CN209940233U - elevator shaft - Google Patents

elevator shaft Download PDF

Info

Publication number
CN209940233U
CN209940233U CN201920184396.8U CN201920184396U CN209940233U CN 209940233 U CN209940233 U CN 209940233U CN 201920184396 U CN201920184396 U CN 201920184396U CN 209940233 U CN209940233 U CN 209940233U
Authority
CN
China
Prior art keywords
curtain wall
hoistway
column
fixing plate
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920184396.8U
Other languages
Chinese (zh)
Inventor
吴红兵
黄宗耀
洪水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Elevator China Co Ltd
Original Assignee
Hitachi Elevator China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Elevator China Co Ltd filed Critical Hitachi Elevator China Co Ltd
Priority to CN201920184396.8U priority Critical patent/CN209940233U/en
Application granted granted Critical
Publication of CN209940233U publication Critical patent/CN209940233U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Elevator Door Apparatuses (AREA)

Abstract

本实用新型涉及一种电梯井道,包括:井道框架,井道框架包括立柱及与立柱连接的横梁,立柱包括外部翼缘,横梁包括外部遮板,且横梁包括第一横梁及第二横梁,外部翼缘的其中一侧与第一横梁的外部遮板拼接,外部翼缘的另一侧与第二横梁的外部遮板拼接。上述的电梯井道中,第一横梁、立柱及第二横梁配合形成井道框架的转角结构,第一横梁与第二横梁呈夹角设置,立柱设置在第一横梁与第二横梁之间,立柱的外部翼缘的一侧与第一横梁的外部遮板拼接,另一侧与第二横梁的外部遮板拼接。从井道外侧观看井道外壁时,立柱不会出现开口,如此,无需对立柱进行封口处理即可避免井道的外侧出现开口,节约成本。

The utility model relates to an elevator hoistway, comprising: a hoistway frame, the hoistway frame includes a column and a beam connected with the column, the column includes an outer flange, the beam includes an outer shutter, and the beam includes a first beam and a second beam. One side of the flange is spliced with the outer shutter of the first beam, and the other side of the outer flange is spliced with the outer shutter of the second beam. In the above-mentioned elevator shaft, the first cross beam, the vertical column and the second horizontal beam cooperate to form the corner structure of the hoistway frame, the first horizontal beam and the second horizontal beam are arranged at an included angle, the vertical column is arranged between the first horizontal beam and the second horizontal beam, and the One side of the outer flange is spliced with the outer shutter of the first beam, and the other side is spliced with the outer shutter of the second beam. When the outer wall of the hoistway is viewed from the outside of the hoistway, there will be no openings in the uprights, so that there is no need to seal the uprights to avoid openings on the outside of the hoistway, saving costs.

Description

电梯井道elevator shaft

技术领域technical field

本实用新型涉及电梯技术领域,特别是涉及一种电梯井道。The utility model relates to the technical field of elevators, in particular to an elevator shaft.

背景技术Background technique

井道是电梯设备的重要组成部分,它能提供一个封闭的空间,起到隔音减震以及保护电梯安全运行的作用。一般电梯的井道为混凝土结构,随着电梯的发展,在建筑外设置井道的情况也越来越多,如果采用传统的混凝土井道,将加大施工难度和延长施工周期,同时也会影响建筑的采光。The hoistway is an important part of elevator equipment. It can provide a closed space, play the role of sound insulation and shock absorption and protect the safe operation of the elevator. Generally, elevator shafts are concrete structures. With the development of elevators, there are more and more cases where shafts are set outside buildings. If traditional concrete shafts are used, it will increase the difficulty of construction and prolong the construction period, and will also affect the construction of the building. lighting.

因此,大多数建筑物外的井道通常采用钢结构井道,而传统的钢结构井道的立柱采用H型钢的话,H型钢总有一侧开口会朝井道外部,为避免影响美观,都会对开口进行封口处理,这将会增加成本。Therefore, the wells outside most buildings usually use steel structure wells, and if the columns of traditional steel structure wells use H-shaped steel, the H-shaped steel always has one side opening facing the outside of the well. In order to avoid affecting the appearance, the openings will be sealed. , which will increase the cost.

实用新型内容Utility model content

基于此,有必要提供一种电梯井道,外形美观,建造成本低。Based on this, it is necessary to provide an elevator shaft with beautiful appearance and low construction cost.

其技术方案如下:Its technical solutions are as follows:

一种电梯井道,包括:井道框架,所述井道框架包括立柱、及与所述立柱连接的横梁,所述立柱包括外部翼缘,所述横梁包括外部遮板,且所述横梁包括第一横梁及第二横梁,所述外部翼缘的其中一侧与所述第一横梁的所述外部遮板拼接,所述外部翼缘的另一侧与所述第二横梁的所述外部遮板拼接。An elevator hoistway, comprising: a hoistway frame, the hoistway frame includes a column, and a beam connected to the column, the column includes an outer flange, the beam includes an outer shutter, and the beam includes a first beam and a second beam, one side of the outer flange is spliced with the outer shutter of the first beam, and the other side of the outer flange is spliced with the outer shutter of the second beam .

上述的电梯井道中,第一横梁、立柱及第二横梁配合形成井道框架的转角结构,第一横梁与第二横梁呈夹角设置,立柱设置在第一横梁与第二横梁之间,立柱的外部翼缘的一侧与第一横梁的外部遮板拼接,另一侧与第二横梁的外部遮板拼接。从井道外侧观看井道外壁时,立柱不会出现开口,如此,无需对立柱进行封口处理,节约成本。In the above-mentioned elevator shaft, the first cross beam, the vertical column and the second horizontal beam cooperate to form the corner structure of the hoistway frame, the first horizontal beam and the second horizontal beam are arranged at an included angle, the vertical column is arranged between the first horizontal beam and the second horizontal beam, and the One side of the outer flange is spliced with the outer shutter of the first beam, and the other side is spliced with the outer shutter of the second beam. When the outer wall of the hoistway is viewed from the outside of the hoistway, there will be no openings in the column, thus eliminating the need to seal the column and saving costs.

下面进一步对技术方案进行说明:The technical solution is further described below:

进一步地,所述井道框架为至少两个,且至少两个所述井道框架沿竖直方向设置,相邻两个所述井道框架中的立柱通过连接组件连接。Further, there are at least two hoistway frames, and the at least two hoistway frames are arranged in a vertical direction, and the uprights in two adjacent hoistway frames are connected by connecting components.

进一步地,在相邻两个所述井道框架中,所述连接组件包括设置于其中一个所述井道框架的所述立柱上的第一连接件、及设置于另一个所述井道框架的所述立柱上的第二连接件,所述第一连接件与所述第二连接件连接。Further, in two adjacent hoistway frames, the connecting assembly includes a first connecting piece disposed on the upright column of one of the hoistway frames, and the first connecting piece disposed on the other hoistway frame. A second connecting piece on the upright column, the first connecting piece is connected with the second connecting piece.

进一步地,所述连接组件还包括第一紧固件,所述第一连接件设有第一安装孔,所述第二连接件设有与所述第一安装孔对应的第二安装孔,所述紧固件穿设于所述第一安装孔及所述第二安装孔中。Further, the connecting assembly further includes a first fastener, the first connecting piece is provided with a first mounting hole, the second connecting piece is provided with a second mounting hole corresponding to the first mounting hole, The fastener passes through the first installation hole and the second installation hole.

进一步地,所述的电梯井道还包括第二紧固件,所述横梁还包括与所述外部遮板连接的连接板,所述连接板设有第三安装孔,在相邻两个所述井道框架中,所述第二紧固件穿设于其中一个所述井道框架的所述第三安装孔及另一个所述井道框架的所述第三安装孔中。Further, the elevator shaft further includes a second fastener, the beam further includes a connecting plate connected to the external shutter, the connecting plate is provided with a third installation hole, and the two adjacent said In the hoistway frame, the second fastener is inserted through the third installation hole of one of the hoistway frames and the third installation hole of the other hoistway frame.

进一步地,所述的电梯井道还包括挡水板,所述挡水板用于遮挡相邻两个所述井道框架之间的间隙。Further, the elevator hoistway further includes a water blocking plate, and the water blocking plate is used to block the gap between two adjacent hoistway frames.

进一步地,所述的电梯井道还包括层门侧幕墙,所述层门侧幕墙包括第一子幕墙及第二子幕墙,所述立柱包括设置在所述层门入口侧的第一立柱与第二立柱,且所述第一立柱与所述第二立柱间隔设置,所述第一子幕墙与所述第一立柱连接,所述第二子幕墙与所述第二立柱连接。Further, the elevator shaft also includes a landing door side curtain wall, the landing door side curtain wall includes a first sub-curtain wall and a second sub-curtain wall, and the vertical column includes a first vertical column and a second sub-curtain wall arranged on the entrance side of the landing door. There are two vertical columns, the first vertical column and the second vertical column are arranged at intervals, the first sub-curtain wall is connected with the first vertical column, and the second sub-curtain wall is connected with the second vertical column.

进一步地,所述横梁还包括设置在所述层门入口侧的门头横梁及地坎横梁,所述门头横梁的两端分别与所述第一立柱及所述第二立柱连接,所述地坎横梁的两端分别与所述第一立柱及所述第二立柱连接,且所述门头横梁与所述地坎横梁间隔设置,所述第一子幕墙设有与所述第一立柱连接的第一折弯边、与所述门头横梁连接的第二折弯边、及与所述地坎横梁连接的第三折弯边,所述第二子幕墙设有与所述第二立柱连接的第四折弯边、与所述门头横梁连接的第五折弯边、及与所述地坎横梁连接的第六折弯边。Further, the beam also includes a door head beam and a sill beam arranged on the entrance side of the landing door, and the two ends of the door head beam are respectively connected with the first column and the second column. Both ends of the sill beam are respectively connected with the first column and the second column, and the door beam and the sill beam are arranged at intervals, and the first sub-curtain wall is provided with the first column. The connected first bending side, the second bending side connected with the door head beam, and the third bending side connected with the sill beam, the second sub-curtain wall is provided with the second The fourth bent side connected with the upright column, the fifth bent side connected with the door head beam, and the sixth bent side connected with the sill beam.

进一步地,所述层门侧幕墙还包括上封板,所述上封板设有第七折弯边及第八折弯边,所述第一子幕墙还设有与所述第七折弯边连接的第九折弯边,所述第二子幕墙还设有与所述第八折弯边连接的第十折弯边。Further, the curtain wall on the side of the landing door further includes an upper sealing plate, the upper sealing plate is provided with a seventh bending edge and an eighth bending edge, and the first sub-curtain wall is also provided with the seventh bending edge. The second sub-curtain wall is also provided with a tenth bent edge connected with the eighth bent edge.

进一步地,所述的电梯井道还包括井道幕墙结构,所述井道幕墙结构包括幕墙本体、竖向固定板及横向固定板,所述竖向固定板设置于所述立柱上,所述横向固定板设置于所述横梁上,所述幕墙本体的第一侧与所述竖向固定板连接,所述幕墙本体的第二侧与所述横向固定板连接。Further, the elevator hoistway also includes a hoistway curtain wall structure, the hoistway curtain wall structure includes a curtain wall body, a vertical fixing plate and a horizontal fixing plate, the vertical fixing plate is arranged on the vertical column, and the horizontal fixing plate is It is arranged on the beam, the first side of the curtain wall body is connected with the vertical fixing plate, and the second side of the curtain wall body is connected with the horizontal fixing plate.

进一步地,所述的井道幕墙结构还包括第一固定件及第二固定件,所述第一固定件与所述竖向固定板连接、并与所述竖向固定板配合形成第一安装槽,所述二固定件与所述横向固定板连接、并与所述横向固定板配合形成第二安装槽,所述幕墙本体的第一侧插设在所述第一安装槽中,所述幕墙本体的第二侧插设在所述第二安装槽中。Further, the hoistway curtain wall structure further includes a first fixing piece and a second fixing piece, and the first fixing piece is connected with the vertical fixing plate and cooperates with the vertical fixing plate to form a first installation groove. , the two fixing pieces are connected with the lateral fixing plate, and cooperate with the lateral fixing plate to form a second installation groove, the first side of the curtain wall body is inserted into the first installation groove, the curtain wall The second side of the body is inserted into the second installation groove.

进一步地,所述的井道幕墙结构还包括第一粘合胶及第二粘合胶,所述第一粘合胶用于使所述第一固定件及所述竖向固定板分别与所述幕墙本体连接,所述第二粘合胶用于使所述第二固定件及所述横向固定板分别与所述幕墙本体连接。Further, the hoistway curtain wall structure further includes a first adhesive glue and a second adhesive glue, and the first adhesive glue is used to make the first fixing member and the vertical fixing plate The curtain wall body is connected, and the second adhesive is used to connect the second fixing piece and the lateral fixing plate with the curtain wall body respectively.

附图说明Description of drawings

图1为本实用新型一实施例所述的电梯井道的结构示意图;1 is a schematic structural diagram of an elevator shaft according to an embodiment of the present invention;

图2为本实用新型一实施例所述的井道框架的结构示意图;2 is a schematic structural diagram of a hoistway frame according to an embodiment of the present invention;

图3为本实用新型一实施例所述的井道框架的俯视结构示意图;3 is a schematic top view of the structure of the hoistway frame according to an embodiment of the present invention;

图4为本实用新型一实施例所述的相邻两个井道框架的连接结构示意图;4 is a schematic diagram of the connection structure of two adjacent hoistway frames according to an embodiment of the present utility model;

图5为本实用新型一实施例所述的电梯井道的层门入口侧的结构示意图;5 is a schematic structural diagram of an entrance side of a landing door of an elevator shaft according to an embodiment of the present invention;

图6为本实用新型一实施例所述的第二幕墙的安装结构示意图;6 is a schematic diagram of the installation structure of the second curtain wall according to an embodiment of the present invention;

图7为本实用新型一实施例所述的上封板的安装结构示意图;7 is a schematic diagram of the installation structure of the upper sealing plate according to an embodiment of the present invention;

图8为本实用新型一实施例所述的井道幕墙结构示意图一;FIG. 8 is a schematic diagram 1 of the hoistway curtain wall structure according to an embodiment of the present utility model;

图9为本实用新型一实施例所述的井道幕墙结构示意图二;9 is a second schematic diagram of the structure of the hoistway curtain wall according to an embodiment of the present utility model;

图10为本实用新型一实施例所述的防水板的安装结构示意图;10 is a schematic diagram of the installation structure of the waterproof board according to an embodiment of the present invention;

图11为本实用新型一实施例所述的立柱与建筑面连接结构示意图。11 is a schematic diagram of a connection structure between a column and a building surface according to an embodiment of the present invention.

附图标记说明:Description of reference numbers:

10、电梯井道,11、层门入口侧,100、井道框架,110、立柱,111、外部翼缘,112、第一立柱,113、第二立柱,120、横梁,121、第一横梁,122、第二横梁,123、外部遮板,124、连接板,125、门头横梁,126、地坎横梁,130、挡水板,200、第一紧固件,210、第一连接件,220、第二连接件,230、第二紧固件,310、第一子幕墙,320、第二子幕墙,321、第六折弯边,3211、长条孔,322、第十折弯边,330、上封板,331、第八折弯边,332、第十一折弯边,410、幕墙本体,420、竖向固定板,430、横向固定板,440、第一固定件,450、第二固定件,460、第一粘合胶,470、第二粘合胶,500、建筑面连接结构。10, elevator shaft, 11, landing door entrance side, 100, shaft frame, 110, column, 111, outer flange, 112, first column, 113, second column, 120, beam, 121, first beam, 122 , second beam, 123, external shutter, 124, connecting plate, 125, door beam, 126, sill beam, 130, water retaining plate, 200, first fastener, 210, first connector, 220 , the second connector, 230, the second fastener, 310, the first sub-curtain wall, 320, the second sub-curtain wall, 321, the sixth bent edge, 3211, the long hole, 322, the tenth bent edge, 330, upper sealing plate, 331, eighth bent edge, 332, eleventh bent edge, 410, curtain wall body, 420, vertical fixing plate, 430, horizontal fixing plate, 440, first fixing piece, 450, The second fixing piece, 460, the first adhesive glue, 470, the second adhesive glue, 500, the building surface connection structure.

具体实施方式Detailed ways

为使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及具体实施方式,对本实用新型进行进一步的详细说明。应当理解的是,此处所描述的具体实施方式仅用以解释本实用新型,并不限定本实用新型的保护范围。In order to make the purpose, technical solutions and advantages of the present utility model more clearly understood, the present utility model will be further described in detail below with reference to the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, and do not limit the protection scope of the present invention.

需要说明的是,当元件被称为“固定于”另一个元件,它可以直接在另一个元件上或者也可以存在居中的元件。当一个元件被认为是“连接”另一个元件,它可以是直接连接到另一个元件或者可能同时存在居中元件。本文所使用的术语“垂直的”、“水平的”、“左”、“右”以及类似的表述只是为了说明的目的,并不表示是唯一的实施方式。It should be noted that when an element is referred to as being "fixed to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for the purpose of illustration only and do not represent the only embodiment.

除非另有定义,本文所使用的所有的技术和科学术语与属于本实用新型的技术领域的技术人员通常理解的含义相同。本文中在本实用新型的说明书中所使用的术语只是为了描述具体的实施方式的目的,不是旨在于限制本实用新型。本文所使用的术语“及/或”包括一个或多个相关的所列项目的任意的和所有的组合。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the technical field to which the present invention belongs. The terms used in the description of the present invention herein are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.

本实用新型中所述“第一”、“第二”不代表具体的数量及顺序,仅仅是用于名称的区分。The "first" and "second" mentioned in the present utility model do not represent a specific quantity and order, but are only used for the distinction of names.

如图1-4所示,一实施例所述的一种电梯井道10,包括:井道框架100,井道框架100包括立柱110、及与立柱连接的横梁120,立柱110包括外部翼缘111,横梁120包括外部遮板123,且横梁120包括第一横梁121及第二横梁122,外部翼缘111的其中一侧与第一横梁121的外部遮板123拼接,外部翼缘111的另一侧与第二横梁122的外部遮板123拼接。As shown in FIGS. 1-4, an elevator shaft 10 according to an embodiment includes: a shaft frame 100, the shaft frame 100 includes a column 110, and a beam 120 connected to the column, the column 110 includes an outer flange 111, and the beam 120 includes an outer shutter 123, and the beam 120 includes a first beam 121 and a second beam 122, one side of the outer flange 111 is spliced with the outer shutter 123 of the first beam 121, and the other side of the outer flange 111 is The outer shutters 123 of the second beam 122 are spliced together.

如图3、图4所示,上述的电梯井道10中,第一横梁121、立柱110及第二横梁122配合形成井道框架100的转角结构,第一横梁121与第二横梁122呈夹角设置,立柱110设置在第一横梁121与第二横梁122之间,立柱110的外部翼缘111的一侧与第一横梁121的外部遮板123拼接,另一侧与第二横梁122的外部遮板123拼接。从井道外侧观看井道外壁时,立柱110不会出现开口,如此,无需对立柱110进行封口处理,节约成本。As shown in FIG. 3 and FIG. 4 , in the above-mentioned elevator shaft 10, the first beam 121, the column 110 and the second beam 122 cooperate to form the corner structure of the hoistway frame 100, and the first beam 121 and the second beam 122 are arranged at an included angle , the column 110 is arranged between the first beam 121 and the second beam 122, one side of the outer flange 111 of the column 110 is spliced with the outer shutter 123 of the first beam 121, and the other side is connected with the outer shield of the second beam 122. Plate 123 is spliced. When the outer wall of the hoistway is viewed from the outside of the hoistway, there will be no openings in the upright column 110, so that the upright column 110 does not need to be sealed, which saves costs.

如图2-4所示,具体到本实施例中,以上所述的电梯井道可以通过附墙架设置在建筑物外侧,井道框架100包括4根立柱110和若干横梁120,立柱110为H型钢(工字型钢),横梁120为型材或板材,在井道框架100的其中一个横截面中,4根横梁120通过4根立柱110首尾相连形成封闭式矩形,第一横梁121为与其中一个立柱110的一侧连接的横梁,第二横梁122为与该立柱110的另一侧连接的横梁。外部翼缘111的其中一侧与第一横梁121的外部遮板无缝拼接且平滑过渡,外部翼缘111的另一侧与第二横梁122的外部遮板无缝拼接且平滑过渡,从电梯井道10的外侧观看时,井道外壁形成封闭式结构,没有开口。且上述H型钢的布置方式不会产生强轴和弱轴,能够避免出现因在弱轴方向产生破坏而加大立柱的规格的需求。As shown in FIGS. 2-4 , specifically in this embodiment, the elevator shaft described above can be set on the outside of the building through a wall frame. The shaft frame 100 includes four uprights 110 and several beams 120, and the uprights 110 are H-shaped steel. (I-beam), the beam 120 is a profile or a plate, in one of the cross sections of the hoistway frame 100, four beams 120 are connected end to end through four columns 110 to form a closed rectangle, and the first beam 121 is connected to one of the columns 110. The second beam 122 is a beam connected to the other side of the column 110 . One side of the outer flange 111 is seamlessly spliced and smoothly transitioned with the outer shutter of the first beam 121, and the other side of the outer flange 111 is seamlessly spliced and smoothly transitioned from the outer shutter of the second beam 122. When viewed from the outside of the hoistway 10, the outer wall of the hoistway forms a closed structure without openings. In addition, the arrangement of the above-mentioned H-beam will not produce strong axis and weak axis, which can avoid the need to increase the size of the column due to damage in the direction of the weak axis.

如图1、图4所示,进一步地,井道框架100为至少两个,且至少两个井道框架100沿竖直方向设置,相邻两个井道框架100中的立柱110通过连接组件连接。电梯井道10由至少两个井道框架100连接形成,相较于整个电梯井道10只由一个井道框架100构成,能有效地减小单个井道框架100设计的长度,方便井道框架100运输。As shown in FIG. 1 and FIG. 4 , further, there are at least two hoistway frames 100 , and the at least two hoistway frames 100 are arranged in a vertical direction, and the uprights 110 in two adjacent hoistway frames 100 are connected by connecting components. The elevator hoistway 10 is formed by connecting at least two hoistway frames 100 . Compared with the entire elevator hoistway 10 consisting of only one hoistway frame 100 , the designed length of a single hoistway frame 100 can be effectively reduced, which facilitates the transportation of the hoistway frame 100 .

如图4所示,在其中一个实施例中,在相邻两个井道框架100中,连接组件包括设置于其中一个井道框架100的立柱110上的第一连接件210、及设置于另一个井道框架100的立柱110上的第二连接件220,第一连接件210与第二连接件220连接。As shown in FIG. 4 , in one embodiment, in two adjacent hoistway frames 100 , the connecting component includes a first connecting member 210 disposed on the column 110 of one of the hoistway frames 100 , and a first connecting member 210 disposed on the other hoistway The second connector 220 on the column 110 of the frame 100 is connected with the first connector 210 and the second connector 220 .

具体地,第一连接件210设置于其中一个井道框架100的立柱110的底端,第二连接件220设置于另一个井道框架100的立柱110的上端,第一连接件210与第二连接件220贴合、以使相邻两个井道框架100上的立柱110对齐。Specifically, the first connector 210 is arranged at the bottom end of the column 110 of one of the hoistway frames 100 , the second connector 220 is arranged at the upper end of the column 110 of the other hoistway frame 100 , the first connector 210 and the second connector 220 is fitted to align the uprights 110 on two adjacent hoistway frames 100 .

进一步地,连接组件还包括第一紧固件200,第一连接件210设有第一安装孔,第二连接件220设有与第一安装孔对应的第二安装孔,紧固件穿设于第一安装孔及第二安装孔中。如此,可以通过第一紧固件200将第一连接件210与第二连接件220固定,从而使相邻两个井道框架100上的立柱110实现固定。Further, the connection assembly further includes a first fastener 200, the first connection member 210 is provided with a first installation hole, the second connection member 220 is provided with a second installation hole corresponding to the first installation hole, and the fastener passes through in the first installation hole and the second installation hole. In this way, the first connecting piece 210 and the second connecting piece 220 can be fixed by the first fastener 200 , so that the vertical columns 110 on two adjacent hoistway frames 100 can be fixed.

可选地,第一安装孔为及第二安装孔为通孔,第一紧固件200为带有螺母的螺栓;或第一安装孔为螺纹孔,第二安装孔为通孔,第一紧固件200为螺栓;或第一安装孔及第二安装孔为销孔,第一紧固件200为销钉。Optionally, the first installation hole is a through hole and the second installation hole is a through hole, and the first fastener 200 is a bolt with a nut; or the first installation hole is a threaded hole, the second installation hole is a through hole, and the first installation hole is a threaded hole. The fastener 200 is a bolt; or the first mounting hole and the second mounting hole are pin holes, and the first fastener 200 is a pin.

具体地本实施例中,第一连接件210及第二连接件220均为法兰,第一安装孔为及第二安装孔为通孔,第一紧固件200为带有螺母的螺栓。Specifically, in this embodiment, the first connecting member 210 and the second connecting member 220 are flanges, the first mounting hole and the second mounting hole are through holes, and the first fastener 200 is a bolt with a nut.

更进一步地,具体到本实施例中,立柱110为H型钢,紧固件位于H型钢的外部翼缘111与内部翼缘之间,如此,在电梯井道10内部即可完成安装第一紧固件200的操作,无需在电梯井道10外部作业。Further, in this embodiment, the upright column 110 is H-shaped steel, and the fastener is located between the outer flange 111 and the inner flange of the H-shaped steel. In this way, the first fastening can be installed inside the elevator shaft 10 . The operation of the unit 200 is not required to work outside the elevator shaft 10 .

在其中一个实施例中,电梯井道10还包括第二紧固件230,横梁120还包括与外部遮板连接的连接板124,连接板124设有第三安装孔,在相邻两个井道框架100中,第二紧固件230穿设于其中一个井道框架100的第三安装孔及另一个井道框架100的第三安装孔中。如此,可以通过第二紧固件230将相邻两个井道框架100上的横梁120固定。In one of the embodiments, the elevator hoistway 10 further includes a second fastener 230, and the cross beam 120 further includes a connecting plate 124 connected to the external shutter. The connecting plate 124 is provided with a third installation hole, and the two adjacent hoistway frames In 100 , the second fastener 230 is inserted through the third installation hole of one of the hoistway frames 100 and the third installation hole of the other hoistway frame 100 . In this way, the beams 120 on two adjacent hoistway frames 100 can be fixed by the second fasteners 230 .

可选地,第三安装孔为通孔,第二紧固件230为带有螺母的螺栓;或第三安装孔为销孔,第二紧固件230为销钉。Optionally, the third installation hole is a through hole, and the second fastener 230 is a bolt with a nut; or the third installation hole is a pin hole, and the second fastener 230 is a pin.

进一步地,连接板124与外部遮板123连接且向电梯井道10的内部延伸,第三安装孔位于电梯井道10的内部,如此,在电梯井道10内部即可完成安装第二紧固件230的操作,无需在电梯井道10外部作业。Further, the connecting plate 124 is connected with the external shutter 123 and extends toward the inside of the elevator shaft 10 , and the third installation hole is located inside the elevator shaft 10 . In this way, the second fastener 230 can be installed inside the elevator shaft 10 . Operation without working outside the elevator shaft 10 .

如图10所示,在其中一个实施例中,还包括挡水板130,挡水板130用于遮挡相邻两个井道框架100之间的间隙。如此,可以防止下雨时雨水从相邻两个井道框架100之间的间隙进入到电梯井道10内,影响电梯设备的使用。As shown in FIG. 10 , in one embodiment, a water blocking plate 130 is further included, and the water blocking plate 130 is used to block the gap between two adjacent hoistway frames 100 . In this way, rainwater can be prevented from entering the elevator hoistway 10 from the gap between two adjacent hoistway frames 100 when it rains, thereby affecting the use of the elevator equipment.

具体地,挡水板130采用折弯结构,挡水板130的上部与上面的井道框架100连接,挡水板130的下部折弯边挡住相邻两个井道框架100之间的间隙。Specifically, the water baffle 130 adopts a bending structure, the upper part of the water baffle 130 is connected with the upper hoistway frame 100 , and the lower bending edge of the water baffle 130 blocks the gap between two adjacent hoistway frames 100 .

更具体地,在相邻两个井道框架100中,挡水板130的上部与上面的井道框架100的横梁120连接,挡水板130的下部折弯边挡住相邻两个井道框架100中相互连接的横梁120之间的间隙。More specifically, in two adjacent hoistway frames 100 , the upper part of the water blocking plate 130 is connected with the beam 120 of the upper hoistway frame 100 , and the lower bending edge of the water blocking plate 130 blocks the mutual in the two adjacent hoistway frames 100 . The gap between the connected beams 120.

如图11所示,需要说明的是,电梯井道10的底层井道框架100通过建筑面连接结构500连接在底坑或地面上。具体地,建筑面连接结构500与立柱110的底部连接,建筑面连接结构500设有孔位,建筑物预埋的锚栓穿入孔位中实现底层井道框架100与地面或底坑的连接。As shown in FIG. 11 , it should be noted that the bottom hoistway frame 100 of the elevator hoistway 10 is connected to the pit or the ground through the building surface connecting structure 500 . Specifically, the building surface connecting structure 500 is connected to the bottom of the column 110 , and the building surface connecting structure 500 is provided with holes into which the anchor bolts embedded in the building penetrate to realize the connection between the bottom hoistway frame 100 and the ground or pit.

具体到本实施例中,建筑面连接结构500为法兰。Specifically in this embodiment, the building surface connecting structure 500 is a flange.

如图2、图5所示,在其中一个实施例中,电梯井道10还包括层门侧幕墙,层门侧幕墙包括第一子幕墙310及第二子幕墙320,立柱110包括设置在层门入口侧11的第一立柱112及第二立柱113、第一立柱112与第二立柱113间隔设置,第一子幕墙310与第一立柱112连接,第二子幕墙320与第二立柱113连接。当电梯层门关闭时,电梯层门与层门侧幕墙配合形成密封结构,用于将电梯井道10的层门入口侧11密封,起到隔音减震以及保护电梯安全运行的作用。As shown in FIG. 2 and FIG. 5 , in one embodiment, the elevator shaft 10 further includes a landing door side curtain wall, the landing door side curtain wall includes a first sub-curtain wall 310 and a second sub-curtain wall 320, and the upright column 110 includes a landing door side curtain wall. The first column 112 , the second column 113 , the first column 112 and the second column 113 on the entrance side 11 are spaced apart, the first sub-curtain wall 310 is connected to the first column 112 , and the second sub-curtain wall 320 is connected to the second column 113 . When the elevator landing door is closed, the elevator landing door cooperates with the landing door side curtain wall to form a sealing structure, which is used to seal the landing door entrance side 11 of the elevator shaft 10, which plays the role of sound insulation and shock absorption and protects the safe operation of the elevator.

如图5-7所示,具体地,在层门入口侧11的两个立柱110中,其中一个为第一立柱112,另一个为第二立柱113,横梁120还包括设置在层门入口侧11的门头横梁125及地坎横梁126,门头横梁125的两端分别与第一立柱112及第二立柱113连接,地坎横梁126的两端分别与第一立柱112及第二立柱113连接,且门头横梁125与地坎横梁126间隔设置,第一子幕墙310设有与第一立柱112连接的第一折弯边、与门头横梁125连接的第二折弯边、及与地坎横梁126连接的第三折弯边,第二子幕墙320设有与第二立柱113连接的第四折弯边、与门头横梁125连接的第五折弯边、及与地坎横梁126连接的第六折弯边321。As shown in FIGS. 5-7 , specifically, among the two uprights 110 on the entrance side 11 of the landing door, one of which is the first upright 112 and the other is the second upright 113 , and the cross beam 120 further includes a beam 120 disposed on the entrance side of the landing door. The door head beam 125 and the sill beam 126 of 11, the two ends of the door head beam 125 are respectively connected with the first column 112 and the second column 113, and the two ends of the sill beam 126 are respectively connected with the first column 112 and the second column 113 connected, and the door head beam 125 and the sill beam 126 are arranged at intervals, the first sub-curtain wall 310 is provided with a first bending side connected with the first column 112, a second bending side connected with the door head beam 125, and The third bent side connected with the sill beam 126, the second sub-curtain wall 320 is provided with the fourth bent side connected with the second column 113, the fifth bent side connected with the door head beam 125, and the sill beam The sixth bent edge 321 connected by 126.

更具体地,第一折弯边为第一子幕墙310的左侧竖向折弯边,第一折弯边通过螺栓与第一立柱112连接,第二折弯边为第一子幕墙310的上侧横向折弯边,第二折弯边通过螺栓与门头横梁125连接,第三折弯边为第一子幕墙310的下侧横向折弯边,第三折弯边通过螺栓与地坎横梁126连接。第四折弯边为第二子幕墙320的右侧竖向折弯边,第四折弯边通过螺栓与第二立柱113连接,第五折弯边为第二子幕墙320的上侧横向折弯边,第五折弯边通过螺栓与门头横梁125连接,第六折弯边321为第二子幕墙320的下侧横向折弯边,第六折弯边321通过螺栓与地坎横梁126连接。More specifically, the first bending side is the left vertical bending side of the first sub-curtain wall 310, the first bending side is connected with the first column 112 by bolts, and the second bending side is the left side of the first sub-curtain wall 310. The upper side is laterally bent, the second bent edge is connected to the door head beam 125 by bolts, the third bent edge is the lower laterally bent edge of the first sub-curtain wall 310, and the third bent edge is connected to the sill through bolts The beams 126 are connected. The fourth bending side is the vertical bending side of the right side of the second sub-curtain wall 320 , the fourth bending side is connected with the second column 113 by bolts, and the fifth bending side is the upper lateral bending side of the second sub-curtain wall 320 . Bending, the fifth bending edge is connected with the door head beam 125 through bolts, the sixth bending edge 321 is the lateral bending edge of the lower side of the second sub-curtain wall 320, and the sixth bending edge 321 is connected to the sill beam 126 through bolts connect.

进一步地,第一折弯边及第一立柱112上用于安装螺栓的孔为长条孔,第二折弯边及门头横梁125上用于安装螺栓的孔为长条孔,第三折弯边及地坎横梁126上用于安装螺栓的孔为长条孔,如此,可以使得第一子幕墙310在水平方向上调节,方便安装。第四折弯边及第二立柱113上用于安装螺栓的孔为长条孔,第五折弯边及门头横梁125上用于安装螺栓的孔为长条孔,第六折弯边321及地坎横梁126上用于安装螺栓的孔为长条孔3211,如此,可以使得第二子幕墙320在水平方向上调节,方便安装。Further, the holes used for installing bolts on the first bending side and the first column 112 are elongated holes, the holes used for installing bolts on the second bending side and the door beam 125 are elongated holes, and the third folding The holes on the flanges and the sill beams 126 for installing bolts are elongated holes, so that the first sub-curtain wall 310 can be adjusted in the horizontal direction, which is convenient for installation. The holes for installing bolts on the fourth bent side and the second column 113 are elongated holes, the holes for mounting bolts on the fifth bent side and the door head beam 125 are elongated holes, and the sixth bent side 321 The holes for installing bolts on the sill beam 126 are elongated holes 3211, so that the second sub-curtain wall 320 can be adjusted in the horizontal direction, which is convenient for installation.

更进一步地,层门侧幕墙还包括上封板330,上封板330设有第七折弯边及第八折弯边331,第一子幕墙310还设有与第七折弯边连接的第九折弯边,第二子幕墙320还设有与第八折弯边331连接的第十折弯边322。Further, the curtain wall on the side of the landing door also includes an upper sealing plate 330, the upper sealing plate 330 is provided with a seventh bending edge and an eighth bending edge 331, and the first sub-curtain wall 310 is also provided with a seventh bending edge. For the ninth bent edge, the second sub-curtain wall 320 is further provided with a tenth bent edge 322 connected with the eighth bent edge 331 .

具体地,第七折弯边为上封板330的左侧竖向折弯边,第八折弯边331为上封板330的右侧竖向折弯边,第九折弯边为第一子幕墙310的右侧竖向折弯边,第十折弯边322为第二子幕墙320的左侧竖向折弯边,第七折弯边与第九折弯边通过螺栓连接,第八折弯边331与第十折弯边322通过螺栓连接。Specifically, the seventh bent edge is the left vertical bent edge of the upper sealing plate 330, the eighth bent edge 331 is the right vertical bent edge of the upper sealing plate 330, and the ninth bent edge is the first The right side of the sub-curtain wall 310 is vertically bent, the tenth bent side 322 is the left side of the second sub-curtain wall 320, the seventh bent side is connected with the ninth bent side by bolts, the eighth The bent edge 331 and the tenth bent edge 322 are connected by bolts.

需要说明的是,以上所述的第一子幕墙310的第九折弯边及第二子幕墙320的第十折弯边322可以充当电梯层门的门框,且上封板330还设有第十一折弯边332,第十一折弯边332为上封板330的下侧横向折弯边,第十一折弯边332可以充当电梯层门的门楣。It should be noted that the above-mentioned ninth bent side of the first sub-curtain wall 310 and the tenth bent side 322 of the second sub-curtain wall 320 can serve as the door frame of the elevator landing door, and the upper sealing plate 330 is also provided with a first Eleven folded edges 332 , the eleventh folded edges 332 are the laterally folded edges of the lower side of the upper sealing plate 330 , and the eleventh folded edges 332 can serve as the lintel of the elevator landing door.

另外,以上的第一子幕墙310的各折弯边还能够提高第一子幕墙310的强度,第二子幕墙320的各折弯边还能够提高第二子幕墙320的强度,上封板330的各折弯边还能够提高上封板330的强度。In addition, the above bending edges of the first sub-curtain wall 310 can also improve the strength of the first sub-curtain wall 310, and the bent edges of the second sub-curtain wall 320 can also improve the strength of the second sub-curtain wall 320. The upper sealing plate 330 Each of the bent edges can also improve the strength of the upper sealing plate 330 .

需要说明的是,以上所述的第一子幕墙310、第二子幕墙320及上封板330均为可拆卸结构。It should be noted that, the first sub-curtain wall 310, the second sub-curtain wall 320 and the upper sealing plate 330 described above are all detachable structures.

如图2、图8、图9所示,在其中一个实施例中,电梯井道10还包括井道幕墙结构,井道幕墙结构包括幕墙本体410、竖向固定板420及横向固定板430,竖向固定板420设置于立柱110上,横向固定板430设置于横梁120上,幕墙本体410的第一侧与竖向固定板420连接,幕墙本体410的第二侧与横向固定板430连接。在井道框架100的两侧及后侧均设置有井道幕墙结构,起到隔音减震以及保护电梯安全运行的作用。As shown in Figure 2, Figure 8, Figure 9, in one embodiment, the elevator shaft 10 also includes a shaft curtain wall structure, and the shaft curtain wall structure includes a curtain wall body 410, a vertical fixing plate 420 and a horizontal fixing plate 430, which are vertically fixed The plate 420 is arranged on the column 110 , the horizontal fixing plate 430 is arranged on the beam 120 , the first side of the curtain wall body 410 is connected with the vertical fixing plate 420 , and the second side of the curtain wall body 410 is connected with the horizontal fixing plate 430 . A hoistway curtain wall structure is provided on both sides and the rear side of the hoistway frame 100, which plays the role of sound insulation and shock absorption and protecting the safe operation of the elevator.

可选地,幕墙本体410可采用玻璃、钢板或彩色钢板等常用建筑幕墙。Optionally, the curtain wall body 410 may adopt a common building curtain wall such as glass, steel plate or colored steel plate.

在另一个实施例中,幕墙本体410为光伏玻璃,可通过太阳能发电。In another embodiment, the curtain wall body 410 is photovoltaic glass, which can generate electricity by solar energy.

进一步地,井道幕墙结构还包括第一固定件440及第二固定件450,第一固定件440与竖向固定板420连接、并与竖向固定板420配合形成第一安装槽,第二固定件450与横向固定板430连接、并与横向固定板430配合形成第二安装槽,幕墙本体410的第一侧插设在第一安装槽中,幕墙本体410的第二侧插设在第二安装槽中。通过使幕墙本体410的第一侧插设在第一安装槽中,幕墙本体410的第二侧插设在第二安装槽中,可以实现幕墙本体410的固定。Further, the hoistway curtain wall structure also includes a first fixing member 440 and a second fixing member 450. The first fixing member 440 is connected with the vertical fixing plate 420 and cooperates with the vertical fixing plate 420 to form a first installation groove, and the second fixing member The member 450 is connected to the horizontal fixing plate 430 and cooperates with the horizontal fixing plate 430 to form a second installation groove. The first side of the curtain wall body 410 is inserted into the first installation groove, and the second side of the curtain wall body 410 is inserted into the second installation groove. installed in the slot. By inserting the first side of the curtain wall body 410 into the first installation groove, and inserting the second side of the curtain wall body 410 into the second installation groove, the fixing of the curtain wall body 410 can be achieved.

具体地,第一固定件440为折弯板,第一固定件440的其中一边通过螺栓与竖向固定板420连接,第一固定件440的另一边与竖向固定板420间隔相对,第二固定件450的其中一边通过螺栓与横向固定板430连接,第二固定件450的另一边与横向固定板430间隔相对。Specifically, the first fixing member 440 is a bending plate, one side of the first fixing member 440 is connected with the vertical fixing plate 420 by bolts, the other side of the first fixing member 440 is opposite to the vertical fixing plate 420 at an interval, and the second One side of the fixing member 450 is connected to the horizontal fixing plate 430 by bolts, and the other side of the second fixing member 450 is opposite to the horizontal fixing plate 430 at an interval.

更进一步地,井道幕墙结构还包括第一粘合胶460及第二粘合胶470,第一粘合胶460用于使第一固定件440及竖向固定板420分别与幕墙本体410连接,第二粘合胶470用于使第二固定件450及横向固定板430分别与幕墙本体410连接。通过第一粘合胶460可以使第一固定件440及竖向固定板420分别与幕墙本体410连接,通过第二粘合胶470可以使第二固定件450及横向固定板430分别与幕墙本体410连接,且第一粘合胶460及第二粘合胶470还能起到减震的作用。Further, the hoistway curtain wall structure also includes a first adhesive 460 and a second adhesive 470, and the first adhesive 460 is used to connect the first fixing member 440 and the vertical fixing plate 420 to the curtain wall body 410 respectively, The second adhesive 470 is used to connect the second fixing member 450 and the lateral fixing plate 430 to the curtain wall body 410 respectively. The first fixing member 440 and the vertical fixing plate 420 can be respectively connected to the curtain wall body 410 by the first adhesive 460 , and the second fixing member 450 and the horizontal fixing plate 430 can be respectively connected to the curtain wall body by the second adhesive 470 . 410 is connected, and the first adhesive 460 and the second adhesive 470 can also play the role of shock absorption.

具体地,第一粘合胶460设置在第一安装槽中,第二粘合胶470设置在第二安装槽中。Specifically, the first adhesive glue 460 is disposed in the first installation groove, and the second adhesive glue 470 is disposed in the second installation groove.

需要说明的是,以上所述的井道幕墙结构为可拆卸结构。It should be noted that the hoistway curtain wall structure described above is a detachable structure.

以上所述实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。The technical features of the above-described embodiments can be combined arbitrarily. For the sake of brevity, all possible combinations of the technical features in the above-described embodiments are not described. However, as long as there is no contradiction between the combinations of these technical features, All should be regarded as the scope described in this specification.

以上所述实施例仅表达了本实用新型的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。因此,本实用新型专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only represent several embodiments of the present utility model, and the descriptions thereof are specific and detailed, but should not be construed as a limitation on the scope of the utility model patent. It should be pointed out that for those of ordinary skill in the art, some modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent for this utility model shall be subject to the appended claims.

Claims (12)

1. An elevator hoistway, comprising: the well frame, the well frame include the stand and with the crossbeam that the stand is connected, the stand includes the outside edge of a wing, the crossbeam includes outside sunshade, just the crossbeam includes first crossbeam and second crossbeam, one of them side on the outside edge of a wing with first crossbeam outside sunshade concatenation, the opposite side on the outside edge of a wing with the second crossbeam outside sunshade concatenation.
2. The elevator hoistway of claim 1, wherein the hoistway frames are at least two, and at least two of the hoistway frames are disposed in a vertical direction, and the columns in adjacent two of the hoistway frames are connected by a connection assembly.
3. The elevator hoistway of claim 2, wherein in adjacent two of the hoistway frames, the connection assembly includes a first connection member provided on the column of one of the hoistway frames and a second connection member provided on the column of the other of the hoistway frames, the first connection member being connected with the second connection member.
4. The elevator hoistway of claim 3, wherein the connection assembly further comprises a first fastener, wherein the first connector is provided with a first mounting hole, wherein the second connector is provided with a second mounting hole corresponding to the first mounting hole, and wherein the fastener is inserted into the first mounting hole and the second mounting hole.
5. The elevator hoistway of claim 2, further comprising a second fastener, wherein the cross beam further comprises a connecting plate connected to the outer shroud, wherein the connecting plate is provided with a third mounting hole, and wherein the second fastener is inserted into the third mounting hole of one of the hoistway frames and the third mounting hole of the other hoistway frame in two adjacent hoistway frames.
6. The elevator hoistway of claim 2, further comprising a water deflector for covering a gap between two adjacent hoistway frames.
7. The elevator hoistway of claim 1, wherein the elevator hoistway defines a landing door entrance side, the elevator hoistway further comprises a landing door side curtain wall, the landing door side curtain wall comprises a first sub curtain wall and a second sub curtain wall, the columns comprise a first column and a second column disposed on the landing door entrance side, the first column and the second column are disposed at an interval, the first sub curtain wall is connected to the first column, and the second sub curtain wall is connected to the second column.
8. The elevator hoistway of claim 7, wherein the beam further comprises a door head beam and a sill beam disposed on the entrance side of the landing door, two ends of the door head beam are connected to the first column and the second column, two ends of the sill beam are connected to the first column and the second column, respectively, the door head beam and the sill beam are disposed at intervals, the first sub-curtain wall is provided with a first bending edge connected to the first column, a second bending edge connected to the door head beam, and a third bending edge connected to the sill beam, and the second sub-curtain wall is provided with a fourth bending edge connected to the second column, a fifth bending edge connected to the door head beam, and a sixth bending edge connected to the sill beam.
9. The elevator hoistway of claim 8, wherein the landing door side curtain wall further comprises an upper sealing plate, the upper sealing plate is provided with a seventh bending edge and an eighth bending edge, the first sub curtain wall is further provided with a ninth bending edge connected with the seventh bending edge, and the second sub curtain wall is further provided with a tenth bending edge connected with the eighth bending edge.
10. The elevator hoistway of claim 1, further comprising a hoistway curtain wall structure, wherein the hoistway curtain wall structure comprises a curtain wall body, a vertical fixing plate and a transverse fixing plate, the vertical fixing plate is arranged on the vertical column, the transverse fixing plate is arranged on the cross beam, a first side of the curtain wall body is connected with the vertical fixing plate, and a second side of the curtain wall body is connected with the transverse fixing plate.
11. The elevator hoistway as claimed in claim 10, wherein the hoistway curtain wall structure further comprises a first fixing member and a second fixing member, the first fixing member is connected to the vertical fixing plate and engaged with the vertical fixing plate to form a first mounting groove, the second fixing member is connected to the lateral fixing plate and engaged with the lateral fixing plate to form a second mounting groove, the first side of the curtain wall body is inserted into the first mounting groove, and the second side of the curtain wall body is inserted into the second mounting groove.
12. The elevator hoistway as claimed in claim 11, wherein the hoistway curtain wall structure further comprises a first adhesive glue and a second adhesive glue, the first adhesive glue is used for connecting the first fixing member and the vertical fixing plate with the curtain wall body, respectively, and the second adhesive glue is used for connecting the second fixing member and the transverse fixing plate with the curtain wall body, respectively.
CN201920184396.8U 2019-02-01 2019-02-01 elevator shaft Expired - Fee Related CN209940233U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920184396.8U CN209940233U (en) 2019-02-01 2019-02-01 elevator shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920184396.8U CN209940233U (en) 2019-02-01 2019-02-01 elevator shaft

Publications (1)

Publication Number Publication Date
CN209940233U true CN209940233U (en) 2020-01-14

Family

ID=69122114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920184396.8U Expired - Fee Related CN209940233U (en) 2019-02-01 2019-02-01 elevator shaft

Country Status (1)

Country Link
CN (1) CN209940233U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109775525A (en) * 2019-02-01 2019-05-21 日立电梯(中国)有限公司 elevator shaft
CN112693993A (en) * 2020-12-31 2021-04-23 南阳中原智能电梯有限公司 Three-dimensional transfer equipment
CN116281492A (en) * 2022-11-08 2023-06-23 波士顿(湖州)家用电梯科技有限公司 Elevator well curtain wall structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109775525A (en) * 2019-02-01 2019-05-21 日立电梯(中国)有限公司 elevator shaft
CN109775525B (en) * 2019-02-01 2024-09-24 日立电梯(中国)有限公司 Elevator shaft
CN112693993A (en) * 2020-12-31 2021-04-23 南阳中原智能电梯有限公司 Three-dimensional transfer equipment
CN116281492A (en) * 2022-11-08 2023-06-23 波士顿(湖州)家用电梯科技有限公司 Elevator well curtain wall structure

Similar Documents

Publication Publication Date Title
CN209940233U (en) elevator shaft
CN106836586B (en) The curtain wall splicing structure and pin-connected panel curtain wall construction of hidden curtain wall system
CN109775525B (en) Elevator shaft
KR101245831B1 (en) Combination structure of curtain wall louver using for tube carrier
KR100959063B1 (en) Frame reinforcement systems for curtain walls and window systems
CN211572122U (en) A kind of partition wall door and window opening keel reinforcement structure
US20200131761A1 (en) Wall system
CN208415626U (en) A kind of novel concrete fiberboard curtain wall system
CN206457959U (en) Grill unit and curtain wall construction
CN218406127U (en) Stay-rope-free overhanging type canopy structure
CN201835548U (en) Armored machine room
CN212507197U (en) A outer facade structure and decorative board for elevator well
RU88696U1 (en) WOODEN BAR FOR ESTABLISHING WALLS
CN111706004B (en) Assembled low-rise building and disassembly method
CN214035284U (en) Semi-hidden frame window sash mounting structure of opening
CN115262917A (en) Method for enhancing wind resistance and water resistance of elevator shaft and construction method thereof
CN208668714U (en) A curtain wall structure with waterproof layer
JP6981688B2 (en) building
CN209163354U (en) A kind of aluminium alloy sightseeing elevator derrick
CN103046677A (en) Hidden opening frame curtain wall
CN109555250A (en) A kind of novel heat-insulation sound insulation double-layer glass curtain wall
CN220150612U (en) Assembled laser house outer wall
CN222909798U (en) Assembled building door and window and wallboard seal structure
CN106939658B (en) A kind of frame concealed curtain wall modernization system
CN218881273U (en) Unit type sunshade water guide structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200114