CN209816674U - A prestressed tension jack installation tool in the cast-in-place box girder box - Google Patents
A prestressed tension jack installation tool in the cast-in-place box girder box Download PDFInfo
- Publication number
- CN209816674U CN209816674U CN201920460757.7U CN201920460757U CN209816674U CN 209816674 U CN209816674 U CN 209816674U CN 201920460757 U CN201920460757 U CN 201920460757U CN 209816674 U CN209816674 U CN 209816674U
- Authority
- CN
- China
- Prior art keywords
- pipe
- cast
- box girder
- hoisting
- place box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种现浇箱梁箱室内预应力张拉千斤顶安装工具,解决了现浇预应力箱梁张拉适用的千斤顶安装效率低、占用场地大、浪费劳动力的技术问题。本实用新型包括设置在现浇箱梁上方的支撑架,所述支撑架为中空的管材,管材的下端部设置有插销,管材的下端部插设在现浇箱梁顶部的预留孔中且所述插销挡止在预留孔的上方,管材的上端部设置有吊装葫芦,吊装葫芦的吊装钢丝绳从管材的上端部贯穿至管材的下端部,吊装钢丝绳的自由端设置有挂接预应力张拉千斤顶的挂钩,现浇箱梁的预留孔下方设置有穿插在预应力张拉千斤顶中心孔内的导向管。本实用新型不仅结构简单、便于制作,而且安装占用工作场地面积小、使用效率高。
The utility model discloses a prestressed tensioning jack installation tool in a cast-in-place box girder box chamber, which solves the technical problems of low installation efficiency, large site occupation and waste of labor force for the jack applicable to cast-in-situ prestressed box girder tensioning. The utility model comprises a support frame arranged above the cast-in-place box girder, the support frame is a hollow pipe, the lower end of the pipe is provided with a bolt, and the lower end of the pipe is inserted in a reserved hole on the top of the cast-in-place box girder and The bolt is stopped above the reserved hole, the upper end of the pipe is provided with a hoisting hoist, the hoisting steel wire rope of the hoisting hoist runs through the upper end of the pipe to the lower end of the pipe, and the free end of the hoisting steel wire is provided with a articulated prestressed tensioner. The hook of the pulling jack is provided with a guide pipe inserted in the center hole of the prestressed tensioning jack under the reserved hole of the cast-in-situ box girder. The utility model not only has a simple structure and is easy to manufacture, but also occupies a small area of the work site for installation and has high use efficiency.
Description
技术领域technical field
本实用新型涉及现浇箱梁施工技术领域,特别是指一种现浇箱梁箱室内预应力张拉千斤顶安装工具。The utility model relates to the technical field of cast-in-place box girder construction, in particular to a prestressed tension jack installation tool in a cast-in-place box girder box chamber.
背景技术Background technique
在现浇预应力箱梁施工中,顶板钢绞线的张拉段往往设置在箱室内部。由于现浇箱梁预应力张拉使用的千斤顶重量较大,且在箱梁内部施工人员活动空间受限,在安装千斤顶时,不仅需要消耗大量劳动力,而且严重影响施工进度。In the construction of cast-in-place prestressed box girders, the tension section of the roof steel strand is often arranged inside the box chamber. Due to the heavy weight of the jacks used in the prestressed tensioning of the cast-in-situ box girder, and the limited space for the construction personnel inside the box girder, the installation of the jacks not only consumes a lot of labor, but also seriously affects the construction progress.
目前工地上使用的安装方法有两种:箱室内部搭设千斤顶托架和箱梁顶搭设千斤顶吊装支架。在箱室内部搭设千斤顶托架需要很好的控制托架的倾角,且托架使用效率较低,每张拉一束,需要搭设一个托架,耗费时间长,严重影响施工进度;在箱室顶面搭设千斤顶吊装支架,虽然利用率较高,但是千斤顶吊装支架需要较大的工作场地,而且吊装支架往往比较笨重,移动时也要耗费较多的劳动力。There are two installation methods currently used on the construction site: a jack bracket is set up inside the box chamber and a jack hoisting bracket is set up on the top of the box girder. It is necessary to control the inclination angle of the bracket well to set up the jack bracket inside the box room, and the use efficiency of the bracket is low. Every time a bundle is pulled, a bracket needs to be erected, which takes a long time and seriously affects the construction progress; in the box room The jack hoisting bracket is set up on the top surface, although the utilization rate is high, but the jack hoisting bracket requires a large work site, and the hoisting bracket is often cumbersome, and it also consumes more labor when moving.
实用新型内容Utility model content
针对上述背景技术中的不足,本实用新型提出一种现浇箱梁箱室内预应力张拉千斤顶安装工具,解决了现浇预应力箱梁张拉适用的千斤顶安装效率低、占用场地大、浪费劳动力的技术问题。Aiming at the deficiencies in the above-mentioned background technology, the utility model proposes a prestressed tension jack installation tool in the cast-in-place box girder box chamber, which solves the problems of low installation efficiency, large space occupation and waste Labor technical issues.
本实用新型的技术方案是这样实现的:一种现浇箱梁箱室内预应力张拉千斤顶安装工具,包括设置在现浇箱梁上方的支撑架,所述支撑架为中空的管材,管材作为支撑架能够有效减小安装占用面积。管材的下端部设置有插销,管材的下端部插设在现浇箱梁顶部的预留孔中且所述插销挡止在预留孔的上方。预留孔能够实现对管材进行水平方向的固定,插销能够实现对管材进行竖直方向上的固定,通过预留孔和插销的固定作用,能够充分保证管材相对现浇箱梁的位置稳定性。管材的上端部设置有吊装葫芦,吊装葫芦的吊装钢丝绳从管材的上端部贯穿至管材的下端部,吊装钢丝绳的自由端设置有挂接预应力张拉千斤顶的挂钩。通过操作吊装葫芦,能够使吊装钢丝绳沿着管材内部上下收缩,进而通过挂钩将预应力张拉千斤顶进行提升。现浇箱梁的预留孔下方设置有穿插在预应力张拉千斤顶中心孔内的导向管,导向管能够对预应力张拉千斤顶进行吊装导向,解决了预应力张拉千斤顶与安装位置上下不对应的问题。The technical scheme of the utility model is realized in the following way: a prestressed tension jack installation tool in the cast-in-place box girder box chamber, including a support frame arranged above the cast-in-place box girder, the support frame is a hollow pipe, and the pipe is used as The support frame can effectively reduce the installation area. The lower end of the pipe is provided with a bolt, and the lower end of the pipe is inserted into the reserved hole on the top of the cast-in-place box girder and the bolt stops above the reserved hole. The reserved hole can realize the horizontal fixing of the pipe, and the bolt can realize the vertical fixing of the pipe. Through the fixing function of the reserved hole and the bolt, the positional stability of the pipe relative to the cast-in-place box girder can be fully guaranteed. The upper end of the pipe is provided with a hoist, and the hoisting wire rope of the hoist runs through the upper end of the pipe to the lower end of the pipe, and the free end of the hoisting wire rope is provided with a hook for hanging a prestressed tension jack. By operating the hoisting hoist, the hoisting wire rope can be shrunk up and down along the interior of the pipe, and then the prestressed tension jack can be lifted through the hook. Below the reserved hole of the cast-in-place box girder, there is a guide pipe interspersed in the center hole of the prestressed tension jack. Corresponding questions.
进一步地,所述吊装葫芦为手摇葫芦,手摇葫芦包括固定连接在管材端部的外壳,外壳内平行设置有手摇轴和绞盘轴,手摇轴上设置有驱动小齿轮,绞盘轴上设置有与驱动小齿轮啮合的减速大齿轮。通过驱动小齿轮与减速大齿轮的啮合,能够使用较小的力输出较大的扭矩,可以有效降低提升预应力张拉千斤顶的劳动力。绞盘轴上设置有缠绕所述吊装钢丝绳的绞盘,所述外壳外设置有与手摇轴相连的L形摇柄,L形摇柄有效提高了提升预应力张拉千斤顶的便捷性。Further, the hoisting hoist is a hand hoist, and the hand hoist includes a shell fixedly connected to the end of the pipe, a hand shaft and a winch shaft are arranged in parallel in the shell, a driving pinion is arranged on the hand shaft, and a drive pinion is arranged on the winch shaft A reduction bull gear meshed with the drive pinion is provided. Through the meshing of the driving pinion and the reduction gear, relatively small force can be used to output relatively large torque, which can effectively reduce the labor force for lifting the prestressed tension jack. The winch shaft is provided with a winch winding the hoisting wire rope, and an L-shaped handle connected to the hand shaft is arranged outside the outer shell, and the L-shaped handle effectively improves the convenience of lifting the prestressed tension jack.
进一步地,所述手摇轴轴向滑动设置在外壳上,手摇轴上设置有制动齿轮,外壳上设置有与制动齿轮活动卡接的制动块。通过抽拉手摇轴,可以便捷地调节啮合模式和制动模式,能够有效防止手摇轴倒转。Further, the hand shaft is axially slidably arranged on the housing, the hand shaft is provided with a brake gear, and the housing is provided with a brake block that is movably engaged with the brake gear. By pulling the hand shaft, the engagement mode and braking mode can be adjusted conveniently, which can effectively prevent the hand shaft from reversing.
进一步地,所述吊装葫芦为电动葫芦,电动葫芦能相对手摇葫芦能够进一步降低施工人员的劳动强度。Further, the hoisting hoist is an electric hoist, and the electric hoist can further reduce the labor intensity of construction personnel compared with the hand hoist.
进一步地,所述管材的上端部或/和下端部设置有与吊装钢丝绳相配合的定滑轮,定滑轮的设置能够有效降低吊装钢丝绳与管材之间的摩擦力,进一步降低了施工人员的劳动强度,同时能够减小摩擦噪音。Further, the upper end or/and the lower end of the pipe are provided with a fixed pulley matched with the hoisting wire rope, the setting of the fixed pulley can effectively reduce the friction between the hoisting wire rope and the pipe, and further reduce the labor intensity of the construction personnel , while reducing friction noise.
进一步地,所述管材的下端部并列设置有若干个插销孔,插销能够选择与不同的插销孔进行配合,以此来适应不同厚度现浇箱梁的施工需求。Further, the lower end of the pipe is provided with several pin holes in parallel, and the pins can be selected to cooperate with different pin holes, so as to meet the construction requirements of cast-in-place box girders with different thicknesses.
本实用新型不仅结构简单、便于制作,而且安装占用工作场地面积小、使用效率高,能够便捷且省力地对预应力张拉千斤顶进行吊装安装。另外,本实用新型还能够在吊装预应力张拉千斤顶时进行导向,进一步节省了施工劳动力,进一步提高了施工效率。通过导向作用,避免了在不同位置反复安装支撑架的弊端,有效提高了支撑架的使用率。The utility model not only has a simple structure and is easy to manufacture, but also occupies a small area of the work site for installation and has high use efficiency, and can hoist and install the prestressed tension jack conveniently and labor-savingly. In addition, the utility model can also guide when hoisting the prestressed tension jack, which further saves construction labor force and further improves construction efficiency. Through the guiding function, the disadvantage of repeatedly installing the support frame at different positions is avoided, and the utilization rate of the support frame is effectively improved.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the embodiment of the utility model more clearly, the accompanying drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the utility model. Those of ordinary skill in the art can also obtain other drawings based on these drawings without any creative effort.
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图2为图1的剖视图;Fig. 2 is the sectional view of Fig. 1;
图3为图1中吊装葫芦的放大图。Fig. 3 is an enlarged view of the hoist hoist in Fig. 1 .
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有付出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
实施例1,一种现浇箱梁箱室内预应力张拉千斤顶安装工具,如图1和图2所示,包括设置在现浇箱梁上方的支撑架1,所述支撑架1为中空的管材,管材作为支撑架能够有效减小安装占用面积。管材的下端部设置有插销2,管材的下端部插设在现浇箱梁顶部的预留孔中且所述插销2挡止在预留孔的上方。预留孔能够实现对管材进行水平方向的固定,插销能够实现对管材进行竖直方向上的固定,通过预留孔和插销的固定作用,能够充分保证管材相对现浇箱梁的位置稳定性。Embodiment 1, a prestressed tension jack installation tool in the cast-in-place box girder box chamber, as shown in Figure 1 and Figure 2, includes a support frame 1 arranged above the cast-in-place box girder, and the support frame 1 is hollow Pipes, pipes as a support frame can effectively reduce the installation area. The lower end of the pipe is provided with a bolt 2, and the lower end of the pipe is inserted into a reserved hole on the top of the cast-in-place box girder and the bolt 2 stops above the reserved hole. The reserved hole can realize the horizontal fixing of the pipe, and the bolt can realize the vertical fixing of the pipe. Through the fixing function of the reserved hole and the bolt, the positional stability of the pipe relative to the cast-in-place box girder can be fully guaranteed.
所述管材的上端部设置有吊装葫芦3,吊装葫芦3与管材之间设置有加强钢板1-3。吊装葫芦3的吊装钢丝绳4从管材的上端部贯穿至管材的下端部,吊装钢丝绳4的自由端设置有挂接预应力张拉千斤顶的挂钩5。通过操作吊装葫芦3,能够使吊装钢丝绳沿着管材内部上下收缩,进而通过挂钩5将预应力张拉千斤顶进行提升。A hoisting gourd 3 is arranged on the upper end of the pipe, and a reinforcing steel plate 1-3 is arranged between the hoisting gourd 3 and the pipe. The hoisting wire rope 4 of the hoisting hoist 3 runs through from the upper end of the pipe to the lower end of the pipe, and the free end of the hoisting wire rope 4 is provided with a hook 5 for hooking a prestressed tension jack. By operating the hoisting hoist 3, the hoisting wire rope can be shrunk up and down along the inside of the pipe, and then the prestressed tension jack can be lifted through the hook 5.
如图3所示,所述吊装葫芦3为手摇葫芦,手摇葫芦包括固定连接在管材端部的外壳3-1,外壳3-1内平行设置有手摇轴3-2和绞盘轴3-3,手摇轴3-2上设置有驱动小齿轮3-4,绞盘轴3-3上设置有与驱动小齿轮3-4啮合的减速大齿轮3-5。通过驱动小齿轮与减速大齿轮的啮合,能够使用较小的力输出较大的扭矩,可以有效降低提升预应力张拉千斤顶的劳动力。绞盘轴3-3上设置有缠绕所述吊装钢丝绳4的绞盘3-6,所述外壳3-4外设置有与手摇轴3-2相连的L形摇柄3-9,L形摇柄3-9有效提高了提升预应力张拉千斤顶的便捷性。As shown in Figure 3, the hoisting hoist 3 is a hand hoist, and the hand hoist includes a shell 3-1 fixedly connected to the end of the pipe, and a hand shaft 3-2 and a winch shaft 3 are arranged in parallel in the shell 3-1 -3, the hand shaft 3-2 is provided with a drive pinion 3-4, and the capstan shaft 3-3 is provided with a deceleration bull gear 3-5 meshing with the drive pinion 3-4. Through the meshing of the driving pinion and the reduction gear, relatively small force can be used to output relatively large torque, which can effectively reduce the labor force for lifting the prestressed tension jack. The capstan shaft 3-3 is provided with a capstan 3-6 winding the hoisting wire rope 4, and the outer shell 3-4 is provided with an L-shaped handle 3-9 connected to the hand shaft 3-2, and the L-shaped handle 3-9 effectively improves the convenience of lifting the prestressed tension jack.
现浇箱梁的预留孔下方设置有穿插在预应力张拉千斤顶中心孔内的导向管,导向管能够对预应力张拉千斤顶进行吊装导向,解决了预应力张拉千斤顶吊装前位置与安装位置上下不对应的问题,避免了在不同位置反复安装支撑架的弊端,有效提高了支撑架的使用率。Below the reserved hole of the cast-in-place box girder, there is a guide pipe interspersed in the center hole of the prestressed tension jack. The guide pipe can guide the hoisting of the prestressed tension jack, which solves the problem of the position and installation of the prestressed tension jack before hoisting. The problem that the position does not correspond to the upper and lower sides avoids the disadvantages of repeatedly installing the support frame at different positions, and effectively improves the utilization rate of the support frame.
本实用新型的使用过程为:操作人员站在箱梁顶面上,根据箱梁顶板厚度调节插销2的位置,把管材的底部安装进箱梁顶面的预留孔内,把吊装钢丝绳4端部的挂钩5连接在预应力张拉千斤顶上,导向管一端套入钢绞线束、另一端穿过预应力张拉千斤顶的中心孔;操作者摇动手摇葫芦的摇柄3-9,动力通过钢丝绳传递到预应力张拉千斤顶上,预应力张拉千斤顶沿导向管向上移动,直到预应力张拉千斤顶移动到张拉安装位置;在张拉完毕后,反方向摇动摇柄3-9,预应力张拉千斤顶在重力作用下缓慢卸落到箱梁底,完成整个操作。The use process of the utility model is as follows: the operator stands on the top surface of the box girder, adjusts the position of the pin 2 according to the thickness of the top plate of the box girder, installs the bottom of the pipe into the reserved hole on the top surface of the box girder, and puts the 4 ends of the hoisting wire rope The hook 5 at the top is connected to the prestressed tension jack, one end of the guide tube is inserted into the steel strand, and the other end passes through the center hole of the prestressed tension jack; the operator shakes the crank handle 3-9 of the hand hoist, and the power passes through The steel wire rope is passed to the prestressed tension jack, and the prestressed tension jack moves upward along the guide tube until the prestressed tension jack moves to the tension installation position; after the tension is completed, shake the handle 3-9 in the opposite direction, and The stress tension jack is slowly unloaded to the bottom of the box girder under the action of gravity to complete the whole operation.
实施例2,一种现浇箱梁箱室内预应力张拉千斤顶安装工具,所述手摇轴3-2轴向滑动设置在外壳3-1上,手摇轴3-2上设置有制动齿轮3-7,外壳3-1上设置有与制动齿轮3-7活动卡接的制动块3-8。通过抽拉手摇轴,可以便捷地调节啮合模式和制动模式,能够有效防止手摇轴倒转。Embodiment 2, a prestressed tension jack installation tool in the cast-in-situ box girder box chamber, the hand shaft 3-2 is axially slidably arranged on the shell 3-1, and the hand shaft 3-2 is provided with a brake For the gear 3-7, the housing 3-1 is provided with a brake block 3-8 that is movably engaged with the brake gear 3-7. By pulling the hand shaft, the engagement mode and braking mode can be adjusted conveniently, which can effectively prevent the hand shaft from reversing.
本实施例的其他结构与实施例1相同。Other structures of this embodiment are the same as those of Embodiment 1.
实施例3,一种现浇箱梁箱室内预应力张拉千斤顶安装工具,所述吊装葫芦3为电动葫芦,电动葫芦能相对手摇葫芦能够进一步降低施工人员的劳动强度。Embodiment 3 is an installation tool for a prestressed tension jack in a cast-in-situ box girder box. The hoisting hoist 3 is an electric hoist, and the electric hoist can further reduce the labor intensity of construction personnel compared with the hand hoist.
本实施例的其他结构与实施例1相同。Other structures of this embodiment are the same as those of Embodiment 1.
实施例4,一种现浇箱梁箱室内预应力张拉千斤顶安装工具,所述管材的上端部和下端部设置有与吊装钢丝绳4相配合的定滑轮1-1,定滑轮1-1的设置能够有效降低吊装钢丝绳4与管材之间的摩擦力,进一步降低了施工人员的劳动强度,同时能够减小摩擦噪音。Embodiment 4, a prestressed tension jack installation tool in the cast-in-situ box girder box chamber, the upper end and the lower end of the pipe are provided with a fixed pulley 1-1 that matches the hoisting wire rope 4, and the fixed pulley 1-1 The setting can effectively reduce the frictional force between the hoisting wire rope 4 and the pipe material, further reduces the labor intensity of construction personnel, and can reduce frictional noise at the same time.
本实施例的其他结构与实施例1或2或3相同。Other structures of this embodiment are the same as Embodiment 1 or 2 or 3.
实施例5,一种现浇箱梁箱室内预应力张拉千斤顶安装工具,所述管材的下端部并列设置有若干个插销孔1-2,插销2能够选择与不同的插销孔1-2进行配合,以此来适应不同厚度现浇箱梁的施工需求。Embodiment 5, a prestressed tension jack installation tool in the cast-in-place box girder box chamber, the lower end of the pipe is provided with a number of pin holes 1-2 in parallel, and the pin 2 can be selected from different pin holes 1-2. In order to meet the construction needs of cast-in-place box girders with different thicknesses.
本实施例的其他结构与实施例1或2或3或4相同。Other structures of this embodiment are the same as Embodiment 1 or 2 or 3 or 4.
本实用新型未详尽之处均为本领域技术人员所公知的常规技术手段。The non-exhaustive parts of the utility model are conventional technical means known to those skilled in the art.
以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920460757.7U CN209816674U (en) | 2019-04-08 | 2019-04-08 | A prestressed tension jack installation tool in the cast-in-place box girder box |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920460757.7U CN209816674U (en) | 2019-04-08 | 2019-04-08 | A prestressed tension jack installation tool in the cast-in-place box girder box |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209816674U true CN209816674U (en) | 2019-12-20 |
Family
ID=68879099
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920460757.7U Expired - Fee Related CN209816674U (en) | 2019-04-08 | 2019-04-08 | A prestressed tension jack installation tool in the cast-in-place box girder box |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209816674U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111719441A (en) * | 2020-07-31 | 2020-09-29 | 中交二公局第二工程有限公司 | A device and method for backward transport of cable-stayed tension jack in box girder |
-
2019
- 2019-04-08 CN CN201920460757.7U patent/CN209816674U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111719441A (en) * | 2020-07-31 | 2020-09-29 | 中交二公局第二工程有限公司 | A device and method for backward transport of cable-stayed tension jack in box girder |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110104522B (en) | Traction type construction lifter for folding roof beam and construction method thereof | |
| CN109823963B (en) | Hoisting equipment for prefabricated components of fabricated building | |
| CN218619838U (en) | Steel pipe truss hoist and mount auxiliary device | |
| CN213171204U (en) | Construction equipment hoisting device | |
| CN218058210U (en) | A hoisting device for prefabricated I-beams in house construction | |
| CN219751780U (en) | Lifting device for installing pipeline in comprehensive pipe rack | |
| CN114892526B (en) | A lifting device for steel box girder construction | |
| CN115973893A (en) | A hoisting device for assembled building components | |
| CN115893162A (en) | Elevator rope releasing device and elevator | |
| CN219079024U (en) | An installation platform for large-tonnage prefabricated pipe piles | |
| CN216997385U (en) | Tower crane for hoisting floor of glass curtain wall | |
| CN216711434U (en) | High-lift hoister | |
| CN212076231U (en) | Self-elevating tower crane standard knot leading-in device | |
| CN120397882B (en) | Wind power mixed tower construction self-lifting hoisting operation platform | |
| CN211283631U (en) | Building construction platform | |
| CN218025168U (en) | Automatic rope-arranging hoister | |
| CN222099436U (en) | A small space wall panel lifting device | |
| CN217708464U (en) | Traction elevator with self-climbing function | |
| CN121269549A (en) | Auxiliary hoisting device special for construction elevator | |
| CN221587805U (en) | Wallboard lifting machine | |
| CN221836598U (en) | A mobile feeding auxiliary device | |
| CN113044729A (en) | Crane | |
| CN221810228U (en) | Prefabricated building digital hoisting machine | |
| CN219885608U (en) | Hoisting platform in elevator well | |
| CN220555619U (en) | Building material lifting machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191220 |