CN209976003U - Pedal gap filling plate of scaffold - Google Patents
Pedal gap filling plate of scaffold Download PDFInfo
- Publication number
- CN209976003U CN209976003U CN201920433882.9U CN201920433882U CN209976003U CN 209976003 U CN209976003 U CN 209976003U CN 201920433882 U CN201920433882 U CN 201920433882U CN 209976003 U CN209976003 U CN 209976003U
- Authority
- CN
- China
- Prior art keywords
- plate
- scaffold
- support plate
- vertical
- extension board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a footboard clearance infill panel of scaffold frame, including the infill panel body, the infill panel body includes panel and first extension board, the second extension board that the level was arranged, the panel includes the intermediate lamella of middle department and is located the overlap joint board at intermediate lamella both ends, the upper end of first extension board with the lower extreme of intermediate lamella links to each other, the upper end of second extension board with the lower extreme of intermediate lamella links to each other, first extension board with be formed with the bayonet socket between the second extension board, the bayonet socket is with the vertical pole looks adaptation of scaffold frame. Above-mentioned pedal clearance infill panel of scaffold frame can shelter from the clearance of vertical pole department, and the overlap joint board at intermediate lamella both ends overlap joint respectively on the footboard of vertical pole both sides, and then makes the footboard seamless joint at vertical pole both ends get up to the potential safety hazard simple structure, easily realization have been eliminated.
Description
Technical Field
The utility model relates to a scaffold frame field especially relates to a footboard clearance infill panel of scaffold frame.
Background
Scaffolding refers to various supports erected on a construction site for workers to handle and solve vertical and horizontal transportation. The scaffold has the advantages of low cost, quick installation, convenient use, strong adaptability and the like, and is widely applied to high-rise building construction.
The footplate is one of the important components of the scaffold. As shown in fig. 1, fig. 1 is a schematic view of a step mounting structure of a scaffold; the footboard is installed between 2 adjacent horizontal poles, however, because the jam of vertical pole on the scaffold, can't normally lay the footboard, and then makes to have the clearance between the footboard of vertical pole both sides, and the workman walks or when transporting article through this clearance, causes stumbling or makes transporting article collapse very easily, and construction tool or other debris are extremely easy to follow this clearance landing and cause the casualties, from this, the urgent need is solved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to above-mentioned problem, a footboard clearance infill panel of scaffold frame is provided to there is gapped between the footboard of solving current scaffold frame vertical pole both sides, the big problem of potential safety hazard.
The utility model aims at realizing through the following technical scheme:
the utility model provides a footboard clearance filler plate of scaffold, includes the filler plate body, the filler plate body is including the panel and first extension board, the second extension board that the level was arranged, the panel includes the intermediate lamella of middle department and is located the overlap joint board at intermediate lamella both ends, the upper end of first extension board with the lower extreme of intermediate lamella links to each other, the upper end of second extension board with the lower extreme of intermediate lamella links to each other, first extension board with be formed with the bayonet socket between the second extension board, the bayonet socket is with the vertical pole looks adaptation of scaffold.
As a preferred scheme of the present invention, the infill panel body further includes an anti-slip assembly for preventing the bayonet from disengaging from the vertical rod of the scaffold, the anti-slip assembly includes a lock pin, a steel wire rope and a limit rod, one end of the lock pin is connected to the first end of the steel wire rope, the other end of the lock pin is hinged to the limit rod, the second end of the steel wire rope is connected to the first support plate/the second support plate, the first support plate is provided with a first through hole for the lock pin to be inserted into, and the second support plate is provided with a second through hole corresponding to the first through hole; through setting up the anticreep subassembly, can avoid the bayonet socket of vertical pole and infill panel body to break away from mutually for the fixed of infill panel body is more firm.
As an optimized scheme of the utility model, first through-hole be 2, 2 first through-holes distribute along the vertical direction of first extension board, it is corresponding, the second through-hole is 2, 2 second through-holes distribute along the vertical direction of second extension board.
As a preferred scheme of the utility model, first extension board, second extension board structure are the same to specifically including diaphragm and the vertical riser of arranging that the level was arranged, be the structure of falling L shape, the upper end of riser with the one end of diaphragm links to each other, the up end laminating of diaphragm fit on the lower terminal surface of intermediate lamella, just the diaphragm pass through the rivet with the intermediate lamella riveting.
As an optimized scheme of the utility model, the diaphragm with the riser structure as an organic whole.
As an optimized scheme of the utility model, the upper surface of intermediate lamella is opened there is the antiskid hole, the outward flange in antiskid hole is upwards protruding.
As an optimized proposal of the utility model, the intermediate plate and the lap-joint plate are of an integrated structure.
The beneficial effects of the utility model are that, a footboard clearance infill panel of scaffold can shelter from the clearance of vertical pole department, and then makes the footboard seamless linking at vertical pole both ends get up to eliminated the potential safety hazard, simple structure, easily realization.
Drawings
Fig. 1 is a schematic view of a pedal mounting structure of a scaffold;
fig. 2 is a front view of a step gap filling plate of a scaffold;
fig. 3 is a plan view of a step gap filling plate of a scaffold.
Detailed Description
The technical solution of the present invention is further explained by the following embodiments with reference to the accompanying drawings. It is to be understood that the embodiments described herein are merely illustrative of the present invention and are not limiting thereof.
Referring to fig. 1 to 3, fig. 1 is a schematic view illustrating a step mounting structure of a scaffold; fig. 2 is a front view of a step gap filling plate of a scaffold; fig. 3 is a plan view of a step gap filling plate of a scaffold.
In this embodiment, a pedal gap filling plate of a scaffold includes a filling plate body, the filling plate body includes a horizontally arranged panel 4, a first support plate 5 and a second support plate 6, the panel 4 includes a middle plate 401 in the middle and bridging plates 402 located at two ends of the middle plate 401, an anti-slip hole 403 is formed in the upper surface of the middle plate 401, the outer edge of the anti-slip hole 403 protrudes upward, the upper end of the first support plate 5 is connected with the lower end of the middle plate 401, the upper end of the second support plate 6 is connected with the lower end of the middle plate 401, a bayonet 9 is formed between the first support plate 5 and the second support plate 6, and the bayonet 9 is adapted to a longitudinal rod 2 of the scaffold.
In order to prevent the bayonet 9 from being separated from the side rail 2 of the scaffold, in this embodiment, the filling board body further includes an anti-slip assembly for preventing the bayonet 9 from being separated from the side rail 2 of the scaffold, and specifically, the anti-falling component comprises a lock pin 702, a steel wire rope 701 and a limiting rod 703, one end of the lock pin 702 is connected with the first end of the steel wire rope 701, the other end of the lock pin 702 is hinged with a limit rod 703, the second end of the steel wire rope 701 is connected with a first supporting plate 5, the first support plate 5 is provided with 2 first through holes for inserting the lock pins 702, the 2 first through holes are distributed along the vertical direction of the first support plate 5, the second support plate 6 is provided with a second through hole corresponding to the first through hole, correspondingly, the number of the second through holes is 2, and the 2 second through holes are distributed along the vertical direction of the second support plate 6.
In this embodiment, the first support plate 5 and the second support plate 6 have the same structure, and specifically include a horizontal plate 501 and a vertical plate 502, which are horizontally arranged, and have an inverted L-shaped structure, the upper end of the vertical plate 502 is connected to one end of the horizontal plate 501, the upper end surface of the horizontal plate 501 is attached to the lower end surface of the intermediate plate 401, and the horizontal plate 501 is riveted to the intermediate plate 401 by a rivet 8.
In order to improve the strength of the first and second support plates 5 and 6, in this embodiment, the horizontal plate 501 and the vertical plate 502 are an integral structure.
In order to improve the strength of the infill panel body, in this embodiment, the middle panel 401 and the bridging panel 402 are of an integral structure.
Above-mentioned footboard clearance infill panel of scaffold frame can shelter from the clearance of vertical pole 2 department, the overlap joint board 402 at intermediate lamella 401 both ends overlaps on the footboard 3 of vertical pole 2 both sides respectively, and then make the footboard 3 seamless joint at vertical pole 2 both ends get up, thereby the potential safety hazard has been eliminated, and bayonet socket 9 and the vertical pole 2 looks block that first extension board 5 and second extension board 6 formed, then insert the second through-hole with lockpin 702 in proper order, first through-hole, then, rotate gag lever post 703, and then accomplish the locking spacing, thereby can prevent that the infill panel is originally breaks away from vertical pole 2 and pops out, the security performance has further been improved, moreover, the steam generator is simple in structure, and easy realization.
The above embodiments have been merely illustrative of the basic principles and features of the present invention, and the present invention is not limited by the above embodiments, and does not depart from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims.
Claims (7)
1. The utility model provides a footboard clearance infill panel of scaffold, includes infill panel body, its characterized in that: the filling plate body comprises a panel, a first support plate and a second support plate which are horizontally arranged, the panel comprises a middle plate in the middle and lap plates positioned at two ends of the middle plate, the upper end of the first support plate is connected with the lower end of the middle plate, the upper end of the second support plate is connected with the lower end of the middle plate, a bayonet is formed between the first support plate and the second support plate, and the bayonet is matched with a longitudinal rod of a scaffold.
2. A scaffold floor gap filler board according to claim 1, wherein: the filling plate body further comprises an anti-falling assembly used for preventing the bayonet from being separated from a longitudinal rod of a scaffold, the anti-falling assembly comprises a lock pin, a steel wire rope and a limiting rod, one end of the lock pin is connected with a first end of the steel wire rope, the other end of the lock pin is hinged with the limiting rod, a second end of the steel wire rope is connected with a first supporting plate/a second supporting plate, a first through hole convenient for the lock pin to be inserted is formed in the first supporting plate, and a second through hole is formed in the position, corresponding to the first through hole, of the second supporting plate.
3. The scaffold floor gap filler board of claim 2, wherein: the number of the first through holes is 2, the 2 first through holes are distributed along the vertical direction of the first support plate, correspondingly, the number of the second through holes is 2, and the 2 second through holes are distributed along the vertical direction of the second support plate.
4. A scaffold floor gap filler board according to claim 3, wherein: the first supporting plate and the second supporting plate are identical in structure and specifically comprise a horizontal plate and a vertical plate, wherein the horizontal plate and the vertical plate are horizontally arranged, the horizontal plate and the vertical plate are of an inverted L-shaped structure, the upper end of the vertical plate is connected with one end of the horizontal plate, the upper end face of the horizontal plate is attached to the lower end face of the middle plate, and the horizontal plate is riveted with the middle plate through rivets.
5. The scaffold floor gap filler board of claim 4, wherein: the transverse plate and the vertical plate are of an integral structure.
6. The scaffold floor gap filler board of claim 5, wherein: the upper surface of the middle plate is provided with an anti-slip hole, and the outer edge of the anti-slip hole protrudes upwards.
7. A step gap filler board for a scaffold according to any one of claims 1 to 6, wherein: the middle plate and the lap joint plate are of an integral structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920433882.9U CN209976003U (en) | 2019-04-01 | 2019-04-01 | Pedal gap filling plate of scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920433882.9U CN209976003U (en) | 2019-04-01 | 2019-04-01 | Pedal gap filling plate of scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209976003U true CN209976003U (en) | 2020-01-21 |
Family
ID=69256399
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920433882.9U Expired - Fee Related CN209976003U (en) | 2019-04-01 | 2019-04-01 | Pedal gap filling plate of scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209976003U (en) |
-
2019
- 2019-04-01 CN CN201920433882.9U patent/CN209976003U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101960059B1 (en) | Safety device for fall prevention of steel tower | |
CN103410304A (en) | Novel scaffold system | |
CN204626921U (en) | A kind of fixed working platform without scaffold construction elevator | |
KR101076562B1 (en) | Supporting structure of slab form | |
CN211173050U (en) | Adjustable pedal device for building scaffold | |
CN211647417U (en) | Safety protection device capable of being recycled | |
CN209976003U (en) | Pedal gap filling plate of scaffold | |
CN106144832A (en) | A kind of special extended type wall-attached frame and preparation method thereof | |
CN209374997U (en) | Distribution box operating platform | |
CN109019371B (en) | Turnover supporting device and tower crane climbing method | |
CN107013013A (en) | A kind of steel structure lift shaft standard knot hoisting fixture and technique | |
CN110965797A (en) | Steel beam edge protection device | |
CN207392719U (en) | Scaffold dust suppression/safety net | |
KR101457917B1 (en) | Steel reinforcement transfer device | |
CN211229470U (en) | Multi-point suspension scaffold | |
CN109356372A (en) | A kind of elevator hoistway construction platform device | |
JP6842738B1 (en) | Suspended scaffolding | |
JP6661142B1 (en) | Hanging scaffold | |
CN209398349U (en) | A kind of mobile maintenance platform of ascending stair formula | |
CN210032555U (en) | Universal safety net and suspension bracket system for scaffold | |
CN209874527U (en) | Building engineering safety protection net | |
CN207092517U (en) | A kind of climbing frame protection net mounting structure | |
CN107700830B (en) | Climbing form structure for building | |
KR102331326B1 (en) | Connecting bridge for scaffolding scaffold | |
CN216239651U (en) | Construction scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200121 Termination date: 20210401 |