CN209816670U - Pedestrian passageway arranged on steel pipe supported in steel sleeve box - Google Patents
Pedestrian passageway arranged on steel pipe supported in steel sleeve box Download PDFInfo
- Publication number
- CN209816670U CN209816670U CN201920315050.7U CN201920315050U CN209816670U CN 209816670 U CN209816670 U CN 209816670U CN 201920315050 U CN201920315050 U CN 201920315050U CN 209816670 U CN209816670 U CN 209816670U
- Authority
- CN
- China
- Prior art keywords
- guardrail
- steel
- steel pipe
- hoop
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 91
- 239000010959 steel Substances 0.000 title claims abstract description 91
- 238000010276 construction Methods 0.000 abstract description 12
- 238000009434 installation Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 abstract description 2
- 125000003003 spiro group Chemical group 0.000 abstract 1
- 239000000463 material Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model relates to a pedestrian passageway of setting on steel bushing incasement support steel pipe supports the steel pipe, supports every certain interval and installs a staple bolt on the steel bushing incasement support steel pipe, and the staple bolt both sides are respectively through bolted connection guardrail montant, through the guardrail horizontal pole of bolted connection angle steel support on the guardrail montant, lay pedestrian passageway panel on supporting the steel pipe, and the both sides of passageway panel are supported on an angle steel of lower floor's guardrail horizontal pole. The utility model discloses can support the pedestrian passageway that provides a safety and stability on the steel pipe in the steel bushing box, all adopt spiro union mode installation between each part, on-the-spot weldless process, construction speed is fast, can dismantle used repeatedly after the construction is accomplished.
Description
Technical Field
The utility model relates to an used steel bushing case installation technical field of aquatic bridge construction, concretely relates to setting supports pedestrian's passageway at steel pipe top in steel bushing case.
Background
When the steel sleeve box is used for underwater bridge construction, a dry and waterless environment is provided for a construction area. The steel casing side plates bear huge water pressure in water, and because the steel pipe piles have good axial compressive strength, a plurality of horizontally arranged steel pipe piles are supported between the opposite side plates in a criss-cross mode in the steel casing to serve as an inner supporting structure for resisting external water pressure.
In the process of installing the steel jacket box, constructors need to operate inside the steel jacket box. Because the construction point positions are dispersed in a plurality of positions in the steel sleeve box, the steel sleeve box is large in size and generally has a length and a width of more than ten meters, and construction operators usually use the inner support steel pipe as a walking channel from one construction point to another construction point. Because the support steel pipe below is unsettled and higher from the steel bushing bottom surface, in order to guarantee personnel's safety of walking, common way is that the welding has the reinforcing bar of certain height as the guardrail in support steel pipe both sides, though simple structure, but the welding can cause certain damage to the steel pipe, influences the reuse, and the steel pipe surface is smooth arc simultaneously, and the pedestrian walks very insecure above that.
Disclosure of Invention
The utility model aims to provide a setting supports the pedestrian passageway at steel pipe top in the steel bushing incasement to the demand of steel bushing incasement construction, is guaranteeing under the prerequisite of constructor safety, avoids the damage of internally supporting the steel pipe, and it is extravagant to reduce the material.
The technical scheme of the utility model as follows:
the utility model provides a setting is at steel bushing incasement support pedestrian passageway on steel pipe which characterized in that: the steel supporting box is characterized in that hoops are arranged on the steel supporting tubes in the steel sleeve box at intervals, each hoop comprises two semicircular hoop plates, two sides of each hoop plate are respectively provided with an outward extending hoop connecting plate, the two hoop plates are buckled on the supporting steel tubes one above the other and are connected through the hoop connecting plates on the two sides of the hoop plates by hoop bolts to be tightly held on the supporting steel tubes; a vertical guardrail fixing rod is arranged on connecting plates on two sides of the upper hoop plate, the lower end of the guardrail fixing rod is welded with the hoop connecting plate, one end of a cross rod is welded at the upper end of the guardrail fixing rod, and the other end of the cross rod is welded with the outer wall of the upper hoop plate; a guardrail vertical rod is respectively supported on the connecting plates at the two sides of each upper hoop plate, and the guardrail vertical rods are connected with the guardrail fixing rods through bolts; arranging a row of guardrail cross bars at regular intervals between the guardrail upright bars on each side of the support steel pipe, wherein the guardrail cross bars are made of angle steel, one edge of the angle steel is connected with the guardrail upright bars through bolts, the other edge of the angle steel is positioned at the inner sides of the guardrail upright bars, and the top surface height of the angle steel edge, facing the inner sides of the guardrail upright bars, of the lowest row of guardrail cross bars on the guardrail upright bars is flush with the top surface height of the support steel pipe; a pedestrian passageway panel is erected on the supporting steel pipe, the middle of the pedestrian passageway panel is supported on the top surface of the supporting steel pipe, and two sides of the pedestrian passageway panel are supported on the edge of the angle steel of the guardrail cross rod which is highly flush with the top surface of the supporting steel pipe.
The utility model has the advantages of all components are bolted connection, and the on-the-spot welding operation that does not have during installation, it is convenient to install, to supporting the steel pipe not damaged, has improved the integrality and the reuse ratio of material, and the panel can select steel sheet or plank according to the current material of job site, and the panel both sides are directly supported on the inboard bottom guardrail horizontal pole of pole setting, and the panel middle part supports in interior support steel pipe top, the walking of being convenient for, and stability is good, can fully ensure the current safety of constructor.
Drawings
Fig. 1 is a schematic cross-sectional structure of the present invention;
FIG. 2 is a schematic view of the installation structure of the hoop on the support steel pipe;
fig. 3 is a schematic side view of the present invention.
Detailed Description
As shown in fig. 1 and 3, the present invention has a hoop 2 installed on the steel casing box inner support steel pipe 1 at regular intervals, the structure of the hoop 2 is as shown in fig. 2, and includes two semicircular hoop plates, two sides of each hoop plate are respectively provided with an outward extending hoop connecting plate 21, the two hoop plates are buckled on the support steel pipe 1 one by one, and are connected by hoop bolts 22 through the hoop connecting plates 21 at two sides of the hoop plates, and tightly clasped on the support steel pipe 1; a vertical guardrail fixing rod 3 is arranged on connecting plates 21 on two sides of the upper hoop plate, the lower end of the guardrail fixing rod 3 is welded with the hoop connecting plate 21, one end of a cross rod 4 is welded at the upper end, and the other end of the cross rod 4 is welded with the outer wall of the upper hoop plate; a guardrail upright rod 5 is respectively supported on the connecting plates 21 at the two sides of each upper hoop plate, and the guardrail upright rods 5 are connected with the guardrail fixing rods 3 through bolts; a row of guardrail cross bars 6 are arranged between the guardrail upright stanchions 5 on each side of the support steel pipe 1 at regular intervals, the guardrail cross bars 6 are made of angle steel, one edge of the angle steel is connected with the guardrail upright stanchions 5 through bolts, the other edge of the angle steel is positioned at the inner sides of the guardrail upright stanchions 5, and the height of the top surface of the angle steel edge, facing the inner sides of the guardrail upright stanchions, of the lowest row of guardrail cross bars 6 on the guardrail upright stanchions is flush with the height of the top surface of the support steel pipe 1; a pedestrian passageway panel 7 is erected on the support steel pipe 1, the middle of the pedestrian passageway panel 7 is supported on the top surface of the support steel pipe 1, and two sides of the pedestrian passageway panel 7 are supported on the edge of the angle steel of the guardrail cross rod 6 which is highly flush with the top surface of the support steel pipe.
The utility model discloses during the specific implementation, all components are all accomplished at the processing of mill, and the guardrail dead lever is in the same place with staple bolt processing preparation, supports the steel pipe in the steel bushing case and installs the completion back, at equidistant installation staple bolt in steel pipe top, behind the fastening staple bolt, the staple bolt installation is accomplished, then installs pole setting and horizontal pole in proper order, all adopts bolted connection between pole setting and the horizontal pole, and on-the-spot weldless operation, construction speed is fast, and used repeatedly can be dismantled to each part after the construction is accomplished.
Claims (1)
1. The utility model provides a setting is at steel bushing incasement support pedestrian passageway on steel pipe which characterized in that: the steel supporting box is characterized in that hoops are arranged on the steel supporting tubes in the steel sleeve box at intervals, each hoop comprises two semicircular hoop plates, two sides of each hoop plate are respectively provided with an outward extending hoop connecting plate, the two hoop plates are buckled on the supporting steel tubes one above the other and are connected through the hoop connecting plates on the two sides of the hoop plates by hoop bolts to be tightly held on the supporting steel tubes; a vertical guardrail fixing rod is arranged on connecting plates on two sides of the upper hoop plate, the lower end of the guardrail fixing rod is welded with the hoop connecting plate, one end of a cross rod is welded at the upper end of the guardrail fixing rod, and the other end of the cross rod is welded with the outer wall of the upper hoop plate; a guardrail vertical rod is respectively supported on the connecting plates at the two sides of each upper hoop plate, and the guardrail vertical rods are connected with the guardrail fixing rods through bolts; arranging a row of guardrail cross bars at regular intervals between the guardrail upright bars on each side of the support steel pipe, wherein the guardrail cross bars are made of angle steel, one edge of the angle steel is connected with the guardrail upright bars through bolts, the other edge of the angle steel is positioned at the inner sides of the guardrail upright bars, and the top surface height of the angle steel edge, facing the inner sides of the guardrail upright bars, of the lowest row of guardrail cross bars on the guardrail upright bars is flush with the top surface height of the support steel pipe; a pedestrian passageway panel is erected on the supporting steel pipe, the middle of the pedestrian passageway panel is supported on the top surface of the supporting steel pipe, and two sides of the pedestrian passageway panel are supported on the edge of the angle steel of the guardrail cross rod which is highly flush with the top surface of the supporting steel pipe.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920315050.7U CN209816670U (en) | 2019-03-12 | 2019-03-12 | Pedestrian passageway arranged on steel pipe supported in steel sleeve box |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920315050.7U CN209816670U (en) | 2019-03-12 | 2019-03-12 | Pedestrian passageway arranged on steel pipe supported in steel sleeve box |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209816670U true CN209816670U (en) | 2019-12-20 |
Family
ID=68875326
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920315050.7U Active CN209816670U (en) | 2019-03-12 | 2019-03-12 | Pedestrian passageway arranged on steel pipe supported in steel sleeve box |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209816670U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112282399A (en) * | 2020-10-09 | 2021-01-29 | 中交二航局成都城市建设工程有限公司 | Safety protective guard suitable for steel shotcrete |
-
2019
- 2019-03-12 CN CN201920315050.7U patent/CN209816670U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112282399A (en) * | 2020-10-09 | 2021-01-29 | 中交二航局成都城市建设工程有限公司 | Safety protective guard suitable for steel shotcrete |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107386327B (en) | U-shaped groove side wall and retaining wall integrated formwork and combined wall composed of the formwork | |
| CN106760461B (en) | A kind of installation method of full fabricated scaffold overhanging | |
| CN102433888B (en) | Assembled steel bushing box | |
| CN104929148B (en) | The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof | |
| CN209780193U (en) | Suspension type scaffold | |
| CN209816670U (en) | Pedestrian passageway arranged on steel pipe supported in steel sleeve box | |
| CN103967021B (en) | A kind of prestressing force support system for elongated rectangular shape foundation ditch | |
| CN107060112B (en) | Comb-shaped connecting piece for connecting steel tube bundle concrete column and floor beam | |
| CN102913007B (en) | Steel reinforcement processing shed and construction method therefor | |
| CN210216478U (en) | Open caisson construction work platform | |
| CN102817617B (en) | Novel guyed shield originating backrest base system | |
| CN105649329A (en) | Reinforcing structure for large-section framework column formworks and construction method | |
| CN209081302U (en) | A tower crane attached assembled operation maintenance platform | |
| CN116025170B (en) | A device for tying and positioning steel bars of a horizontal beam on water in a wharf project and a construction method thereof | |
| CN202100020U (en) | Protective shed for building construction site | |
| CN219260734U (en) | Bridge cylindrical pier capping beam construction platform | |
| CN214116678U (en) | Assembled fetal membrane | |
| CN211647233U (en) | Supporting device of assembled overhanging scaffold | |
| CN209816633U (en) | Bidirectional separation type pedestrian trestle for overwater bridge construction | |
| CN110593113B (en) | Portable telescopic compression-resistant bending-resistant bracket and installation method | |
| CN211777451U (en) | A shield advanced drilling grouting platform | |
| CN208917865U (en) | Assembled arcading barricade | |
| CN206396764U (en) | A kind of supporting pile column of deep basal pit | |
| CN110306443B (en) | Aquatic tie beam bracket device and corresponding construction method | |
| CN209907886U (en) | An adjustable prefabricated stair construction platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |