CN209787614U - A special case for electronic communication equipment - Google Patents
A special case for electronic communication equipment Download PDFInfo
- Publication number
- CN209787614U CN209787614U CN201822181400.3U CN201822181400U CN209787614U CN 209787614 U CN209787614 U CN 209787614U CN 201822181400 U CN201822181400 U CN 201822181400U CN 209787614 U CN209787614 U CN 209787614U
- Authority
- CN
- China
- Prior art keywords
- face
- rod
- box
- hollow load
- box body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004891 communication Methods 0.000 title claims abstract description 53
- 238000009434 installation Methods 0.000 claims abstract description 39
- 238000005192 partition Methods 0.000 claims description 42
- 238000007789 sealing Methods 0.000 claims description 9
- 238000000034 method Methods 0.000 claims description 5
- 238000001125 extrusion Methods 0.000 claims 2
- 238000011084 recovery Methods 0.000 claims 1
- 238000000926 separation method Methods 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 4
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Landscapes
- Casings For Electric Apparatus (AREA)
Abstract
Description
技术领域technical field
本实用新型是一种电子通信设备专用机箱,属于通讯设备安装领域。The utility model is a special case for electronic communication equipment, which belongs to the field of installation of communication equipment.
背景技术Background technique
通讯设备通常需要多个设备组合进行共同工作实现通讯目的,且通过机箱进行安装,现有技术中,通讯设备安装机箱结构固定,不能根据所要安装的通讯设备的尺寸进行调节,容易出现空间利用率不高的情况,适应性不佳,所以需要一种电子通信设备专用机箱以解决上述出现的问题。Communication equipment usually requires a combination of multiple devices to work together to achieve communication purposes, and is installed through a chassis. In the prior art, the structure of the communication equipment installation chassis is fixed and cannot be adjusted according to the size of the communication equipment to be installed, which is prone to space utilization. If it is not high, the adaptability is not good, so a special case for electronic communication equipment is needed to solve the above-mentioned problems.
实用新型内容Utility model content
针对现有技术存在的不足,本实用新型目的是提供一种电子通信设备专用机箱,以解决上述背景技术中提出的问题。Aiming at the deficiencies in the prior art, the purpose of this utility model is to provide a special case for electronic communication equipment, so as to solve the problems raised in the above-mentioned background technology.
为了实现上述目的,本实用新型是通过如下的技术方案来实现:一种电子通信设备专用机箱,包括箱体,所述箱体前端面左部位置通过合页一连接左门板,所述左门板右端通过合页二与右门板相连接,所述右门板右端面加工T型槽,所述T型槽内部安装T型块,且T型块右端面固定横向L型块,所述横向L型块卡接在竖向L型块内部,所述竖向L型块固定在箱体右端面前部位置,所述箱体内部右端安装小型设备安装组件,所述箱体左端安装大型设备安装组件。In order to achieve the above object, the utility model is achieved through the following technical solutions: a special case for electronic communication equipment, including a box body, the left part of the front end of the box body is connected to the left door panel through a hinge, and the left door panel The right end is connected with the right door panel through the second hinge, and the right end surface of the right door panel is processed with a T-shaped slot, and a T-shaped block is installed inside the T-shaped slot, and a horizontal L-shaped block is fixed on the right end of the T-shaped block. The block is clamped inside the vertical L-shaped block, and the vertical L-shaped block is fixed at the front position of the right end of the box body. The right end of the box body is installed with a small equipment installation component, and the left end of the box body is installed with a large equipment installation component.
进一步地,所述合页二设有两个,所述左门板右端上部位置以及下部位置分别通过合页二与右门板相连接,提高了左门板与右门板连接的稳定性,当需要对小型通讯设备进行检修操作时,向上移动横向L型块,使横向L型块带动T型块在T型槽内部移动,从而使横向L型块与竖向L型块分离,然后使右门板绕着合页二旋转,并折叠在左门板前侧面,减小了打开箱体时左门板和右门板所占空间。Further, two hinges are provided, and the upper position and the lower position of the right end of the left door panel are respectively connected to the right door panel through the second hinge, which improves the stability of the connection between the left door panel and the right door panel. When the communication equipment is overhauled, move the horizontal L-shaped block upwards, so that the horizontal L-shaped block drives the T-shaped block to move inside the T-shaped slot, so that the horizontal L-shaped block is separated from the vertical L-shaped block, and then the right door panel is wound around The second hinge rotates and is folded on the front side of the left door panel, which reduces the space occupied by the left door panel and the right door panel when the cabinet is opened.
进一步地,所述小型设备安装组件包括滑槽、滑块、隔板、左载板、连接杆、螺纹杆、螺纹套、移动套、右载板、凸块以及锁紧螺栓,所述箱体内部下端面以及上端面均加工滑槽,所述滑槽内部均安装滑块,所述隔板上端面以及下端面均固定滑块,所述螺纹杆固定在箱体内部右端,所述螺纹杆环形侧面套装移动套,且移动套环形侧面右端与箱体内部左侧面相贴合,所述右载板右端固定在移动套环形侧面,所述右载板左端面固定连接杆,所述连接杆左端安装在盲孔内部,所述盲孔加工在左载板右端面,所述螺纹套通过螺纹啮合在移动套下侧的螺纹杆环形侧面,所述隔板右端面上部位置以及下部位置均固定凸块,所述凸块上端面加工螺纹孔,所述锁紧螺栓通过螺纹啮合在螺纹孔内部。Further, the small equipment installation assembly includes a chute, a slider, a partition, a left carrier, a connecting rod, a threaded rod, a threaded sleeve, a moving sleeve, a right carrier, a bump and a locking bolt, and the box body Both the inner lower end surface and the upper end surface are processed with chute, and sliders are installed inside the chute, the upper surface and the lower end surface of the partition are fixed with sliders, the threaded rod is fixed at the right end inside the box, and the threaded rod The moving sleeve is set on the ring side, and the right end of the ring side of the moving sleeve fits the left side inside the box, the right end of the right carrier plate is fixed on the ring side of the moving sleeve, and the connecting rod is fixed on the left end of the right carrier plate, and the connecting rod The left end is installed inside the blind hole, and the blind hole is processed on the right end surface of the left carrier plate. The threaded sleeve is engaged with the annular side of the threaded rod on the lower side of the moving sleeve through threads, and the upper and lower positions of the right end surface of the partition are fixed. The bump is processed with a threaded hole on the upper surface of the bump, and the locking bolt is engaged in the threaded hole through threads.
进一步地,所述锁紧螺栓正下方的箱体内部下侧面加工防滑纹,且防滑纹横截面呈波浪形,在使用过程中,根据所需安装设备的宽度移动隔板的位置,从而推动隔板,使隔板带动滑块在滑槽内部移动,当隔板移动至预定位置时,工作人员停止移动隔板,然后工作人员转动锁紧螺栓,使锁紧螺栓在螺纹孔内部转动并移动,当锁紧螺栓移动至与箱体内部下侧面紧密贴合时,工作人员停止转动锁紧螺栓,从而实现隔板的固定,防滑纹的存在提高了锁紧螺栓与箱体内壁贴合的稳定性,便于隔板的移动以及定位,从而适应不同宽度的小型通讯设备的安装。Further, anti-slip lines are processed on the inner lower side of the box directly below the locking bolts, and the cross-section of the anti-slip lines is wavy. During use, the position of the partition is moved according to the width of the required installation equipment, thereby pushing the partition plate, so that the partition drives the slider to move inside the chute. When the partition moves to the predetermined position, the staff stops moving the partition, and then the staff turns the locking bolt, so that the locking bolt rotates and moves inside the threaded hole. When the locking bolt moves to fit closely with the inner lower side of the box, the staff stops turning the locking bolt, so as to realize the fixing of the partition, and the existence of anti-slip lines improves the stability of the fitting between the locking bolt and the inner wall of the box , to facilitate the movement and positioning of the partition, thus adapting to the installation of small communication equipment of different widths.
进一步地,所述左载板上端面中部位置加工透气孔,所述左载板和右载板上端面均固定防滑胶垫,在使用过程中,工作人员根据小型通讯设备的高度向左移动左载板,使左载板带动盲孔沿着连接杆移动,当左载板移动至与隔板右侧面相贴合时,停止移动左载板,然后工作人员推动移动套,使移动套沿着螺纹杆移动,移动套移动带动右载板移动,右载板移动通过连接杆带动左载板移动,当右载板移动至预定高度时,工作人员转动螺纹套,使螺纹套通过螺纹啮合的作用下移动至与右载板下侧面相贴合的位置,实现右载板以及左载板的定位,然后工作人员将小型通讯设备放置在左载板和右载板上侧面即可,便于适应不同高度的小型设备的安装。Further, air holes are processed in the middle of the upper surface of the left carrier, and anti-slip rubber pads are fixed on the upper surfaces of the left carrier and the right carrier. During use, the staff moves to the left according to the height of the small communication equipment Carrier, so that the left carrier drives the blind hole to move along the connecting rod. When the left carrier moves to fit the right side of the partition, stop moving the left carrier, and then the staff pushes the moving sleeve to make the moving sleeve move along the The threaded rod moves, the movement of the moving sleeve drives the movement of the right carrier, and the movement of the right carrier drives the movement of the left carrier through the connecting rod. When the right carrier moves to a predetermined height, the staff turns the threaded sleeve to make the threaded sleeve engage through the thread. Move down to the position that fits the lower side of the right carrier to realize the positioning of the right carrier and the left carrier, and then the staff can place the small communication equipment on the sides of the left and right carrier, which is convenient to adapt High degree of installation of small equipment.
进一步地,所述大型设备安装组件包括延伸箱、开口、挡板、卡口、左空心载杆、左弹簧、中心杆、右空心载杆以及右弹簧,所述箱体后端面左部位置加工开口,所述开口后侧的箱体后端面连接延伸箱,所述开口内部右端面以及左端面均加工卡口,所述挡板卡接在卡口内部,所述箱体内部左侧面加工左卡孔,所述左卡孔正右方的隔板左端面加工右卡孔,所述左空心载杆左端安装在左卡孔内部,所述左弹簧安装在左空心载杆内部,所述左弹簧右端与中心杆左侧面相接触,所述中心杆左端卡接在左空心载杆内部,所述中心杆右端卡接在右空心载杆内部,且中心杆右端与右弹簧相接触,所述右弹簧安装在右空心载杆内部,所述右空心载杆右端卡接在右卡孔内部。Further, the large-scale equipment installation assembly includes an extension box, an opening, a baffle, a bayonet, a left hollow load rod, a left spring, a center rod, a right hollow load rod, and a right spring. Opening, the rear end surface of the box on the rear side of the opening is connected to the extension box, the right end surface and the left end surface of the opening are processed with bayonets, the baffle is snapped inside the bayonet, and the left side of the box is processed The left clamping hole, the left end of the partition on the right side of the left clamping hole is processed with the right clamping hole, the left end of the left hollow loading rod is installed inside the left clamping hole, the left spring is installed inside the left hollow loading rod, the The right end of the left spring is in contact with the left side of the center rod, the left end of the center rod is clamped inside the left hollow load rod, the right end of the center rod is clamped inside the right hollow load rod, and the right end of the center rod is in contact with the right spring, so The right spring is installed inside the right hollow load rod, and the right end of the right hollow load rod is clamped inside the right clamping hole.
进一步地,所述左卡孔设有两个以上,两个以上所述左卡孔等距加工在箱体内部左侧面中部位置,所述右卡孔设有两个以上,两个以上所述右卡孔等距加工在隔板左侧面中部位置,所述左空心载杆环形侧面和右空心载杆环形侧面均套装防滑胶套,在使用过程中,工作人员将左空心载杆卡接在左卡孔内部,然后工作人员相向拉动右空心载杆和左空心载杆,使右空心载杆移动对右弹簧产生挤压力,同时左空心载杆对左弹簧产生挤压力,从而使左弹簧和右弹簧均产生形变,从而左空心载杆和右空心载杆沿着中心杆相向移动,当左空心载杆和右空心载杆移动至预定位置时,工作人员将左空心载杆对准相应高度的左卡孔,右空心载杆对准相应高度的右卡孔,然后放松左空心载杆和右空心载杆,在左弹簧和右弹簧恢复形变的弹力作用下,左空心载杆左端移动至左卡孔内部,同时右空心载杆移动至右卡孔内部,然后将大型设备分别放置在左空心载杆和右空心载杆上侧面以及隔板左侧的箱体内部下侧面,便于适应不同高度的大型通讯设备。Further, there are more than two left card holes, and the two or more left card holes are equidistantly processed in the middle of the left side of the box body, and the right card holes are provided with more than two, and the two or more holes are The right clamping hole is equidistantly processed in the middle of the left side of the partition, and the ring side of the left hollow load rod and the ring side of the right hollow load rod are equipped with anti-slip rubber sleeves. During use, the staff will clamp the left hollow load rod Connected to the inside of the left card hole, and then the staff pulls the right hollow load rod and the left hollow load rod towards each other, so that the right hollow load rod moves to generate a squeezing force on the right spring, and at the same time, the left hollow load rod generates a squeezing force on the left spring, thereby Both the left spring and the right spring are deformed, so that the left hollow load rod and the right hollow load rod move toward each other along the center rod. When the left hollow load rod and the right hollow load rod move to the predetermined position, the staff will move the left hollow load rod Align the left clamping hole of the corresponding height, align the right hollow load rod with the right clamping hole of the corresponding height, and then loosen the left hollow load rod and the right hollow load rod, under the action of the elastic force of the left spring and the right spring to restore the deformation, the left hollow load Move the left end of the rod to the inside of the left clamping hole, and at the same time move the right hollow loading rod to the inside of the right clamping hole, and then place the large equipment on the upper side of the left hollow loading rod and the right hollow loading rod and the lower side of the box on the left side of the partition , It is convenient to adapt to large communication equipment of different heights.
进一步地,所述挡板左端面固定把手,所述延伸箱左端面以及右端面边缘位置均固定翼板,所述翼板通过螺钉与箱体后端面相连接,且延伸箱前端面安装密封条,在使用过程中,当所需安装的通讯设备纵向长度较大时,工作人员向左拉动把手,把手移动带动挡板在卡口内部移动,从而使挡板移出,并与开口分离,然后工作人员将延伸箱前端面与开口后侧的箱体后端面相贴合,然后通过螺钉将翼板固定在箱体后端面,实现延伸箱与箱体的连接,从而使安装的大型通讯设备后端放置在延伸箱内部,密封条提高了延伸箱与箱体连接的密封性,该设计便于适应大型通讯设备的安装。Further, the handle is fixed on the left end of the baffle, and the edge positions of the left end and the right end of the extension box are fixed with wings, and the wings are connected to the rear end of the box by screws, and a sealing strip is installed on the front end of the extension box , during use, when the longitudinal length of the communication equipment to be installed is large, the staff pulls the handle to the left, and the handle moves to drive the baffle to move inside the bayonet, so that the baffle moves out and separates from the opening, and then works The personnel fit the front end of the extension box with the rear end of the box on the rear side of the opening, and then fix the wing plate on the rear end of the box with screws to realize the connection between the extension box and the box, so that the rear end of the large communication equipment installed Placed inside the extension box, the sealing strip improves the sealing of the connection between the extension box and the box body. This design is convenient for the installation of large communication equipment.
本实用新型的有益效果:本实用新型的一种电子通信设备专用机箱,因本实用新型添加了滑槽、滑块、隔板、左载板、连接杆、螺纹杆、螺纹套、移动套、右载板、盲孔、凸块以及锁紧螺栓,实现了适应不同尺寸的小型通讯设备安装的安装,提高了空间利用率。Beneficial effects of the utility model: the utility model is a special case for electronic communication equipment, because the utility model adds a chute, a slider, a partition, a left carrier plate, a connecting rod, a threaded rod, a threaded sleeve, a moving sleeve, The right carrier plate, blind holes, bumps and locking bolts realize the installation suitable for the installation of small communication equipment of different sizes and improve the space utilization rate.
因本实用新型添加了延伸箱、开口、挡板、卡口、左卡孔、左空心载杆、左弹簧、中心杆、右空心载杆、右弹簧以及右卡孔,实现了使用不同尺寸大型通讯设备的安装。Because the utility model adds extension boxes, openings, baffles, bayonets, left clamping holes, left hollow load rods, left springs, center rods, right hollow load rods, right springs and right clamping holes, the use of large Installation of communication equipment.
附图说明Description of drawings
通过阅读参照以下附图对非限制性实施例所作的详细描述,本实用新型的其它特征、目的和优点将会变得更明显:Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:
图1为本实用新型一种电子通信设备专用机箱的结构示意图;Fig. 1 is a structural schematic diagram of a special case for electronic communication equipment of the present invention;
图2为本实用新型一种电子通信设备专用机箱中小型设备安装组件的结构示意图;Fig. 2 is a structural schematic diagram of a small and medium-sized equipment installation assembly in a special case for electronic communication equipment of the present invention;
图3为本实用新型一种电子通信设备专用机箱中小型设备安装组件的A处放大结构示意图;Figure 3 is a schematic diagram of the enlarged structure at A of a small and medium-sized equipment installation component in a special case for electronic communication equipment of the present invention;
图4为本实用新型一种电子通信设备专用机箱中大型设备安装组件的结构示意图;Fig. 4 is a structural schematic diagram of a large-scale equipment installation component in a special case for electronic communication equipment of the present invention;
图中:1-箱体、2-左门板、3-右门板、4-小型设备安装组件、5-大型设备安装组件、6-横向L型块、7-竖向L型块、8-T型槽、401-滑槽、402-滑块、403-隔板、404-左载板、405-连接杆、406-螺纹杆、407-螺纹套、408-移动套、409-右载板、410-盲孔、411-凸块、412-锁紧螺栓、501-延伸箱、502-开口、503-挡板、504-卡口、505-左卡孔、506-左空心载杆、507-左弹簧、508-中心杆、509-右空心载杆、510-右弹簧、511-右卡孔。In the figure: 1-box body, 2-left door panel, 3-right door panel, 4-small equipment installation components, 5-large equipment installation components, 6-horizontal L-shaped block, 7-vertical L-shaped block, 8-T Groove, 401-chute, 402-slider, 403-partition, 404-left carrier, 405-connecting rod, 406-threaded rod, 407-threaded sleeve, 408-moving sleeve, 409-right carrier, 410-blind hole, 411-bump, 412-lock bolt, 501-extension box, 502-opening, 503-baffle, 504-bayonet, 505-left card hole, 506-left hollow rod, 507- Left spring, 508-central rod, 509-right hollow load rod, 510-right spring, 511-right card hole.
具体实施方式Detailed ways
为使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施方式,进一步阐述本实用新型。In order to make the technical means, creative features, goals and effects achieved by the utility model easy to understand, the utility model will be further elaborated below in conjunction with specific embodiments.
请参阅图1-图4,本实用新型提供一种技术方案:一种电子通信设备专用机箱,包括箱体1,箱体1前端面左部位置通过合页一连接左门板2,左门板2右端通过合页二与右门板3相连接,右门板3右端面加工T型槽8,T型槽8内部安装T型块,且T型块右端面固定横向L型块6,横向L型块6卡接在竖向L型块7内部,竖向L型块7固定在箱体1右端面前部位置,箱体1内部右端安装小型设备安装组件4,箱体1左端安装大型设备安装组件5。Please refer to Fig. 1-Fig. 4, the utility model provides a kind of technical scheme: a kind of special case of electronic communication equipment, comprise box body 1, the position of the left part of the front end of box body 1 is connected with left door panel 2 through hinge one, left door panel 2 The right end is connected with the right door panel 3 through the hinge 2, the right end surface of the right door panel 3 is processed with a T-shaped slot 8, and a T-shaped block is installed inside the T-shaped slot 8, and the right end of the T-shaped block is fixed with a horizontal L-shaped block 6, and the horizontal L-shaped block 6 is clamped inside the vertical L-shaped block 7, and the vertical L-shaped block 7 is fixed on the front of the right end of the box body 1. The small equipment installation assembly 4 is installed on the right end of the box body 1, and the large equipment installation assembly 5 is installed on the left end of the box body 1. .
小型设备安装组件4包括滑槽401、滑块402、隔板403、左载板404、连接杆405、螺纹杆406、螺纹套407、移动套408、右载板409、凸块411以及锁紧螺栓412,箱体1内部下端面以及上端面均加工滑槽401,滑槽401内部均安装滑块402,隔板403上端面以及下端面均固定滑块402,螺纹杆406固定在箱体1内部右端,螺纹杆406环形侧面套装移动套408,且移动套408环形侧面右端与箱体1内部左侧面相贴合,右载板409右端固定在移动套408环形侧面,右载板409左端面固定连接杆405,连接杆405左端安装在盲孔410内部,盲孔410加工在左载板404右端面,螺纹套407通过螺纹啮合在移动套408下侧的螺纹杆406环形侧面,隔板403右端面上部位置以及下部位置均固定凸块411,凸块411上端面加工螺纹孔,锁紧螺栓412通过螺纹啮合在螺纹孔内部。Small equipment installation assembly 4 comprises chute 401, slide block 402, dividing plate 403, left carrier plate 404, connecting rod 405, threaded rod 406, threaded sleeve 407, moving sleeve 408, right carrier plate 409, projection 411 and locking Bolt 412, chute 401 is processed on the inner lower end surface and upper end surface of box body 1, slider 402 is installed inside chute 401, slider 402 is fixed on the upper end surface and lower end surface of partition plate 403, threaded rod 406 is fixed on box body 1 The inner right end, the threaded rod 406 annular side cover moving sleeve 408, and the right end of the annular side of the moving sleeve 408 fits the inner left side of the box body 1, the right end of the right carrier plate 409 is fixed on the annular side of the moving sleeve 408, and the left end surface of the right carrier plate 409 Fix the connecting rod 405, the left end of the connecting rod 405 is installed inside the blind hole 410, the blind hole 410 is processed on the right end surface of the left carrier plate 404, the threaded sleeve 407 is engaged with the annular side of the threaded rod 406 on the lower side of the moving sleeve 408 through threads, and the separator 403 Both the upper position and the lower position of the right end face are fixed with the protruding block 411 , the upper end face of the protruding block 411 is processed with a threaded hole, and the locking bolt 412 is engaged in the threaded hole through threads.
大型设备安装组件5包括延伸箱501、开口502、挡板503、卡口504、左空心载杆506、左弹簧507、中心杆508、右空心载杆509以及右弹簧510,箱体1后端面左部位置加工开口502,开口502后侧的箱体1后端面连接延伸箱501,开口502内部右端面以及左端面均加工卡口504,挡板503卡接在卡口504内部,箱体1内部左侧面加工左卡孔505,左卡孔505正右方的隔板403左端面加工右卡孔511,左空心载杆506左端安装在左卡孔505内部,左弹簧507安装在左空心载杆506内部,左弹簧507右端与中心杆508左侧面相接触,中心杆508左端卡接在左空心载杆506内部,中心杆508右端卡接在右空心载杆509内部,且中心杆508右端与右弹簧510相接触,右弹簧510安装在右空心载杆509内部,右空心载杆509右端卡接在右卡孔511内部。The large equipment installation assembly 5 includes an extension box 501, an opening 502, a baffle plate 503, a bayonet 504, a left hollow load rod 506, a left spring 507, a center rod 508, a right hollow load rod 509, and a right spring 510. The opening 502 is processed at the left position, the rear end surface of the box body 1 on the rear side of the opening 502 is connected to the extension box 501, the right end surface and the left end surface of the opening 502 are processed with bayonet 504, the baffle 503 is snapped inside the bayonet 504, and the box body 1 The left card hole 505 is processed on the left side of the interior, and the right card hole 511 is processed on the left end of the partition plate 403 on the right side of the left card hole 505. Inside the loading rod 506, the right end of the left spring 507 is in contact with the left side of the central rod 508, the left end of the central rod 508 is clamped inside the left hollow loading rod 506, the right end of the central rod 508 is clamped inside the right hollow loading rod 509, and the central rod 508 The right end is in contact with the right spring 510 , the right spring 510 is installed inside the right hollow loading rod 509 , and the right end of the right hollow loading rod 509 is clamped inside the right clamping hole 511 .
作为本实用新型的一个实施例:合页二设有两个,左门板2右端上部位置以及下部位置分别通过合页二与右门板3相连接,提高了左门板2与右门板3连接的稳定性,当需要对小型通讯设备进行检修操作时,向上移动横向L型块6,使横向L型块6带动T型块在T型槽8内部移动,从而使横向L型块6与竖向L型块7分离,然后使右门板3绕着合页二旋转,并折叠在左门板2前侧面,减小了打开箱体1时左门板2和右门板3所占空间。As an embodiment of the present utility model: there are two hinges, the upper position and the lower position of the right end of the left door panel 2 are respectively connected with the right door panel 3 through the hinge two, which improves the stability of the connection between the left door panel 2 and the right door panel 3 When it is necessary to carry out maintenance operations on small communication equipment, move the horizontal L-shaped block 6 upwards, so that the horizontal L-shaped block 6 drives the T-shaped block to move inside the T-shaped slot 8, so that the horizontal L-shaped block 6 and the vertical L-shaped block Block 7 separates, then makes right door panel 3 rotate around hinge 2, and is folded in left door panel 2 front sides, has reduced left door panel 2 and right door panel 3 occupied space when casing 1 is opened.
作为本实用新型的一个实施例:锁紧螺栓412正下方的箱体1内部下侧面加工防滑纹,且防滑纹横截面呈波浪形,在使用过程中,根据所需安装设备的宽度移动隔板403的位置,从而推动隔板403,使隔板403带动滑块402在滑槽401内部移动,当隔板403移动至预定位置时,工作人员停止移动隔板403,然后工作人员转动锁紧螺栓412,使锁紧螺栓412在螺纹孔内部转动并移动,当锁紧螺栓412移动至与箱体1内部下侧面紧密贴合时,工作人员停止转动锁紧螺栓412,从而实现隔板403的固定,防滑纹的存在提高了锁紧螺栓412与箱体1内壁贴合的稳定性,便于隔板403的移动以及定位,从而适应不同宽度的小型通讯设备的安装。As an embodiment of the present utility model: anti-slip lines are processed on the inner lower side of the box body 1 directly below the locking bolt 412, and the cross-section of the anti-slip lines is wavy. During use, move the partition according to the width of the required installation equipment 403, so as to push the partition 403, so that the partition 403 drives the slider 402 to move inside the chute 401. When the partition 403 moves to the predetermined position, the staff stops moving the partition 403, and then the staff turns the locking bolt 412, so that the locking bolt 412 rotates and moves inside the threaded hole. When the locking bolt 412 moves to closely fit with the inner lower side of the box body 1, the staff stops rotating the locking bolt 412, thereby realizing the fixing of the partition 403 , the existence of the anti-skid pattern improves the stability of the bonding between the locking bolt 412 and the inner wall of the box body 1, and facilitates the movement and positioning of the partition 403, thereby adapting to the installation of small communication devices of different widths.
作为本实用新型的一个实施例:左载板404上端面中部位置加工透气孔,左载板404和右载板409上端面均固定防滑胶垫,在使用过程中,工作人员根据小型通讯设备的高度向左移动左载板404,使左载板404带动盲孔410沿着连接杆405移动,当左载板404移动至与隔板403右侧面相贴合时,停止移动左载板404,然后工作人员推动移动套408,使移动套408沿着螺纹杆406移动,移动套408移动带动右载板409移动,右载板409移动通过连接杆405带动左载板404移动,当右载板409移动至预定高度时,工作人员转动螺纹套407,使螺纹套407通过螺纹啮合的作用下移动至与右载板409下侧面相贴合的位置,实现右载板409以及左载板404的定位,然后工作人员将小型通讯设备放置在左载板404和右载板409上侧面即可,便于适应不同高度的小型设备的安装。As an embodiment of the present utility model: the middle position of the upper end surface of the left carrier 404 is processed with air holes, and the upper ends of the left carrier 404 and the right carrier 409 are fixed with anti-skid rubber pads. Move the left carrier 404 to the left so that the left carrier 404 drives the blind hole 410 to move along the connecting rod 405. When the left carrier 404 moves to fit the right side of the partition 403, stop moving the left carrier 404, Then the staff pushes the moving sleeve 408 to make the moving sleeve 408 move along the threaded rod 406. The moving sleeve 408 moves to drive the right carrier 409 to move, and the right carrier 409 moves to drive the left carrier 404 to move through the connecting rod 405. When the right carrier When 409 moves to a predetermined height, the staff rotates the threaded sleeve 407, so that the threaded sleeve 407 moves to the position that fits the lower side of the right carrier 409 under the action of thread engagement, so that the right carrier 409 and the left carrier 404 are aligned. Positioning, and then the staff can place the small communication equipment on the upper side of the left carrier 404 and the right carrier 409, which is convenient for the installation of small devices of different heights.
作为本实用新型的一个实施例:左卡孔505设有两个以上,两个以上左卡孔505等距加工在箱体1内部左侧面中部位置,右卡孔511设有两个以上,两个以上右卡孔511等距加工在隔板403左侧面中部位置,左空心载杆506环形侧面和右空心载杆509环形侧面均套装防滑胶套,在使用过程中,工作人员将左空心载杆506卡接在左卡孔505内部,然后工作人员相向拉动右空心载杆509和左空心载杆506,使右空心载杆509移动对右弹簧510产生挤压力,同时左空心载杆506对左弹簧507产生挤压力,从而使左弹簧507和右弹簧510均产生形变,从而左空心载杆506和右空心载杆509沿着中心杆508相向移动,当左空心载杆506和右空心载杆509移动至预定位置时,工作人员将左空心载杆506对准相应高度的左卡孔505,右空心载杆509对准相应高度的右卡孔511,然后放松左空心载杆506和右空心载杆509,在左弹簧507和右弹簧510恢复形变的弹力作用下,左空心载杆506左端移动至左卡孔505内部,同时右空心载杆509移动至右卡孔511内部,然后将大型设备分别放置在左空心载杆506和右空心载杆509上侧面以及隔板403左侧的箱体1内部下侧面,便于适应不同高度的大型通讯设备。As an embodiment of the present utility model: there are more than two left card holes 505, and more than two left card holes 505 are equidistantly processed in the middle of the left side of the box body 1, and more than two right card holes 511 are provided. More than two right clamping holes 511 are equidistantly processed in the middle part of the left side of the dividing plate 403, and the ring side of the left hollow load rod 506 and the ring side of the right hollow load rod 509 are equipped with anti-slip rubber sleeves. The hollow load rod 506 is clamped inside the left clamping hole 505, and then the staff pulls the right hollow load rod 509 and the left hollow load rod 506 in opposite directions, so that the right hollow load rod 509 moves to generate a pressing force on the right spring 510, and the left hollow load The rod 506 produces a pressing force on the left spring 507, so that both the left spring 507 and the right spring 510 are deformed, so that the left hollow rod 506 and the right hollow rod 509 move toward each other along the center rod 508, when the left hollow rod 506 When the right hollow load rod 509 moves to the predetermined position, the staff will align the left hollow load rod 506 with the left card hole 505 of the corresponding height, and the right hollow load rod 509 with the right clamp hole 511 of the corresponding height, and then loosen the left hollow load. The rod 506 and the right hollow rod 509, under the elastic force of the left spring 507 and the right spring 510 to restore the deformation, the left end of the left hollow rod 506 moves to the inside of the left card hole 505, and the right hollow rod 509 moves to the right card hole 511 at the same time Inside, large-scale equipment is then placed on the upper side of the left hollow load bar 506 and the right hollow load bar 509 and the inner lower side of the box body 1 on the left side of the partition 403, which is convenient for adapting to large-scale communication equipment of different heights.
作为本实用新型的一个实施例:挡板503左端面固定把手,延伸箱501左端面以及右端面边缘位置均固定翼板,翼板通过螺钉与箱体1后端面相连接,且延伸箱501前端面安装密封条,在使用过程中,当所需安装的通讯设备纵向长度较大时,工作人员向左拉动把手,把手移动带动挡板503在卡口504内部移动,从而使挡板503移出,并与开口502分离,然后工作人员将延伸箱501前端面与开口502后侧的箱体1后端面相贴合,然后通过螺钉将翼板固定在箱体1后端面,实现延伸箱501与箱体1的连接,从而使安装的大型通讯设备后端放置在延伸箱501内部,密封条提高了延伸箱501与箱体1连接的密封性,该设计便于适应大型通讯设备的安装。As an embodiment of the present utility model: the handle is fixed on the left end surface of the baffle plate 503, the left end surface and the edge position of the right end surface of the extension box 501 are all fixed wing plates, the wing plate is connected with the rear end surface of the box body 1 by screws, and the front end of the extension box 501 Install the sealing strip on the surface. During use, when the longitudinal length of the communication equipment to be installed is large, the staff pulls the handle to the left, and the handle moves to drive the baffle 503 to move inside the bayonet 504, so that the baffle 503 is moved out. And separated from the opening 502, then the staff fit the front end of the extension box 501 with the rear end of the box 1 on the rear side of the opening 502, and then fix the wing plate on the rear end of the box 1 by screws to realize the extension box 501 and the box. The connection of the body 1, so that the rear end of the installed large communication equipment is placed inside the extension box 501, and the sealing strip improves the sealing of the connection between the extension box 501 and the box body 1. This design is convenient for the installation of large communication equipment.
以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点,对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。The basic principles and main features of the utility model and the advantages of the utility model have been shown and described above. For those skilled in the art, it is obvious that the utility model is not limited to the details of the above-mentioned exemplary embodiments, and without departing from the utility model The present utility model can be realized in other specific forms without the spirit or essential features. Therefore, no matter from all points of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to be included in the claims All changes within the meaning and range of equivalents of the required elements are included in the present invention.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only contains an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822181400.3U CN209787614U (en) | 2018-12-24 | 2018-12-24 | A special case for electronic communication equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822181400.3U CN209787614U (en) | 2018-12-24 | 2018-12-24 | A special case for electronic communication equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209787614U true CN209787614U (en) | 2019-12-13 |
Family
ID=68790570
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201822181400.3U Expired - Fee Related CN209787614U (en) | 2018-12-24 | 2018-12-24 | A special case for electronic communication equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209787614U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111654989A (en) * | 2020-06-20 | 2020-09-11 | 江苏富联通讯技术有限公司 | A kind of cabinet for 5G communication module and using method thereof |
| CN112533412A (en) * | 2020-11-26 | 2021-03-19 | 正元地理信息集团股份有限公司 | Telemetering terminal equipment for municipal pipe network monitoring based on NB-IoT technology |
-
2018
- 2018-12-24 CN CN201822181400.3U patent/CN209787614U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111654989A (en) * | 2020-06-20 | 2020-09-11 | 江苏富联通讯技术有限公司 | A kind of cabinet for 5G communication module and using method thereof |
| CN112533412A (en) * | 2020-11-26 | 2021-03-19 | 正元地理信息集团股份有限公司 | Telemetering terminal equipment for municipal pipe network monitoring based on NB-IoT technology |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112271568B (en) | Switch board convenient to maintenance | |
| CN203586512U (en) | Plate type filter and air conditioner with same | |
| CN215008965U (en) | Drawer that special leakproofness of switch board is strong | |
| CN217823794U (en) | Be convenient for extension formula high voltage distribution device | |
| CN216794380U (en) | Box transformer substation convenient to install | |
| CN217334890U (en) | Novel cable stable structure that multi-functional distribution device used | |
| CN109600948A (en) | A kind of dedicated cabinet of electronic communication equipment | |
| CN112003217B (en) | A connection structure of a high-efficiency heat dissipation busway | |
| CN214757385U (en) | High-reliability metal cabinet | |
| CN219998836U (en) | Mounting mechanism for mounting and fixing power distribution cabinet | |
| CN221264172U (en) | Network security equipment convenient to dismouting | |
| CN221710227U (en) | Output panel for power supply equipment | |
| CN112271572A (en) | In put cabinet body | |
| CN207788650U (en) | Glass substrate grinders workbench | |
| CN209452419U (en) | A kind of multi-functional maintenance device of power equipment | |
| CN212750741U (en) | Convenient fixing device is used in circuit breaker installation | |
| CN219041137U (en) | Grid-connected protection device of photovoltaic power generation system | |
| CN111355136A (en) | A current transformer installation structure of a ring main unit | |
| CN220822195U (en) | Fast-assembling formula ammeter case | |
| CN221947650U (en) | High-low voltage switch cabinet convenient to overhaul | |
| CN220653813U (en) | UPS power cabinet tray structure | |
| CN219998708U (en) | Distribution board easy to assemble, disassemble and fix | |
| CN218214903U (en) | High-frequency transformer stable in installation | |
| CN222355774U (en) | Distribution box for electrical engineering | |
| CN221126681U (en) | Block terminal of easy to assemble |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191213 |