CN209723354U - A kind of bamboo wood fiberboard suspended ceiling - Google Patents
A kind of bamboo wood fiberboard suspended ceiling Download PDFInfo
- Publication number
- CN209723354U CN209723354U CN201920197788.8U CN201920197788U CN209723354U CN 209723354 U CN209723354 U CN 209723354U CN 201920197788 U CN201920197788 U CN 201920197788U CN 209723354 U CN209723354 U CN 209723354U
- Authority
- CN
- China
- Prior art keywords
- hanging piece
- piece
- bamboo
- fiberboard
- separator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports Or Holders For Household Use (AREA)
Abstract
本实用新型公开了一种竹木纤维板吊顶,包括墙体,所述墙体的外表面安装连接有安装片,所述安装片的内侧紧密贴合设置有连接块,所述分隔片的外表面开设有槽孔,所述分隔片的上端外侧等间距卡合设置有下吊片,且下吊片和分隔片的内部均贯穿设置有第二螺栓,所述下吊片的上端内侧设置有三角龙骨,且三角龙骨的上端外侧设置有上吊片,所述上吊片的上端外侧紧密贴合设置有吊杆,且上吊片和第三螺栓的内部均贯穿设置有第三螺栓,所述吊杆的上端外表面通过螺纹连接有膨胀螺丝。该竹木纤维板吊顶,安装工作省时省力,零件调节比较灵活,给高空作业减轻了难度,装置的稳定性较好,安装间隙和尺寸都可以调节控制。
The utility model discloses a bamboo-wood fiber board ceiling, which comprises a wall body, the outer surface of the wall body is installed and connected with a mounting piece, the inner side of the installation piece is closely fitted with a connecting block, and the outer surface of the separation piece is There are slotted holes, and the outer side of the upper end of the separator is equidistantly engaged with the lower hanging piece, and the inside of the lower hanging piece and the separator are both provided with second bolts, and the inner side of the upper end of the lower hanging piece is provided with a triangular keel, and the outer side of the upper end of the triangular keel is provided with a hanging piece, the outer side of the upper end of the hanging piece is closely fitted with a suspender rod, and the inside of the hanging piece and the third bolt is provided with a third bolt. The outer surface of the upper end is threadedly connected with expansion screws. The bamboo-wood fiberboard suspended ceiling saves time and labor in installation work, and the adjustment of parts is relatively flexible, which reduces the difficulty of high-altitude operations, the stability of the device is good, and the installation gap and size can be adjusted and controlled.
Description
技术领域technical field
本实用新型涉及吊顶相关技术领域,具体为一种竹木纤维板吊顶。The utility model relates to the related technical field of suspended ceilings, in particular to a bamboo-wood fiberboard suspended ceiling.
背景技术Background technique
随着建筑装修行业的不断发展,人们不仅注重装饰的造型和美观,同样注重稳定性的问题,那么在建筑装饰中一项比较大的工程就是吊顶了,无论是在商场、家庭、超市等各大建筑房屋内都需要进行的项目,实际上是为了展示建筑室内顶部的美观性,但是目前市场上吊顶的安装结构有很多种,丰富多样,但是质量也参差不齐。With the continuous development of the building decoration industry, people not only pay attention to the shape and beauty of the decoration, but also pay attention to the stability of the problem. Then a relatively large project in the building decoration is the ceiling, whether it is in shopping malls, homes, supermarkets, etc. The projects that need to be carried out in large buildings are actually to show the aesthetics of the top of the building. However, there are many kinds of installation structures for suspended ceilings on the market, which are rich and varied, but the quality is also uneven.
一般的竹木纤维板吊顶安装施工过程繁重,费工费时,零件调节不够灵活,给高空作业带来一定的难度,装置的稳定性较差,安装间隙和尺寸都不方便调节控制,因此,我们提出一种竹木纤维板吊顶,以便于解决上述中提出的问题。The installation and construction process of the general bamboo-wood fiberboard ceiling is heavy, labor-intensive and time-consuming, and the adjustment of parts is not flexible enough, which brings certain difficulties to high-altitude operations. The stability of the device is poor, and the installation gap and size are inconvenient to adjust and control. Therefore, we propose A bamboo-wood fiberboard suspended ceiling is provided to solve the above-mentioned problems.
发明内容Contents of the invention
本实用新型的目的在于提供一种竹木纤维板吊顶,以解决上述背景技术中提出的现有的竹木纤维板吊顶安装施工过程繁重,费工费时,零件调节不够灵活,给高空作业带来一定的难度,装置的稳定性较差,安装间隙和尺寸都不方便调节控制的问题。The purpose of this utility model is to provide a kind of bamboo-wood fiberboard ceiling, to solve the existing bamboo-wood fiberboard ceiling installation and construction process proposed in the above-mentioned background technology is heavy, labor-intensive and time-consuming, parts adjustment is not flexible enough, brings certain problems to high-altitude operations Difficulty, the stability of the device is poor, and the installation gap and size are inconvenient to adjust and control.
为实现上述目的,本实用新型提供如下技术方案:一种竹木纤维板吊顶,包括墙体,所述墙体的外表面安装连接有安装片,且安装片的内部贯穿设置有第一螺栓,所述安装片的内侧紧密贴合设置有连接块,且连接块的外表面固定连接有分隔片,所述分隔片的外表面开设有槽孔,且分隔片的前后两侧表面均紧密贴合安装有纤维板本体,所述分隔片的上端外侧等间距卡合设置有下吊片,且下吊片和分隔片的内部均贯穿设置有第二螺栓,所述下吊片的上端内侧设置有三角龙骨,且三角龙骨的上端外侧设置有上吊片,所述上吊片的上端外侧紧密贴合设置有吊杆,且上吊片和第三螺栓的内部均贯穿设置有第三螺栓,所述吊杆的上端外表面通过螺纹连接有膨胀螺丝。In order to achieve the above object, the utility model provides the following technical solutions: a bamboo-wood fiberboard ceiling, including a wall, the outer surface of the wall is installed and connected with a mounting piece, and the inside of the mounting piece is provided with a first bolt. The inner side of the mounting piece is tightly fitted with a connecting block, and the outer surface of the connecting block is fixedly connected with a separator, the outer surface of the separator is provided with slot holes, and the front and rear surfaces of the separator are closely fitted and installed There is a fiberboard body, and the outer side of the upper end of the separator is equidistantly engaged with a lower hanging piece, and the inside of the lower hanging piece and the separator are both provided with second bolts, and the inner side of the upper end of the lower hanging piece is provided with a triangular keel , and the outer side of the upper end of the triangular keel is provided with a hanging piece, the outer side of the upper end of the hanging piece is closely fitted with a suspender rod, and the inside of the hanging piece and the third bolt is provided with a third bolt, the upper end of the suspender rod The outer surface is threadedly connected with expansion screws.
优选的,所述连接块呈长方形框架结构,且连接块通过第一螺栓与安装片相连接,并且安装片呈“L”字型结构。Preferably, the connecting block has a rectangular frame structure, and the connecting block is connected to the mounting piece through a first bolt, and the mounting piece is in an "L" shape.
优选的,所述纤维板本体前后两侧均通过螺栓连接有分隔片,且连接块与下吊片以及下吊片与下吊片之间均安装有纤维板本体。Preferably, the front and rear sides of the fiberboard body are connected with separators by bolts, and the fiberboard body is installed between the connecting block and the hanging piece and between the hanging piece and the lower hanging piece.
优选的,所述下吊片的上下两端均呈“U”字型结构,且下吊片与三角龙骨之间的连接方式为卡合连接。Preferably, the upper and lower ends of the lower hanging piece are in a "U" shape, and the connection between the lower hanging piece and the triangular keel is a snap connection.
优选的,所述上吊片呈“T”字型结构,且上吊片的下端部分与三角龙骨的外表面相契合,并且上吊片在三角龙骨的外表面为滑动结构。Preferably, the hanging piece has a "T"-shaped structure, and the lower end of the hanging piece fits with the outer surface of the triangular keel, and the hanging piece has a sliding structure on the outer surface of the triangular keel.
优选的,所述吊杆包括螺纹丝杆、夹块和安装孔,螺纹丝杆的下端焊接连接有夹块,且夹块的外表面开设有安装孔。Preferably, the suspension rod includes a threaded screw rod, a clamp block and a mounting hole, the lower end of the threaded screw rod is welded to the clamp block, and the outer surface of the clamp block is provided with a mounting hole.
优选的,所述夹块的纵截面呈“U”字型结构,且夹块与上吊片的连接方式为卡合连接。Preferably, the longitudinal section of the clamping block has a "U"-shaped structure, and the connection mode between the clamping block and the hanging piece is a snap connection.
与现有技术相比,本实用新型的有益效果是:该竹木纤维板吊顶,安装工作省时省力,零件调节比较灵活,给高空作业减轻了难度,装置的稳定性较好,安装间隙和尺寸都可以调节控制;Compared with the prior art, the beneficial effects of the utility model are: the bamboo-wood fiberboard ceiling saves time and effort in installation work, the adjustment of parts is more flexible, the difficulty of high-altitude operations is alleviated, the stability of the device is better, and the installation gap and size can be adjusted and controlled;
1.设置有安装片、连接块和分隔片,通过安装片的作用方便调节分隔片的安装位置和安装间隔,方便安装不同大小的纤维板本体,且通过连接块的作用保持分隔片能够保持稳定且呈站立状态,便于固定纤维板本体;1. There are installation pieces, connection blocks and separation pieces. Through the function of the installation pieces, it is convenient to adjust the installation position and installation interval of the separation pieces. In a standing state, it is convenient to fix the fiberboard body;
2.设置有下吊片、三角龙骨和上吊片,下吊片可以在分隔片上随意滑动,从而方便调节左右的间隔,从而安装不同长度尺寸的纤维板本体,通过三角龙骨的作用使得上吊片能够随意滑动调节位置,且通过上吊片可以连接安装吊杆;2. There are lower hanging pieces, triangular keels and upper hanging pieces. The lower hanging pieces can slide freely on the separator, so as to facilitate the adjustment of the left and right intervals, so that fiberboard bodies of different lengths and sizes can be installed. Slide to adjust the position, and the hanging rod can be connected to the installation through the upper hanging piece;
3.设置有第三螺栓和吊杆,通过第三螺栓的作用将吊杆固定安装在上吊片上,即与三角龙骨固定连接,并且通过吊杆可以调节安装高度,增加吊装的稳定性。3. There is a third bolt and a suspender, and the suspender is fixedly installed on the upper hanging piece through the action of the third bolt, that is, it is fixedly connected with the triangular keel, and the installation height can be adjusted through the suspender to increase the stability of the hoisting.
附图说明Description of drawings
图1为本实用新型正视剖面结构示意图;Fig. 1 is the schematic diagram of the utility model front section structure;
图2为本实用新型俯视剖面结构示意图;Fig. 2 is the schematic diagram of the top view section structure of the utility model;
图3为本实用新型下吊片的侧视剖面结构示意图;Fig. 3 is a side view sectional structure schematic diagram of the hanging piece of the utility model;
图4为本实用新型图1中A处放大结构示意图;Fig. 4 is the schematic diagram of enlarged structure at A place in Fig. 1 of the utility model;
图5为本实用新型吊杆的整体结构示意图。Fig. 5 is a schematic diagram of the overall structure of the suspender of the present invention.
图中:1、墙体;2、安装片;3、第一螺栓;4、连接块;5、分隔片;6、槽孔;7、纤维板本体;8、下吊片;9、第二螺栓;10、三角龙骨;11、上吊片;12、第三螺栓;13、吊杆;1301、螺纹丝杆;1302、夹块;1303、安装孔;14、膨胀螺丝。In the figure: 1. Wall body; 2. Mounting piece; 3. First bolt; 4. Connecting block; 5. Separator; 6. Slot hole; 7. Fiberboard body; 8. Hanging piece; 9. Second bolt ; 10, triangular keel; 11, hanging piece; 12, the third bolt; 13, suspension rod; 1301, threaded screw; 1302, clip block; 1303, mounting hole;
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
请参阅图1-5,本实用新型提供一种技术方案:一种竹木纤维板吊顶,包括墙体1、安装片2、第一螺栓3、连接块4、分隔片5、槽孔6、纤维板本体7、下吊片8、第二螺栓9、三角龙骨10、上吊片11、第三螺栓12、吊杆13和膨胀螺丝14,墙体1的外表面安装连接有安装片2,且安装片2的内部贯穿设置有第一螺栓3,安装片2的内侧紧密贴合设置有连接块4,且连接块4的外表面固定连接有分隔片5,分隔片5的外表面开设有槽孔6,且分隔片5的前后两侧表面均紧密贴合安装有纤维板本体7,分隔片5的上端外侧等间距卡合设置有下吊片8,且下吊片8和分隔片5的内部均贯穿设置有第二螺栓9,下吊片8的上端内侧设置有三角龙骨10,且三角龙骨10的上端外侧设置有上吊片11,上吊片11的上端外侧紧密贴合设置有吊杆13,且上吊片11和第三螺栓12的内部均贯穿设置有第三螺栓12,吊杆13的上端外表面通过螺纹连接有膨胀螺丝14。Please refer to Figures 1-5, the utility model provides a technical solution: a bamboo fiberboard ceiling, including a wall 1, a mounting piece 2, a first bolt 3, a connecting block 4, a separation piece 5, a slot hole 6, and a fiberboard The body 7, the lower hanging piece 8, the second bolt 9, the triangular keel 10, the upper hanging piece 11, the third bolt 12, the suspender 13 and the expansion screw 14, the outer surface of the wall 1 is connected with the installation piece 2, and the installation piece The inside of the installation piece 2 is provided with a first bolt 3, the inner side of the mounting piece 2 is closely fitted with a connection block 4, and the outer surface of the connection block 4 is fixedly connected with a separator 5, and the outer surface of the separator 5 is provided with a slot 6 , and the surface of the front and rear sides of the separator 5 is tightly fitted with a fiberboard body 7, and the outer side of the upper end of the separator 5 is equidistantly engaged with the lower hanging piece 8, and the lower hanging piece 8 and the inside of the separator 5 are all penetrated. A second bolt 9 is provided, a triangular keel 10 is arranged on the inner side of the upper end of the lower hanging piece 8, and an upper hanging piece 11 is arranged on the outer side of the upper end of the triangular keel 10, and a suspender 13 is arranged on the outer side of the upper end of the upper hanging piece 11, and the hanging A third bolt 12 is provided through the inside of the sheet 11 and the third bolt 12 , and the outer surface of the upper end of the suspender 13 is threadedly connected with an expansion screw 14 .
如图1-2中连接块4呈长方形框架结构,且连接块4通过第一螺栓3与安装片2相连接,并且安装片2呈“L”字型结构,增加分隔片5安装的稳定性,如图1中纤维板本体7前后两侧均通过螺栓连接有分隔片5,且连接块4与下吊片8以及下吊片8与下吊片8之间均安装有纤维板本体7,通过分隔片5围合安装纤维板本体7,尺寸相配,安装精密。As shown in Figure 1-2, the connecting block 4 is a rectangular frame structure, and the connecting block 4 is connected to the mounting piece 2 through the first bolt 3, and the mounting piece 2 has an "L"-shaped structure, which increases the stability of the installation of the separator 5 As shown in Fig. 1, the front and rear sides of the fiberboard body 7 are connected with separators 5 by bolts, and the fiberboard body 7 is installed between the connecting block 4 and the lower hanging piece 8 and between the lower hanging piece 8 and the lower hanging piece 8. The sheet 5 encloses and installs the fiberboard body 7, the size matches, and the installation is precise.
如图1-3中下吊片8的上下两端均呈“U”字型结构,且下吊片8与三角龙骨10之间的连接方式为卡合连接,使下吊片8可以随意滑动,调节其在三角龙骨10上的位置和数量,如图4中上吊片11呈“T”字型结构,且上吊片11的下端部分与三角龙骨10的外表面相契合,并且上吊片11在三角龙骨10的外表面为滑动结构,方便随意滑动上吊片11,来调节上吊片11在三角龙骨10上的数量和位置。As shown in Figure 1-3, the upper and lower ends of the hanging piece 8 are in a "U" shape, and the connection between the hanging piece 8 and the triangular keel 10 is a snap connection, so that the hanging piece 8 can slide freely , adjust its position and quantity on the triangular keel 10, as shown in Figure 4, the upper hanging piece 11 has a "T"-shaped structure, and the lower end part of the upper hanging piece 11 fits with the outer surface of the triangular keel 10, and the upper hanging piece 11 is in the triangle. The outer surface of the keel 10 is a sliding structure, which is convenient to slide the hanging piece 11 at will to adjust the quantity and position of the hanging piece 11 on the triangular keel 10 .
如图5中吊杆13包括螺纹丝杆1301、夹块1302和安装孔1303,螺纹丝杆1301的下端焊接连接有夹块1302,且夹块1302的外表面开设有安装孔1303,通过吊杆13可以调节安装高度,增加吊装的稳定性,如图5中夹块1302的纵截面呈“U”字型结构,且夹块1302与上吊片11的连接方式为卡合连接,方便夹块1302与上吊片11固定连接。Suspension rod 13 comprises threaded screw rod 1301, clamping block 1302 and installation hole 1303 in Fig. 5, and the lower end of threaded screw rod 1301 is welded and connected with clamping block 1302, and the outer surface of clamping block 1302 is provided with mounting hole 1303, through suspension rod 13 can adjust the installation height and increase the stability of hoisting, as shown in Figure 5, the longitudinal section of the clamp block 1302 is a "U"-shaped structure, and the connection mode between the clamp block 1302 and the hanging piece 11 is a snap connection, which is convenient for the clamp block 1302 It is fixedly connected with the hanging piece 11.
工作原理:在使用该竹木纤维板吊顶时,首先安装该装置时,可以先在墙体1上对应打孔,然后将安装片2安装在墙体1上,再将连接块4和分隔片5等间距的架在左右两侧的安装片2上,再将第一螺栓3从连接块4的内部插入从而将连接块4与安装片2固定连接,接着根据需要在分隔片5上等间距的安装下吊片8,然后在连接块4和下吊片8以及下吊片8与下吊片8之间均安装纤维板本体7,通过槽孔6螺纹连接固定,再在前后排的多组下吊片8上安装三角龙骨10,即将三角龙骨10的下端从下吊片8的上端槽内依次插入,接着根据需要在三角龙骨10的上表面卡合安装相应数量的上吊片11,同理将上吊片11的下端从三角龙骨10的上方的一端插入然后滑动调节位置,最后再将吊杆13通过2组第三螺栓12的作用安装固定在上吊片11的上端,根据高度需要再利用吊杆13和膨胀螺丝14与顶面进行固定安装,以上便完成该竹木纤维板吊顶的一系列操作,本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。Working principle: When using the bamboo-wood fiberboard ceiling, when installing the device first, you can punch holes on the wall 1 first, then install the installation piece 2 on the wall 1, and then install the connecting block 4 and the separator 5 Equally spaced frames are placed on the mounting pieces 2 on the left and right sides, and then the first bolt 3 is inserted from the inside of the connecting block 4 to fix the connecting block 4 and the mounting piece 2, and then equidistant on the separator 5 as required. Install the lower hanging piece 8, then install the fiberboard body 7 between the connecting block 4 and the lower hanging piece 8, and between the lower hanging piece 8 and the lower hanging piece 8, and connect and fix it through the slotted hole 6. Install the triangular keel 10 on the hanging piece 8, that is, insert the lower end of the triangular keel 10 from the upper end groove of the lower hanging piece 8 in sequence, and then install a corresponding number of upper hanging pieces 11 on the upper surface of the triangle keel 10 as required. The lower end of the hanging piece 11 is inserted from the upper end of the triangular keel 10 and then slid to adjust the position, and finally the suspender 13 is installed and fixed on the upper end of the hanging piece 11 through the action of two sets of third bolts 12, and the suspender is reused according to the height. 13 and expansion screw 14 are fixedly installed with the top surface, and a series of operations of the bamboo-wood fiberboard suspended ceiling are completed above, and the content not described in detail in this specification belongs to the prior art known to those skilled in the art.
本实用新型使用到的标准零件均可以从市场上购买,异形件根据说明书的和附图的记载均可以进行订制,各个零件的具体连接方式均采用现有技术中成熟的螺栓、铆钉、焊接等常规手段,机械、零件和设备均采用现有技术中,常规的型号,加上电路连接采用现有技术中常规的连接方式,在此不再详述。The standard parts used in the utility model can be purchased from the market, and the special-shaped parts can be customized according to the instructions and the records of the drawings. The specific connection methods of each part adopt mature bolts, rivets, welding Conventional means, machinery, parts and equipment all adopt conventional models in the prior art, and circuit connections adopt conventional connection methods in the prior art, which will not be described in detail here.
尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments, or perform equivalent replacements for some of the technical features. Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement, etc., should be included in the protection scope of the utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920197788.8U CN209723354U (en) | 2019-02-14 | 2019-02-14 | A kind of bamboo wood fiberboard suspended ceiling |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920197788.8U CN209723354U (en) | 2019-02-14 | 2019-02-14 | A kind of bamboo wood fiberboard suspended ceiling |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209723354U true CN209723354U (en) | 2019-12-03 |
Family
ID=68682893
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920197788.8U Expired - Fee Related CN209723354U (en) | 2019-02-14 | 2019-02-14 | A kind of bamboo wood fiberboard suspended ceiling |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209723354U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111519821A (en) * | 2020-05-27 | 2020-08-11 | 邵颖聪 | Triangular keel mounting structure of building ceiling |
-
2019
- 2019-02-14 CN CN201920197788.8U patent/CN209723354U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111519821A (en) * | 2020-05-27 | 2020-08-11 | 邵颖聪 | Triangular keel mounting structure of building ceiling |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN210288975U (en) | Assembling type wall keel structure capable of being leveled | |
| CN209723354U (en) | A kind of bamboo wood fiberboard suspended ceiling | |
| CN211714329U (en) | Light gauge steel gypsum board suspended ceiling structure | |
| CN211114335U (en) | An inner corner structure of suspended ceiling and wall that is convenient for construction | |
| CN211572472U (en) | A scaffolding for building construction | |
| CN205259429U (en) | Press mounting type smallpox | |
| CN211204385U (en) | Energy-saving air conditioner installation base | |
| CN205296536U (en) | Joint formula keel connecting piece | |
| CN205189199U (en) | Suspended ceiling keel articulates piece | |
| CN217601808U (en) | A glass curtain wall glass no pressure block hanging system | |
| CN209509262U (en) | A kind of pendant component and a kind of blank assemblies | |
| CN217949495U (en) | Double-layer suspended ceiling connecting mechanism with support structure | |
| CN209907682U (en) | Metal curtain wall bracket hanging piece | |
| CN204626853U (en) | A kind of unit assembled mounting structure of special-shaped cambered surface moulding GRG decoration panel | |
| CN212405680U (en) | Large-scale abnormal shape smallpox assembled furred ceiling structure | |
| CN212358757U (en) | Building curtain convenient to installation | |
| CN213143539U (en) | High temperature resistant no rubber joint stone material curtain wall construction | |
| CN210767738U (en) | A ceiling plate leveling device for interior decoration | |
| CN203947648U (en) | A kind of Skeleton hanging part structure | |
| CN203947652U (en) | A kind of Skeleton hanging part structure | |
| CN222862845U (en) | A high-rise building safety construction device | |
| CN216042375U (en) | Joint formula dado suspended structure | |
| CN214574978U (en) | Building curtain wall mounting and fixing support | |
| CN223090682U (en) | Flue structure for supporting and hanging | |
| CN207160346U (en) | A kind of stand apparatus for the dislocation of curtain wall facade expansion joint |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240704 Address after: No. 125, Toutuoling Village, Lianyi Village Committee, Tianmuhu Town, Liyang City, Changzhou City, Jiangsu Province 213000 Patentee after: Wang Donghao Country or region after: China Address before: Taisha Industrial Park, Pingluo County, Shizuishan City, Ningxia Hui Autonomous Region Patentee before: Ningxia Haoxin plastic steel Technology Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240904 Address after: Building 2, No. 5 Jianye Road, Tianmuhu Industrial Park, Tianmuhu Town, Liyang City, Changzhou City, Jiangsu Province, 213000 Patentee after: Jiangsu Wansheng Construction Development Co.,Ltd. Country or region after: China Address before: No. 125, Toutuoling Village, Lianyi Village Committee, Tianmuhu Town, Liyang City, Changzhou City, Jiangsu Province 213000 Patentee before: Wang Donghao Country or region before: China |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191203 |