CN209874137U - Structure for enhancing integrity of outer wall - Google Patents

Structure for enhancing integrity of outer wall Download PDF

Info

Publication number
CN209874137U
CN209874137U CN201920434379.5U CN201920434379U CN209874137U CN 209874137 U CN209874137 U CN 209874137U CN 201920434379 U CN201920434379 U CN 201920434379U CN 209874137 U CN209874137 U CN 209874137U
Authority
CN
China
Prior art keywords
wall
angle steel
integrity
steel ring
ring beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920434379.5U
Other languages
Chinese (zh)
Inventor
黄彬
陈敬
谭奇伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan University Engineering Design Research Institute Co Ltd
Original Assignee
Sichuan University Engineering Design Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan University Engineering Design Research Institute Co Ltd filed Critical Sichuan University Engineering Design Research Institute Co Ltd
Priority to CN201920434379.5U priority Critical patent/CN209874137U/en
Application granted granted Critical
Publication of CN209874137U publication Critical patent/CN209874137U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

本实用新型涉及一种增强外墙整体性的结构,涉及房屋建筑技术领域,其包括设置在外墙朝向室内一侧的构造柱和角钢圈梁,角钢圈梁和构造柱均与外墙可拆卸连接,构造柱沿着外墙的高度方向设置,角钢圈梁与构造柱垂直,角钢圈梁与构造柱之间可拆卸连接。本实用新型具有在加固外墙的同时,保持外墙的原有风貌,提高外墙的整体性,保持建筑物原有外立面风格的效果。

The utility model relates to a structure for enhancing the integrity of an outer wall, and relates to the technical field of building construction, which includes a structural column and an angle steel ring beam arranged on the side of the outer wall facing the interior, and the angle steel ring beam and the structural column are both detachably connected with the outer wall , the structural column is arranged along the height direction of the outer wall, the angle steel ring beam is perpendicular to the structural column, and the angle steel ring beam and the structural column are detachably connected. The utility model has the effects of maintaining the original style of the outer wall while strengthening the outer wall, improving the integrity of the outer wall and maintaining the original style of the outer facade of the building.

Description

一种增强外墙整体性的结构A structure that enhances the integrity of the façade

技术领域technical field

本实用新型涉及房屋建筑技术领域,尤其涉及一种增强外墙整体性的结构。The utility model relates to the technical field of building construction, in particular to a structure for enhancing the integrity of an outer wall.

背景技术Background technique

外墙,从建筑学的角度来讲,是围护建筑物,使之形成室内、室外的分界构件。它的功能有:承担一定、荷载遮挡风雨、保温隔热、防止噪音和防火安全等。当砖混房屋无构造柱、圈梁或构造柱圈梁设置不符合现行规范要求时,或纵横墙交接处咬槎有明显缺陷,房屋的整体性较差,则应增设构造柱、圈梁进行加固。From an architectural point of view, the outer wall is to enclose the building and make it form the boundary between indoor and outdoor. Its functions are: bear a certain load, shelter from wind and rain, heat insulation, noise prevention and fire safety. When the masonry-concrete building has no structural columns, ring beams or the setting of structural columns and ring beams does not meet the requirements of the current code, or there are obvious defects in the joints of vertical and horizontal walls, and the integrity of the building is poor, structural columns and ring beams should be added for repair. reinforcement.

现有技术中,在外墙上设置钢筋混凝土圈梁及圈梁时,会将构造柱、圈梁与墙体采用混凝土销键或植筋的方式连接,将构造柱、圈梁设置于墙体以外。这种方法湿作业多,对外立面影响较大,难以达到保留既有建筑风格的目的。In the prior art, when installing reinforced concrete ring beams and ring beams on the outer wall, the structural columns and ring beams are connected to the wall by means of concrete pins or bars, and the structural columns and ring beams are placed outside the wall . This method has a lot of wet work and has a great impact on the exterior facade, making it difficult to achieve the purpose of retaining the existing architectural style.

实用新型内容Utility model content

本实用新型的目的在于提供一种增强外墙整体性的结构,具有能效保留的既有建筑外立面风格的效果。The purpose of the utility model is to provide a structure that enhances the integrity of the outer wall, which has the effect of retaining the energy efficiency of the existing building facade style.

本实用新型的上述目的是通过以下技术方案得以实现的:The above-mentioned purpose of the utility model is achieved through the following technical solutions:

一种增强外墙整体性的结构,包括设置在外墙朝向室内一侧的构造柱和角钢圈梁,所述角钢圈梁和构造柱均与外墙可拆卸连接,所述构造柱沿着外墙的高度方向设置,所述角钢圈梁与构造柱垂直,所述角钢圈梁与构造柱之间可拆卸连接。A structure for enhancing the integrity of the exterior wall, comprising a construction column and an angle steel ring beam arranged on the side of the exterior wall facing the interior, the angle steel ring beam and the construction column are both detachably connected to the exterior wall, and the construction column is along the exterior wall The height direction is set, the angle steel ring beam is perpendicular to the construction column, and the angle steel ring beam is detachably connected to the construction column.

通过采用上述技术方案,用于加固外墙的构造柱和角钢圈梁设置在外墙朝向室内一侧,不会破坏外墙外侧的结构,可保持外墙原有的样子,从而可保持建筑物原有的外立面风格;现有技术中采用的圈梁属于湿作业,在制作圈梁的过程中,混凝土结构需要支模,钢筋绑扎和浇筑等,步骤繁琐,费时费力,而本发实用新型中用圈梁部分改为角钢圈梁或型钢,角钢圈梁或型钢的施工属于干作业,省时省力,还能在一定程度上节约材料。用于加固外墙的构造柱和角钢圈梁设置在外墙朝向室内一侧,可以在加固外墙的同时,保持外墙的原有风貌,提高外墙的整体性,保持建筑物原有外立面风格。By adopting the above technical scheme, the structural columns and angle steel ring beams used to reinforce the exterior wall are arranged on the side of the exterior wall facing the interior, which will not damage the structure on the outside of the exterior wall, and can maintain the original appearance of the exterior wall, thereby maintaining the original appearance of the building. Some facade styles; the ring beams used in the prior art belong to wet work. In the process of making ring beams, the concrete structure needs formwork support, steel bar binding and pouring, etc. The steps are cumbersome, time-consuming and laborious, while the utility model of the present invention The part of the medium-use ring beam is changed to an angle steel ring beam or section steel. The construction of the angle steel ring beam or section steel is a dry operation, which saves time and effort, and can also save materials to a certain extent. The structural columns and angle steel ring beams used to strengthen the exterior wall are set on the side of the exterior wall facing the interior, which can maintain the original appearance of the exterior wall while strengthening the exterior wall, improve the integrity of the exterior wall, and maintain the original facade of the building. surface style.

本实用新型进一步设置为:所述角钢圈梁上设置有多个加劲肋。The utility model is further configured as follows: the angle steel ring beam is provided with a plurality of stiffening ribs.

通过采用上述技术方案,在角钢圈梁上设置有多个加劲肋,可以提高角钢圈梁的稳定性和抗扭性能,一定程度上有利于阻止外墙发型形变,从而起到加固外墙的作用,从而提高外墙的整体性。By adopting the above technical scheme, multiple stiffening ribs are arranged on the angle steel ring beam, which can improve the stability and torsional performance of the angle steel ring beam, and help to prevent the deformation of the outer wall to a certain extent, thus playing the role of strengthening the outer wall , thereby improving the integrity of the exterior wall.

本实用新型进一步设置为:所述构造柱与外墙之间通过第一锚栓连接。The utility model is further configured as: the structural column and the outer wall are connected through a first anchor bolt.

通过采用上述技术方案,构造柱与外墙之间通过第一锚栓连接,连接结构简单,操作方便,易于实施。By adopting the above technical solution, the structural column and the outer wall are connected through the first anchor bolt, the connection structure is simple, the operation is convenient, and the implementation is easy.

本实用新型进一步设置为:所述第一锚栓靠近构造柱的一端与外墙朝向室外一侧之间的距离大于第一锚栓的长度。The utility model is further configured as follows: the distance between the end of the first anchor bolt close to the construction column and the side of the outer wall facing the outdoor is greater than the length of the first anchor bolt.

通过采用上述技术方案,第一锚栓靠近构造柱的一端与外墙朝向室外一侧之间的距离大于第一锚栓的长度,即第一锚栓不会穿透外墙,不会对外墙朝向室外的一侧造成损坏,不会影响外墙的原有风貌,从而保持外墙的外立面风格。By adopting the above technical solution, the distance between the end of the first anchor bolt close to the construction column and the side of the outer wall facing the outdoor is greater than the length of the first anchor bolt, that is, the first anchor bolt will not penetrate the outer wall, and will not penetrate the outer wall. Damage to the side facing the outside will not affect the original style of the exterior wall, thereby maintaining the façade style of the exterior wall.

本实用新型进一步设置为:所述角钢圈梁与外墙朝向室内一侧之间通过第二锚栓连接。The utility model is further configured as: the angle steel ring beam is connected to the side of the outer wall facing the room through a second anchor bolt.

通过采用上述技术方案,角钢圈梁与外墙朝向室内一侧之间通过第二锚栓连接,连接结构简单,操作方便,易于实施。By adopting the above technical scheme, the angle steel ring beam is connected to the indoor side of the outer wall through the second anchor bolt, the connection structure is simple, the operation is convenient, and it is easy to implement.

本实用新型进一步设置为:所述第二锚栓靠近角钢圈梁的一端与外墙朝向室外一侧之间的距离大于第二锚栓的长度。The utility model is further configured as follows: the distance between the end of the second anchor bolt close to the angle steel ring beam and the side of the outer wall facing the outdoor is greater than the length of the second anchor bolt.

通过采用上述技术方案,第二锚栓靠近角钢圈梁的一端与外墙朝向室外一侧之间的距离大于第二锚栓的长度,即第二锚栓不会穿透外墙,不会对外墙朝向室外的一侧造成损坏,不会影响外墙的原有风貌,从而可提高外墙的整体性。By adopting the above technical solution, the distance between the end of the second anchor bolt close to the angle steel ring beam and the side of the outer wall facing the outdoor is greater than the length of the second anchor bolt, that is, the second anchor bolt will not penetrate the outer wall and will not Damage to the side of the wall facing the outside will not affect the original style of the exterior wall, thereby improving the integrity of the exterior wall.

本实用新型进一步设置为:所述构造柱上预设有用于供角钢圈梁穿过的穿孔。The utility model is further configured as follows: the construction column is preset with a perforation for the angle steel ring beam to pass through.

通过采用上述技术方案,构造柱上预设有穿孔,构造柱施工前,使角钢圈梁穿过穿孔预埋于构造柱内,然后再浇筑混凝土,使得角钢圈梁与构造柱连成整体网格形式,对网格内的砌体形成约束,有效增强外墙的整体性。By adopting the above technical scheme, perforations are preset on the structural columns. Before the construction of the structural columns, the angle steel ring beams are embedded in the structural columns through the perforations, and then concrete is poured, so that the angle steel ring beams and the structural columns are connected to form an integral grid The form constrains the masonry within the grid and effectively enhances the integrity of the exterior wall.

本实用新型进一步设置为:所述构造柱的表面设置有砂浆面层。The utility model is further configured as follows: the surface of the construction column is provided with a mortar surface layer.

通过采用上述技术方案,砂浆面层可覆盖构造柱表面的混凝土层,使构造柱表面变得更光滑,且便于后期对构造柱的装饰。By adopting the above technical solution, the mortar surface layer can cover the concrete layer on the surface of the structural column, so that the surface of the structural column becomes smoother, and it is convenient for later decoration of the structural column.

综上所述,本实用新型具有以下有益效果:In summary, the utility model has the following beneficial effects:

1、用于加固外墙的构造柱和角钢圈梁设置在外墙朝向室内一侧,可保持建筑物原有的外立面风格,且角钢圈梁的施工属于干作业,省时省力,可以在加固外墙的同时,保持外墙的原有风貌,保持建筑物原有外立面风格;1. The structural columns and angle steel ring beams used to reinforce the exterior wall are set on the side of the exterior wall facing the interior, which can maintain the original facade style of the building, and the construction of the angle steel ring beams is a dry operation, saving time and effort, and can be used in While strengthening the exterior wall, maintain the original style of the exterior wall and the original facade style of the building;

2、构造柱施工前,使角钢圈梁穿过穿孔预埋于构造柱内,然后再浇筑混凝土,使得角钢圈梁与构造柱连成整体网格形式,对网格内的砌体形成约束,有效增强外墙的整体性。2. Before the construction of the structural column, the angle steel ring beam is pre-embedded in the structural column through the perforation, and then concrete is poured, so that the angle steel ring beam and the structural column are connected into an overall grid form, and the masonry in the grid is constrained. Effectively enhance the integrity of the exterior wall.

附图说明Description of drawings

图1是本实用新型的整体结构(构造柱位于墙角)的结构的第一剖视图;Fig. 1 is the first cross-sectional view of the structure of the utility model's overall structure (the construction column is located at the corner);

图2是本实用新型的整体结构(构造柱位于墙角)的结构的第二剖视图;Fig. 2 is the second cross-sectional view of the structure of the utility model's overall structure (the construction column is located at the corner);

图3是本实用新型的整体结构(构造柱不位于墙角)的结构的第三剖视图;Fig. 3 is the third cross-sectional view of the structure of the utility model's overall structure (the construction column is not located at the corner);

图4是本实用新型的构造柱的俯视图,主要展示砂浆面层。Fig. 4 is a top view of the construction column of the present invention, mainly showing the mortar surface layer.

附图标记:1、构造柱;2、角钢圈梁;3、加劲肋;4、第一锚栓;5、第二锚栓;6、穿孔;7、砂浆面层。Reference signs: 1. Structural column; 2. Angle steel ring beam; 3. Stiffener; 4. First anchor bolt; 5. Second anchor bolt; 6. Perforation; 7. Mortar surface layer.

具体实施方式Detailed ways

以下结合附图对本实用新型作进一步详细说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.

参照图1、2,为本实用新型公开的一种增强外墙整体性的结构,包括设置在外墙朝向室内一侧的构造柱1和角钢圈梁2,构造柱1沿着外墙的高度方向设置,角钢圈梁2与构造柱1相互垂直。结合图3,构造柱1和角钢圈梁2具体设置时,若遇到两个外墙的有拐角时,将构造柱1设置在两外墙拐角朝向室内处;若遇到单面外墙时,尽可能将构造柱1设置在两边或中间。Referring to Figures 1 and 2, it is a structure to enhance the integrity of the exterior wall disclosed by the utility model, including a structural column 1 and an angle steel ring beam 2 arranged on the side of the external wall facing the interior, and the structural column 1 is along the height direction of the external wall Set, the angle steel ring beam 2 and the construction column 1 are perpendicular to each other. Combined with Figure 3, when setting up the structural column 1 and the angle steel ring beam 2, if there are corners on the two outer walls, set the structural column 1 at the corner of the two outer walls facing the interior; if there is a single outer wall , set the construction column 1 on both sides or in the middle as much as possible.

参照图1、2,用于加固外墙的构造柱1和角钢圈梁2设置在外墙朝向室内一侧,不会破坏外墙外侧的结构,可保持外墙原有的样子,从而可保持建筑物原有的外立面风格;用圈梁部分改为角钢圈梁2,角钢圈梁2的施工属于干作业,省时省力,还能在一定程度上节约材料。在其它实施例中,还可以用型钢代替角钢圈梁2。用于加固外墙的构造柱1和角钢圈梁2设置在外墙朝向室内一侧,可以在加固外墙的同时,保持外墙的原有风貌,提高外墙的整体性,保持建筑物原有外立面风格。Referring to Figures 1 and 2, the structural columns 1 and angle steel ring beams 2 used to reinforce the exterior wall are arranged on the side of the exterior wall facing the interior, which will not damage the structure on the outside of the exterior wall, and can maintain the original appearance of the exterior wall, thereby maintaining the building The original facade style of the building; the ring beam part is changed to the angle steel ring beam 2, and the construction of the angle steel ring beam 2 is a dry operation, which saves time and effort, and can also save materials to a certain extent. In other embodiments, section steel can also be used instead of the angle steel ring beam 2 . The structural columns 1 and angle steel ring beams 2 used to reinforce the exterior wall are arranged on the side of the exterior wall facing the interior, which can maintain the original appearance of the exterior wall while strengthening the exterior wall, improve the integrity of the exterior wall, and maintain the original structure of the building. Facade style.

参照图2、3,构造柱1与外墙之间通过第一锚栓4连接,本实施例中,第一锚栓4连接为具体为化学锚栓连接,第一锚栓4靠近构造柱1的一端与外墙朝向室外一侧之间的距离大于第一锚栓4的长度。构造柱1与外墙之间的连接结构简单,操作方便,易于实施,且第一锚栓4不会穿透外墙,不会对外墙朝向室外的一侧造成损坏,不会影响外墙的原有风貌,从而保持外墙的外立面风格。角钢圈梁2与外墙朝向室内一侧之间通过第二锚栓5连接,本实施例中,第二锚栓5连接为混凝土螺钉连接,第二锚栓5靠近角钢圈梁2的一端与外墙朝向室外一侧之间的距离大于第二锚栓5的长度。角钢圈梁2与外墙之间的连接结构简单,操作方便,易于实施,第二锚栓5不会穿透外墙,不会对外墙朝向室外的一侧造成损坏,不会影响外墙的原有风貌,从而可提高外墙的整体性。Referring to Figures 2 and 3, the structural column 1 is connected to the outer wall through the first anchor bolt 4. In this embodiment, the connection of the first anchor bolt 4 is specifically a chemical anchor bolt connection, and the first anchor bolt 4 is close to the structural column 1. The distance between one end of the outer wall and the outdoor side of the outer wall is greater than the length of the first anchor bolt 4 . The connection structure between the structural column 1 and the outer wall is simple, easy to operate, and easy to implement, and the first anchor bolt 4 will not penetrate the outer wall, will not cause damage to the side of the outer wall facing the outside, and will not affect the appearance of the outer wall. The original style, so as to maintain the facade style of the outer wall. The angle steel ring beam 2 is connected to the indoor side of the outer wall through a second anchor bolt 5. In this embodiment, the second anchor bolt 5 is connected to a concrete screw connection, and one end of the second anchor bolt 5 close to the angle steel ring beam 2 is connected to the The distance between the sides of the outer wall facing the outdoor is greater than the length of the second anchor bolt 5 . The connection structure between the angle steel ring beam 2 and the exterior wall is simple, easy to operate, and easy to implement. The second anchor bolt 5 will not penetrate the exterior wall, will not cause damage to the side of the exterior wall facing the outside, and will not affect the surface of the exterior wall. The original style can improve the integrity of the exterior wall.

参照图3、4,构造柱1上预设有用于供角钢圈梁2穿过的穿孔6,构造柱1上预设有穿孔6,构造柱1施工前,使角钢圈梁2穿过穿孔6预埋于构造柱1内,然后再浇筑混凝土,使得角钢圈梁2与构造柱1连成整体网格形式,对网格内的砌体形成约束,有效增强外墙的整体性。构造柱1的表面设置有砂浆面层7,砂浆面层7可覆盖构造柱1表面的混凝土层,使构造柱1表面变得更光滑,且便于后期对构造柱1的装饰。Referring to Figures 3 and 4, the structural column 1 is preset with a perforation 6 for the angle steel ring beam 2 to pass through. Pre-embedded in the structural column 1, and then pouring concrete, so that the angle steel ring beam 2 and the structural column 1 are connected to form an integral grid form, constraining the masonry in the grid, and effectively enhancing the integrity of the outer wall. The surface of the structural column 1 is provided with a mortar surface layer 7, which can cover the concrete layer on the surface of the structural column 1, so that the surface of the structural column 1 becomes smoother, and is convenient for later decoration of the structural column 1.

参照图1、3,角钢圈梁2上设置有多个加劲肋3,可以提高角钢圈梁2的稳定性和抗扭性能,一定程度上有利于阻止外墙发型形变,从而起到加固外墙的作用,从而提高外墙的整体性。Referring to Figures 1 and 3, the angle steel ring beam 2 is provided with a plurality of stiffening ribs 3, which can improve the stability and torsional performance of the angle steel ring beam 2, and to a certain extent help prevent the deformation of the outer wall, thereby strengthening the outer wall function, thereby improving the integrity of the exterior wall.

本实施例的实施原理为:将构造柱1设置在外墙朝向室内一侧,通过化学锚栓连接的方式将构造柱1连接在外墙上,在构造柱1上预设有穿孔6,构造柱1施工前,使角钢圈梁2穿过穿孔6预埋于构造柱1内,然后再浇筑混凝土,使得角钢圈梁2与构造柱1连成整体网格形式,对网格内的砌体形成约束,有效增强外墙的整体性。通过第二锚栓5连接(混凝土螺钉连接),将角钢圈梁2固定在外墙上,最后在构造柱1表面涂抹砂浆面层7。用于加固外墙的构造柱1和角钢圈梁2设置在外墙朝向室内一侧,可以在加固外墙的同时,提高外墙的整体性的同时,保持外墙的原有风貌、保持建筑物原有外立面风格。The implementation principle of this embodiment is as follows: the construction column 1 is arranged on the side of the exterior wall facing the interior, and the construction column 1 is connected to the exterior wall by means of chemical anchor bolt connection. The construction column 1 is preset with a perforation 6, and the construction column 1 Before construction, the angle steel ring beam 2 is pre-embedded in the structural column 1 through the perforation 6, and then concrete is poured, so that the angle steel ring beam 2 and the structural column 1 are connected into an integral grid form, forming constraints on the masonry in the grid , effectively enhance the integrity of the exterior wall. The angle steel ring beam 2 is fixed on the outer wall through the second anchor bolt 5 connection (concrete screw connection), and finally the mortar surface layer 7 is applied on the surface of the construction column 1 . The structural columns 1 and angle steel ring beams 2 used to reinforce the exterior wall are arranged on the side of the exterior wall facing the interior, which can not only strengthen the exterior wall, but also improve the integrity of the exterior wall while maintaining the original appearance of the exterior wall and maintaining the building quality. Original façade style.

本具体实施方式的实施例均为本实用新型的较佳实施例,并非依此限制本实用新型的保护范围,故:凡依本实用新型的结构、形状、原理所做的等效变化,均应涵盖于本实用新型的保护范围之内。The embodiments of this specific embodiment are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model accordingly: all equivalent changes made according to the structure, shape and principle of the present utility model are all applicable. Should be covered within the protection scope of the present utility model.

Claims (8)

1. The utility model provides a structure of reinforcing outer wall wholeness, its characterized in that, is including setting up at outer wall towards constructional column (1) and angle steel circle roof beam (2) of indoor one side, angle steel circle roof beam (2) and constructional column (1) all can be dismantled with the outer wall and be connected, constructional column (1) sets up along the direction of height of outer wall, angle steel circle roof beam (2) are perpendicular with constructional column (1), can dismantle between angle steel circle roof beam (2) and constructional column (1) and be connected.
2. A structure for reinforcing the integrity of external walls according to claim 1, characterized in that said angle steel ring beam (2) is provided with a plurality of stiffeners (3).
3. A structure for reinforcing the integrity of an exterior wall according to claim 1, wherein said construction columns (1) are connected to the exterior wall by means of first anchor bolts (4).
4. A structure for enhancing the integrity of an external wall according to claim 3, wherein the distance between the end of the first anchor (4) adjacent to the construction column (1) and the side of the external wall facing outdoors is greater than the length of the first anchor (4).
5. A structure for enhancing the integrity of an external wall according to claim 1, wherein the angle steel ring beam (2) is connected with the indoor side of the external wall through a second anchor bolt (5).
6. A structure for enhancing the integrity of an external wall according to claim 5, characterized in that the distance between the end of the second anchor bolt (5) close to the angle steel ring beam (2) and the outdoor side of the external wall is larger than the length of the second anchor bolt (5).
7. A structure for reinforcing the integrity of external walls according to claim 1, characterized in that said construction columns (1) are predisposed with perforations (6) for the passage of the angle steel loop beams (2).
8. A structure for enhancing the integrity of exterior walls according to claim 1, characterized in that the surface of the construction column (1) is provided with a mortar finish (7).
CN201920434379.5U 2019-04-01 2019-04-01 Structure for enhancing integrity of outer wall Expired - Fee Related CN209874137U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920434379.5U CN209874137U (en) 2019-04-01 2019-04-01 Structure for enhancing integrity of outer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920434379.5U CN209874137U (en) 2019-04-01 2019-04-01 Structure for enhancing integrity of outer wall

Publications (1)

Publication Number Publication Date
CN209874137U true CN209874137U (en) 2019-12-31

Family

ID=68957837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920434379.5U Expired - Fee Related CN209874137U (en) 2019-04-01 2019-04-01 Structure for enhancing integrity of outer wall

Country Status (1)

Country Link
CN (1) CN209874137U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719888A (en) * 2020-07-11 2020-09-29 江苏筑镹营造科技有限公司 Method for additionally arranging ring beam and constructional column in existing masonry building body

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719888A (en) * 2020-07-11 2020-09-29 江苏筑镹营造科技有限公司 Method for additionally arranging ring beam and constructional column in existing masonry building body
CN111719888B (en) * 2020-07-11 2021-10-22 江苏筑镹营造科技有限公司 Method for additionally arranging ring beam and constructional column in existing masonry building body

Similar Documents

Publication Publication Date Title
JP5077664B2 (en) RC building method with no external insulation and no adjacent space
CN103104094A (en) Construction method of lattice light-gauge steel house
CN211622587U (en) Square-wood combined structure of aluminum alloy template of non-standard layer of high-rise building
CN103806647A (en) Assembly and disassembly process for large-span concrete bidirectional dense rib beam formwork case
CN207749908U (en) A kind of enclosure wall of full assembly lightweight steel construction
CN112359994A (en) CL heat preservation system construction method
CN111456065A (en) Assembled prefabricated brick tire membrane
CN208950069U (en) A kind of light-duty prefabricated buildings
CN209874137U (en) Structure for enhancing integrity of outer wall
CN204531519U (en) A kind of metope and roof heat insulation system
CN104727446A (en) Construction method of large aluminum alloy formwork at settlement joint
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
JP5302441B2 (en) Construction method of concrete container house
CN114592591B (en) Support-free prefabricated air conditioner bracket and construction method
CN201495643U (en) Inner wall insulation skeleton
CN202831299U (en) A kind of staggered seam double wall panel inner partition wall
CN108729563B (en) An anti-decay structural system for wooden columns in walls of antique buildings
CN205475769U (en) Net strengthening rib external wall insulation board is rolled over to metal
CN206987042U (en) A kind of green building steel structure frame
CN221895991U (en) A new type of shear wall external non-removal insulation wall panel
CN216892802U (en) Prefabricated luffer boards that waft
CN217232307U (en) An antique building head wall modeling column structure
CN2866679Y (en) Phosphogypsum formwork doubles as a reinforced concrete densely ribbed tic-tac-toe slab floor
CN206053398U (en) Masonry structure historical building seismic reinforcing structure
CN206189690U (en) Roof boarding and room lid

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191231