CN209993147U - Large-span prestressing force post-tensioning construction teaching model - Google Patents

Large-span prestressing force post-tensioning construction teaching model Download PDF

Info

Publication number
CN209993147U
CN209993147U CN201920481709.6U CN201920481709U CN209993147U CN 209993147 U CN209993147 U CN 209993147U CN 201920481709 U CN201920481709 U CN 201920481709U CN 209993147 U CN209993147 U CN 209993147U
Authority
CN
China
Prior art keywords
anchoring device
tensioning
piece
top beam
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920481709.6U
Other languages
Chinese (zh)
Inventor
赵德彬
田友才
郑国磊
赵联波
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201920481709.6U priority Critical patent/CN209993147U/en
Application granted granted Critical
Publication of CN209993147U publication Critical patent/CN209993147U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a large-span prestress post-tensioning construction teaching model, which comprises a top beam, a support column, a bottom plate, a left anchoring device, a right anchoring device, a prestressed cable, a tensioning anchoring device and a KB plate, wherein the top beam and the bottom plate are fixedly connected into a whole through the support column, the left anchoring device, the right anchoring device, the prestressed cable, the tensioning anchoring device and the KB plate are all arranged in a space between the top beam and the bottom plate, the left anchoring device, the right anchoring device and the tensioning anchoring device are all composed of a sleeve piece and a moving piece, a mounting plate and an elastic piece are respectively arranged at the upper end and the lower end in the sleeve piece, one end of the elastic piece is fixedly connected with the mounting plate, the other end is connected with a trapezoidal adjusting block arranged on the moving piece, slideways are embedded at the two sides of the trapezoidal adjusting block, a slide rod slides in the slideways to drive a positioning antiskid piece to pass in and, thereby being movably connected with a limit cavity plate arranged in the inner cavity of the top beam or the bottom plate.

Description

Large-span prestressing force post-tensioning construction teaching model
Technical Field
The utility model relates to a teaching simulation device specifically is a large-span prestressing force back tension construction teaching model.
Background
At present, due to the fact that the requirement for prestress is high in the teaching of prestress construction, teaching animation schematic diagrams are mainly played during teaching, and some teaching models made of steel wires penetrating through polyurethane foam boards are also available.
Therefore, the utility model provides a construction teaching model is drawn to tension behind large-span prestressing force convenient to anchor and stretch-draw prestressing cable has solved the problem that the aforesaid exists.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a large-span prestressing force back tension construction teaching model to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a large-span prestressed post-tensioning construction teaching model comprises a top beam, a support column, a bottom plate, a left anchoring device, a right anchoring device, a prestressed steel cable, a tensioning anchoring device and a KB plate, wherein the top beam and the bottom plate are fixedly connected into a whole through the support column, the left anchoring device, the right anchoring device, the prestressed steel cable, the tensioning anchoring device and the KB plate are all arranged in a space between the top beam and the bottom plate, the left anchoring device, the right anchoring device and the tensioning anchoring device are all composed of a sleeve piece and a moving piece, a mounting plate and an elastic piece are mounted at the upper end and the lower end of the inside of the sleeve piece, one end of the elastic piece is fixedly connected with the mounting plate, the other end of the elastic piece is connected with a trapezoidal adjusting block arranged on the moving piece, slide ways are embedded in two sides of the trapezoidal adjusting block, a slide rod slides in the slide ways to drive a positioning anti-skid piece to pass in and out of a through groove arranged on the side edge of the sleeve piece, and therefore a limiting cavity plate arranged in an inner cavity of a top.
As an optimized technical scheme, the base is installed to the below of bottom plate, is provided with the evacuation subassembly in the base, and the evacuation subassembly includes evacuating device, power, connecting wire and control panel, through connecting wire electric connection between control panel and the evacuating device, evacuating device is linked together through pipeline and sucking disc, and the sucking disc setting is in the middle of the bottom of base.
As an optimized technical scheme, the supporting seat is all installed all around to the bottom of base, and the supporting seat is equipped with the elastic seat with the junction of base.
As an optimized technical proposal, the tensioning anchoring device is provided with a handle.
As an optimized technical proposal of the utility model, one end of the movable part protruding the top beam is provided with a handle.
As an optimized technical scheme, the middle part of back timber and bottom plate all is equipped with the movable groove that removes about the confession moving part from top to bottom, and the both sides in movable groove are equallyd divide cloth have the spacing groove of adaptation in location antiskid.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model relates to a large-span prestressing force back tension construction teaching model through back timber, bottom plate, left anchor, right anchor and the stretch-draw anchor that sets up, can solve current prestressing force teaching model and be difficult to the problem of stretch-draw and anchor, reaches the purpose that improves teaching efficiency.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of the external member and the movable member of the present invention;
fig. 3 is the schematic view of the structure of the movable groove and the limiting groove of the present invention.
In the figure: 1. a top beam; 2. a support pillar; 3. a base plate; 4. a left anchoring device; 5. a right anchoring device; 6. prestressed steel cables; 7. tensioning the anchoring device; 8. KB plate; 9. a kit; 10. a movable member; 11. mounting a plate; 12. an elastic member; 13. a trapezoidal adjusting block; 14. a slide rod; 15. positioning the anti-slip piece; 16. a limiting cavity plate; 17. a base; 18. a vacuum pumping assembly; 19. a control panel; 20. a suction cup; 21. a supporting seat; 22. an elastic seat; 23. a handle; 24. a handle; 25. a movable groove; 26. a limiting groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "horizontal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Referring to fig. 1-3, the present invention provides a technical solution: a large-span prestress post-tensioning construction teaching model comprises a top beam 1, a support column 2, a bottom plate 3, a left anchoring device 4, a right anchoring device 5, a prestressed steel cable 6, a tensioning anchoring device 7 and a KB plate 8, wherein the top beam 1 and the bottom plate 3 are fixedly connected into a whole through the support column 2, the left anchoring device 4, the right anchoring device 5, the prestressed steel cable 6, the tensioning anchoring device 7 and the KB plate 8 are all arranged in a space between the top beam 1 and the bottom plate 3, the left anchoring device 4, the right anchoring device 5 and the tensioning anchoring device 7 are all composed of a sleeve 9 and a moving part 10, a mounting plate 11 and an elastic part 12 are arranged at the upper end and the lower end of the inside of the sleeve 9, one end of the elastic part 12 is fixedly connected with the mounting plate 11, the other end of the elastic part is connected with a trapezoid adjusting block 13 arranged on the moving part 10, slideways are embedded in two sides of the trapezoid adjusting block 13, a slide rod 14 slides in the slide way to drive a positioning part, thereby movably connecting a limit cavity plate 16 arranged in the inner cavity of the top beam 1 or the bottom plate 3.
The base 17 is installed to the below of bottom plate 3, is provided with evacuation subassembly 18 in the base 17, and evacuation subassembly 18 includes evacuating device, power, connecting wire and control panel 19, through connecting wire electric connection between control panel 19 and the evacuating device, and evacuating device is linked together through pipeline and sucking disc 20, and sucking disc 20 sets up in the middle of the bottom of base 17.
All install supporting seat 21 around base 17's bottom, supporting seat 21 is equipped with elastic seat 22 with base 17's junction, and when unable adjustment base 17, the operation personnel press back timber 1 downwards for elastic seat 22 is compressed, and sucking disc 20 butt is subaerial, and vacuum apparatus is opened to later rethread control panel 19, makes sucking disc 20 can adsorb subaerial, fixes base 17.
A handle 23 is arranged on the tension anchor device 7.
The end of the movable member 10 protruding from the top beam 1 is provided with a handle 24.
The middle parts of the top beam 1 and the bottom plate 3 are both provided with movable grooves 25 for the movable part 10 to move up and down and left and right, and both sides of the movable grooves 25 are distributed with limit grooves 26 adapted to the positioning anti-skid members 15.
The working principle is as follows:
when the device is used for teaching, a teaching person presses the top beam 1 downwards to compress the elastic seat 22, the suction cup 20 is abutted to the ground, and then the vacuumizing device is started through the control panel 19 to enable the suction cup 20 to be adsorbed on the ground and fix the base 17;
then, a handle 24 of the movable piece 10 on the left anchoring device 4 is pressed downwards, so that the trapezoidal adjusting block 13 on the movable piece 10 can synchronously move downwards, the sliding rod 14 is driven to slide in a slideway of the trapezoidal adjusting block 13 to drive the positioning anti-skid piece 15 to enter a through groove arranged on the side edge of the sleeve piece 9, so that the sliding rod 14 is far away from a limiting cavity plate 16 arranged in the inner cavity of the top beam 1 or the bottom plate 3, the left anchoring device 4 is horizontally moved forwards or backwards, after the position is determined, the handle 24 of the movable piece 10 on the left anchoring device 4 is loosened, the trapezoidal adjusting block 13 is upwards reset under the action of the elastic piece 12, the sliding rod 14 slides in the slideway of the trapezoidal adjusting block 13 to drive the positioning anti-skid piece 15 to extend out of the through groove arranged on the side edge of the sleeve piece 9, and then abuts against the limiting cavity plate 16 arranged in the inner cavity of the top beam 1 or the bottom;
then, the above-described actions are repeated to fix the position of the right anchoring device 5;
finally, the whole process of prestress construction is simulated by the tensioning anchoring device 7, the purpose of teaching is achieved, and the model is simple in structure, convenient to use and convenient for teaching simulation of students.
It is worth noting that: the whole device is controlled by the master control button, and the equipment matched with the control button is common equipment, so that the device belongs to the existing well-known technology, and the electrical connection relation and the specific circuit structure of the device are not repeated.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A large-span prestress post-tensioning construction teaching model is characterized by comprising a top beam (1), a support column (2), a bottom plate (3), a left anchoring device (4), a right anchoring device (5), a prestressed steel cable (6), a tensioning anchoring device (7) and a KB plate (8), wherein the top beam (1) and the bottom plate (3) are fixedly connected into a whole through the support column (2), the left anchoring device (4), the right anchoring device (5), the prestressed steel cable (6), the tensioning anchoring device (7) and the KB plate (8) are all arranged in a space between the top beam (1) and the bottom plate (3), the left anchoring device (4), the right anchoring device (5) and the tensioning anchoring device (7) are all composed of a sleeve piece (9) and a moving piece (10), mounting plates (11) and elastic pieces (12) are arranged at the upper end and the lower end of the interior of the sleeve piece (9), one end of the elastic piece (12) is fixedly connected with the mounting plate (11), the other end of the elastic piece is connected with a trapezoidal adjusting block (13) arranged on the moving piece (10), slideways are embedded in two sides of the trapezoidal adjusting block (13), and a sliding rod (14) slides in the slideways to drive the positioning anti-skid piece (15) to enter and exit in a through groove arranged on the side edge of the external piece (9), so that the elastic piece is movably connected with a limiting cavity plate (16) arranged in an inner cavity of the top beam (1) or the bottom plate (3).
2. The large-span pre-stressed post-tensioning construction teaching model as claimed in claim 1, wherein a base (17) is installed below the bottom plate (3), a vacuumizing assembly (18) is arranged in the base (17), the vacuumizing assembly (18) comprises a vacuumizing device, a power supply, a connecting wire and a control panel (19), the control panel (19) and the vacuumizing device are electrically connected through the connecting wire, the vacuumizing device is communicated with the sucker (20) through a pipeline, and the sucker (20) is arranged in the middle of the bottom of the base (17).
3. The large-span pre-stressed post-tensioning construction teaching model as claimed in claim 1, wherein supporting seats (21) are installed around the bottom of the base (17), and an elastic seat (22) is arranged at the joint of the supporting seats (21) and the base (17).
4. The large-span pre-stressed post-tensioning construction teaching model as claimed in claim 1, wherein a handle (23) is arranged on the tensioning and anchoring device (7).
5. The large-span prestress post-tensioning construction teaching model as claimed in claim 1, wherein a handle (24) is arranged at one end of the movable member (10) protruding out of the top beam (1).
6. The large-span pre-stressed post-tensioning construction teaching model as claimed in claim 1, wherein the middle parts of the top beam (1) and the bottom plate (3) are respectively provided with a movable groove (25) for the movable member (10) to move up and down and left and right, and both sides of the movable groove (25) are respectively provided with a limiting groove (26) adapted to the positioning anti-skid member (15).
CN201920481709.6U 2019-04-10 2019-04-10 Large-span prestressing force post-tensioning construction teaching model Active CN209993147U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920481709.6U CN209993147U (en) 2019-04-10 2019-04-10 Large-span prestressing force post-tensioning construction teaching model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920481709.6U CN209993147U (en) 2019-04-10 2019-04-10 Large-span prestressing force post-tensioning construction teaching model

Publications (1)

Publication Number Publication Date
CN209993147U true CN209993147U (en) 2020-01-24

Family

ID=69291069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920481709.6U Active CN209993147U (en) 2019-04-10 2019-04-10 Large-span prestressing force post-tensioning construction teaching model

Country Status (1)

Country Link
CN (1) CN209993147U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113129674A (en) * 2021-04-01 2021-07-16 柳州铁道职业技术学院 Bridge prestress cognition training teaching device and use method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113129674A (en) * 2021-04-01 2021-07-16 柳州铁道职业技术学院 Bridge prestress cognition training teaching device and use method

Similar Documents

Publication Publication Date Title
CN208322534U (en) A kind of battery core positioning device
CN116586483B (en) Steel construction connecting piece processingequipment that bends
CN112832535B (en) Device and method for positioning and installing reinforcing steel bars for house building
CN209753876U (en) Automatic shaping and bending mechanism for pins of motor connector assembly
CN214544039U (en) Fixed frock of installation motor magnetic shoe
CN210459913U (en) Floor fitment is with paving device
CN208575478U (en) Chair framework torsional spring automatic assembly equipment
CN114619469A (en) Photovoltaic panel installation robot for flexible support system
CN115015670A (en) Be used for multi-functional power adapter circuit testing arrangement
CN221174726U (en) Battery test rack
CN216462602U (en) Automatic welding jig is used in production and processing of outer wall scene light lamp
CN213117014U (en) Pressure maintaining jig
CN211220438U (en) Regulator cubicle mounting panel assembly device
CN112571517A (en) Electronic device processing system
CN211118338U (en) Electromechanical device installation device
CN222142479U (en) Fire pump room equipment installation auxiliary device
CN220177874U (en) Connecting device for two wallboards of aluminum foil separator
CN218081049U (en) Automatic welding device for electric iron accessories
CN218510478U (en) Interim installation device of outdoor supervisory equipment
CN218974415U (en) Full liquid crystal automobile combination instrument fixing device
CN214692985U (en) Hoist device is used in building engineering construction
CN221538826U (en) Tool special for disassembling and assembling fire-fighting equipment
CN218920792U (en) Server storage cabinet
CN222370683U (en) A welding device with good stability
CN219151230U (en) Panel rounding device is used in jar body production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant