CN210013553U - Holding pole suitable for assembling transmission line iron tower - Google Patents
Holding pole suitable for assembling transmission line iron tower Download PDFInfo
- Publication number
- CN210013553U CN210013553U CN201920579852.9U CN201920579852U CN210013553U CN 210013553 U CN210013553 U CN 210013553U CN 201920579852 U CN201920579852 U CN 201920579852U CN 210013553 U CN210013553 U CN 210013553U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- transmission line
- mounting plate
- iron tower
- line iron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title claims abstract description 44
- 230000005540 biological transmission Effects 0.000 title claims abstract description 22
- 229910052742 iron Inorganic materials 0.000 title claims abstract description 22
- 230000000694 effects Effects 0.000 claims description 5
- 230000006978 adaptation Effects 0.000 claims description 2
- 238000005192 partition Methods 0.000 abstract description 4
- 238000009434 installation Methods 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 9
- 239000010959 steel Substances 0.000 description 9
- 238000000034 method Methods 0.000 description 6
- 230000009471 action Effects 0.000 description 3
- 230000032258 transport Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000007373 indentation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model discloses an embrace pole suitable for transmission line iron tower equipment is used, including upper end festival, well end festival and lower end festival, the top fixedly connected with backup pad of upper end festival, the bottom of upper end festival and the fixed frame of the top and the equal fixedly connected with in bottom of well end festival, two of fixed frame inner wall all around fixedly connected with mounting panel, the top threaded connection of mounting panel has the dead lever, the utility model relates to a transmission line iron tower equipment technical field. This armful of pole suitable for transmission line iron tower equipment usefulness, through two equal fixedly connected with mounting panels all around of fixed frame inner wall, be convenient for carry out the partition to armful of pole, it is more convenient to carry, when connecting, does not need use tools, and easy operation has saved the time of manpower and cost, and connection stability is better, through the bottom fixedly connected with handle of slide, uses convenient and fast more, is convenient for carry out the partition and the installation, uses more stably and safety.
Description
Technical Field
The utility model relates to a transmission line iron tower equipment technical field specifically is a hold pole suitable for transmission line iron tower equipment usefulness.
Background
The iron tower of power transmission line is a tower-shaped building for power transmission, and its structure is characterized by that all tower types are space truss structure, and the bar members are mainly formed from single equilateral angle steel or combined angle steel, and the bar members are connected by adopting coarse bolt, and are connected by means of shearing force of bolt, and the whole tower is formed from angle steel, connecting steel plate and bolt, and the individual components, such as tower foot, etc. are welded into a combined component by several steel plates, so that it is very convenient for hot-galvanized corrosion-proofing, transportation and construction, and erection, and the holding pole is a large column for lifting, and can be used together with winding engine, pulley block and steel wire rope, and can lift several hundred tons of heavy material on site, and its column body is formed from angle steel, and its column body is made up by using steel plate in a.
At the in-process of assembling the transmission line iron tower, need to hold the pole through the use and lift by crane the equipment to each equipment position of iron tower, because hold the pole the volume great, weight is heavier, when transporting, constructor is not convenient for carry, wholly transports comparatively difficultly, the split is carried, generally connect through the bolt during the use, the bolt is not hard up easily in the use, reduce the stability of connecting, and when the bolt is connected, install through the instrument, the time of cost is longer.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a hold pole suitable for transmission line iron tower equipment is used has solved and has not been convenient for carry, and the bolt is not hard up easily in the use, reduces the stability of connecting, and when the bolt is connected, installs through the instrument, the longer problem of time of cost.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a holding pole suitable for assembling a power transmission line iron tower comprises an upper end section, a middle end section and a lower end section, wherein the top of the upper end section is fixedly connected with a supporting plate, the bottom of the upper end section and the top and the bottom of the middle end section are both fixedly connected with fixed frames, the peripheries of two inner walls of the fixed frames are both fixedly connected with mounting plates, the top of each mounting plate is in threaded connection with a fixed rod, one end of each fixed rod, which is close to the mounting plate, penetrates through the mounting plates and extends to the outer parts of the mounting plates, the surface of the fixed rod, which extends to one end of the outer parts of the mounting plates, is movably connected with a connecting block, the top of each connecting block is fixedly connected with the bottom of the mounting plate, the middle of each connecting block is provided with a movable groove matched with the fixed rod, the two sides of each movable groove are both provided with, and the spring is fixedly connected between the top and the bottom of one side of the sliding plate and the top and the bottom of one side of the inner wall of the mounting groove, and the clamping block is fixedly connected to one side of the sliding plate far away from the spring.
Preferably, the clamping grooves matched with the clamping blocks are formed in the two sides of the surface of the fixing rod, one end, far away from the movable groove, of the connecting rod penetrates through the sliding plate and extends to the outer portion of the sliding plate, one end, extending to the outer portion of the sliding plate, of the connecting rod is fixedly connected with the other side of the movable groove, and a handle is fixedly connected to the bottom of the sliding plate.
Preferably, the handle is kept away from the outside of one end through connection piece and extension to the connecting block of slide, two the relative one side swing joint of fixed frame, two the relative one side swing joint of mounting panel.
Preferably, one end of the fixing rod, which is far away from the mounting plate, is fixedly connected with a handle, and a threaded hole matched with the fixing rod is formed in the top of the mounting plate.
Preferably, the bottom of the lower end section is rotatably connected with a base, and the top of the supporting plate is fixedly connected with a pole holding cap.
Preferably, both sides of the holding rod cap are fixedly connected with a fixing frame, and the back of the fixing frame is rotatably connected with a pulley.
Advantageous effects
The utility model provides an embrace pole suitable for transmission line iron tower equipment usefulness. Compared with the prior art, the method has the following beneficial effects:
(1) the holding pole for assembling the power transmission line iron tower is characterized in that a mounting plate is fixedly connected around the inner walls of two fixing frames, the top of the mounting plate is in threaded connection with a fixed rod, one end of the fixed rod, which is close to the mounting plate, penetrates through the mounting plate and extends to the outside of the mounting plate, the surface of the fixed rod, which extends to the outer end of the mounting plate, is movably connected with a connecting block, the top of the connecting block is fixedly connected with the bottom of the mounting plate, the middle of the connecting block is provided with a movable groove matched with the fixed rod, the two sides of the movable groove are provided with mounting grooves, the top and the bottom of one side of the inner wall of the mounting groove are fixedly connected with connecting rods, a sliding plate is slidably connected between the top and the bottom of the inner wall of the movable groove, be convenient for carry out the partition to embracing the pole, it is more convenient to carry, when connecting, does not need use tools, easy operation has saved the time of manpower and cost, and connection stability is better.
(2) This embrace pole suitable for transmission line iron tower equipment usefulness, bottom fixedly connected with handle through the slide, the one end through connection piece of slide is kept away from to the handle and is extended to the outside of connecting block, two fixed frame one side swing joint relative, two one side swing joint that the mounting panel is relative, the one end fixedly connected with handle of mounting panel is kept away from to the dead lever, the screw hole with dead lever looks adaptation is seted up at the top of mounting panel, convenient and fast more uses, be convenient for carry out the partition and install, it is more stable and safe to use.
Drawings
FIG. 1 is a front view of the structure of the present invention;
fig. 2 is a top view of the fixing frame structure of the present invention;
FIG. 3 is a cross-sectional view of the mounting plate and connecting block structure of the present invention;
fig. 4 is an enlarged view of a portion a of fig. 3 according to the present invention;
fig. 5 is a partial enlarged view of the point B in fig. 1 according to the present invention.
In the figure: 1 upper end section, 2 middle end section, 3 lower end section, 4 backup pads, 5 fixed frames, 6 mounting panels, 7 fixed rods, 8 connecting blocks, 9 movable grooves, 10 mounting grooves, 11 connecting rods, 12 sliding plates, 13 springs, 14 clamping blocks, 15 clamping grooves, 16 handles, 17 handles, 18 threaded holes, 19 bases, 20 holding rod caps, 21 fixed frames and 22 pulleys.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a holding pole suitable for assembling a power transmission line iron tower comprises an upper end section 1, a middle end section 2 and a lower end section 3, wherein the number of the middle end sections 2 is a plurality, the bottom of the lower end section 3 is rotatably connected with a base 19, the top of a supporting plate 4 is fixedly connected with a holding pole cap 20, two sides of the holding pole cap 20 are both fixedly connected with a fixing frame 21, the back of the fixing frame 21 is rotatably connected with a pulley 22, the holding pole cap 20 is connected with a hoisting steel wire rope through the pulley 22, the top of the upper end section 1 is fixedly connected with the supporting plate 4, the bottom of the upper end section 1 and the top and the bottom of the middle end section 2 are both fixedly connected with a fixing frame 5, the top of the lower end section 3 is also provided with a fixing frame 5, when the fixing frame is connected with the middle end section 2, the connecting mode is the same as that of the upper end section 1 and the middle end section 2, when every two middle end sections 2 are connected, the mode is, the top of the mounting plate 6 is in threaded connection with a fixing rod 7, the upper end of the surface of the fixing rod 7 is provided with threads matched with the threaded hole 18, one end of the fixing rod 7, far away from the mounting plate 6, is fixedly connected with a handle 17, the top of the mounting plate 6 is provided with the threaded hole 18 matched with the fixing rod 7, two sides of the surface of the fixing rod 7 are both provided with clamping grooves 15 matched with the clamping blocks 14, one end of the connecting rod 11, far away from the movable groove 9, penetrates through the sliding plate 12 and extends to the outside of the sliding plate 12, one end of the connecting rod 11, extending to the outside of the sliding plate 12, is fixedly connected with the other side of the movable groove 9, the bottom of the sliding plate 12 is fixedly connected with a handle 16, through the arrangement of the handle 16 and the handle 17, the use is more convenient and quicker, the disassembly and installation, the opposite sides of the two mounting plates 6 are movably connected, one end of the fixed rod 7 close to the mounting plates 6 penetrates through the mounting plates 6 and extends to the outside of the mounting plates 6, the surface of one end of the fixed rod 7 extending to the outside of the mounting plates 6 is movably connected with a connecting block 8, the top of the connecting block 8 is fixedly connected with the bottom of the mounting plate 6, the middle part of the connecting block 8 is provided with a movable groove 9 matched with the fixed rod 7, and both sides of the movable groove 9 are provided with mounting grooves 10, the top and the bottom of one side of the inner wall of the mounting groove 10 are fixedly connected with connecting rods 11, a sliding plate 12 is connected between the top and the bottom of the inner wall of the movable groove 9 in a sliding way, and all fixedly connected with spring 13 between the top and the bottom of slide 12 one side and the top and the bottom of mounting groove 10 inner wall one side, spring 13 can be changed after using for a long time, guarantees elasticity, and slide 12 keeps away from one side fixedly connected with fixture block 14 of spring 13.
During the use, transport and the transport embracing the pole breakdown, when installing, contact two pole festivals, two fixed frames 5 of embracing on the pole festivals link together, thereby make mounting panel 6 stack in the fixed frame 5 together, then constructor swivel fixing pole 7, screw hole 18 on mounting panel 6 is twisted into to dead lever 7 through the screw thread on dead lever 7, hold handle 16, handle 16 to the pulling of connecting block 8 both sides, make slide 12 drive fixture block 14 extrusion spring 13, slide 12 slides on connecting rod 11, fixture block 14 indentation activity inslot 9, in 7 bottoms of dead lever get into connecting block 8, loosen handle 16, spring 13 atress is kick-backed, slide 12 drives fixture block 14 and gets into in the draw-in groove 15, fix dead lever 7, thereby two pole festivals are fixed together, other pole festivals analogize in proper order.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a embrace pole suitable for transmission line iron tower equipment is used, includes upper end festival (1), well end festival (2) and lower extreme festival (3), the top fixedly connected with backup pad (4) of upper end festival (1), its characterized in that: the bottom of the upper end section (1) and the top and the bottom of the middle end section (2) are fixedly connected with a fixed frame (5), two mounting plates (6) are fixedly connected with the periphery of the inner wall of the fixed frame (5), the top of each mounting plate (6) is in threaded connection with a fixed rod (7), one end of each fixed rod (7) close to the corresponding mounting plate (6) penetrates through the corresponding mounting plate (6) and extends to the outside of the corresponding mounting plate (6), the surface of one end, extending to the outside of the corresponding mounting plate (6), of each fixed rod (7) is movably connected with a connecting block (8), the top of each connecting block (8) is fixedly connected with the bottom of the corresponding mounting plate (6), a movable groove (9) matched with the corresponding fixed rod (7) is formed in the middle of the corresponding connecting block (8), mounting grooves (10) are formed in both sides of the movable grooves (9), and connecting rods (11, sliding connection has slide (12) between the top of activity groove (9) inner wall and the bottom, and equal fixedly connected with spring (13) between the top of slide (12) one side and bottom and the top of mounting groove (10) inner wall one side and the bottom, slide (12) keep away from one side fixedly connected with fixture block (14) of spring (13).
2. The holding pole suitable for assembling the power transmission line iron tower according to claim 1, characterized in that: draw-in groove (15) with fixture block (14) looks adaptation are all seted up to the both sides on dead lever (7) surface, slide (12) are run through and extend to the outside of slide (12) to the one end that activity groove (9) were kept away from in connecting rod (11), connecting rod (11) extend to the opposite side fixed connection of the outside one end of slide (12) and activity groove (9), the bottom fixedly connected with handle (16) of slide (12).
3. The holding pole suitable for assembling the power transmission line iron tower as claimed in claim 2, wherein: one end of the handle (16) far away from the sliding plate (12) penetrates through the connecting block (8) and extends to the outside of the connecting block (8), and the fixing frame (5) is movably connected to one side opposite to the fixing frame and the mounting plate (6) is movably connected to one side opposite to the mounting plate.
4. The holding pole suitable for assembling the power transmission line iron tower according to claim 1, characterized in that: the handle (17) is fixedly connected to one end, far away from the mounting plate (6), of the fixing rod (7), and a threaded hole (18) matched with the fixing rod (7) is formed in the top of the mounting plate (6).
5. The holding pole suitable for assembling the power transmission line iron tower according to claim 1, characterized in that: the bottom of the lower end section (3) is rotatably connected with a base (19), and the top of the supporting plate (4) is fixedly connected with a pole holding cap (20).
6. The holding pole suitable for assembling the power transmission line iron tower as claimed in claim 5, wherein: both sides of the pole holding cap (20) are fixedly connected with a fixing frame (21), and the back of the fixing frame (21) is rotatably connected with a pulley (22).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920579852.9U CN210013553U (en) | 2019-04-26 | 2019-04-26 | Holding pole suitable for assembling transmission line iron tower |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920579852.9U CN210013553U (en) | 2019-04-26 | 2019-04-26 | Holding pole suitable for assembling transmission line iron tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210013553U true CN210013553U (en) | 2020-02-04 |
Family
ID=69315877
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920579852.9U Active CN210013553U (en) | 2019-04-26 | 2019-04-26 | Holding pole suitable for assembling transmission line iron tower |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210013553U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116335466A (en) * | 2023-04-23 | 2023-06-27 | 国网江苏省电力有限公司宿迁供电分公司 | Automatic pole holding device and splicing method suitable for automatic disassembly and assembly on construction sites |
-
2019
- 2019-04-26 CN CN201920579852.9U patent/CN210013553U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116335466A (en) * | 2023-04-23 | 2023-06-27 | 国网江苏省电力有限公司宿迁供电分公司 | Automatic pole holding device and splicing method suitable for automatic disassembly and assembly on construction sites |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11028651B2 (en) | Drilling rig | |
| CN114476968A (en) | Multi-functional assembled hoisting device for building prefabricated component | |
| CN117303197A (en) | Movable hanging bracket | |
| CN204096996U (en) | Electric hoisting device | |
| CN113833281A (en) | Intelligent wallboard mounting robot with adjustable mounting range and mounting method | |
| CN110027981B (en) | Be used for wire pole production to use hoisting device | |
| CN211338504U (en) | Auxiliary tool for hoisting steel structure construction | |
| CN103500961B (en) | A special tool for live replacement of tension insulator strings | |
| CN112267579A (en) | Connection structure for assembled steel construction building | |
| CN207829430U (en) | Lifting type operation platform for suspension operation | |
| CN212374717U (en) | Power cable lifting device | |
| CN213027206U (en) | Electric overhead ground wire lifting device | |
| CN219180305U (en) | Be used for power equipment installation to use multi-angle insulation supporting platform | |
| CN218931468U (en) | Hoisting structure and steel structure transfer equipment for manufacturing steel structure factory building | |
| CN115520769B (en) | A safety lifting device for railway construction and its use method | |
| CN208072990U (en) | building construction operation platform | |
| CN106246094A (en) | A kind of novel mounting attachment and using method thereof | |
| CN210885022U (en) | Building material lifting device | |
| CN212053828U (en) | Steel construction engineering component rotating device | |
| CN203582376U (en) | Slidably mounting and lifting structure | |
| CN112239138A (en) | Electric power optical cable hoisting device | |
| CN218124155U (en) | Draw gear for laying indoor high-place cable | |
| CN220868763U (en) | Stabilizing device for building construction and construction platform thereof | |
| CN222181614U (en) | A steel structure hoisting equipment for green building construction | |
| CN207405779U (en) | Detachable Liftable steel frame movable room |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |