有第二喷淋管结构,同时除雾层的上部设置有洁净室。The right port of the dust pipe is connected to the middle part of the left part of the annular surface of the water spray filter tower, and a filling layer and a defogging layer are arranged above the inside of the water spray filter tower, and a first layer is arranged below the filling layer. In the spray pipe structure, a second spray pipe structure is arranged below the mist removal layer, and a clean room is arranged at the upper part of the mist removal layer.

优选的,所述搅碎室的上方连通设置有下料斗,且搅碎室下部连通设置有碎料室,同时碎料室的前侧面设置有出料口。Preferably, a lower hopper is communicated with the crushing chamber, a crushing chamber is communicated with the lower part of the crushing chamber, and a discharge port is provided on the front side of the crushing chamber.

优选的,所述搅碎室的左部通过固定螺栓安装有固定架,且固定架内固定有电机,电机上安装有第一皮带轮,并且第一皮带轮与第二皮带轮之间传动连接有皮带。Preferably, a fixing frame is installed on the left part of the crushing chamber through fixing bolts, a motor is fixed in the fixing frame, a first pulley is installed on the motor, and a belt is drivingly connected between the first pulley and the second pulley.

优选的,所述水喷淋式过滤塔的内底部安装有净化水箱,水喷淋式过滤塔的底部外侧安装有循环水箱,并且净化水箱与循环水箱之间连接有引出水管,并且循环水箱内安装有循环水泵,循环水泵上连接有引入水管。Preferably, a purified water tank is installed on the inner bottom of the water spray filter tower, a circulating water tank is installed on the outer side of the bottom of the water spray filter tower, and an outlet pipe is connected between the purified water tank and the circulating water tank, and inside the circulating water tank A circulating water pump is installed, and an introduction water pipe is connected to the circulating water pump.

优选的,所述引入水管的上端由下至上分别连接有第一喷淋管结构和第二喷淋管结构,且第一喷淋管结构和第二喷淋管结构的结构设置一致,均安装有多个水喷头。Preferably, the upper ends of the water introduction pipes are respectively connected with a first spray pipe structure and a second spray pipe structure from bottom to top, and the structures of the first spray pipe structure and the second spray pipe structure are consistent and installed. There are multiple water sprinklers.

优选的,所述水喷淋式过滤塔内的净化水箱与循环水箱通过引入水管与引出水管构成水循环结构,净化水箱内的净化水通过引出水管导向循环水箱内设置,循环水箱内的水流通过引入水管上连接的第一喷淋管结构和第二喷淋管结构喷向水喷淋式过滤塔内设置,喷出的水流可落入净化水箱内设置。Preferably, the purified water tank and the circulating water tank in the water spray filter tower form a water circulation structure through the introduction water pipe and the leading water pipe, the purified water in the purified water tank is guided to the circulating water tank through the leading water pipe, and the water flow in the circulating water tank is set through the introduction The first spray pipe structure and the second spray pipe structure connected on the water pipe are sprayed into the water spray filter tower, and the sprayed water flow can be set in the purified water tank.

优选的,所述水喷淋式过滤塔的上端连接有第一通风管,第一通风管的另一端连接在风机上,且风机的右侧连接有第二通风管,第二通风管的上部设置有风帽。Preferably, the upper end of the water spray filter tower is connected with a first ventilation pipe, the other end of the first ventilation pipe is connected with the fan, and the right side of the fan is connected with a second ventilation pipe, and the upper part of the second ventilation pipe A hood is provided.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:

1.该环保型建筑垃圾处理设备,整体结构设置更加合理,分别设置有搅碎机体、水喷淋式过滤塔和风机,搅碎机体主要用于建筑垃圾回收并进行搅碎设置,在搅碎过程中会产生大量的灰尘,灰尘飞扬在空气当中,通过灰尘管道导入水喷淋式过滤塔内设置,在水喷淋式过滤塔内进行喷淋、吸附,去除空气当中大颗粒的灰尘以及异味,使得空气更加洁净;1. The overall structure of this environmentally friendly construction waste treatment equipment is more reasonable. It is equipped with a crushing body, a water spray filter tower and a fan. The crushing body is mainly used for construction waste recovery and crushing settings. During the process, a large amount of dust will be generated, and the dust will fly in the air. It will be introduced into the water spray filter tower through the dust pipe, and then sprayed and adsorbed in the water spray filter tower to remove large particles of dust and peculiar smell in the air. , making the air cleaner;

2.通过利用风机经过洁净的空气经过第一通风管和第二通风管进行吸出并排放出去,整个设置设备合理简便,方便建筑垃圾回收再利用时有效使用,吸收含灰尘空气,并及时进行清洁处理,避免污染周边环境的空气,保障工作人员健康的工作环境,提高整体工作效率。2. By using the clean air of the fan to suck out and discharge through the first ventilation pipe and the second ventilation pipe, the whole installation equipment is reasonable and simple, which is convenient for the effective use of construction waste recycling and reuse, absorbs dust-containing air, and cleans it in time. Treatment, avoid polluting the air of the surrounding environment, ensure the healthy working environment of the staff, and improve the overall work efficiency.

3.本设备的搅碎机体、水喷淋式过滤塔和风机各自的结构设置,搅碎机体的上部设置有下料斗,搅碎机体的中部设置有搅碎室,搅碎机体的下部设置有碎料室,搅碎机体的结构由上至下设置合理,用于搅碎建筑垃圾便利,方便工作人员进行操作,无需复杂的工作程序,上手容易,有助于提高工作效率;3. The respective structures of the crushing body, the water spray filter tower and the fan of the equipment are arranged. The upper part of the crushing body is provided with a lower hopper, the middle of the crushing body is provided with a crushing chamber, and the lower part of the crushing body is provided with a crushing chamber. The structure of the crushing chamber and the crushing body is reasonably set from top to bottom, which is convenient for crushing construction waste, convenient for the staff to operate, without complicated work procedures, easy to use, and helps to improve work efficiency;

4.在搅碎机体与风机之间设置有水喷淋式过滤塔,通过水喷淋式进行清洁含大量灰尘等物质的空气,清理容量大,清理更加快速便利,同时水喷淋式过滤塔内部的净化水箱与外部的循环水箱之间构成的水循环结构更加节省水资源,合理利用水源,节省成本损耗,之后通过风机进行鼓风,将洁净的空气通过第一通风管引入第二通风管,再通过风帽排出,排放方便省事。4. There is a water spray filter tower between the crushing body and the fan. The air containing a lot of dust and other substances is cleaned by the water spray type. The cleaning capacity is large and the cleaning is faster and more convenient. At the same time, the water spray filter tower is used. The water circulation structure formed between the internal purified water tank and the external circulating water tank saves more water resources, makes rational use of water sources, and saves cost and loss. Then it is discharged through the hood, which is convenient and hassle-free.

附图说明Description of drawings

图1为本实用新型结构的正视示意图;Fig. 1 is the front view schematic diagram of the utility model structure;

图2为本实用新型结构的剖面结构示意图;Fig. 2 is the sectional structure schematic diagram of the utility model structure;

图3为本实用新型结构的建筑垃圾搅碎机体内部示意图;Fig. 3 is the internal schematic diagram of the construction waste shredding body of the utility model structure;

图4为本实用新型结构的水喷淋式过滤塔内部结构示意图;4 is a schematic diagram of the internal structure of the water spray filter tower of the utility model structure;

图5为本实用新型结构的通风管道连接结构示意图。FIG. 5 is a schematic diagram of the ventilation duct connection structure of the structure of the present invention.

图中标号:1、搅碎机体,2、搅碎室,3、下料斗,4、皮带,5、第一皮带轮,6、电机,7、固定架,8、第二皮带轮,9、转轴,10、搅碎轮,11、碎料室,12、出料口,13、灰尘管道,14、净化水箱,15、第一喷淋管结构,16、填充层,17、第二喷淋管结构,18、除雾层,19、水喷淋式过滤塔,20、洁净室,21、第一通风管,22、引入水管,23、循环水泵,24、循环水箱,25、引出水管,26、风机,27、第二通风管,28、风帽。Labels in the figure: 1. Crushing body, 2. Crushing chamber, 3. Lower hopper, 4. Belt, 5. First pulley, 6. Motor, 7. Fixing frame, 8. Second pulley, 9. Rotating shaft, 10. Crushing wheel, 11, Crushing chamber, 12, Discharge port, 13, Dust pipe, 14, Purified water tank, 15, First spray pipe structure, 16, Filling layer, 17, Second spray pipe structure , 18, defogging layer, 19, water spray filter tower, 20, clean room, 21, first ventilation pipe, 22, inlet pipe, 23, circulating water pump, 24, circulating water tank, 25, outlet pipe, 26, Fan, 27, second ventilation pipe, 28, hood.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

请参阅图1-5,本实用新型提供一种技术方案:一种环保型建筑垃圾处理设备,包括搅碎机体1、搅碎室2、下料斗3、皮带4、第一皮带轮5、电机6、固定架7、第二皮带轮8、转轴9、搅碎轮10、碎料室11、出料口12、灰尘管道13、净化水箱14、第一喷淋管结构15、填充层16、第二喷淋管结构17、除雾层18、水喷淋式过滤塔19、洁净室20、第一通风管21、引入水管22、循环水泵23、循环水箱24、引出水管25、风机26、第二通风管27和风帽28,搅碎机体1的上部内设置有搅碎室2,且搅碎室2内前后并排设置有两组搅碎轮10,每组搅碎轮10的中心均套置有转轴9,转轴9的左端均安装有第二皮带轮8,且第二皮带轮8上传动连接有皮带4,搅碎室2的上方连通设置有下料斗3,且搅碎室2下部连通设置有碎料室11,同时碎料室11的前侧面设置有出料口12,搅碎室2的左部通过固定螺栓安装有固定架7,且固定架7内固定有电机6,电机6上安装有第一皮带轮5,并且第一皮带轮5与第二皮带轮8之间传动连接有皮带4,并且搅碎室2的右侧设置有灰尘管道13,同时搅碎室2的上部空间与灰尘管道13相连通设置,灰尘管道13的右端口连接在水喷淋式过滤塔19的环面左部中部,且水喷淋式过滤塔19的内部上方设置有填充层16和除雾层18,并且填充层16的下方设置有第一喷淋管结构15,除雾层18的下方设置有第二喷淋管结构17,同时除雾层18的上部设置有洁净室20,水喷淋式过滤塔19的内底部安装有净化水箱14,水喷淋式过滤塔19的底部外侧安装有循环水箱24,并且净化水箱14与循环水箱24之间连接有引出水管25,并且循环水箱24内安装有循环水泵23,循环水泵23上连接有引入水管22,引入水管22的上端由下至上分别连接有第一喷淋管结构15和第二喷淋管结构17,且第一喷淋管结构15和第二喷淋管结构17的结构设置一致,均安装有多个水喷头,水喷淋式过滤塔19内的净化水箱14与循环水箱24通过引入水管22与引出水管25构成水循环结构,净化水箱14内的净化水通过引出水管25导向循环水箱24内设置,循环水箱24内的水流通过引入水管22上连接的第一喷淋管结构15和第二喷淋管结构17喷向水喷淋式过滤塔19内设置,喷出的水流可落入净化水箱14内设置,水喷淋式过滤塔19的上端连接有第一通风管21,第一通风管21的另一端连接在风机26上,且风机26的右侧连接有第二通风管27,第二通风管27的上部设置有风帽28。1-5, the present utility model provides a technical solution: an environmentally friendly construction waste treatment equipment, including a crushing body 1, a crushing chamber 2, a lower hopper 3, a belt 4, a first pulley 5, and a motor 6 , fixed frame 7, second pulley 8, rotating shaft 9, crushing wheel 10, crushing chamber 11, discharge port 12, dust pipe 13, purified water tank 14, first spray pipe structure 15, filling layer 16, second Spray pipe structure 17, defogging layer 18, water spray filter tower 19, clean room 20, first ventilation pipe 21, inlet water pipe 22, circulating water pump 23, circulating water tank 24, outlet water pipe 25, fan 26, second The ventilation pipe 27 and the hood 28 are provided with a crushing chamber 2 in the upper part of the crushing body 1, and two groups of crushing wheels 10 are arranged side by side in the crushing chamber 2, and the center of each group of crushing wheels 10 is sleeved with The second pulley 8 is installed on the left end of the rotating shaft 9 and the rotating shaft 9, and the second pulley 8 is connected with a belt 4 for transmission. The material chamber 11, while the front side of the crushing chamber 11 is provided with a discharge port 12, the left part of the crushing chamber 2 is installed with a fixing frame 7 through fixing bolts, and a motor 6 is fixed in the fixing frame 7, and a motor 6 is installed on it. The first pulley 5, and the belt 4 is connected in a driving manner between the first pulley 5 and the second pulley 8, and the right side of the crushing chamber 2 is provided with a dust duct 13, while the upper space of the crushing chamber 2 is connected with the dust duct 13 The right port of the dust pipe 13 is connected to the middle part of the left part of the annular surface of the water spray filter tower 19, and the filling layer 16 and the mist removal layer 18 are arranged above the inside of the water spray filter tower 19, and the filling layer 16 is provided with a first spray pipe structure 15, a second spray pipe structure 17 is provided below the mist removal layer 18, and a clean room 20 is provided above the mist removal layer 18, and the water spray filter tower 19 is provided. A purified water tank 14 is installed at the inner bottom, a circulating water tank 24 is installed on the outside of the bottom of the water spray filter tower 19, and an outlet pipe 25 is connected between the purified water tank 14 and the circulating water tank 24, and a circulating water pump 23 is installed in the circulating water tank 24. , the circulating water pump 23 is connected with an introduction water pipe 22, and the upper end of the introduction water pipe 22 is respectively connected with a first spray pipe structure 15 and a second spray pipe structure 17 from bottom to top, and the first spray pipe structure 15 and the second spray pipe structure 15 The structure of the shower pipe structure 17 is consistent, and a plurality of water nozzles are installed. The purified water tank 14 and the circulating water tank 24 in the water spray filter tower 19 form a water circulation structure through the inlet water pipe 22 and the outlet water pipe 25. The purified water is led to the circulating water tank 24 through the lead-out water pipe 25, and the water in the circulating water tank 24 is sprayed to the water-spraying filter tower 19 through the first spray pipe structure 15 and the second spray pipe structure 17 connected to the introduction water pipe 22. The upper end of the water spray filter tower 19 is connected with the first ventilation pipe 21, and the other end of the first ventilation pipe 21 is connected with the fan 26, and the fan 26 The right side of the connection has a second ventilation The upper part of the pipe 27 and the second ventilation pipe 27 is provided with a wind cap 28.

如图1-2所示,图中展示本设备的整体结构设置,分别设置有搅碎机体1、水喷淋式过滤塔19和风机26,搅碎机体1主要用于建筑垃圾回收并进行搅碎设置,在搅碎过程中会产生大量的灰尘,灰尘飞扬在空气当中,通过灰尘管道13导入水喷淋式过滤塔19内设置,在水喷淋式过滤塔19内进行喷淋、吸附,去除空气当中大颗粒的灰尘以及异味,使得空气更加洁净,之后通过利用风机26经过洁净的空气经过第一通风管21和第二通风管27进行吸出并排放出去,整个设置设备合理简便,方便建筑垃圾回收再利用时有效使用,吸收含灰尘空气,并及时进行清洁处理,避免污染周边环境的空气,保障工作人员健康的工作环境,提高整体工作效率。As shown in Figure 1-2, the figure shows the overall structure of the equipment, which are respectively provided with a crushing body 1, a water spray filter tower 19 and a fan 26. The crushing body 1 is mainly used for construction waste recycling and stirring. In the crushing process, a large amount of dust will be generated, and the dust will fly in the air and be introduced into the water spray filter tower 19 through the dust pipe 13 to set up, and spray and adsorb in the water spray filter tower 19. Remove large particles of dust and peculiar smell in the air to make the air cleaner, and then use the fan 26 to pass the clean air through the first ventilation duct 21 and the second ventilation duct 27 to suck out and discharge, and the whole installation equipment is reasonable and simple, which is convenient for construction Effective use of waste recycling and reuse, absorbing dusty air, and timely cleaning, avoiding air pollution in the surrounding environment, ensuring a healthy working environment for staff, and improving overall work efficiency.

如图3-5所示,图中分别展示本设备的搅碎机体1、水喷淋式过滤塔19和风机26各自的结构设置,搅碎机体1的上部设置有下料斗3,搅碎机体1的中部设置有搅碎室2,搅碎机体1的下部设置有碎料室11,搅碎机体1的结构由上至下设置合理,用于搅碎建筑垃圾便利,方便工作人员进行操作,无需复杂的工作程序,上手容易,有助于提高工作效率,在搅碎机体1与风机26之间设置有水喷淋式过滤塔19,通过水喷淋式进行清洁含大量灰尘等物质的空气,清理容量大,清理更加快速便利,同时水喷淋式过滤塔19内部的净化水箱14与外部的循环水箱24之间构成的水循环结构更加节省水资源,合理利用水源,节省成本损耗,之后通过风机26进行鼓风,将洁净的空气通过第一通风管21引入第二通风管27,再通过风帽28排出,排放方便省事。As shown in Figure 3-5, the figure shows the respective structural settings of the crushing body 1, the water spray filter tower 19 and the fan 26 of the equipment. The upper part of the crushing body 1 is provided with a lower hopper 3. The crushing body The middle part of 1 is provided with a crushing chamber 2, and the lower part of the crushing body 1 is provided with a crushing chamber 11. The structure of the crushing body 1 is set reasonably from top to bottom, which is convenient for crushing construction waste and convenient for staff to operate. There is no need for complicated work procedures, and it is easy to get started, which helps to improve work efficiency. A water spray filter tower 19 is arranged between the crushing body 1 and the fan 26, and the air containing a lot of dust and other substances is cleaned by the water spray type. , the cleaning capacity is large, and the cleaning is faster and more convenient. At the same time, the water circulation structure formed between the purified water tank 14 inside the water spray filter tower 19 and the external circulating water tank 24 saves water resources, makes rational use of water sources, and saves cost and loss. The fan 26 blows air, and the clean air is introduced into the second ventilation pipe 27 through the first ventilation pipe 21, and then discharged through the air cap 28, which is convenient and convenient to discharge.

工作原理:在使用该环保型建筑垃圾处理设备时,将可以进再利用的建筑垃圾投入到下料斗3内,通过下料斗3连通搅碎室2,之后会直接落入搅碎室2的上部,此时会通过搅碎室2内相向转动的两组搅碎轮10进行搅碎,搅碎后的细料会落入到碎料室11内,之后可通过出料口12滑出,在搅碎室2内搅碎轮10进行搅碎建筑垃圾的过程当中,会产生大量的灰尘,含有大量灰尘的空气通过灰尘管道13进入到水喷淋式过滤塔19内,经过水喷淋式过滤塔19内第一喷淋管结构15的初次喷淋去除空气中的大颗粒物,并经过填充层16的吸附过滤,去除不易被水喷落的颗粒物以及臭气,之后再次经过第二喷淋管结构17的喷淋,使得空气更加洁净,再通过第二喷淋管结构17上部的除雾层18进行去雾气,使得空气不会太湿润,去除雾气后的空气进入到洁净室20内,在风机26的作用下,通过第一通风管21经过风机26进入到第二通风管27内,之后通过第二通风管27上部的风帽28排出外界,整个设置工整流程清晰明确,使用轻松便利,为工整人员提供清新健康的工作环境,更保护了空气环境卫生。Working principle: When using this environmentally friendly construction waste treatment equipment, the construction waste that can be recycled is put into the lower hopper 3, connected to the crushing chamber 2 through the lower hopper 3, and then directly falls into the upper part of the crushing chamber 2 , at this time, it will be crushed by the two sets of crushing wheels 10 that rotate oppositely in the crushing chamber 2, and the crushed fine materials will fall into the crushing material chamber 11, and then slide out through the discharge port 12. During the process of crushing the construction waste by the crushing wheel 10 in the crushing chamber 2, a large amount of dust will be generated, and the air containing a large amount of dust will enter the water spray filter tower 19 through the dust pipe 13, and will be filtered by the water spray type. The primary spray of the first spray pipe structure 15 in the tower 19 removes large particles in the air, and the adsorption and filtration of the filling layer 16 removes the particles and odors that are not easily sprayed by water, and then passes through the second spray pipe again. The spray of the structure 17 makes the air cleaner, and then the mist removal layer 18 on the upper part of the second spray pipe structure 17 is used to remove the mist, so that the air will not be too humid, and the air after the mist removal enters the clean room 20. Under the action of the fan 26, the first ventilation pipe 21 enters the second ventilation pipe 27 through the fan 26, and then the air cap 28 on the upper part of the second ventilation pipe 27 is discharged to the outside world. The neat staff provides a fresh and healthy working environment, and also protects the air sanitation.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (7)

1. The utility model provides an environment-friendly construction waste treatment equipment, includes pulper body (1), water sprays formula filter tower (19) and fan (26), its characterized in that: a stirring chamber (2) is arranged in the upper part of the stirring machine body (1), two groups of stirring wheels (10) are arranged in the stirring chamber (2) in parallel from front to back, a rotating shaft (9) is sleeved in the center of each group of stirring wheels (10), a second belt pulley (8) is mounted at the left end of each rotating shaft (9), a belt (4) is connected to the second belt pulley (8) in a transmission manner, a dust pipeline (13) is arranged on the right side of the stirring chamber (2), and meanwhile the upper space of the stirring chamber (2) is communicated with the dust pipeline (13);
the right port of the dust pipeline (13) is connected to the left part of the ring surface of the water spraying type filter tower (19), a filling layer (16) and a demisting layer (18) are arranged above the inside of the water spraying type filter tower (19), a first spray pipe structure (15) is arranged below the filling layer (16), a second spray pipe structure (17) is arranged below the demisting layer (18), and a clean room (20) is arranged on the upper part of the demisting layer (18).
2. The environment-friendly construction waste disposal device of claim 1, wherein: the upper part of the stirring and crushing chamber (2) is communicated with a discharging hopper (3), the lower part of the stirring and crushing chamber (2) is communicated with a crushing chamber (11), and the front side surface of the crushing chamber (11) is provided with a discharging hole (12).
3. The environment-friendly construction waste disposal device of claim 1, wherein: the left part of stirring crushing room (2) installs mount (7) through fixing bolt, and mount (7) internal fixation has motor (6), installs first belt pulley (5) on motor (6) to the transmission is connected with belt (4) between first belt pulley (5) and second belt pulley (8).
4. The environment-friendly construction waste disposal device of claim 1, wherein: purifying water tank (14) are installed to the interior bottom of water spray filter tower (19), and circulating water tank (24) are installed in the bottom outside of water spray filter tower (19) to be connected with between purifying water tank (14) and circulating water tank (24) and draw outlet pipe (25), and install circulating water pump (23) in circulating water tank (24), be connected with on circulating water pump (23) and draw inlet tube (22).
5. The environment-friendly construction waste disposal apparatus of claim 4, wherein: the upper end of the leading-in water pipe (22) is connected with a first spray pipe structure (15) and a second spray pipe structure (17) from bottom to top respectively, and the structures of the first spray pipe structure (15) and the second spray pipe structure (17) are arranged consistently and are provided with a plurality of water spray heads.
6. The environment-friendly construction waste disposal device of claim 1, wherein: purified water tank (14) and circulation tank (24) in water spray filter tower (19) constitute water circulation structure through introducing inlet pipe (22) and leading outlet pipe (25), and the purified water in purified water tank (14) is set up through leading outlet pipe (25) direction circulation tank (24), and the rivers in circulation tank (24) are spout to water spray filter tower (19) through introducing inlet pipe (22) and set up with second shower structure (17) on connecting first shower structure (15), and spun rivers can fall into and set up in purified water tank (14).
7. The environment-friendly construction waste disposal device of claim 1, wherein: the upper end of the water spraying type filter tower (19) is connected with a first ventilation pipe (21), the other end of the first ventilation pipe (21) is connected to a fan (26), the right side of the fan (26) is connected with a second ventilation pipe (27), and an air cap (28) is arranged on the upper portion of the second ventilation pipe (27).
CN201920745361.7U 2019-05-23 2019-05-23 An environmentally friendly construction waste treatment equipment Expired - Fee Related CN210022338U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920745361.7U CN210022338U (en) 2019-05-23 2019-05-23 An environmentally friendly construction waste treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920745361.7U CN210022338U (en) 2019-05-23 2019-05-23 An environmentally friendly construction waste treatment equipment

Publications (1)

Publication Number Publication Date
CN210022338U true CN210022338U (en) 2020-02-07

Family

ID=69367299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920745361.7U Expired - Fee Related CN210022338U (en) 2019-05-23 2019-05-23 An environmentally friendly construction waste treatment equipment

Country Status (1)

Country Link
CN (1) CN210022338U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112808745A (en) * 2021-01-08 2021-05-18 付启阳 Ecological protection's inorganic waste material purification treatment equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112808745A (en) * 2021-01-08 2021-05-18 付启阳 Ecological protection's inorganic waste material purification treatment equipment
CN112808745B (en) * 2021-01-08 2021-12-10 赵牧青 An ecologically protected inorganic waste purification treatment equipment

Similar Documents

Publication Publication Date Title
CN208711343U (en) A kind of workshop dedusting and purifying device
CN207951016U (en) A kind of food production workshop dust-extraction unit
CN204510113U (en) Without airborne dust dry-type dust-proof vehicle
CN209568403U (en) A road vacuum cleaner
CN210022338U (en) An environmentally friendly construction waste treatment equipment
CN214233360U (en) Be used for construction dust collector
CN211849179U (en) Road cleaning dust collector for bridge construction
CN210584286U (en) Aerated concrete block dust collector
CN210086139U (en) Highway cleaning vehicle
CN209221755U (en) A kind of dust-extraction unit of antenna cover
CN209791654U (en) Dust removal device of pulverizer
CN102179117B (en) Cloth-bag dust removing device using water to clear ash
CN218093102U (en) Be applicable to ventilation unit for coal mine
CN205867900U (en) Powder dust removal collection device
CN212663756U (en) Environment-friendly asphalt recycling device
CN211302531U (en) Asphalt mixing plant
CN213643587U (en) Cement manufacture waste gas treatment equipment of environmental protection
CN211025616U (en) A kind of air purification equipment for collecting waste silk in textile workshop
CN212142001U (en) A purifier that is used for industrial waste residue waste material processing for organic wall material
CN108930237A (en) A kind of gravity settling chamber of refuse cleaning vehicle
CN222266685U (en) Desulfurization dust remover for wire mesh processing
CN205412453U (en) Water purification device for oil depot environmental protection
CN218077112U (en) Road construction dust device
CN218553470U (en) Washing tower with dust removal function
CN220589392U (en) Air washer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200207