CN209822060U - Multifunctional combined training facility for simulation low-voltage distribution line - Google Patents
Multifunctional combined training facility for simulation low-voltage distribution line Download PDFInfo
- Publication number
- CN209822060U CN209822060U CN201920004861.5U CN201920004861U CN209822060U CN 209822060 U CN209822060 U CN 209822060U CN 201920004861 U CN201920004861 U CN 201920004861U CN 209822060 U CN209822060 U CN 209822060U
- Authority
- CN
- China
- Prior art keywords
- simulated
- low
- voltage
- guide rail
- climbing pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本实用新型公开了一种仿真低压配电线路多功能组合培训设施包括安装在地面上的延伸导轨,所述延伸导轨一端安装有用于模拟电源端的模拟电源爬杆,所述延伸导轨的另一端安装有模拟墙体,所述延伸导轨的中部安装有模拟中间爬杆,所述模拟电源爬杆和模拟墙体的顶端架设有低压架空线路,低压架空线路的中部架设在所述模拟中间爬杆上,所述模拟中间爬杆和所述模拟墙体之间架设有低压接户线路,所述延伸导轨的一端还安装有用于保护作业人员的接地装置。低压配电线路所有设施都在此仿真装置上能够组装并进行操作,其功能齐全、技术先进,同时占地面积小,可放置在室内或者室外,可移动拆卸,可任意调整距离,适应多级别、多种情形下的需要。
The utility model discloses a multifunctional combination training facility for simulating low-voltage power distribution lines, which includes an extension guide rail installed on the ground, one end of the extension guide rail is installed with a simulated power supply climbing pole for simulating the power supply end, and the other end of the extension guide rail is installed There is a simulated wall, a simulated intermediate climbing pole is installed in the middle of the extended guide rail, a low-voltage overhead line is erected on the top of the simulated power supply climbing pole and the simulated wall, and the middle part of the low-voltage overhead line is erected on the simulated intermediate climbing pole A low-voltage household connection line is erected between the simulated intermediate climbing pole and the simulated wall, and a grounding device for protecting workers is also installed at one end of the extended guide rail. All facilities of low-voltage power distribution lines can be assembled and operated on this simulation device. It has complete functions, advanced technology, and small footprint. It can be placed indoors or outdoors, removable and disassembled, and the distance can be adjusted arbitrarily, adapting to multiple levels. , The needs of a variety of situations.
Description
技术领域technical field
本实用新型具体涉及一种仿真低压配电线路多功能组合培训设施。The utility model specifically relates to a multifunctional combination training facility for simulating low-voltage power distribution lines.
背景技术Background technique
目前,现有技术内没有专门的仿真低压配电线路多功能组合培训设施。At present, there is no special multi-functional combination training facility for simulating low-voltage power distribution lines in the prior art.
现有技术内低压配电线路培训设施是由淘汰或者实际运行的拉线、电杆、低压线路、横担以及绝缘子组成的。培训设施功能单一、设备陈旧、技术落后、标准不一致,不能满足现今电力发展,存在一系列安全隐患,而目前现有技术内没有专门的多功能培训设施来满足培训的要求。The prior art internal low-voltage power distribution line training facilities are composed of obsolete or actually operated stay wires, poles, low-voltage lines, cross-arms and insulators. The training facilities have a single function, outdated equipment, backward technology, and inconsistent standards, which cannot meet the current power development, and there are a series of safety hazards. At present, there is no special multi-functional training facility in the existing technology to meet the training requirements.
实用新型内容Utility model content
本实用新型要解决的技术问题是克服上述缺陷,提供一种结构简单,使用方便,实用性强,使用过程更加安全,应用范围广,能从理论培训配电线路的结构、原理、性能、技术参数,以及设备的运行、维护、操作方法和注意事项,是从事农网配电岗位所需掌握的关键技能实操项目的培训设施。The technical problem to be solved by the utility model is to overcome the above-mentioned defects and provide a simple structure, convenient use, strong practicability, safer use process, wide application range, and can theoretically train the structure, principle, performance and technology of power distribution lines. The parameters, as well as the operation, maintenance, operation methods and precautions of the equipment, are the training facilities for the key skills and practical projects required for rural power distribution posts.
为解决上述技术问题,本实用新型的结构特点是包括安装在地面上的延伸导轨,所述延伸导轨一端安装有用于模拟电源端的模拟电源爬杆,所述延伸导轨的另一端安装有模拟墙体,所述延伸导轨的中部安装有模拟中间爬杆,所述模拟电源爬杆和模拟墙体的顶端架设有低压架空线路,低压架空线路的中部架设在所述模拟中间爬杆上,所述模拟中间爬杆和所述模拟墙体之间架设有低压接户线路,所述延伸导轨的一端还安装有用于保护作业人员的接地装置,所述延伸导轨上安装有两个可在延伸导轨上滑动的固定盘,两个所述固定盘分别安装在所述模拟中间爬杆的两侧,所述固定盘上均安装有用于固定所述模拟中间爬杆的拉线,所述延伸导轨上位于模拟电源爬杆的一侧安装有光伏发电组件,所述延伸导轨上位于模拟墙体的一侧还安装有低压电能表箱。In order to solve the above technical problems, the utility model is characterized in that it includes an extension guide rail installed on the ground, one end of the extension guide rail is installed with a simulated power supply climbing pole for simulating the power supply end, and the other end of the extension guide rail is installed with a simulated wall , the middle part of the extended guide rail is installed with a simulated intermediate climbing pole, and the top of the simulated power supply climbing pole and the simulated wall is erected with a low-voltage overhead line, and the middle part of the low-voltage overhead line is erected on the simulated intermediate climbing pole. A low-voltage household connection line is erected between the intermediate climbing pole and the simulated wall, and a grounding device for protecting workers is installed at one end of the extended guide rail. The two fixed plates are installed on both sides of the simulated intermediate climbing pole respectively, and the pull wires for fixing the simulated intermediate climbing pole are installed on the fixed plates, and the extended guide rail is located on the simulated power supply A photovoltaic power generation module is installed on one side of the climbing pole, and a low-voltage electric energy meter box is also installed on the side of the simulated wall on the extended guide rail.
作为优选的技术方案,所述模拟电源爬杆的顶端安装有电源侧横担、第一金具组件,所述模拟中间爬杆的顶端安装有中间直线杆横担、第三金具组件,所述模拟墙体的顶端安装有负荷侧横担、第二金具组件。As a preferred technical solution, the top of the simulated power climbing pole is equipped with a power supply side cross arm and the first hardware assembly, and the top of the simulated middle climbing pole is equipped with an intermediate straight rod cross arm and a third hardware assembly. The top of the wall is installed with a load side cross arm and a second fitting assembly.
作为优选的技术方案,所述电源侧横担、第一金具组件包括直角挂板、平行挂板、球头挂环、单联弯头和耐张线夹,所述中间直线杆横担、第三金具组件包括绝缘子中的直角挂板、平行挂板、球头挂环、单联弯头和耐张线夹,所述负荷侧横担、第二金具组件包括金具包括直角挂板、平行挂板、球头挂环、单联弯头和耐张线夹。As a preferred technical solution, the cross arm on the power supply side and the first fitting assembly include right-angle hanging plates, parallel hanging plates, ball-end hanging rings, single-joint elbows and tension clamps, and the middle straight bar cross-arm and the second The three fittings components include right-angle hanging plates, parallel hanging plates, ball-end hanging rings, single-joint elbows and strain clamps in the insulator. Plates, Ball Rings, Single Elbows and Strain Clamps.
作为优选的技术方案,所述低压架空线路包括绝缘导线、架空横担、悬式绝缘子、针式绝缘子、U型抱箍、螺丝、并钩线夹、拉线抱箍、延长环、楔形线夹、拉线绝缘子、UT线夹、拉线棒、拉线石、U型环、钢绞线和钢丝卡子,所述低压接户线路包括绝缘导线、支撑横担、碟式绝缘子、平行连板、螺丝、扎线和并沟线夹。As a preferred technical solution, the low-voltage overhead line includes insulated wires, overhead cross arms, suspension insulators, pin insulators, U-shaped hoops, screws, hook clamps, pull wire hoops, extension rings, wedge-shaped wire clamps, Guy insulators, UT clamps, guy rods, guy stones, U-rings, steel strands and steel wire clips, the low-voltage household connections include insulated wires, supporting cross-arms, disc insulators, parallel connecting plates, screws, and tie wires and ditch clips.
作为优选的技术方案,所述低压架空线路用于提供架空横担的安装实训,悬式绝缘子的绑扎、低压针式绝缘子更换实训,低压配电线路放线、紧线、撤线实训,钢芯铝绞线钳压法连接、0.4kV架空绝缘线承力导线钳压法连接实训,绝缘导线带电工作、邻近带电绝缘导线的工作、同杆(塔)架设多回线路中部分线路停电的工作实训。As a preferred technical solution, the low-voltage overhead line is used to provide training for the installation of overhead cross-arms, the binding of suspension insulators, the training for replacing low-voltage pin insulators, and the training for setting out, tightening, and withdrawing wires for low-voltage distribution lines , Steel-cored aluminum stranded wire clamp connection, 0.4kV overhead insulated wire load-bearing wire clamp connection practice training, insulated conductor live work, work adjacent to live insulated conductors, part of the lines in the multi-circuit line erected on the same pole (tower) Power outage job training.
作为优选的技术方案,所述低压接户线路用于提供低压接户线横担安装、碟式绝缘子串组装实训,碟式绝缘子的绑扎、更换实训,低压接户线放线、紧线与撤线实训,低压接户线弓子线接续、T接下线实训的工作实训。As a preferred technical solution, the low-voltage household line is used to provide low-voltage household line cross-arm installation, disc insulator string assembly training, disc insulator binding and replacement training, low-voltage household line pay-off, line tightening Work training with line withdrawal training, low-voltage household line bow sub-line connection, and T connection offline training.
作为优选的技术方案,所述模拟电源爬杆、模拟墙体、模拟中间爬杆、低压架空线路、低压接户线路、固定盘、光伏发电组件和低压电能表箱可拆卸安装在所述延伸导轨上。As a preferred technical solution, the simulated power supply climbing pole, simulated wall, simulated intermediate climbing pole, low-voltage overhead line, low-voltage household connection line, fixed plate, photovoltaic power generation module and low-voltage electric energy meter box are detachably installed on the extended guide rail superior.
作为优选的技术方案,所述延伸导轨每隔10cm设置有螺丝固定孔,地面上等距离预制有螺栓,所述延伸导轨通过平垫、弹簧垫和螺母与螺栓配合将延伸导轨固定在地面上As a preferred technical solution, the extension guide rail is provided with screw fixing holes every 10 cm, and bolts are prefabricated equidistantly on the ground, and the extension guide rail is fixed on the ground through the cooperation of flat pads, spring pads and nuts with the bolts
采用上述技术方案后,本发明设计为多功能组合式,能够提供多种实施例组合进行杆塔上作业、杆塔施工、放线、紧线与撤线、低压架空绝缘导线工作、邻近带电导线的工作、同杆(塔)架设多回线路中部分线路停电的工作以及低压针式绝缘子更换、悬式绝缘子更换、钢芯铝绞线钳压法连接、0.4kV架空绝缘线承力导线钳压法连接、拉线制作、低压配电线路停电、验电、装拆接地线、绳扣制作使用、接地电阻安装测试,低压配电线路所有设施、设备都在此仿真装置上能够组装并进行操作,其功能齐全、技术先进,同时占地面积小,可放置在室内或者室外,可移动、拆卸,可任意调整距离,适应多级别、多种情形下的需要。After adopting the above-mentioned technical scheme, the present invention is designed as a multi-functional combined type, which can provide various combinations of embodiments for operations on pole towers, pole tower construction, line release, line tightening and line withdrawal, low-voltage overhead insulated conductor work, and work adjacent to live conductors , The work of partial line power failure in the erection of multi-circuit lines on the same pole (tower), the replacement of low-voltage pin insulators, the replacement of suspension insulators, the connection of steel-cored aluminum stranded wires by clamping, and the connection of 0.4kV overhead insulated wire load-bearing conductors by clamping , pull wire production, low-voltage distribution line power outage, electrical inspection, assembly and disassembly of grounding wires, production and use of rope buckles, installation and testing of grounding resistance, all facilities and equipment of low-voltage distribution lines can be assembled and operated on this simulation device, and its functions It is complete, advanced in technology, and occupies a small area. It can be placed indoors or outdoors, and can be moved and disassembled. The distance can be adjusted arbitrarily to meet the needs of multiple levels and situations.
附图说明Description of drawings
以下附图仅旨在于对本实用新型做示意性说明和解释,并不限定本实用新型的范围。其中:The following drawings are only intended to illustrate and explain the utility model schematically, and do not limit the scope of the utility model. in:
图1是本实用新型实施例的电路原理示意图;Fig. 1 is the circuit schematic diagram of the utility model embodiment;
图2是本实用新型实施例的组装结构示意图;Fig. 2 is the assembly structure schematic diagram of the utility model embodiment;
图3是图2的俯视图。FIG. 3 is a top view of FIG. 2 .
具体实施方式Detailed ways
下面结合附图和实施例,进一步阐述本实用新型。在下面的详细描述中,只通过说明的方式描述了本实用新型的某些示范性实施例。毋庸置疑,本领域的普通技术人员可以认识到,在不偏离本实用新型的精神和范围的情况下,可以用各种不同的方式对所描述的实施例进行修正。因此,附图和描述在本质上是说明性的,而不是用于限制权利要求的保护范围。Below in conjunction with accompanying drawing and embodiment, further set forth the utility model. In the following detailed description, certain exemplary embodiments of the present invention are described by way of illustration only. Needless to say, those skilled in the art would realize that the described embodiments may be modified in various different ways, all without departing from the spirit and scope of the present invention. Accordingly, the drawings and description are illustrative in nature and not intended to limit the scope of the claims.
参照附图,该仿真低压配电线路多功能组合培训设施包括安装在地面上的延伸导轨1,延伸导轨1上每隔10cm设置有螺丝固定孔,地面上等距离预制有螺栓,延伸导轨1通过平垫、弹簧垫和螺母与螺栓配合将延伸导轨1固定在地面上,延伸导轨1一端安装有用于模拟电源端的模拟电源爬杆2,模拟电源爬杆2的顶端安装有电源侧横担、第一金具组件21,延伸导轨1的另一端安装有模拟墙体3,模拟墙体3的顶端安装有负荷侧横担、第二金具组件31,延伸导轨1的中部安装有模拟中间爬杆4,模拟中间爬杆4的顶端安装有中间直线杆横担、第三金具组件41,模拟电源爬杆2和模拟墙体3的顶端架设有低压架空线路A,低压架空线路A的中部架设在模拟中间爬杆4上,模拟中间爬杆4和模拟墙体3之间架设有低压接户线路B,延伸导轨1的左端还安装有用于保护作业人员的接地装置5,延伸导轨1上安装有两个可在延伸导轨1上滑动的固定盘6,两个固定盘6分别安装在模拟中间爬杆4的两侧,固定盘6上均安装有用于一同固定或分别固定模拟电源爬杆2、模拟中间爬杆4和模拟墙体3的拉线7,延伸导轨1上位于模拟电源爬杆2的一侧安装有光伏发电组件8,延伸导轨1上位于模拟墙体3的一侧还安装有低压电能表箱9。Referring to the accompanying drawings, the multi-functional combination training facility for simulated low-voltage power distribution lines includes an extension guide rail 1 installed on the ground. Screw fixing holes are arranged on the extension guide rail 1 every 10 cm. Bolts are prefabricated at equal distances on the ground, and the extension guide rail 1 passes Flat pads, spring pads and nuts cooperate with the bolts to fix the extension guide rail 1 on the ground. One end of the extension guide rail 1 is installed with an analog power supply climbing pole 2 for the analog power supply end. A fitting assembly 21, the other end of the extended guide rail 1 is installed with a simulated wall 3, the top of the simulated wall 3 is equipped with a load side crossarm and a second fitting assembly 31, and the middle part of the extended guide rail 1 is installed with a simulated intermediate climbing rod 4, The top of the simulated middle climbing pole 4 is equipped with a middle linear rod cross arm and the third fitting assembly 41, and the top of the simulated power climbing pole 2 and the simulated wall 3 is provided with a low-voltage overhead line A, and the middle part of the low-voltage overhead line A is set up in the middle of the simulated On the climbing pole 4, a low-voltage household connection line B is erected between the simulated intermediate climbing pole 4 and the simulated wall 3, and the left end of the extension guide rail 1 is also installed with a grounding device 5 for protecting workers. The fixed disc 6 that can slide on the extension guide rail 1, the two fixed discs 6 are respectively installed on both sides of the simulated middle climbing pole 4, and the fixed discs 6 are installed with the analog power climbing pole 2 and the simulated middle pole for fixing together or separately. The climbing pole 4 and the pull wire 7 of the simulated wall 3, the photovoltaic power generation module 8 is installed on the extension guide rail 1 on the side of the simulated power climbing pole 2, and the low-voltage electric energy meter is installed on the extension guide rail 1 on the side of the simulated wall 3 Box 9.
模拟电源爬杆2、模拟墙体3、模拟中间爬杆4、低压架空线路A、低压接户线路B、固定盘6、光伏发电组件8和低压电能表箱9可拆卸安装在延伸导轨1上。Simulated power supply climbing pole 2, simulated wall body 3, simulated intermediate climbing pole 4, low-voltage overhead line A, low-voltage household connection line B, fixed plate 6, photovoltaic power generation module 8 and low-voltage electric energy meter box 9 are detachably installed on the extension guide rail 1 .
电源侧横担、第一金具组件21包括直角挂板、平行挂板、球头挂环、单联弯头和耐张线夹,中间直线杆横担、第三金具组件41包括绝缘子中的直角挂板、平行挂板、球头挂环、单联弯头和耐张线夹,负荷侧横担、第二金具组件31包括金具包括直角挂板、平行挂板、球头挂环、单联弯头和耐张线夹,本段中的所述的器件均为现有技术中公开的器件,在此不做详细介绍。The cross arm on the power supply side, the first fitting assembly 21 includes right-angle hanging plates, parallel hanging plates, ball-end hanging rings, single-joint elbows and strain clamps, the middle straight bar cross-arm, and the third fitting assembly 41 include right-angled insulators Hanging plate, parallel hanging plate, ball-end hanging ring, single-joint elbow and tension clamp, load-side cross arm, second fitting assembly 31 including fittings including right-angle hanging plate, parallel hanging plate, ball-end hanging ring, single-link The elbow and the strain clamp, the devices mentioned in this paragraph are all devices disclosed in the prior art, and will not be described in detail here.
低压架空线路A包括绝缘导线10、架空横担、悬式绝缘子、针式绝缘子、U型抱箍、螺丝、并钩线夹、拉线抱箍、延长环、楔形线夹、拉线绝缘子、UT线夹、拉线棒、拉线石、U型环、钢绞线和钢丝卡子,低压架空线路A用于提供架空横担的安装实训,悬式绝缘子的绑扎、低压针式绝缘子更换实训,低压配电线路放线、紧线、撤线实训,钢芯铝绞线钳压法连接、0.4kV架空绝缘线承力导线钳压法连接实训,绝缘导线10带电工作、邻近带电绝缘导线10的工作、同杆塔架设多回线路中部分线路停电的工作实训。Low-voltage overhead line A includes insulated conductors 10, overhead cross-arms, suspension insulators, pin insulators, U-shaped hoops, screws, parallel hook clamps, guyed hoops, extension rings, wedge-shaped wire clamps, guyed insulators, and UT wire clamps , pull rods, pull stones, U-rings, steel strands and wire clamps, low-voltage overhead line A is used to provide training for the installation of overhead cross-arms, binding of suspension insulators, training for replacement of low-voltage pin insulators, and low-voltage power distribution Line setting, tightening, and wire withdrawal training, steel-cored aluminum stranded wire clamp connection, 0.4kV overhead insulated wire load-bearing conductor clamp connection training, insulated conductor 10 live work, adjacent live insulated conductor 10 work , Work training for power outages in some lines in the multi-circuit line erected on the same tower.
低压接户线路B包括绝缘导线10、支撑横担、碟式绝缘子、平行连板、螺丝、扎线和并沟线夹,低压接户线路B用于提供低压接户线横担安装、碟式绝缘子串组装实训,碟式绝缘子的绑扎、更换实训,低压接户线放线、紧线与撤线实训,低压接户线弓子线接续、T接下线实训的工作实训。The low-voltage household connection line B includes insulated wires 10, supporting cross-arms, disc insulators, parallel connecting plates, screws, binding wires and parallel trench clamps. The low-voltage household connection line B is used to provide low-voltage household connection cross-arm installation, disc Insulator string assembly training, disc insulator binding and replacement training, low-voltage household line setting-off, tightening and withdrawal training, low-voltage household line bow-line connection, and T-connection off-line training.
为了克服现有技术内没有功能齐全、技术先进、标准一致的低压配电线路多功能组合培训设施这一问题,提供一种仿真型的低压配电线路多功能组合培训设施,该装置能从理论培训配电线路的结构、原理、性能、技术参数,以及设备的运行、维护、操作方法和注意事项,是从事农网配电岗位所需掌握的关键技能实操项目的培训设施。In order to overcome the problem that there is no multi-functional combined training facility for low-voltage distribution lines with complete functions, advanced technology and consistent standards in the prior art, a simulated multi-functional combined training facility for low-voltage distribution lines is provided. The structure, principle, performance and technical parameters of the training distribution line, as well as the operation, maintenance, operation methods and precautions of the equipment, are the training facilities for the key skills and practical projects required for the post of rural power distribution.
本实用新型可以训练的科目有多种:The subject that the utility model can train has multiple:
a. 拉线制作:将模拟中间爬杆4、固定盘6固定在可延伸导轨1上,人员地面调整拉线7对模拟中间爬杆4进行稳定性加固后,进行登杆训练;a. Cable production: fix the simulated middle climbing pole 4 and the fixed plate 6 on the extendable guide rail 1, adjust the stay wire 7 on the ground to strengthen the stability of the simulated middle climbing pole 4, and carry out pole climbing training;
b. 攀登杆塔以及低压配电线路杆塔上作业:使用脚扣登高时,将模拟中间爬杆4固定在延伸导轨1上,人员使用脚扣登杆培训;使用梯子登高时,将模拟墙体3固定在延伸导轨1上,人员使用梯子登高培训;b. Climbing pole towers and low-voltage distribution line pole tower operations: when using foot buckles to climb high, fix the simulated middle climbing pole 4 on the extension guide rail 1, and train personnel to use the foot buckles to climb the pole; when using ladders to climb high, simulate the wall 3 Fixed on the extended guide rail 1, personnel use ladders for training;
c. 支撑横担和架空横担的安装、绝缘子的绑扎和更换:将模拟中间爬杆4固定在延伸导轨1上,人员登杆进行横担的安装和绝缘子的更换、绑扎;c. Installation of supporting cross-arm and overhead cross-arm, binding and replacement of insulators: fix the simulated intermediate climbing pole 4 on the extension guide rail 1, and install the cross-arm, replace and bind insulators by climbing on the pole;
d. 低压架空线路A杆塔施工、放线、紧线与撤线、低压架空绝缘导线工作、邻近带电导线的工作、同杆(塔)架设多回线路中部分线路停电的工作:电源侧模拟电源爬杆2、模拟中间爬杆4、模拟墙体3、固定盘6、接地装置5依次固定在可延伸导轨1上,人员登杆装设拉线,并架设低压配电线路;d. Construction of pole and tower of low-voltage overhead line A, line release, line tightening and withdrawal, work on low-voltage overhead insulated conductors, work on adjacent live conductors, work on power failure of some lines in multi-circuit lines erected on the same pole (tower): analog power supply on the power supply side The climbing pole 2, the simulated intermediate climbing pole 4, the simulated wall 3, the fixed plate 6, and the grounding device 5 are sequentially fixed on the extendable guide rail 1, and the personnel climb the pole to install the pull wire and erect the low-voltage power distribution line;
e.低压接户线路B配电安装:将模拟中间爬杆4、模拟墙体3、低压接户线路B、低压电能表箱9固定在延伸导轨1上,人员登杆装设低压接户线;e. Low-voltage household line B power distribution installation: fix the simulated intermediate climbing pole 4, simulated wall 3, low-voltage household line B, and low-voltage electric energy meter box 9 on the extension guide rail 1, and install the low-voltage household line on the pole;
f.低压电能表箱9及箱内电能表、集中器安装并调试:将低压电能表箱9固定在延伸导轨1上,人员安装电能表箱并调试;f. Installation and commissioning of the low-voltage electric energy meter box 9 and the electric energy meter and concentrator inside the box: fix the low-voltage electric energy meter box 9 on the extension guide rail 1, and install and debug the electric energy meter box by personnel;
g.光伏发电电源低压线路:将模拟电源爬杆2、光伏发电组件8固定在延伸导轨1上,人员安装光伏发电装置并调试;g. Photovoltaic power supply low-voltage line: Fix the analog power climbing pole 2 and photovoltaic power generation module 8 on the extended guide rail 1, and personnel install and debug the photovoltaic power generation device;
h.接电电阻安装、测试:将接地装置5固定在延伸导轨1上,人员拆除或者安装接地装置5并测试;h. Electric resistance installation and testing: fix the grounding device 5 on the extended guide rail 1, remove or install the grounding device 5 and test;
i.低压配电线路停电、验电、装拆接地线:在安装好的低压接户线路B上进行停电、验电、装拆接地线;i. Power failure, power inspection, installation and removal of grounding wires for low-voltage distribution lines: power failure, power inspection, installation and removal of grounding wires on the installed low-voltage household connection line B;
j.钢芯铝绞线钳压法连接、0.4kV架空绝缘线承力导线钳压法连接:在安装好的低压架空线路A上任意一相导线断线,人员进行断线接续。j. Steel-cored aluminum stranded wire clamp connection, 0.4kV overhead insulated wire load-bearing conductor clamp connection: If any phase conductor on the installed low-voltage overhead line A is disconnected, personnel will perform disconnection connection.
以上显示和描述了本实用新型的基本原理、主要特征及本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles, main features and advantages of the present utility model have been shown and described above. Those skilled in the art should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection required by the utility model is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920004861.5U CN209822060U (en) | 2019-01-03 | 2019-01-03 | Multifunctional combined training facility for simulation low-voltage distribution line |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920004861.5U CN209822060U (en) | 2019-01-03 | 2019-01-03 | Multifunctional combined training facility for simulation low-voltage distribution line |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209822060U true CN209822060U (en) | 2019-12-20 |
Family
ID=68870651
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920004861.5U Active CN209822060U (en) | 2019-01-03 | 2019-01-03 | Multifunctional combined training facility for simulation low-voltage distribution line |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209822060U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111583750A (en) * | 2020-06-24 | 2020-08-25 | 江苏无国界航空技术有限公司 | A standard line construction training frame |
-
2019
- 2019-01-03 CN CN201920004861.5U patent/CN209822060U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111583750A (en) * | 2020-06-24 | 2020-08-25 | 江苏无国界航空技术有限公司 | A standard line construction training frame |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105932599A (en) | Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set | |
| WO2016023141A1 (en) | Process for live replacement of tension hard-tube bus-bar jumper insulator of +/- 800kv ultra-high-voltage dc transmission line | |
| CN204645808U (en) | Bar stepped on by cement pole cable | |
| CN205791227U (en) | Charged for replacement UHV transmission line insulator chain tool set | |
| CN105298201A (en) | Electric-transmission-line cable-terminal three-dimensional downwards-leading device | |
| CN208078525U (en) | Three-phase conducting wire for distribution network live line work upright bar struts insulating frame | |
| CN108806383A (en) | Distribution training frame and distribution Training Methodology | |
| CN204028135U (en) | The reassembling type verifying attachment of small-sized lightning arrester | |
| CN209822060U (en) | Multifunctional combined training facility for simulation low-voltage distribution line | |
| CN204424804U (en) | Equipotential changes the instrument of the two soft bus strain insulator of simply connected | |
| CN106033872B (en) | Equipotential changes the instrument of the double soft bus strain insulators of simply connected | |
| CN105449612A (en) | A conductive wire insulation support plate apparatus | |
| CN202572183U (en) | Large-current telescopic high-altitude cable connecting clamp | |
| CN206931928U (en) | A kind of 10kV distributions uninterrupted operation fixed power source lead wire insulation cross-arm | |
| CN101907675A (en) | A method for finding faults in distribution network lines | |
| CN205646196U (en) | Looped netowrk cabinet earthing device | |
| CN203895633U (en) | Short circuit grounding wire suitable for box transformer substation and electricity distribution room | |
| CN201584691U (en) | Special tool for 220KV double-circuit common-tower line accessing tension-resistance high-pressure high-electric field | |
| CN206908257U (en) | A kind of power network is grid-connected to use fixed equipment | |
| CN110164268A (en) | A kind of power distribution network standardization power transformation platform teaching instrument | |
| CN104538891B (en) | A kind of composite insulator outlet method | |
| CN209525776U (en) | A kind of distribution line training frame | |
| CN203589662U (en) | Sectional ground wire connection structure | |
| CN204046514U (en) | A kind of power supply architecture for DC power transmission line on-Line Monitor Device | |
| CN203481755U (en) | 35kV overhead transmission line jumper wire bracket |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |