CN209653377U - The straight degree of dry concrete wall horizontal joint template adjusts bracing means - Google Patents

The straight degree of dry concrete wall horizontal joint template adjusts bracing means Download PDF

Info

Publication number
CN209653377U
CN209653377U CN201920318372.7U CN201920318372U CN209653377U CN 209653377 U CN209653377 U CN 209653377U CN 201920318372 U CN201920318372 U CN 201920318372U CN 209653377 U CN209653377 U CN 209653377U
Authority
CN
China
Prior art keywords
concrete wall
horizontal joint
bracing means
angle steel
dry concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920318372.7U
Other languages
Chinese (zh)
Inventor
周杰
夏阳
刘�文
刘涛
姜海峰
伍玉亮
敖菊莲
李少雄
于耀
刘铮
刘裕林
姚霞光
郎宇飞
李金恺
刘明敬
曾文静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Construction Engineering Group Co Ltd
Original Assignee
Shenzhen Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Construction Engineering Group Co Ltd filed Critical Shenzhen Construction Engineering Group Co Ltd
Priority to CN201920318372.7U priority Critical patent/CN209653377U/en
Application granted granted Critical
Publication of CN209653377U publication Critical patent/CN209653377U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本实用新型公开了清水混凝土墙水平缝模板顺直度调整加固装置,其包括分别安装于两个外接的用于围成浇筑混凝土的容置槽的模板的顶部的两个角钢,两个角钢水平相互对应,每一角钢的一边安装于一模板的外表面的顶部,每一角钢的另一边上均设有相互水平对应的加高部;清水混凝土墙水平缝模板顺直度调整加固装置还包括两端分别安装于两个加高部上的第一限位件。两个模板的顶部均设有一个角钢,另一边上设有加高部,第一限位件的两端分别连接两个加高部,因此,当混凝土浇筑于两个模板围成的容置槽中时,第一限位件对两个模板有克服混凝土的作用力的拉力,使得两个模板保持相互平行的位置,从而浇筑的混凝土墙面的具有更好的顺直度。

The utility model discloses a straightness adjustment and reinforcement device for a horizontal joint formwork of a clear-faced concrete wall, which comprises two angle steels respectively installed on the tops of two externally connected formworks for forming an accommodating groove for pouring concrete, and the two angle steels are horizontal Corresponding to each other, one side of each angle steel is installed on the top of the outer surface of a formwork, and the other side of each angle steel is provided with heightened parts corresponding to each other; The two ends are respectively installed on the first limiting pieces on the two raised parts. An angle steel is provided on the top of the two formworks, and a heightened part is provided on the other side, and the two ends of the first limiting member are respectively connected to the two raised parts. When in the groove, the first limiting member has a pulling force to the two formworks to overcome the concrete force, so that the two formworks maintain a position parallel to each other, so that the poured concrete wall has better straightness.

Description

清水混凝土墙水平缝模板顺直度调整加固装置Straightness adjustment and reinforcement device for horizontal joint formwork of fair-faced concrete wall

技术领域technical field

本实用新型涉及建筑辅料的技术领域,具体而言,涉及清水混凝土墙水平缝模板顺直度调整加固装置。The utility model relates to the technical field of construction auxiliary materials, in particular to a straightness adjustment and reinforcement device for a horizontal joint formwork of a fair-faced concrete wall.

背景技术Background technique

在建筑领域,浇筑混凝土墙体时需要用模板围成容置混凝土的容置槽。具体可以通过两块相互对应的模板围成墙体腔。在对模板固定的过程中,现有技术是对两块模板的底部进行固定,但是随着混凝土浇筑于墙体腔中,两块模板的顶部容易受混凝土的作用力而向相互背离的方向撑开,因此容易造成浇筑的墙体不顺直。In the field of construction, when pouring concrete walls, it is necessary to use templates to form accommodating grooves for accommodating concrete. Specifically, the wall cavity can be surrounded by two templates corresponding to each other. In the process of fixing the templates, the existing technology is to fix the bottoms of the two templates, but as the concrete is poured into the wall cavity, the tops of the two templates are easily supported in directions away from each other by the force of the concrete. Open, so it is easy to cause the poured wall to be not straight.

实用新型内容Utility model content

有鉴于此,本实用新型提出了清水混凝土墙水平缝模板顺直度调整加固装置,其目的在于提高浇筑的混凝土墙面的顺直度。In view of this, the utility model proposes a straightness adjustment and reinforcement device for the horizontal joint formwork of the fair-faced concrete wall, and its purpose is to improve the straightness of the poured concrete wall.

具体的,本实用新型提出了以下具体的实施例:Specifically, the utility model proposes the following specific embodiments:

清水混凝土墙水平缝模板顺直度调整加固装置,其包括分别安装于两个外接的用于围成浇筑混凝土的容置槽的模板的顶部的两个角钢,两个所述角钢水平相互对应,每一所述角钢的一边安装于一所述模板的外表面的顶部,每一所述角钢的另一边上均设有相互水平对应的加高部;The straightness adjustment and reinforcement device of the horizontal joint formwork of the fair-faced concrete wall includes two angle steels respectively installed on the top of the formwork of two externally connected formworks for enclosing the accommodating groove for pouring concrete, and the two angle steel levels correspond to each other, One side of each said angle steel is installed on the top of the outer surface of a said formwork, and the other side of each said angle steel is provided with mutually horizontally corresponding elevated parts;

所述清水混凝土墙水平缝模板顺直度调整加固装置还包括两端分别安装于两个加高部上的第一限位件。The straightness adjustment and reinforcement device for the horizontal joint formwork of the fair-faced concrete wall also includes a first stopper whose two ends are respectively installed on the two heightening parts.

进一步地,在本实用新型中,两个所述模板的顶部均设有相互水平对应的安装部;Further, in the present utility model, the tops of the two templates are provided with installation parts corresponding to each other horizontally;

所述清水混凝土墙水平缝模板顺直度调整加固装置还包括两端分别安装于两个所述安装部上的第二限位件。The straightness adjustment and strengthening device of the horizontal joint formwork of the fair-faced concrete wall also includes a second stopper whose two ends are respectively installed on the two installation parts.

进一步地,在本实用新型中,所述第二限位件的底部设有分别抵接两个所述安装部的内表面的两个抵接件。Further, in the present utility model, the bottom of the second limiting member is provided with two abutting members respectively abutting against the inner surfaces of the two installation parts.

进一步地,在本实用新型中,所述安装部的顶部与所述角钢的上表面持平。Further, in the present utility model, the top of the installation part is flat with the upper surface of the angle steel.

进一步地,在本实用新型中,所述第一限位件的正投影与所述模板垂直,所述第二限位件与所述第一限位件平行。Further, in the present utility model, the orthographic projection of the first limiting member is perpendicular to the template, and the second limiting member is parallel to the first limiting member.

进一步地,在本实用新型中,所述加高部为方通。Further, in the present utility model, the raised portion is square.

进一步地,在本实用新型中,所述第一限位件为钢筋。Further, in the present utility model, the first limiting member is a steel bar.

进一步地,在本实用新型中,所述安装部为压顶板条。Further, in the present utility model, the installation part is a top pressing strip.

进一步地,在本实用新型中,所述第二限位件为角钢条。Further, in the present utility model, the second limiting member is an angle steel bar.

进一步地,在本实用新型中,所述角钢的一边通过螺杆安装于所述模板上。Further, in the present utility model, one side of the angle steel is installed on the formwork through a screw.

本实用新型的清水混凝土墙水平缝模板顺直度调整加固装置,其包括分别安装于两个外接的用于围成浇筑混凝土的容置槽的模板的顶部的两个角钢,两个所述角钢水平相互对应,每一所述角钢的一边安装于一所述模板的外表面的顶部,每一所述角钢的另一边上均设有相互水平对应的加高部;所述清水混凝土墙水平缝模板顺直度调整加固装置还包括两端分别安装于两个加高部上的所述第一限位件。在本实用新型中,两个模板的顶部均设有一个角钢,每一角钢的一边安装于与其对应的模板的外表面,另一边上设有加高部,第一限位件的两端分别连接两个加高部,因此,当混凝土浇筑于两个模板围成的容置槽中时,第一限位件对两个模板有克服混凝土的作用力的拉力,使得两个模板保持相互平行的位置,从而浇筑的混凝土墙面的具有更好的顺直度。The straightness adjustment and strengthening device of the horizontal seam formwork of the fair-faced concrete wall of the present utility model comprises two angle steels respectively installed on the tops of the formworks of two externally connected formworks for enclosing the accommodating groove for pouring concrete, and the two angle steels are The levels correspond to each other, and one side of each angle steel is installed on the top of the outer surface of a template, and the other side of each angle steel is provided with heightening parts corresponding to each other horizontally; the horizontal joint of the fair-faced concrete wall The straightness adjustment and strengthening device of the formwork also includes the first stopper whose two ends are respectively installed on the two raised parts. In the utility model, the tops of the two templates are provided with an angle steel, one side of each angle steel is installed on the outer surface of the template corresponding to it, and the other side is provided with a heightened part, and the two ends of the first limiting member are respectively Connect the two elevated parts, so when concrete is poured in the accommodating groove surrounded by the two formworks, the first limiting member has a pulling force on the two formworks to overcome the force of the concrete, so that the two formworks are kept parallel to each other position, so that the poured concrete wall has better straightness.

综上所述,本实用新型特殊的结构,其具有上述诸多的优点及实用价值,并在同类产品中未见有类似的方法公开发表或使用而确属创新,产生了好用且实用的效果,较现有的技术具有增进的多项功效,从而较为适于实用,并具有广泛的产业价值。To sum up, the special structure of the utility model has the above-mentioned many advantages and practical value, and no similar method has been published or used in similar products, so it is indeed an innovation, and it has produced a useful and practical effect Compared with the existing technology, it has multiple enhanced functions, thus it is more suitable for practical use and has extensive industrial value.

为使本实用新型的上述目的、特征和优点能更明显易懂,下文特举较佳实施例,并配合所附附图,作详细说明如下。In order to make the above-mentioned purpose, features and advantages of the present invention more comprehensible, preferred embodiments are specifically cited below, together with the accompanying drawings, and are described in detail as follows.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本实用新型的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following drawings will be briefly introduced in the embodiments. It should be understood that the following drawings only show some embodiments of the present invention. Therefore, it should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can also be obtained according to these drawings without creative work.

图1为本实用新型的清水混凝土墙水平缝模板顺直度调整加固装置的一实施例的侧视图;Fig. 1 is the side view of an embodiment of the straightness adjustment reinforcement device of the horizontal joint formwork of the fair-faced concrete wall of the present utility model;

图2为本实用新型的清水混凝土墙水平缝模板顺直度调整加固装置的一实施例的局部放大图。Fig. 2 is a partially enlarged view of an embodiment of the straightness adjustment and reinforcement device of the horizontal joint formwork of the fair-faced concrete wall of the utility model.

图中:100-清水混凝土墙水平缝模板顺直度调整加固装置;10-角钢;20-模板;21-安装部;30-加高部;40-第一限位件;50-第二限位件;51-抵In the figure: 100-the straightness adjustment and reinforcement device of the horizontal joint formwork of the fair-faced concrete wall; 10-angle steel; 20-formwork; 21-installation part; 30-heightening part; bit; 51-arrival

接件;60-螺杆。Adapter; 60-screw.

具体实施方式Detailed ways

在下文中,将更全面地描述本实用新型的各种实施例。本实用新型可具有各种实施例,并且可在其中做出调整和改变。然而,应理解:不存在将本实用新型的各种实施例限于在此公开的特定实施例的意图,而是应将本实用新型理解为涵盖落入本实用新型的各种实施例的精神和范围内的所有调整、等同物和/或可选方案。Hereinafter, various embodiments of the present invention will be described more fully. The invention is capable of various embodiments, and adaptations and changes are possible therein. It should be understood, however, that there is no intention to limit the various embodiments of the invention to the particular embodiments disclosed herein, but rather the invention should be understood to cover various embodiments falling within the spirit and spirit of the various embodiments of the invention. All modifications, equivalents and/or alternatives within the scope.

在下文中,可在本实用新型的各种实施例中使用的术语“包括”或“可包括”指示所公开的功能、操作或元件的存在,并且不限制一个或更多个功能、操作或元件的增加。此外,如在本实用新型的各种实施例中所使用,术语“包括”、“具有”及其同源词仅意在表示特定特征、数字、步骤、操作、元件、组件或前述项的组合,并且不应被理解为首先排除一个或更多个其它特征、数字、步骤、操作、元件、组件或前述项的组合的存在或增加一个或更多个特征、数字、步骤、操作、元件、组件或前述项的组合的可能性。Hereinafter, the terms "comprising" or "may include" that may be used in various embodiments of the present invention indicate the presence of disclosed functions, operations or elements, and do not limit one or more functions, operations or elements. increase. In addition, as used in various embodiments of the present invention, the terms "comprising", "having" and their cognates are only intended to represent specific features, numbers, steps, operations, elements, components or combinations of the foregoing , and should not be understood as excluding the existence of one or more other features, numbers, steps, operations, elements, components or combinations of the foregoing or adding one or more features, numbers, steps, operations, elements, Possibility of components or combinations of the foregoing.

在本实用新型的各种实施例中使用的表述(诸如“第一”、“第二”等)可修饰在各种实施例中的各种组成元件,不过可不限制相应组成元件。例如,以上表述并不限制所述元件的顺序和/或重要性。以上表述仅用于将一个元件与其它元件区别开的目的。例如,第一用户装置和第二用户装置指示不同用户装置,尽管二者都是用户装置。例如,在不脱离本实用新型的各种实施例的范围的情况下,第一元件可被称为第二元件,同样地,第二元件也可被称为第一元件。Expressions (such as 'first', 'second', etc.) used in various embodiments of the present invention may modify various constituent elements in various embodiments, but may not limit the corresponding constituent elements. For example, the above expressions do not limit the order and/or importance of the elements described. The above expressions are used only for the purpose of distinguishing one element from other elements. For example, a first user device and a second user device indicate different user devices although both are user devices. For example, a first element could be termed a second element, and, similarly, a second element could be termed a first element, without departing from the scope of various embodiments of the present invention.

应注意到:在本实用新型中,除非另有明确的规定和定义,“安装”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接、也可以是可拆卸连接、或者一体地连接;可以是机械连接,也可以是电连接;可以是直接连接,也是可以通过中间媒介间接相连;可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。It should be noted that in this utility model, terms such as "installation", "connection" and "fixation" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection unless otherwise specified and defined. , or integrally connected; may be mechanically connected, may also be electrically connected; may be directly connected, or may be indirectly connected through an intermediary; may be internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model according to specific situations.

在本实用新型中,本领域的普通技术人员需要理解的是,文中指示方位或者位置关系的术语为基于附图所示的方位或者位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或者元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the present utility model, those of ordinary skill in the art need to understand that the terms indicating orientation or positional relationship herein are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the utility model and simplifying the description, and It is not to indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and operate in a specific orientation, and thus should not be construed as limiting the present invention.

在本实用新型的各种实施例中使用的术语仅用于描述特定实施例的目的并且并非意在限制本实用新型的各种实施例。除非另有限定,否则在这里使用的所有术语(包括技术术语和科学术语)具有与本实用新型的各种实施例所属领域普通技术人员通常理解的含义相同的含义。所述术语(诸如在一般使用的词典中限定的术语)将被解释为具有与在相关技术领域中的语境含义相同的含义并且将不被解释为具有理想化的含义或过于正式的含义,除非在本实用新型的各种实施例中被清楚地限定。The terms used in the various embodiments of the present invention are for the purpose of describing particular embodiments only and are not intended to limit the various embodiments of the present invention. Unless otherwise defined, all terms (including technical terms and scientific terms) used herein have the same meaning as commonly understood by those of ordinary skill in the art to which various embodiments of the present invention belong. The terms (such as those defined in commonly used dictionaries) will be interpreted as having the same meaning as the contextual meaning in the relevant technical field and will not be interpreted as having an idealized meaning or an overly formal meaning, Unless clearly defined in various embodiments of the present invention.

实施例Example

如图1-2。As shown in Figure 1-2.

清水混凝土墙水平缝模板顺直度调整加固装置100,其包括分别安装于两个外接的用于围成浇筑混凝土的容置槽的模板20的顶部的两个角钢10,两个所述角钢10水平相互对应,每一所述角钢10的一边安装于一所述模板20的外表面的顶部,每一所述角钢10的另一边上均设有相互水平对应的加高部30;The straightness adjustment and reinforcement device 100 of the horizontal joint formwork of the fair-faced concrete wall includes two angle steels 10 installed on the top of the formwork 20 of two externally connected formworks 20 for enclosing the accommodation groove for pouring concrete respectively, and the two angle steels 10 Levels correspond to each other, one side of each angle steel 10 is installed on the top of the outer surface of a template 20, and the other side of each angle steel 10 is provided with a heightened portion 30 corresponding to each other horizontally;

所述清水混凝土墙水平缝模板顺直度调整加固装置100还包括两端分别安装于两个加高部30上的第一限位件40。The straightness adjustment and strengthening device 100 of the horizontal joint formwork of the fair-faced concrete wall also includes a first stopper 40 whose two ends are respectively installed on the two raised parts 30 .

上述,外接的两个模板20对应安装,围成用于容置混凝土的容置槽。可以理解的是,待混凝土干燥后则形成混凝土墙面。每个模板20的顶部设有一个角钢10,每一角钢10的一边安装于与其对应的模板20的顶部的外表面,角钢10的另一边上设有加高部30,第一限位件40的两端分别连接两个加高部30。两个角钢10相互水平对应,两个加高部30也相互水平对应,两个角钢10的连线与两个加高部30的连线相互平行。As mentioned above, the two external formworks 20 are installed correspondingly to enclose the accommodating tank for accommodating concrete. It can be understood that, after the concrete dries, a concrete wall surface is formed. The top of each template 20 is provided with an angle steel 10, one side of each angle steel 10 is installed on the outer surface of the top of the template 20 corresponding to it, and the other side of the angle steel 10 is provided with a heightened portion 30, the first stopper 40 The two ends of each are respectively connected with two raised parts 30 . The two angle steels 10 correspond horizontally to each other, and the two raised parts 30 also correspond horizontally to each other, and the connecting line of the two angle steels 10 and the connecting line of the two raised parts 30 are parallel to each other.

需要进一步说明的是,加高部30与角钢10的连接是固定连接,具体地,加高部30与角钢10可以是焊接,卡接等。第一限位件40的两端与两个加高部30的连接也可以为焊接,卡接等。焊接通过下列三种途径达成接合的目的:1、熔焊——加热欲接合之工件使之局部熔化形成熔池,熔池冷却凝固后便接合,必要时可加入熔填物辅助,它是适合各种金属和合金的焊接加工,不需压力。2、压焊——焊接过程必须对焊件施加压力,属于各种金属材料和部分金属材料的加工。3、钎焊——采用比母材熔点低的金属材料做钎料,利用液态钎料润湿母材,填充接头间隙,并与母材互相扩散实现链接焊件。适合于各种材料的焊接加工,也适合于不同金属或异类材料的焊接加工。It should be further explained that the connection between the raised portion 30 and the angle steel 10 is a fixed connection, specifically, the raised portion 30 and the angle steel 10 may be welded, clamped, or the like. The connection between the two ends of the first limiting member 40 and the two raised portions 30 may also be welded, clamped and the like. Welding achieves the purpose of joining through the following three ways: 1. Fusion welding - heating the workpiece to be joined to make it partially melt to form a molten pool, and the molten pool is cooled and solidified before joining. If necessary, fillers can be added to assist. It is suitable Welding of various metals and alloys without pressure. 2. Pressure welding - the welding process must exert pressure on the weldment, which belongs to the processing of various metal materials and some metal materials. 3. Brazing—Using a metal material with a lower melting point than the base metal as the solder, using liquid solder to wet the base metal, filling the joint gap, and interdiffusion with the base metal to realize the joint weldment. It is suitable for welding processing of various materials, and also suitable for welding processing of different metals or heterogeneous materials.

进一步地,第一限位件40可以为不能收缩及伸展的硬质材料制成,例如,第一限位件40可以为钢筋、钢管、或铜块等。因此,第一限位件40可以对两个模板20的顶部起到限位的作用,使两个模板20之间既不会被撑开,也不会相互靠拢,而在本实施例中,当混凝土浇筑于两个模板20围成的容置槽中时,第一限位件40对两个模板20有克服混凝土的作用力的拉力,使得两个模板20持续保持相互平行的位置,从而浇筑的混凝土墙面的具有更好的顺直度。Further, the first limiting member 40 may be made of a hard material that cannot be contracted or stretched. For example, the first limiting member 40 may be a steel bar, a steel pipe, or a copper block. Therefore, the first limiting member 40 can limit the tops of the two templates 20, so that the two templates 20 will neither be stretched nor approach each other. In this embodiment, When the concrete is poured in the accommodating groove surrounded by the two formworks 20, the first stopper 40 has a pulling force to overcome the action force of the concrete on the two formworks 20, so that the two formworks 20 continue to maintain a position parallel to each other, thereby Poured concrete walls have better straightness.

在本实施例中,两个所述模板20的顶部均设有相互水平对应的安装部21;In this embodiment, the tops of the two templates 20 are provided with installation parts 21 corresponding to each other horizontally;

所述清水混凝土墙水平缝模板顺直度调整加固装置100还包括两端分别安装于两个所述安装部21上的第二限位件50。The straightness adjustment and strengthening device 100 of the horizontal joint formwork of the fair-faced concrete wall also includes a second stopper 50 whose two ends are respectively installed on the two installation parts 21 .

上述,为了进一步加强对于外接的两个模板20的顶部的限位作用,在两个模板20的顶部分别设置一个相互水平对应的安装部21,两个安装部21的高度相等,在两个安装部21上安装有第二限位件50,也即是第二限位件50的两端分别连接一个安装部21。第二限位件50在安装部21上的安装方式可以为焊接、卡接、螺钉连接等。具体地,在本实施例中,第二限位件50的两端可以通过螺钉安装与两个安装部21上。安装部21在模板20顶部的安装方式也可以为焊接、卡接、螺钉连接等。需要进一步说明的是,在本实施例中,安装部21在模板20顶部的安装方式为螺钉安装。As mentioned above, in order to further strengthen the limiting effect on the tops of the two external formworks 20, a mounting portion 21 corresponding to each other is provided on the tops of the two formworks 20, and the heights of the two mounting portions 21 are equal. A second limiting member 50 is installed on the portion 21 , that is, two ends of the second limiting member 50 are respectively connected to a mounting portion 21 . The installation method of the second limiting member 50 on the installation portion 21 may be welding, clamping, screwing and the like. Specifically, in this embodiment, both ends of the second limiting member 50 can be installed on the two installation parts 21 by screws. The installation method of the installation part 21 on the top of the formwork 20 may also be welding, clamping, screwing and the like. It should be further explained that, in this embodiment, the installation method of the installation part 21 on the top of the formwork 20 is screw installation.

进一步地,第二限位件50可以为不能收缩及伸展的硬质材料制成,例如,第二限位件50可以为钢筋、钢管、或铜块等。因此,第二限位件50可以对两个模板20的顶部起到进一步限位的作用,使两个模板20之间既不会被撑开,也不会相互靠拢,而在本实施例中,当混凝土浇筑于两个模板20围成的容置槽中时,第二限位件50对两个模板20有克服混凝土的作用力的拉力,使得两个模板20持续保持相互平行的位置,从而浇筑的混凝土墙面的具有更好的顺直度。Further, the second limiting member 50 can be made of a hard material that cannot be contracted or stretched, for example, the second limiting member 50 can be a steel bar, a steel pipe, or a copper block. Therefore, the second limiting member 50 can further limit the tops of the two templates 20, so that the two templates 20 will neither be stretched nor approach each other, while in this embodiment , when the concrete is poured in the accommodating groove surrounded by the two formworks 20, the second limiting member 50 has a pulling force on the two formworks 20 to overcome the force of the concrete, so that the two formworks 20 continue to maintain a position parallel to each other, Thus, the poured concrete wall has better straightness.

在本实施例中,所述第二限位件50的底部设有分别抵接两个所述安装部21的内表面的两个抵接件51。In this embodiment, the bottom of the second limiting member 50 is provided with two abutting members 51 respectively abutting against inner surfaces of the two mounting portions 21 .

上述,在第二限位件50的底部设有两个抵接件51,两个抵接件51分别抵接两个安装部21的内表面,也即是一个抵接件51对应抵接一个安装部21的内表面。由于安装部21安装于模板20的顶部,且安装部21与模板20固定连接,因此,抵接件51使两个安装部21不相互靠拢,也就可以对两个模板20向内靠拢进行限位,使得两个模板20之间不会往彼此的方向位移。需要进步一步说明的是,抵接件51固定安装于第二限位件50的底部,至于抵接件51固定安装于第二限位件50的方式,可以为焊接的固定方式。As mentioned above, two abutting pieces 51 are provided at the bottom of the second limiting piece 50, and the two abutting pieces 51 respectively abut against the inner surfaces of the two installation parts 21, that is, one abutting piece 51 abuts against one correspondingly. The inner surface of the mounting part 21. Since the installation part 21 is installed on the top of the formwork 20, and the installation part 21 is fixedly connected with the formwork 20, therefore, the abutting member 51 prevents the two installation parts 21 from approaching each other, so that the two formworks 20 can be limited inwardly. position, so that the two templates 20 will not be displaced toward each other. It should be further explained that the abutting piece 51 is fixedly installed on the bottom of the second limiting piece 50 , and the fixing method of the abutting piece 51 on the second limiting piece 50 may be welding.

在一实施例中,可以先安装下部模板20,再将角钢10安装于嵌缝条螺杆60上。然后安装安装部21,然后再安装第二限位件50及第二限位件底件50的抵接件51,待模板20加固调直到位后,焊接安装加高部30及第一限位件40。待模板20顺直调整完成后,浇筑混凝土,混凝土浇筑完成,终凝前先拆除第二限位件50,最后等到混凝土凝固后,再拆除加高部30及第一限位件40。In one embodiment, the lower template 20 can be installed first, and then the angle steel 10 can be installed on the caulking screw 60 . Then install the installation part 21, and then install the second spacer 50 and the abutting piece 51 of the second spacer bottom part 50. After the template 20 is reinforced and adjusted to the position, the heightening part 30 and the first spacer are welded and installed. 40 pieces. After the formwork 20 has been adjusted straightly, the concrete is poured. After the concrete pouring is completed, the second stopper 50 is removed before the final setting, and finally the heightening part 30 and the first stopper 40 are removed after the concrete solidifies.

在本实施例中,所述安装部21的顶部与所述角钢10的上表面持平。In this embodiment, the top of the mounting portion 21 is flush with the upper surface of the angle steel 10 .

上述,安装部21安装于模板20的顶部,是指安装部21安装于模板20的顶部上表面,而角钢10安装于模板20的顶部,是指角钢10安装于模板20的顶部的外表面(也即是模板20的侧面的顶部)。Above-mentioned, installation part 21 is installed on the top of formwork 20, refers to that installation part 21 is installed on the top upper surface of formwork 20, and angle steel 10 is installed on the top of formwork 20, refers to that angle steel 10 is installed on the outer surface of the top of formwork 20 ( That is, the top of the side of the template 20).

而安装部21的顶部与角钢10的上表面持平是指角钢10用于安装加高部30的一边高于模板20,而安装部21安装于模板20上时,安装部21也高于模板20,为了装置的整体性及安装的便利性,也为了安装部21上的第二限位件50底部的抵接件51可以更稳固地抵接安装部21,因此将安装部21的顶部与角钢10用于安装加高部30的一边持平。The top of the installation part 21 is flat with the upper surface of the angle steel 10, which means that the side of the angle steel 10 used to install the raised part 30 is higher than the formwork 20, and when the installation part 21 is installed on the formwork 20, the installation part 21 is also higher than the formwork 20 , for the integrity of the device and the convenience of installation, and also for the abutment piece 51 at the bottom of the second stopper 50 on the installation part 21 can abut against the installation part 21 more firmly, so the top of the installation part 21 and the angle steel 10 is used to install one side of the raised portion 30 to be flat.

在本实施例中,所述第一限位件40的正投影与所述模板20垂直,所述第二限位件50与所述第一限位件40平行。In this embodiment, the orthographic projection of the first limiting member 40 is perpendicular to the template 20 , and the second limiting member 50 is parallel to the first limiting member 40 .

上述,为了在对模板20的顶部进行限位时,第一限位件40的受力更加均匀,因此第一限位件40的正投影于模板20垂直,也即是第一限位件40垂直两边的模板20。第二限位件50与第一限位件40相互平行,也即是第二限位件50的正投影,也与两边的模板20垂直。As mentioned above, in order to limit the top of the template 20, the force of the first limiting member 40 is more uniform, so the orthographic projection of the first limiting member 40 is perpendicular to the template 20, that is, the first limiting member 40 Formwork 20 on both sides vertically. The second limiting member 50 is parallel to the first limiting member 40 , that is, the orthographic projection of the second limiting member 50 is also perpendicular to the templates 20 on both sides.

在本实施例中,所述加高部30为方通。In this embodiment, the raised portion 30 is a square hole.

上述,该方通可以为钢方通,该钢方通的规格可以为五厘米乘五厘米,当然,还可以为其他规格,例如八厘米乘厘米。As mentioned above, the square duct can be a steel square duct, and the size of the steel square duct can be five centimeters by five centimeters, of course, it can also be other specifications, such as eight centimeters by centimeters.

在本实施例中,所述第一限位件40为钢筋。In this embodiment, the first limiting member 40 is a steel bar.

上述,第一限位件40可以为钢筋,在本实施例中,该钢筋的规格可以为直径为2厘米的端钢筋。As mentioned above, the first limiting member 40 may be a steel bar, and in this embodiment, the specification of the steel bar may be an end steel bar with a diameter of 2 cm.

在本实施例中,所述安装部21为压顶板条。In this embodiment, the installation part 21 is a top pressing strip.

上述,是指安装部21可以为压顶板条,因此,其可以通过螺钉安装于模板20的顶部。第二限位件50也可以通过螺钉安装于压顶板条上,第二限位件50上可以设有用于安装螺钉的孔。在另一实施例中,安装部21还可以为木梢。The above mentioned means that the installation part 21 can be a top slat, therefore, it can be installed on the top of the formwork 20 by screws. The second limiting member 50 may also be installed on the top slat by screws, and the second limiting member 50 may be provided with holes for installing screws. In another embodiment, the installation part 21 can also be a wooden tip.

在本实施例中,所述第二限位件50为角钢10条。In this embodiment, the second limiting member 50 is 10 pieces of angle steel.

上述,第二限位件50为角钢条,安装于第二限位件50底部的抵接件51也可以为方通,该方通的规格可以为三厘米乘三厘米。As mentioned above, the second limiting member 50 is an angle steel bar, and the abutting member 51 installed on the bottom of the second limiting member 50 can also be a square channel, and the size of the square channel can be three centimeters by three centimeters.

在本实施例中,所述角钢10的一边通过螺杆安装于所述模板20上。In this embodiment, one side of the angle steel 10 is installed on the template 20 through a screw.

上述,角钢10上设有用于被螺杆60穿过的螺杆孔,角钢10通过螺杆60固定安装于模板20上,需要进一步说明的是,在本实施例中,该螺杆孔至少为一个。As mentioned above, the angle steel 10 is provided with a screw hole for the screw 60 to pass through, and the angle steel 10 is fixedly installed on the formwork 20 through the screw 60. It should be further explained that in this embodiment, there is at least one screw hole.

尽管以上较多使用了表示结构的术语,但并不排除使用其它术语的可能性。使用这些术语仅仅是为了更方便地描述和解释本实用新型的本质;把它们解释成任何一种附加的限制都是与本实用新型精神相违背的。Although the above uses more terminology representing structures, the possibility of using other terms is not excluded. These terms are only used to describe and explain the essence of the utility model more conveniently; interpreting them as any kind of additional limitation is contrary to the spirit of the utility model.

以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the utility model, and are not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (10)

1. the straight degree of dry concrete wall horizontal joint template adjusts bracing means, which is characterized in that including being respectively arranged in two Two angle steel at the top of the template of the external accommodation groove for surrounding casting concrete, two angle steel are horizontal mutually right It answers, the top of the outer surface for being installed on a template on one side of each angle steel, on the another side of each angle steel Increase portion equipped with mutual level is corresponding;
The straight degree adjustment bracing means of the dry concrete wall horizontal joint template further includes that both ends are respectively arranged in two and increase The first locating part in portion.
2. the straight degree of dry concrete wall horizontal joint template according to claim 1 adjusts bracing means, which is characterized in that Mutually horizontal corresponding mounting portion is equipped at the top of two templates;
The straight degree adjustment bracing means of dry concrete wall horizontal joint template further includes that both ends are respectively arranged in described in two The second locating part on mounting portion.
3. the straight degree of dry concrete wall horizontal joint template according to claim 2 adjusts bracing means, which is characterized in that The bottom of second locating part is equipped with two fittings for abutting the inner surface of two mounting portions respectively.
4. the straight degree of dry concrete wall horizontal joint template according to claim 2 adjusts bracing means, which is characterized in that The top of the mounting portion and the upper surface of the angle steel maintain an equal level.
5. the straight degree of dry concrete wall horizontal joint template according to claim 2 adjusts bracing means, which is characterized in that The orthographic projection of first locating part is vertical with the template, and second locating part is parallel with first locating part.
6. the straight degree of dry concrete wall horizontal joint template according to claim 1 adjusts bracing means, which is characterized in that The portion of increasing leads to for side.
7. the straight degree of dry concrete wall horizontal joint template according to claim 1 adjusts bracing means, which is characterized in that First locating part is reinforcing bar.
8. the straight degree of dry concrete wall horizontal joint template according to claim 2 adjusts bracing means, which is characterized in that The mounting portion is the lath that bears down on one.
9. the straight degree of dry concrete wall horizontal joint template according to claim 2 adjusts bracing means, which is characterized in that Second locating part is angle steel bar.
10. the straight degree of dry concrete wall horizontal joint template according to claim 1 adjusts bracing means, feature exists In the angle steel is installed in the template by screw rod on one side.
CN201920318372.7U 2019-03-11 2019-03-11 The straight degree of dry concrete wall horizontal joint template adjusts bracing means Expired - Fee Related CN209653377U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920318372.7U CN209653377U (en) 2019-03-11 2019-03-11 The straight degree of dry concrete wall horizontal joint template adjusts bracing means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920318372.7U CN209653377U (en) 2019-03-11 2019-03-11 The straight degree of dry concrete wall horizontal joint template adjusts bracing means

Publications (1)

Publication Number Publication Date
CN209653377U true CN209653377U (en) 2019-11-19

Family

ID=68526930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920318372.7U Expired - Fee Related CN209653377U (en) 2019-03-11 2019-03-11 The straight degree of dry concrete wall horizontal joint template adjusts bracing means

Country Status (1)

Country Link
CN (1) CN209653377U (en)

Similar Documents

Publication Publication Date Title
CN205444456U (en) Precast concrete lotus root roof beam rebar positioning board
CN212053719U (en) Bottom support device
CN106437146A (en) Template used for casting floor beam and construction method of floor beam
CN213062931U (en) A kind of aluminum mold anti-sill reinforcement device
CN210002871U (en) board descending area template supporting device
CN216505827U (en) U-shaped plastering-free cavity prefabricated part
CN219548378U (en) Combined welding-free aluminum alloy corner template
CN219011931U (en) Concrete wall corner post template reinforced structure
CN216190301U (en) A turning aid device for prefabricated components
CN209704021U (en) Stubble Bracket for Mounting of Clear-faced Concrete Wall Formwork
CN211848940U (en) A supplementary mould that is used for prefabricated bent cap and prefabricated stand to connect
CN116733217A (en) Node supporting structure of space curved surface precision control bracket system and mounting method
CN205330173U (en) Aluminum alloy template system passes magazine
CN217537345U (en) A pouring pre-embedded connection device
CN116005956A (en) Formwork system and construction method for reinforced concrete horizontal tie beams with masonry filled walls
CN219241353U (en) Novel aluminum template pull sheet system
CN210013093U (en) Novel concrete road side form template reinforcing device
CN208718214U (en) A kind of prefabricated wall panels
CN220768618U (en) Positioning tool for steel structure reinforcing steel bar connector
CN221663965U (en) A kind of assembled shear wall splicing node structure
CN218193470U (en) Arch frame bottom plate welding tool
CN222862876U (en) Steel template for preventing axillary angle defect
CN206457730U (en) A formwork for construction cover beams
CN217267618U (en) Template assembly for construction of comprehensive pipe rack
CN219033787U (en) Box-type column on-site splicing and positioning structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191119