CN209670021U - A rainwater drainage system - Google Patents
A rainwater drainage system Download PDFInfo
- Publication number
- CN209670021U CN209670021U CN201822124738.5U CN201822124738U CN209670021U CN 209670021 U CN209670021 U CN 209670021U CN 201822124738 U CN201822124738 U CN 201822124738U CN 209670021 U CN209670021 U CN 209670021U
- Authority
- CN
- China
- Prior art keywords
- well
- horizontal pipe
- transition
- exterior wall
- building exterior
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
本实用新型涉及排水工程技术领域,尤其涉及一种雨污水排放系统,一种雨污水排放系统,包括检查井,建筑外墙,建筑外墙与检查井之间设有横管,检查井与建筑外墙之间还设有过渡井,横管包括上行横管,下行横管,上行横管一端位于建筑外墙内,另一端位于过渡井内,下行横管一端位于过渡井内,另一端位于检查井内,上行横管的上方预留沉降空间,于沉降空间内,过渡井可相对于上行横管向下移动,能够有效解决当室外地面沉降量较大时,雨污水管错位、断裂以及渗漏的问题,同时施工工艺简单,工程造价低,后续维护费用低,维护便利。
This utility model relates to the field of drainage engineering technology, and in particular to a rainwater and sewage discharge system. The system includes a manhole, a building exterior wall, a horizontal pipe between the building exterior wall and the manhole, and a transition well between the manhole and the building exterior wall. The horizontal pipe includes an upward horizontal pipe and a downward horizontal pipe. One end of the upward horizontal pipe is located inside the building exterior wall, and the other end is located inside the transition well. One end of the downward horizontal pipe is located inside the transition well, and the other end is located inside the manhole. A settlement space is reserved above the upward horizontal pipe. Within this settlement space, the transition well can move downward relative to the upward horizontal pipe. This effectively solves the problems of misalignment, breakage, and leakage of rainwater and sewage pipes when the outdoor ground settlement is large. Furthermore, the system has a simple construction process, low project cost, low subsequent maintenance costs, and convenient maintenance.
Description
技术领域technical field
本实用新型涉及排水工程技术领域,尤其涉及一种雨污水排放系统。The utility model relates to the technical field of drainage engineering, in particular to a rainwater sewage discharge system.
背景技术Background technique
一般建筑雨污水管一端与建筑物基础或地下室剪力墙固定,另一端穿检查井井壁。由于室外地面沉降量较大,建筑物和室外地面相对高差增大,高差容易引起排水横管错位、断裂以及渗漏。Generally, one end of the building rainwater pipe is fixed to the building foundation or the basement shear wall, and the other end passes through the wall of the inspection well. Due to the large amount of outdoor ground settlement, the relative height difference between the building and the outdoor ground increases, and the height difference is likely to cause dislocation, breakage and leakage of the horizontal drainage pipe.
现有的城市道路雨污管道多采用钢筋混凝土管,使用砂浆抹带或者橡胶圈来密封管间接口以防止渗漏,但是该做法抵抗不均匀沉降能力差,使管道之间出现错位,导致溶液渗漏。Existing urban road rain and sewage pipelines mostly use reinforced concrete pipes, and mortar bands or rubber rings are used to seal the joints between pipes to prevent leakage. However, this method has poor resistance to uneven settlement, causing misalignment between pipes, resulting in solution leakage.
公告号为CN 206802505U的中国专利公开了一种城市雨污水管,包括多个相连的水管单体,水管单体包括水管单体主体,水管单体主体为HDPE双壁波纹管或PE管,水管单体主体两端设置有与水管单体主体材料相同且制成一体的水管单体连接法兰,两个水管单体通过水管单体连接法兰连接,相连接的水管单体连接法兰之间设置有橡胶密封圈,多个相连接的水管单体组成水管组;两个水管组通过伸缩装置连接,伸缩装置可伸缩。该申请虽然一定程度上能够提高管道的抗渗性与稳定性,但是当室外地面沉降量较大,管道仍会出现错位、断裂,除此之外,该申请做法工艺较为复杂。The Chinese patent with the notification number CN 206802505U discloses an urban rain and sewage pipe, which includes a plurality of connected water pipe monomers. The water pipe monomer includes a water pipe monomer body. The two ends of the monomer body are provided with a water pipe monomer connecting flange made of the same material as the water pipe monomer body. The two water pipe monomers are connected through the water pipe monomer connecting flange. There is a rubber sealing ring between them, and a plurality of connected water pipes form a water pipe group; the two water pipe groups are connected by a telescopic device, and the telescopic device can be stretched. Although this application can improve the impermeability and stability of the pipeline to a certain extent, when the outdoor ground has a large amount of settlement, the pipeline will still be dislocated and broken. In addition, the application process is relatively complicated.
实用新型内容Utility model content
本实用新型的目的是为了解决室外地面沉降量较大而造成雨污水管错位、断裂以及渗漏的问题,提供一种结构简单,有效抵抗室外地面较大沉降的雨污水排放系统。The purpose of the utility model is to solve the problem of misalignment, breakage and leakage of rainwater and sewage pipes caused by large outdoor ground settlement, and to provide a rainwater discharge system with simple structure and effective resistance to large outdoor ground settlement.
为实现上述目的,本实用新型采用以下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种雨污水排放系统,包括检查井,建筑外墙,所述建筑外墙与所述检查井之间设有横管,所述检查井与所述建筑外墙之间还设有过渡井,所述横管包括上行横管,下行横管,所述上行横管一端位于所述建筑外墙内,另一端位于所述过渡井内,所述下行横管一端位于所述过渡井内,另一端位于所述检查井内,所述上行横管的上方预留沉降空间,于所述沉降空间内,所述过渡井可相对于所述上行横管向下移动。A rainwater drainage system, comprising an inspection well, a building exterior wall, a horizontal pipe is provided between the building exterior wall and the inspection well, and a transition well is also provided between the inspection well and the building exterior wall, The horizontal pipe includes an upward horizontal pipe and a downward horizontal pipe. One end of the upward horizontal pipe is located in the building exterior wall, and the other end is located in the transition well. One end of the downward horizontal pipe is located in the transition well, and the other end is in the transition well. In the inspection well, a settlement space is reserved above the ascending transverse pipe, and in the settlement space, the transition well can move downward relative to the ascending transverse pipe.
进一步地,所述过渡井与所述建筑外墙贴紧,所述沉降空间为所述过渡井井壁设置的U型槽,所述上行横管另一端位于所述U型槽内。Further, the transition well is in close contact with the exterior wall of the building, the settlement space is a U-shaped groove provided on the wall of the transition well, and the other end of the ascending horizontal pipe is located in the U-shaped groove.
进一步地,所述U型槽顶端设有过渡井封盖,遮盖过渡井,所述过渡井封盖内设有过渡井井盖。Further, a transition well cover is provided on the top of the U-shaped groove to cover the transition well, and a transition well cover is provided inside the transition well cover.
进一步地,所述U型槽的数量为一个或数个。Further, the number of the U-shaped groove is one or several.
进一步地,所述U型槽的高度为预留沉降量。Further, the height of the U-shaped groove is the reserved settlement amount.
进一步地,所述过渡井与所述建筑外墙之间设有间隔区,所述过渡井的一侧井壁为断面,所述上行横管另一端位于过渡井井壁断面处,所述上行横管上方的间隔区形成所述沉降空间。Further, a spacer is provided between the transition well and the outer wall of the building, one side of the transition well is a section, the other end of the upward horizontal pipe is located at the section of the transition well wall, and the upward The spacer above the transverse tube forms the settling space.
进一步地,所述沉降空间与所述过渡井连通形成维修井。Further, the settlement space communicates with the transition well to form a maintenance well.
进一步地,所述维修井的顶部设有维修井封盖,遮盖维修井,维修井封盖内设有维修井井盖。Further, a maintenance well cover is provided on the top of the maintenance well to cover the maintenance well, and a maintenance well cover is provided inside the maintenance well cover.
进一步地,所述断面距地面的高度为预留沉降量。Further, the height of the section from the ground is the reserved settlement amount.
进一步地,所述下行横管的高度低于所述上行横管。Further, the height of the descending transverse tube is lower than that of the ascending transverse tube.
相比于现有技术,本实用新型具有以下有益效果:Compared with the prior art, the utility model has the following beneficial effects:
一、通过增设过渡井,将横管分为上行横管与下行横管以及将上行横管上方预留沉降空间,能够有效解决当室外地面沉降量较大时,雨污水管错位、断裂以及渗漏的问题;1. By adding a transition well, dividing the horizontal pipe into an upward horizontal pipe and a downward horizontal pipe, and reserving a settlement space above the upward horizontal pipe, it can effectively solve the misalignment, fracture and seepage of the rainwater and sewage pipes when the outdoor ground settlement is large. leakage problem;
二、施工工艺简单,工程造价低,后续维护费用低,维护便利。2. The construction process is simple, the project cost is low, the follow-up maintenance cost is low, and the maintenance is convenient.
附图说明Description of drawings
图1是本实用新型实施例一的一种雨污水排放系统平面图;Fig. 1 is a plan view of a rainwater drainage system in Embodiment 1 of the present invention;
图2是图1中的A-A剖面图;Fig. 2 is A-A sectional view among Fig. 1;
图3是图1中的B-B剖面图;Fig. 3 is the B-B sectional view among Fig. 1;
图4是图1中的C-C剖面图;Fig. 4 is a C-C sectional view among Fig. 1;
图5是本实用新型实施例二的一种雨污水排放系统平面图;Fig. 5 is a plan view of a rainwater drainage system according to Embodiment 2 of the present invention;
图6是图5中的A-A剖面图;Fig. 6 is A-A sectional view among Fig. 5;
图7是图5中的B-B剖面图;Fig. 7 is the B-B sectional view among Fig. 5;
图8是图5中的C-C剖面图。Fig. 8 is a sectional view of C-C in Fig. 5 .
图中:1为检查井、2为建筑外墙、3为过渡井、4为上行横管、5为下形横管、6为U型槽、7为断面、8为维修井。In the figure: 1 is the inspection well, 2 is the outer wall of the building, 3 is the transition well, 4 is the upward horizontal pipe, 5 is the downward horizontal pipe, 6 is the U-shaped groove, 7 is the section, and 8 is the maintenance well.
具体实施方式Detailed ways
下面通过具体实施例对本实用新型的技术方案作进一步描述说明。The technical scheme of the utility model is further described and illustrated through specific embodiments below.
实施例一Embodiment one
本实施例提供一种雨污水排放系统,包括检查井1,建筑外墙2,建筑外墙2与检查井1之间设有横管。检查井1与建筑外墙2之间还设有过渡井3。横管包括上行横管4,下行横管5。上行横管4一端位于建筑外墙2内,另一端位于过渡井3内。下行横管5一端位于过渡井3内,另一端位于检查井1内。上行横管4的上方预留沉降空间,于沉降空间内,过渡井3可相对于上行横管4向下移动。This embodiment provides a rainwater drainage system, which includes an inspection well 1 , a building exterior wall 2 , and a horizontal pipe is arranged between the building exterior wall 2 and the inspection well 1 . A transition well 3 is also provided between the inspection well 1 and the building exterior wall 2 . The transverse pipes include an ascending transverse pipe 4 and a descending transverse pipe 5 . One end of the ascending horizontal pipe 4 is located in the building exterior wall 2 , and the other end is located in the transition shaft 3 . One end of the descending horizontal pipe 5 is located in the transition well 3 and the other end is located in the inspection well 1 . A settling space is reserved above the ascending transverse pipe 4, and in the descending space, the transition well 3 can move downward relative to the ascending transverse pipe 4.
通过增设过渡井3将传统的一根横管分为上行横管4与下行横管5,上行横管4固定在建筑外墙2内,因此上行横管4不会随着建筑外地面的沉降而沉降。虽然上行横管4的一端固定在过渡井3内,但上方预留的沉降空间可以避免上行横管4承受建筑外地面下沉的压力,充分保证上行横管4不会变形损坏。下行横管5的两端分别固定在过渡井3与检查井1内,过渡井3与检查井1随地面沉降而整体下沉,地面下沉部分可不定期加高,保持与现在地坪齐平。过渡井3与检查井1沉降差较小,因此两者之间连接的下行横管5不易变形损坏。在上行横管4与下行横管5均不会变形损坏的前提下,室外地面沉降量较大时,雨污水排放系统仍能正常运行。By adding a transition well 3, a traditional horizontal pipe is divided into an upward horizontal pipe 4 and a downward horizontal pipe 5, and the upward horizontal pipe 4 is fixed inside the building exterior wall 2, so the upward horizontal pipe 4 will not follow the settlement of the ground outside the building And sink. Although one end of the ascending horizontal pipe 4 is fixed in the transition well 3, the settling space reserved above can prevent the ascending transverse pipe 4 from bearing the pressure of ground subsidence outside the building, and fully guarantee that the ascending transverse pipe 4 will not be deformed and damaged. The two ends of the descending horizontal pipe 5 are respectively fixed in the transition well 3 and the inspection well 1. The transition well 3 and the inspection well 1 sink as a whole with the ground subsidence, and the subsidence part of the ground can be raised irregularly to keep it flush with the current floor . The settlement difference between the transition well 3 and the inspection well 1 is small, so the descending horizontal pipe 5 connected between the two is not easily deformed and damaged. Under the premise that neither the ascending horizontal pipe 4 nor the descending horizontal pipe 5 will be deformed or damaged, the rainwater discharge system can still operate normally when the outdoor ground settlement is large.
本实施例中,过渡井3与建筑外墙2贴紧,沉降空间为过渡井3井壁设置的U型槽6,上行横管4另一端位于U型槽6内。上行横管4穿出建筑外墙2后,即刻放置于过渡井3井壁的U型槽6内。过渡井3发生沉降后,U型槽6与上行横管4产生间隙,间隙需定期封堵。因过渡井3与建筑外墙2贴紧,所以不需另设维修井8。In this embodiment, the transition well 3 is close to the building exterior wall 2, and the settlement space is the U-shaped groove 6 provided on the wall of the transition well 3, and the other end of the ascending horizontal pipe 4 is located in the U-shaped groove 6. After the ascending horizontal pipe 4 passes through the building exterior wall 2, it is immediately placed in the U-shaped groove 6 of the well wall of the transition well 3. After the transition well 3 settles, there is a gap between the U-shaped groove 6 and the ascending horizontal pipe 4, and the gap needs to be plugged regularly. Because the transition well 3 is close to the building exterior wall 2, so it is not necessary to establish a maintenance well 8 in addition.
U型槽6顶端设有过渡井封盖,遮盖过渡井3,过渡井封盖内设有过渡井井盖,过渡井封盖同时遮盖U型槽6的顶端开口。U型槽6的数量为一个或数个,根据现场实际情况确定U型槽6数量。U型槽6的高度为预留沉降量,上行横管4处于U型槽6的高度值范围内,不受建筑外地面沉降影响。优选地,过渡井3为矩形,充分保证过渡井3的井壁与建筑外墙3密切贴合。The top of the U-shaped groove 6 is provided with a transition well cover to cover the transition well 3. The transition well cover is provided with a transition well cover, and the transition well cover covers the top opening of the U-shaped groove 6 simultaneously. The quantity of U-shaped groove 6 is one or several, and the quantity of U-shaped groove 6 is determined according to the actual situation on site. The height of the U-shaped groove 6 is the reserved settlement amount, and the ascending horizontal pipe 4 is within the height value range of the U-shaped groove 6, and is not affected by the ground settlement outside the building. Preferably, the transition well 3 is rectangular, which fully ensures that the well wall of the transition well 3 is in close contact with the building exterior wall 3 .
实施例二Embodiment two
本实施例提供另一种种雨污水排放系统,与实施例一不同之处在于过渡井3与建筑外墙2有一定间隔,并且设置不同的沉降空间。This embodiment provides another rainwater drainage system, which is different from the first embodiment in that there is a certain distance between the transition well 3 and the outer wall 2 of the building, and different settlement spaces are set.
过渡井3与建筑外墙2之间设有间隔区,过渡井3的一侧井壁为断面7,上行横管4另一端位于过渡井3井壁断面7处,上行横管4上方的间隔区形成沉降空间。There is an interval area between the transition well 3 and the building exterior wall 2, the well wall on one side of the transition well 3 is a section 7, the other end of the upward horizontal pipe 4 is located at the well wall section 7 of the transition well 3, and the interval above the upward horizontal pipe 4 The area forms a subsidence space.
上行横管4穿过建筑外墙2后,伸出一端距离后,放置于过渡井3井壁的断面7处。位于上行横管4上方的间隔区域被挖空,不覆盖土层,形成沉降空间,保证上行横管4不受建筑外地面沉降影响。After the ascending horizontal pipe 4 passes through the building exterior wall 2, after stretching out a distance from one end, it is placed at the section 7 of the well wall of the transition well 3. The interval area above the ascending horizontal pipe 4 is hollowed out without covering the soil layer to form a settlement space to ensure that the ascending transverse pipe 4 is not affected by the ground settlement outside the building.
沉降空间与过渡井3连通形成维修井8。维修井8的顶部设有维修井封盖,遮盖维修井8,维修井8的封盖内设有维修井8的井盖。维修井8使得雨污管的维护费降低,并且维护便利。断面7距地面的高度为预留沉降量,上行横管4处于断面7距地面高度值范围内,不受建筑外地面沉降影响。The settlement space communicates with the transition well 3 to form a maintenance well 8 . The top of the maintenance well 8 is provided with a maintenance well cover to cover the maintenance well 8 , and the cover of the maintenance well 8 is provided with a well cover of the maintenance well 8 . The maintenance well 8 reduces the maintenance cost of the rain and sewage pipe and facilitates maintenance. The height of section 7 from the ground is the reserved settlement amount, and the ascending horizontal pipe 4 is within the range of the height of section 7 from the ground, and is not affected by the settlement of the ground outside the building.
除此之外,在实施例一与实施例二中,下行横管5的高度低于上行横管4,通过上行横管4与下行横管5之间的产生的高度差,雨水或者污水能够顺利流出过渡井3。过渡井3随地面沉降而整体下沉。In addition, in Embodiment 1 and Embodiment 2, the height of the descending horizontal pipe 5 is lower than that of the ascending horizontal pipe 4, and through the height difference between the ascending horizontal pipe 4 and the descending horizontal pipe 5, rainwater or sewage can Smooth flow out of the transition well 3. The transition well 3 sinks as a whole with the ground subsidence.
以上对本实用新型的实施例进行了详细说明,对本领域的普通技术人员而言,依据本实用新型提供的思想,在具体实施方式上会有改变之处,而这些改变也应视为本实用新型的保护范围。The embodiments of the present utility model have been described in detail above. For those of ordinary skill in the art, according to the ideas provided by the present utility model, there will be changes in the specific implementation, and these changes should also be regarded as the present utility model. scope of protection.
Claims (10)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821973892 | 2018-11-28 | ||
| CN2018219738923 | 2018-11-28 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209670021U true CN209670021U (en) | 2019-11-22 |
Family
ID=68562652
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201822124738.5U Expired - Fee Related CN209670021U (en) | 2018-11-28 | 2018-12-18 | A rainwater drainage system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209670021U (en) |
-
2018
- 2018-12-18 CN CN201822124738.5U patent/CN209670021U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106836285B (en) | A monitoring and waterproof structure of underground pipe gallery based on building information | |
| CN209025252U (en) | An exterior wall waterproof structure of a prefabricated building | |
| CN103147614B (en) | Pool with multi-layer structure and building method thereof | |
| CN103132488B (en) | Reverse osmosis water treatment method and reverse osmosis drainage system for face rockfill dam in construction period | |
| CN204715426U (en) | A kind of water burst drainage system for closed deep foundation ditch exploratory hole | |
| CN207268009U (en) | A drainage system of underground comprehensive pipe gallery based on the existing sewage channel | |
| CN209670021U (en) | A rainwater drainage system | |
| CN114045880B (en) | Basement post-pouring belt treatment process | |
| CN209924095U (en) | Prefabricated assembly type linear drainage ditch structure for overpass road section | |
| CN201202121Y (en) | Foundation Pit Drainage Network | |
| CN206646546U (en) | One kind is based on architecture information underground pipe gallery monitoring waterproof construction | |
| CN209670010U (en) | Storm water drainage system | |
| CN116254862A (en) | A Foundation Pit Drainage System Combining with Internal Support of Deep and Large Foundation Pit | |
| CN112459220A (en) | Assembled drainage pump station that can be under construction fast | |
| CN201972231U (en) | Sewage inspection well | |
| CN201883523U (en) | Rainwater inspection well | |
| CN208934084U (en) | A kind of pvc rain sewage inspection well | |
| CN201206277Y (en) | Integrated drainage inspection well apparatus | |
| CN211873089U (en) | Nuclear power plant drainage immersed tube connecting assembly | |
| CN205839813U (en) | A kind of anti-leakage structure of basement building reserved passageway junction movement joint | |
| CN109695274A (en) | A kind of disposable embedded water stop joint of building engineering draining | |
| CN219298284U (en) | Beam-slab raft foundation leakage maintenance structure | |
| CN217999656U (en) | Complex hydrogeology of city tunnel prevents drainage device | |
| CN216108877U (en) | Basement boundary drop well | |
| CN205100246U (en) | Inspection shaft of embedded cat ladder |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191122 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |