CN209723185U - A kind of construction of hydro project drainage pipeline splicing structure - Google Patents

A kind of construction of hydro project drainage pipeline splicing structure Download PDF

Info

Publication number
CN209723185U
CN209723185U CN201920003027.4U CN201920003027U CN209723185U CN 209723185 U CN209723185 U CN 209723185U CN 201920003027 U CN201920003027 U CN 201920003027U CN 209723185 U CN209723185 U CN 209723185U
Authority
CN
China
Prior art keywords
inner sleeve
pipe
outer sleeve
sleeve
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920003027.4U
Other languages
Chinese (zh)
Inventor
解双峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920003027.4U priority Critical patent/CN209723185U/en
Application granted granted Critical
Publication of CN209723185U publication Critical patent/CN209723185U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction of hydro project drainage pipeline splicing structures, including first pipe and second pipe, one end of the first pipe is welded with the first outer sleeve, one end of the second pipe is welded with the first inner sleeve, first inner sleeve is socketed in first outer sleeve, the inside of first outer sleeve is equipped with rubber pad, and first inner sleeve end be close to rubber pad, the surface of the first pipe is equipped with first sliding groove, the surface of the second pipe is equipped with second sliding slot, the second outer sleeve is slidably fitted on the inside of the first sliding groove, the second inner sleeve is slidably fitted on the inside of the second sliding slot, second outer sleeve and the second inner sleeve are socketed.The construction of hydro project realizes dual-seal by the first outer sleeve and the first inner sleeve, the second outer sleeve and the second inner sleeve with drainage pipeline splicing structure, greatly increases the sealing effect connected between pipeline.

Description

A kind of construction of hydro project drainage pipeline splicing structure
Technical field
The utility model relates to hydraulic engineering technical field, specially a kind of construction of hydro project drainage pipeline assembly knot Structure.
Background technique
Hydraulic engineering be in order to control, the water resources and environment of utilization and protection earth's surface and underground and every engineering for building The general name of construction.
Currently, existing hydraulic engineering drainage pipeline is in splicing, it is mostly straight for the quick installation and removal of pipeline Connecing will be clamped between pipeline, this splicing structure the case where it is easy to appear leaks when in use, and leakproofness is poor.
Utility model content
It is existing to solve the purpose of this utility model is to provide a kind of construction of hydro project drainage pipeline splicing structure Hydraulic engineering drainage pipeline splicing when, be mostly that will directly be carried out between pipeline for the quick installation and removal of pipeline Clamping, this splicing structure the case where it is easy to appear leaks when in use, the poor problem of leakproofness.
To achieve the above object, the utility model provides the following technical solutions: a kind of construction of hydro project drainage pipeline Splicing structure, including first pipe and second pipe, one end of the first pipe are welded with the first outer sleeve, second pipe The one end in road is welded with the first inner sleeve, and the first inner sleeve is socketed in first outer sleeve, first outer sleeve it is interior Side is equipped with rubber pad, and rubber pad is close in the end of the first inner sleeve, and the surface of the first pipe is equipped with first sliding groove, described The surface of second pipe is equipped with second sliding slot, and the second outer sleeve is slidably fitted on the inside of the first sliding groove, and described second is sliding The second inner sleeve is slidably fitted on the inside of slot, second outer sleeve and the second inner sleeve are socketed.
Preferably, the side of first inner sleeve and the first outer sleeve is equipped with annular groove, second outer sleeve and The inner side of second inner sleeve is equipped with annular rubber ring, and the annular rubber ring is connected in annular groove.
Compared with prior art, the utility model has the beneficial effects that construction of hydro project drainage pipeline assembly knot Structure realizes dual-seal by the first outer sleeve and the first inner sleeve, the second outer sleeve and the second inner sleeve, greatly increases The sealing effect connected between pipeline.
Detailed description of the invention
Fig. 1 is the overall structure front cross-sectional view of the utility model.
In figure: 1 first pipe, 2 second pipes, 3 first outer sleeves, 4 first inner sleeves, 7 rubber pads, 8 first sliding grooves, 9 Second sliding slot, 10 second outer sleeves, 11 second inner sleeves, 14 annular grooves, 15 annular rubber rings.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, the utility model provides a kind of a kind of construction of hydro project drainage pipeline assembly knot of technical solution Structure, including first pipe 1 and second pipe 2, one end of first pipe 1 are welded with the first outer sleeve 3, one end of second pipe 2 It is welded with the first inner sleeve 4, the first inner sleeve 4 is socketed in the first outer sleeve 3, and the inside of the first outer sleeve 3 is equipped with rubber pad 7, and rubber pad 7 is close in the end of the first inner sleeve 4,3 inner wall of the first outer sleeve and 4 outer surface of the first inner sleeve are equipped with sealing Screw thread, the first outer sleeve 3 and the first inner sleeve 4 are threadedly coupled by sealing, and the surface of first pipe 1 is equipped with first sliding groove 8, the The surface of two pipelines 2 is equipped with second sliding slot 9, and the inside of first sliding groove 8 is slidably fitted with the second outer sleeve 10, second sliding slot 9 Inside is slidably fitted with the second inner sleeve 11, and the second outer sleeve 10 and the second inner sleeve 11 are socketed, 10 inner wall of the second outer sleeve and Second inner sleeve, 11 outer surface is equipped with sealing screw thread, is connected between the second outer sleeve 10 and the second inner sleeve 11 by sealing screw thread It connects.
Referring to Fig. 1, the side of the first inner sleeve 4 and the first outer sleeve 3 is equipped with annular groove 14,10 He of the second outer sleeve The inner side of second inner sleeve 11 is equipped with annular rubber ring 15, and annular rubber ring 15 is connected in annular groove 14.
When the utility model is specifically implemented: when in use, the first outer sleeve 3 and the first inner sleeve 4 are passed through sealing spiral shell Line connection can connect first pipe 1 and second pipe 2, so so that the side of the first inner sleeve 4 squeezes rubber pad 7 The second outer sleeve 10 and the second inner sleeve 11 are threadedly coupled by sealing afterwards, so that annular rubber ring 15 is stuck in annular groove 14 It is interior, it can be ensured that sealing, the first inner sleeve 4 between the first outer sleeve 3 and the second outer sleeve 10 and between the second inner sleeve 11 Sealing, to be realized by the first outer sleeve 3 and the first inner sleeve 4, the second outer sleeve 10 and the second inner sleeve 11 dual close Envelope, greatly increases the sealing effect connected between pipeline.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (2)

1. a kind of construction of hydro project drainage pipeline splicing structure, including first pipe (1) and second pipe (2), feature Be: one end of the first pipe (1) is welded with the first outer sleeve (3), and one end of the second pipe (2) is welded with first Inner sleeve (4), the first inner sleeve (4) are socketed in first outer sleeve (3), and the inside of first outer sleeve (3) is equipped with Rubber pad (7), and rubber pad (7) are close in the end of the first inner sleeve (4), it is sliding that the surface of the first pipe (1) is equipped with first Slot (8), the surface of the second pipe (2) are equipped with second sliding slot (9), and the is slidably fitted on the inside of the first sliding groove (8) Two outer sleeves (10) are slidably fitted with the second inner sleeve (11) on the inside of the second sliding slot (9), second outer sleeve (10) It is socketed with the second inner sleeve (11).
2. a kind of construction of hydro project drainage pipeline splicing structure according to claim 1, it is characterised in that: described The side of one inner sleeve (4) and the first outer sleeve (3) is equipped with annular groove (14), second outer sleeve (10) and the second inner sleeve The inner side of cylinder (11) is equipped with annular rubber ring (15), and the annular rubber ring (15) is connected in annular groove (14).
CN201920003027.4U 2019-01-02 2019-01-02 A kind of construction of hydro project drainage pipeline splicing structure Expired - Fee Related CN209723185U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920003027.4U CN209723185U (en) 2019-01-02 2019-01-02 A kind of construction of hydro project drainage pipeline splicing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920003027.4U CN209723185U (en) 2019-01-02 2019-01-02 A kind of construction of hydro project drainage pipeline splicing structure

Publications (1)

Publication Number Publication Date
CN209723185U true CN209723185U (en) 2019-12-03

Family

ID=68678899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920003027.4U Expired - Fee Related CN209723185U (en) 2019-01-02 2019-01-02 A kind of construction of hydro project drainage pipeline splicing structure

Country Status (1)

Country Link
CN (1) CN209723185U (en)

Similar Documents

Publication Publication Date Title
CN206846132U (en) A kind of hydraulic engineering pipeline protection cover
CN204785051U (en) Novel antiseep push pipe
CN205026239U (en) Top is advanced with two rubber rings joint steel bell and spigot reinforced concrete pipe
CN204962055U (en) Dual protection drain pipe
CN204785253U (en) FRP pipe says and pipe connection sleeve
CN209723185U (en) A kind of construction of hydro project drainage pipeline splicing structure
CN202032221U (en) Insertion type pipeline joint
CN202031163U (en) Inspection well with plug-in sleeve
CN210800363U (en) Leakage-proof pipe for building water supply and drainage
CN210106854U (en) PE bellows for municipal drainage
CN204004972U (en) Multi-way PP-R manages stacked joint
CN209308067U (en) The segmentation of assembled underground pipe gallery tube wall and multilayer flashing connecting node
CN202360962U (en) Fast-insertion type pipe joint expansion waterproofing V-shaped ring
CN204901125U (en) Conduit's adapter sleeve
CN213299098U (en) Compound glass fiber reinforced plastic jacking pipe
CN218441094U (en) Steel-plastic adapter for threaded pipe fitting
CN213393974U (en) Quick connecting device of pipeline for hydraulic engineering
CN204882985U (en) Cable sleeve sealing member
CN204080865U (en) A kind of fiber glass reinforced plastics inspection well parts
CN213452327U (en) Secondary-sealing PE water supply pipeline
CN220354679U (en) Can improve bellows structure of bellows axial strength
CN204226891U (en) A kind of novel pipe fitting is direct
CN214662813U (en) Ultrahigh pressure double-clamping sleeve three-way connector
CN206846125U (en) A kind of new plumbing PVC pipeline snap joint
CN210165039U (en) Building water supply and drainage pipeline connecting component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191203

Termination date: 20210102