CN209941967U - A T-shaped wall panel connection structure - Google Patents
A T-shaped wall panel connection structure Download PDFInfo
- Publication number
- CN209941967U CN209941967U CN201920608226.8U CN201920608226U CN209941967U CN 209941967 U CN209941967 U CN 209941967U CN 201920608226 U CN201920608226 U CN 201920608226U CN 209941967 U CN209941967 U CN 209941967U
- Authority
- CN
- China
- Prior art keywords
- connection structure
- wall
- connection
- plate
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000000903 blocking effect Effects 0.000 claims description 36
- 229910000831 Steel Inorganic materials 0.000 claims description 28
- 238000009434 installation Methods 0.000 claims description 28
- 239000010959 steel Substances 0.000 claims description 28
- 238000007711 solidification Methods 0.000 claims description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 239000004567 concrete Substances 0.000 abstract description 21
- 238000010276 construction Methods 0.000 abstract description 17
- 239000010426 asphalt Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 238000010008 shearing Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000853 adhesive Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑技术领域,尤其涉及一种T型墙板连接结构。The utility model relates to the technical field of construction, in particular to a T-shaped wall panel connection structure.
背景技术Background technique
相比于传统的现浇式钢筋混凝土建筑,装配式建筑的构件在工厂或预制场先制作好,然后在施工现场进行安装,具有节省模板,高效快捷,材料节约无浪费,生产现场和施工现场无环境污染等优点。但是,现有装配式建筑技术仍然存在一些不足,无法保证多数节点干法连接后不再浇筑混凝土,节点连接后依旧需要采用现浇的方式将墙体的多个位置浇筑混凝土再次连接,如剪力墙与剪力墙之间的连接(尤其是T型的墙-墙连接),为了连接稳固,剪力墙与剪力墙之间的多个位置均会采用现浇的边缘构件,该种安装方式影响施工速度,降低施工效率,同时现场浇筑需要进行支模、混凝土浇筑等操作,造成施工现场复杂化,安全隐患提高的同时增加了施工成本。Compared with traditional cast-in-place reinforced concrete buildings, the components of prefabricated buildings are first fabricated in factories or prefabricated fields, and then installed at the construction site, which saves templates, is efficient and fast, saves materials without waste, and can be used on production sites and construction sites. No environmental pollution and other advantages. However, there are still some deficiencies in the existing prefabricated building technology, which cannot guarantee that most nodes will not be poured after dry connection. For the connection between the force wall and the shear wall (especially the T-shaped wall-to-wall connection), in order to stabilize the connection, cast-in-place edge members are used in many positions between the shear wall and the shear wall. The installation method affects the construction speed and reduces the construction efficiency. At the same time, the on-site pouring requires operations such as formwork and concrete pouring, which complicates the construction site, increases the safety hazards and increases the construction cost.
因此,需要提出一种T型墙板连接结构,能够解决T型墙板在安装时多个位置需要浇筑混凝土的问题。Therefore, it is necessary to propose a T-shaped wall panel connection structure, which can solve the problem that concrete needs to be poured in multiple positions during installation of the T-shaped wall panel.
实用新型内容Utility model content
本实用新型的目的在于提出一种T型墙板连接结构,能够减少T型墙板安装后需要浇筑混凝土的位置点,提高T型墙板连接效率。The purpose of the utility model is to provide a T-shaped wall panel connection structure, which can reduce the position points where concrete needs to be poured after the T-shaped wall panels are installed, and improve the connection efficiency of the T-shaped wall panels.
为达此目的,本实用新型采用以下技术方案:For this purpose, the utility model adopts the following technical solutions:
提供一种T型墙板连接结构,包括:Provide a T-shaped wall panel connection structure, including:
两个相互垂直设置的第一墙体;two first walls arranged perpendicular to each other;
第一连接结构,两个所述第一墙体相互靠近的一端均预埋有至少一个所述第一连接结构;a first connection structure, at least one of the first connection structures is pre-embedded at the ends of the two first walls that are close to each other;
第二墙体;其靠近两个所述第一墙体的一端开设有安装槽,所述第二墙体一端端部与两个所述第一墙体连接组成T型结构;a second wall; one end of the second wall close to the two first walls is provided with a mounting slot, and one end of the second wall is connected with the two first walls to form a T-shaped structure;
第二连接结构,所述第二墙体内预埋有至少一个所述第二连接结构,所述第二连接结构的一端预埋入所述第二墙体内,另一端与预埋于两个所述第一墙体的所述第一连接结构连接。The second connection structure, at least one of the second connection structures is pre-embedded in the second wall, one end of the second connection structure is pre-embedded in the second wall, and the other end is pre-embedded in the two walls. The first connecting structures of the first walls are connected.
作为优选,所述第二连接结构包括第一预埋钢筋和连接板,所述连接板设置于所述第二墙体靠近所述第一墙体的一端,所述连接板位于所述安装槽内,所述第一预埋钢筋一端与所述连接板固定连接,另一端预埋于所述第二墙体内。Preferably, the second connecting structure includes a first embedded steel bar and a connecting plate, the connecting plate is disposed at one end of the second wall body close to the first wall body, and the connecting plate is located in the installation groove One end of the first pre-embedded steel bar is fixedly connected to the connecting plate, and the other end is pre-embedded in the second wall.
作为优选,所述连接板为L型板,所述连接板上还设置有加强支撑板。Preferably, the connecting plate is an L-shaped plate, and a reinforcing support plate is further provided on the connecting plate.
作为优选,所述第一连接结构包括第一连接螺母和阻挡板,所述阻挡板设置于所述第一墙体的端部,所述阻挡板贴合于所述连接板的一个侧板,所述阻挡板将所述第一连接螺母阻挡在第一墙体内。Preferably, the first connecting structure includes a first connecting nut and a blocking plate, the blocking plate is disposed at the end of the first wall, and the blocking plate is attached to one side plate of the connecting plate, The blocking plate blocks the first connecting nut in the first wall.
作为优选,所述第一连接结构还包括防凝固盒,所述防凝固盒与所述阻挡板形成一能够容纳所述第一连接螺母的封闭腔室。Preferably, the first connection structure further includes an anti-solidification box, and the anti-solidification box and the blocking plate form a closed chamber capable of accommodating the first connection nut.
作为优选,所述第一连接结构还包括第二预埋钢筋,所述第二预埋钢筋的一端与所述阻挡板固定连接,所述第二预埋钢筋预埋于所述第一墙体内。Preferably, the first connection structure further includes a second embedded steel bar, one end of the second embedded steel bar is fixedly connected to the blocking plate, and the second embedded steel bar is embedded in the first wall. Inside.
作为优选,所述第二连接结构还包括连接螺柱,所述连接螺柱依次穿过所述连接板和所述阻挡板与所述第一连接螺母连接。Preferably, the second connecting structure further includes a connecting stud, and the connecting stud is connected to the first connecting nut through the connecting plate and the blocking plate in sequence.
作为优选,所述第二连接结构还包括第二连接螺母,所述第二连接螺母固定设置于所述连接板上,所述连接螺柱与所述第二连接螺母螺纹连接。Preferably, the second connection structure further includes a second connection nut, the second connection nut is fixedly arranged on the connection plate, and the connection stud is threadedly connected to the second connection nut.
作为优选,每个所述第一连接结构均与两个所述第二连接结构连接。Preferably, each of the first connection structures is connected to two of the second connection structures.
作为优选,所述第一连接结构包括套筒,所述套筒内设置有内螺纹孔。Preferably, the first connection structure includes a sleeve, and the sleeve is provided with an internal threaded hole.
本实用新型有益效果:Beneficial effects of the utility model:
本实用新型中提供的T型墙板连接结构,第一墙体上不设置任何能够浇筑混凝土的凹槽,而在第二墙体上靠近第一墙体的一端开设安装槽,设置安装槽的目的是为了方便将第二墙体和两个第一墙体固定安装成T型结构,便于第二连接结构和第一连接结构的安装。第二连接结构分别和两个第一连接结构连接,能够保证第二墙体和每个第一墙体之间连接,当第一连接结构和第二连接结构连接完成后,从安装槽处浇筑混凝土,完成T型墙板连接结构的安装,获得T型墙。相对于现有技术中多个混凝土浇筑位置点而言,本实用新型中只存在安装槽一个混凝土浇筑位置点,因此,本实用新型提供的T型墙板连接结构能够提高施工速度和施工效率,同时降低了施工成本。同时,第一墙体和第二墙体立模简单,方便预制。In the T-shaped wall panel connection structure provided in the present utility model, the first wall body is not provided with any grooves capable of pouring concrete, and the second wall body is provided with an installation groove at one end close to the first wall body. The purpose is to facilitate the fixed installation of the second wall body and the two first wall bodies into a T-shaped structure, so as to facilitate the installation of the second connection structure and the first connection structure. The second connection structures are respectively connected with the two first connection structures, which can ensure the connection between the second wall and each of the first walls. Concrete, complete the installation of the T-shaped wall panel connection structure, and obtain the T-shaped wall. Compared with a plurality of concrete pouring positions in the prior art, there is only one concrete pouring position in the installation groove in the present invention. Therefore, the T-shaped wall panel connection structure provided by the present invention can improve the construction speed and construction efficiency. At the same time, the construction cost is reduced. At the same time, the first wall body and the second wall body are simple in vertical form, which is convenient for prefabrication.
附图说明Description of drawings
图1是本实用新型实施例1提供的T型墙板连接结构的俯视图;1 is a top view of a T-shaped wallboard connection structure provided in Embodiment 1 of the present invention;
图2是本实用新型实施例1提供的第二连接结构的俯视图;2 is a top view of the second connection structure provided in Embodiment 1 of the present invention;
图3是图2提供的第二连接结构的侧视图;Fig. 3 is the side view of the second connection structure that Fig. 2 provides;
图4是本实用新型实施例2提供的T型墙板连接结构的俯视图。FIG. 4 is a top view of the T-shaped wallboard connection structure provided in
图中:In the picture:
1、第一墙体;2、第二墙体;3、第一预埋钢筋;4、连接板;41、连接孔;5、加强支撑板;6、第一连接螺母;7、阻挡板;8、防凝固盒;9、第二预埋钢筋;10、连接螺柱;11、第二连接螺母;12、套筒;13、沥青卷材。1. The first wall; 2. The second wall; 3. The first embedded steel bar; 4. The connecting plate; 41. The connecting hole; 5. The reinforcing support plate; 6. The first connecting nut; 7. The blocking plate; 8. Anti-solidification box; 9. Second pre-embedded steel bar; 10. Connecting stud; 11. Second connecting nut; 12. Sleeve; 13. Asphalt coil.
具体实施方式Detailed ways
下面结合附图和实施例对本实用新型作进一步的详细说明。可以理解的是,此处所描述的具体实施例仅仅用于解释本实用新型,而非对本实用新型的限定。另外还需要说明的是,为了便于描述,附图中仅示出了与本实用新型相关的部分而非全部结构。The present utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, but not to limit the present invention. In addition, it should be noted that, for the convenience of description, the drawings only show some but not all structures related to the present invention.
在本实用新型的描述中,除非另有明确的规定和限定,术语“相连”、“连接”、“固定”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present invention, unless otherwise expressly specified and limited, the terms "connected", "connected" and "fixed" should be understood in a broad sense, for example, it may be a fixed connection, a detachable connection, or a fixed connection. It can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be an internal connection between two elements or an interaction relationship between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.
在本实用新型中,除非另有明确的规定和限定,第一特征在第二特征之“上”或之“下”可以包括第一和第二特征直接接触,也可以包括第一和第二特征不是直接接触而是通过它们之间的另外的特征接触。而且,第一特征在第二特征“之上”、“上方”和“上面”包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”包括第一特征在第二特征正下方和斜下方,或仅仅表示第一特征水平高度小于第二特征。In the present invention, unless otherwise expressly specified and limited, a first feature "on" or "under" a second feature may include the first and second features in direct contact, or may include the first and second features The features are not in direct contact but through additional features between them. Also, the first feature being "above", "over" and "above" the second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is level higher than the second feature. The first feature is "below", "below" and "below" the second feature includes the first feature being directly below and diagonally below the second feature, or simply means that the first feature has a lower level than the second feature.
在本实施例的描述中,术语“上”、“下”、“右”、等方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述和简化操作,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”仅仅用于在描述上加以区分,并没有特殊的含义。In the description of this embodiment, the terms "upper", "lower", "right", etc. are based on the orientation or positional relationship shown in the accompanying drawings, which are only for convenience of description and simplified operation, rather than indicating Or imply that the referred device or element must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as a limitation of the present invention. In addition, the terms "first" and "second" are only used for distinction in description, and have no special meaning.
本实施例中提供了一种T型墙板连接结构,该T型墙板连接结构在连接后,能够减少需要浇筑混凝土的位置点,该T型墙板连接结构应用在住宅或办公楼的建造中,还可以应用在建筑装修中。In this embodiment, a T-shaped wall panel connection structure is provided. After the T-shaped wall panel connection structure is connected, the location points that need to be poured can be reduced. The T-shaped wall panel connection structure is used in the construction of residential or office buildings. It can also be used in building decoration.
本实用新型提供了一种T型墙板连接结构,该结构包括两个相互垂直设置的第一墙体1、第二墙体2、第一连接结构和第二连接结构,其中两个第一墙体1相互靠近的一端均预埋有至少一个第一连接结构。第二墙体2靠近两个第一墙体1的一端开设有安装槽21。第二墙体2内预埋有至少一个第二连接结构,第二连接结构的一端预埋入第二墙体2内,另一端与预埋于两个第一墙体1的第一连接结构连接。第二墙体2的一端端部与两个第一墙体1连接组成T型结构。The utility model provides a T-shaped wall panel connection structure, which comprises two mutually perpendicularly arranged first wall bodies 1,
本实用新型中提供的T型墙板连接结构,第一墙体1上不设置任何能够浇筑混凝土的凹槽,而在第二墙体2上靠近第一墙体1的一端开设安装槽21,设置安装槽21的目的是为了方便将第二墙体2和两个第一墙体1固定安装成T型结构,第二连接结构分别和两个第一连接结构连接,能够保证第二墙体2和每个第一墙体1之间连接,当第一连接结构和第二连接结构连接完成后,从安装槽21处浇筑混凝土,完成T型墙板连接结构的安装,获得T型墙。相对于现有技术中多个混凝土浇筑位置点而言,本实用新型中只存在安装槽21一个混凝土浇筑位置点,因此,本实用新型提供的T型墙板连接结构能够提高施工速度和施工效率,同时降低了施工成本。In the T-shaped wall panel connection structure provided in the present invention, the first wall body 1 is not provided with any grooves capable of pouring concrete, and the
实施例1Example 1
图1是本实用新型实施例提供的T型墙板连接结构的俯视图;图2是本实用新型实施例提供的第二连接结构的俯视图;图3是图2提供的第二连接结构的侧视图;如图1-图3所示,本实施例中第一连接结构和第二连接结构固定连接,且安装时通过安装槽21处对第一连接结构和第二连接结构进行有效的连接。Fig. 1 is a top view of a T-shaped wallboard connection structure provided by an embodiment of the present invention; Fig. 2 is a top view of a second connection structure provided by an embodiment of the present invention; Fig. 3 is a side view of the second connection structure provided by Fig. 2 1-3, in this embodiment, the first connection structure and the second connection structure are fixedly connected, and the first connection structure and the second connection structure are effectively connected through the
本实施例中提供的第二连接结构包括第一预埋钢筋3和连接板4,第一预埋钢筋3一端与连接板4固定连接,连接板4设置在第二墙体2靠近第一墙体1的一端;第一预埋钢筋3的另一端预埋入第二墙体2内。由于第二墙体2设置有安装槽21,因此,第一预埋钢筋3部分预埋入第二墙体2内,其中一部分则裸露在安装槽21处,待第一连接结构和第二连接结构连接后,再浇筑混凝土对该第一预埋钢筋3进行隐藏。第一预埋钢筋3预埋在第二墙体2内,同时第一预埋钢筋3与连接板4固定连接,因此,连接板4具体设置在第二墙体2的安装槽21内,第一预埋钢筋3能够实现连接板4与第二墙体2的固定,并提供较强的拉拔力,保证第二连接结构在第二墙体2内固定。当第二墙体2受到剪切力后,第二连接结构不会从第二墙体2内脱出。需要说明的是,第一预埋钢筋3的长度和半径应根据第二墙体2的长度和宽度进行选型,保证第二连接结构的强度,防止第二连接结构在第二墙体2受到较大的剪切力时与第二墙体2发生脱离。The second connection structure provided in this embodiment includes a first embedded
优选地,连接板4为L型板,连接板4上还设置有加强支撑板5,加强支撑板5能提高连接板4的整体刚度,保证连接板4能够抵抗来自两个第一墙体1施加的荷载。具体地,该加强支撑板5分别与连接板4的两连接侧壁连接。同时连接板4的两连接侧壁上均设置有连接孔41,连接孔41用于将连接板4与第一连接结构连接。连接板4为L型板,能够保证连接板4分别与两个第一墙体1连接,同时保证连接板4在耗材最少的情况下,实现第二墙体2与第一墙体1的连接。由于该第二连接结构用于连接T型墙板,因此,将连接板4设置成L型能够使两个第一墙体1不再开设安装槽21就能够实现第一连接结构和第二连接结构的连接。Preferably, the connecting
作为优选,第一连接结构包括第一连接螺母6和阻挡板7,阻挡板7设置在第一墙体1的端部,当第一连接结构和第二连接结构连接后,阻挡板7贴合连接板4的一个侧板,同时两个第一墙体1的阻挡板7相互垂直,阻挡板7将第一连接螺母6阻挡在第一墙体1内。防止第一连接螺母6在预埋过程中位置发生偏移。同时设置阻挡板7还能够在安装时更容易找到第一连接螺母6的具体位置。第一连接螺母6可以焊接在阻挡板7上,防止第一连接螺母位置偏移引起的连接耗时的问题发生。Preferably, the first connection structure includes a first connection nut 6 and a blocking plate 7, and the blocking plate 7 is disposed at the end of the first wall 1. After the first connecting structure and the second connecting structure are connected, the blocking plate 7 is attached One side plate of the connecting
第一连接结构和第二连接结构之间可以为焊接连接,但是T型墙在受到较大的剪力时,第一连接结构和第二连接结构的焊接点应力集中容易出现焊点断裂的问题,且焊接对于第一墙体1和第二墙体2的位置精度要求较高。为了解决上述问题,本实施例中第二连接结构还包括连接螺柱10,即第二连接结构与第一连接结构螺纹连接,具体是连接板4与第一连接螺母6通过连接螺柱10连接。连接螺柱10依次穿过连接板4和阻挡板7后与第一连接螺母6连接。连接螺柱10在受到较大的剪切力时,变形小,保证第一连接结构和第二连接结构连接的稳定性,提供T型墙板连接结构的整体强度。The first connection structure and the second connection structure can be welded connection, but when the T-shaped wall is subjected to a large shear force, the stress concentration of the welding point of the first connection structure and the second connection structure is prone to the problem of welding point fracture. , and welding has higher requirements on the positional accuracy of the first wall body 1 and the
进一步地,为了能够将第二连接结构和第一连接结构稳定的连接,本实施例中第二连接结构还包括第二连接螺母11,第二连接螺母11固定设置于连接板4上,并与连接孔41连通。连接螺柱10与第二连接螺母11螺纹连接,需要说明的是,连接孔41可为光孔,也可为螺纹孔,而为了便于加工,本实施例中连接孔41为光孔,连接螺柱10两端分别通过第一连接螺母6和第二连接螺母11实现对连接板4和阻挡板7的连接。阻挡板7上设置有通孔,保证连接螺柱10穿过阻挡板7与第一连接螺母6螺纹连接。Further, in order to stably connect the second connection structure and the first connection structure, in this embodiment, the second connection structure further includes a
进一步地,为了防止第一连接螺母6被混凝土封堵,本实施例中第一连接结构还包括防凝固盒8,防凝固盒8与阻挡板7形成一能够容纳第一连接螺母6的封闭腔室。预埋时,先将第一连接螺母6置入防凝固盒8内,而后将阻挡板7与防凝固盒8贴紧,并置入制造第一墙体1的模具中,浇筑混凝土后,待混凝土凝固后即可形成第一墙体1。Further, in order to prevent the first connecting nut 6 from being blocked by concrete, the first connecting structure in this embodiment further includes an
为了实现阻挡板7稳固的设置在第一墙体1内,防止在运输过程中阻挡板7受到颠簸而掉落,并提高第一连接结构的连接强度,本实施例中第一连接结构还包括预埋在第一墙体1内的第二预埋钢筋9,第二预埋钢筋9的一端与阻挡板7固定连接,另一端则延伸向第一墙体1内部。具体地,第二预埋钢筋9与阻挡板7之间通过焊接连接。需要说明的是,第二预埋钢筋9长度根据第一墙体1的长度选型,且第二预埋钢筋9的直径也应根据第一墙体1的长度和高度选型,保证第一连接结构的强度。防止第一连接结构在第一墙体1受到较大的剪切力时与第一墙体1发生脱离。In order to realize that the blocking plate 7 is stably arranged in the first wall 1, prevent the blocking plate 7 from being bumped and fall off during transportation, and improve the connection strength of the first connection structure, in this embodiment, the first connection structure further includes: One end of the second
需要说明的是,本实施例中每个第一墙体1上设置的第一连接结构与第二墙体2上设置的第二连接结构数量均相同。即每个第二连接结构均连接两个第一连接结构,该种限定方式,能够保证第一墙体1和第二墙体2之间稳定连接。同时第二墙体2上设置的第二连接结构数量在本实施例中为三个,可以认为的是,三个第二连接结构在第二墙体2的上中下布置,保证第二墙体2与第一墙体1连接的强度。在其他实施例中可以根据第二墙体2的高度设置第二连接结构。It should be noted that, in this embodiment, the number of the first connection structures provided on each of the first wall bodies 1 is the same as that of the second connection structures provided on the
进一步地,上述加强支撑板5数量为两个,且夹取支撑板为三角形板,支撑板为三角形板便于连接螺柱10的安装,同时第一预埋钢筋3和第二预埋钢筋9的数量均为四根,保证第一连接结构和第二连接结构安装在墙体内的稳定性。Further, the number of the above-mentioned reinforcing
进一步地,该T型墙板连接结构还包括沥青卷材13,沥青卷材13设置在连接板4和阻挡板7之间,沥青卷材13分别与连接板4和阻挡板7贴合设置。具体地,沥青卷材13为SBS自粘式改性沥青卷材。Further, the T-shaped wall panel connecting structure further includes an
上述T型墙板连接结构,安装过程如下:The installation process of the above T-shaped wall panel connection structure is as follows:
准备已经预埋有第一安装结构的第一墙体1和预埋有第二安装结构的第二墙体2;Prepare the first wall body 1 with the first installation structure pre-embedded and the
连接板4与阻挡板7之间放置沥青卷材13,并对齐;The
将连接螺柱10穿过连接孔41并与第一连接螺母6螺纹连接;Pass the connecting
将第二连接螺母11旋拧在螺柱上,并抵紧连接板4;Screw the second connecting
在连接板4与阻挡板5的接缝处打入建筑防水胶;Inject building waterproof glue at the joint between the connecting
在安装槽21处浇筑混凝土,混凝土凝结干燥后,安装完成。Concrete is poured at the
实施例2Example 2
与实施例1不同之处在,本实施例中提供的第一连接结构与实施例1中的连接结构不同。图4是本实施例提供的T型墙板连接结构的俯视图,如图4所示,第一连接结构包括套筒12,套筒12内设置有内螺纹孔。预埋第一连接结构时,只需要将套筒12放置在第一墙体1的模具指定位置即可,浇筑混凝土后形成第一墙体1,完成预埋目的。The difference from Embodiment 1 is that the first connection structure provided in this embodiment is different from the connection structure in Embodiment 1. FIG. 4 is a top view of the T-shaped wallboard connection structure provided in this embodiment. As shown in FIG. 4 , the first connection structure includes a sleeve 12 , and the sleeve 12 is provided with an internal thread hole. When pre-embedding the first connection structure, it is only necessary to place the sleeve 12 at the designated position of the mold of the first wall body 1, and after pouring concrete, the first wall body 1 is formed to complete the pre-embedding purpose.
第一连接结构与第二连接结构在连接时,连接螺柱10通过第二连接螺母11和套筒12实现对第一连接结构和第二连接结构的连接,该种连接方式简便,同时在第一墙体1上不开设孔洞,在后期浇筑混凝土时,浇筑点少,节省安装时间的同时也节省了建筑材料。When the first connection structure and the second connection structure are connected, the
本实施例的其他结构与实施例1相同,在此不再赘叙。The other structures of this embodiment are the same as those of Embodiment 1, and are not repeated here.
此外,上述仅为本实用新型的较佳实施例及所运用技术原理。本领域技术人员会理解,本实用新型不限于这里所述的特定实施例,对本领域技术人员来说能够进行各种明显的变化、重新调整和替代而不会脱离本实用新型的保护范围。因此,虽然通过以上实施例对本实用新型进行了较为详细的说明,但是本实用新型不仅仅限于以上实施例,在不脱离本实用新型构思的情况下,还可以包括更多其他等效实施例,而本实用新型的范围由所附的权利要求范围决定。In addition, the above are only the preferred embodiments of the present invention and the applied technical principles. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and various obvious changes, readjustments and substitutions can be made to those skilled in the art without departing from the protection scope of the present invention. Therefore, although the present utility model has been described in detail through the above embodiments, the present utility model is not limited to the above embodiments, and can also include more other equivalent embodiments without departing from the concept of the present utility model. Rather, the scope of the present invention is determined by the scope of the appended claims.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920608226.8U CN209941967U (en) | 2019-04-29 | 2019-04-29 | A T-shaped wall panel connection structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920608226.8U CN209941967U (en) | 2019-04-29 | 2019-04-29 | A T-shaped wall panel connection structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209941967U true CN209941967U (en) | 2020-01-14 |
Family
ID=69130715
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920608226.8U Expired - Fee Related CN209941967U (en) | 2019-04-29 | 2019-04-29 | A T-shaped wall panel connection structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209941967U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111456274A (en) * | 2020-04-16 | 2020-07-28 | 湖南贵庭住宅工业集团有限公司 | Assembled wall connection structure |
-
2019
- 2019-04-29 CN CN201920608226.8U patent/CN209941967U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111456274A (en) * | 2020-04-16 | 2020-07-28 | 湖南贵庭住宅工业集团有限公司 | Assembled wall connection structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109707173B (en) | Construction method of assembly type laminated beam plate installation auxiliary device | |
| CN108678220B (en) | A concrete shear wall with integrated steel formwork installation | |
| CN110206210A (en) | Assembled composite floor plate and its construction method | |
| CN104294920B (en) | The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post and preparation method | |
| CN107060104B (en) | A prefabricated steel frame concrete box unit structure system and its construction method | |
| CN209941967U (en) | A T-shaped wall panel connection structure | |
| CN108999297A (en) | A kind of novel fabricated primary and secondary beam connecting node and attaching method thereof | |
| CN216948873U (en) | L-Shaped Shear Wall Assemblies and Building Structures | |
| CN110241946A (en) | A horizontal connection structure of an assembled energy-dissipating frame shear wall and its construction method | |
| CN109797902A (en) | Prefabrication ash wall body plate | |
| CN204001409U (en) | Precast composite slab | |
| CN114875973B (en) | Construction method of concrete well in narrow space | |
| CN216076318U (en) | Reinforcing device for aluminum alloy reverse ridge template | |
| CN211949120U (en) | An installation structure of a fully prefabricated floor slab | |
| CN212104748U (en) | A connection structure for stable installation of fully prefabricated floor slabs | |
| CN118065544B (en) | A dry connection structure for prefabricated walls | |
| CN112663788A (en) | Assembled rapid construction method | |
| CN208294062U (en) | A kind of concrete wall template and support combinations structure | |
| CN209412978U (en) | Connection nodes for prefabricated buildings and prefabricated buildings | |
| CN109057318B (en) | Prefabricated building formwork system and wall module | |
| CN108086589A (en) | Prefabricated wall, prefabricated unit body, building system and construction method thereof | |
| CN207905134U (en) | A kind of novel integrated wall plate of assembled | |
| CN216239270U (en) | Assembled rectangular opening component and connecting node of assembled rectangular opening component and superposed beam slab | |
| CN220908715U (en) | Installation structure of assembled wall | |
| CN112144699A (en) | Shear wall vertical joint connection structure, shear wall structure and construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: Room 2, 177 Jinrong Road, Jinxi Town, Kunshan City, Suzhou City, Jiangsu Province Patentee after: Kunshan zhuyou Zhizao Construction Technology Co.,Ltd. Address before: Room 2, 177 Jinrong Road, Jinxi Town, Kunshan City, Suzhou City, Jiangsu Province Patentee before: KUNSHAN ZHONGMIN ZHUYOU SMART MANUFACTURING BUILDING TECHNOLOGY Co.,Ltd. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200114 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |