An automatic transfer and exchange system for electroplating hangers Download PDFInfo
- Publication number
- CN209652467U CN209652467U CN201920307123.8U CN201920307123U CN209652467U CN 209652467 U CN209652467 U CN 209652467U CN 201920307123 U CN201920307123 U CN 201920307123U CN 209652467 U CN209652467 U CN 209652467U
- Authority
- CN
- China
- Prior art keywords
- exchange
- transport unit
- hanger
- electroplating
- cantilever
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Intermediate Stations On Conveyors (AREA)
Abstract
Description
技术领域technical field
本实用新型属于架高平台的电镀设备领域,尤其涉及一种电镀挂具的自动搬运交换系统。The utility model belongs to the field of electroplating equipment with elevated platforms, in particular to an automatic transfer and exchange system for electroplating hangers.
背景技术Background technique
电镀是利用电解原理在某些金属表面镀上一薄层其它金属或合金的过程。电镀需要一个向电镀槽供电的低压大电流电源以及由电镀液、待镀工件和阳极构成的电解装置。其中,电镀液成分视镀层不同而不同,但均含有提供金属离子的主盐,能络合主盐中金属离子形成络合物的络合剂,用于稳定溶液酸碱度的缓冲剂,阳极活化剂和特殊添加物。电镀过程是镀液中的金属离子在外电场的作用下,经电极反应还原成金属原子,并在阴极上进行金属沉积的过程。因此,这是一个包括液相传质、电化学反应和电结晶等步骤的金属电沉积过程。Electroplating is the process of plating a thin layer of other metals or alloys on the surface of certain metals using the principle of electrolysis. Electroplating requires a low-voltage high-current power supply to supply power to the electroplating tank and an electrolytic device consisting of electroplating solution, workpiece to be plated and anode. Among them, the composition of the electroplating solution varies depending on the plating layer, but they all contain the main salt that provides metal ions, the complexing agent that can complex the metal ions in the main salt to form a complex, the buffer used to stabilize the pH of the solution, and the anode activator. and special additions. The electroplating process is a process in which metal ions in the plating solution are reduced to metal atoms by electrode reaction under the action of an external electric field, and metal deposition is carried out on the cathode. Therefore, this is a metal electrodeposition process that includes steps such as liquid phase mass transfer, electrochemical reaction, and electrocrystallization.
在现有电镀设备领域中,设备自动化程度普遍较低,为了将电镀挂具不间断的依次完成电镀、卸料、放料并自动转移到下一工位,以达到节省劳动力,提高生产效率的目的,必然需要专用的工具来辅助完成。In the field of existing electroplating equipment, the degree of automation of the equipment is generally low. In order to continuously complete the electroplating, unloading, and discharging of the electroplating racks and automatically transfer them to the next station, in order to save labor and improve production efficiency In order to achieve the purpose, special tools are necessary to assist in the completion.
实用新型内容Utility model content
为了克服上述问题,本实用新型提供了一种电镀挂具的自动搬运交换系统,解决现有系统集成度低,自动化程度低,生产效率不高的问题。In order to overcome the above problems, the utility model provides an automatic transfer and exchange system for electroplating hangers, which solves the problems of low integration, low automation and low production efficiency of the existing system.
本实用新型解决其技术问题所采用的技术方案是:一种电镀挂具的自动搬运交换系统,其包括:The technical solution adopted by the utility model to solve the technical problem is: an automatic transfer and exchange system for electroplating hangers, which includes:
第一传送部,具有架体,若干个间隔、且可沿竖直方向运动的第一升降机构,以及用于将所有第一升降机构沿水平方向步进运动的第一横移机构;所述第一升降机构上安装有悬臂,悬臂的自由端处安置有用于悬挂电镀挂具的挂架;在第一升降机构的下部设有电镀槽。The first transmission part has a frame body, a plurality of spaced first lifting mechanisms that can move in the vertical direction, and a first traverse mechanism for moving all the first lifting mechanisms in steps in the horizontal direction; A cantilever is installed on the first lifting mechanism, and a hanger for hanging an electroplating hanger is arranged at the free end of the cantilever; an electroplating tank is arranged at the bottom of the first lifting mechanism.
交换部,具有固定在架体上、且朝第一横移机构下游侧方向而设置的工作台,以及固定在工作台上分别与两第一升降机构的悬臂相配合的限位座;当第一升降机构下降时,对应两相邻第一升降机构上的悬臂被限制在限位座上,其余第一升降机构上的悬臂通过挂架将电镀挂具浸入电镀槽内。The exchange part has a workbench fixed on the frame body and arranged towards the downstream side of the first traversing mechanism, and a limit seat fixed on the workbench to cooperate with the cantilevers of the two first elevating mechanisms respectively; When a lifting mechanism descends, the cantilevers on the corresponding two adjacent first lifting mechanisms are limited on the limit seats, and the cantilevers on the remaining first lifting mechanisms immerse the electroplating hanger in the electroplating tank through the hanger.
第二传送部,设置在第一传送部的竖直方向,其具有沿水平方向步进运动的第二横移机构,所述第二横移机构上间隔设置有若干个挂钩,该挂钩与挂架相配合,将电镀处理后的电镀挂具向下游侧搬运。The second transmission part is arranged in the vertical direction of the first transmission part, and it has a second traverse mechanism that moves step by step along the horizontal direction. Several hooks are arranged at intervals on the second traverse mechanism, and the hooks and the hooks Cooperate with the frame to transport the electroplating rack after electroplating to the downstream side.
升降式自动交换机,用于将所述交换部限位座上的电镀挂具搬运到第二传送部上,包括机架,安装在机架上、用于将电镀完毕的挂具从第一传送部移转到第二传送部的交换箱体,以及驱动所述交换箱体沿竖直方向运动的第二升降机构;所述交换箱体包括可正反转的减速电机,设置在减速电机左右两侧的扁心轮,以及分别安装在两扁心轮上的机械手交换提钩;当交换箱体位于第一传送部和第二传送部所在高度时,减速电机的转动方向彼此相反,并且两机械手交换提钩在同一时间内的转动方向彼此相反。利用减速电机带动扁心轮正反转,实现机械手交换提钩的正反交替运动,实现电镀挂具的放挂及卸挂。The lifting automatic switch is used to transport the electroplating hangers on the limit seat of the exchange part to the second transmission part, including a frame, which is installed on the frame and used to transfer the electroplated hangers from the first transfer part. transfer to the exchange box of the second transmission part, and the second lifting mechanism that drives the exchange box to move in the vertical direction; the exchange box includes a reversible geared motor, which is arranged on the left and right The flat heart wheels on both sides, and the manipulator exchange hooks respectively installed on the two flat heart wheels; when the exchange box is at the height of the first transmission part and the second transmission part, the rotation directions of the geared motors are opposite to each other, and the two The direction of rotation of the manipulators exchanging the lifting hooks at the same time is opposite to each other. The geared motor is used to drive the flat heart wheel to rotate positively and negatively to realize the positive and negative alternating movement of the manipulator to exchange the lifting hook, and to realize the hanging and unhanging of the electroplating rack.
进一步的,所述第二升降机构包括升降减速机,与升降减速机相连的传动轴,安装在传动轴上、且与交换箱体相连的升降圈带,以及设置在升降圈带远离交换箱体一侧的配重块。Further, the second lifting mechanism includes a lifting reducer, a transmission shaft connected to the lifting reducer, a lifting loop mounted on the transmission shaft and connected to the exchange box, and a lifting loop arranged on the lifting loop away from the exchange box. Weights on one side.
进一步的,所述机架的两侧上还设有升降导轨。Further, lifting guide rails are also provided on both sides of the frame.
进一步的,所述挂架可活动地安置在悬臂上,所述机械手交换提钩与挂架相适配。Further, the hanger is movably arranged on the cantilever, and the manipulator exchanges the lifting hook to match the hanger.
初始状态时,悬挂电镀挂具的挂架安置在第一升降机构的悬臂上,第一升降机构向下运动,进而带动电镀挂具浸入电镀槽中,待电镀处理完毕后,第一升降机构带动电镀挂具向上运动;接着,第一横移机构带动所有的第一升降机构沿水平方向移动一个工位,此时位于交换部上方的两第一升降机构的悬臂上分别为空和悬挂有电镀处理后的电镀挂具的挂架;当第一升降机构再次向下运动时,位于交换部上方的悬臂被限制在限位座上,其余第一升降机构上的悬臂向下运动带动电镀挂具进入电镀槽中。In the initial state, the hanger for hanging the electroplating hanger is placed on the cantilever of the first lifting mechanism, and the first lifting mechanism moves downward to drive the electroplating hanger to immerse in the electroplating tank. After the electroplating process is completed, the first lifting mechanism drives The electroplating hanger moves upward; then, the first traversing mechanism drives all the first lifting mechanisms to move one station in the horizontal direction. The hanger of the treated electroplating hanger; when the first lifting mechanism moves downward again, the cantilever above the exchange part is restricted on the limit seat, and the cantilever on the rest of the first lifting mechanism moves downward to drive the electroplating hanger into the electroplating tank.
当位于交换部上方的悬臂被限制在限位座上时,升降式自动交换机的交换箱体运动到第一传送部所在的平面,减速电机控制两机械手交换提钩分别正转、反转,进而将悬挂有电镀处理后的电镀挂具的挂架从限位座上其中一个悬臂上卸下,并将另一个挂架放置在另一个悬臂上;接着,第二升降机构控制交换箱体运动到第二传送部所在的平面,减速电机控制两机械手交换提钩分别反转、正转,进而将先前卸下的挂架放置在第二传送部的其中一个挂钩上,并从另一个挂钩处卸下另一个挂架。When the cantilever above the exchange part is restricted on the limit seat, the exchange box of the lift-type automatic switchboard moves to the plane where the first transmission part is located. The hanger that hangs the electroplating hanger after the electroplating treatment is unloaded from one of the cantilevers on the limit seat, and another hanger is placed on the other cantilever; then, the second lifting mechanism controls the movement of the exchange box to On the plane where the second transmission part is located, the deceleration motor controls the two manipulators to exchange the lifting hooks to reverse and forward respectively, and then place the previously unloaded hanger on one of the hooks of the second transmission part, and unload it from the other hook. Get down another hanger.
当升降式自动交换机的交换箱体在第一传送部所在的平面放挂、卸挂完成后,第一升降机构再次向上运动,并带动交换部上的两悬臂脱离限位座。When the exchange box of the lift-type automatic switchboard is hung and unloaded on the plane where the first transmission part is located, the first lifting mechanism moves upward again, and drives the two cantilever arms on the exchange part to break away from the limit seat.
当升降式自动交换机的交换箱体在第二传送部所在的平面放挂、卸挂完成后,第二横移机构带动所有的挂钩沿水平方向移动至下一个工位。When the exchange box of the lift-type automatic exchange is hung and unhung on the plane where the second transmission part is located, the second traverse mechanism drives all the hooks to move horizontally to the next station.
本实用新型针对现有设备上下料效率低,员工劳动强度大,自动化程度低的问题,设计出电镀挂具的自动搬运交换系统,有效释放了劳动力,降低了作业强度,且自动化程度较高。综上,本实用新型集成度高,自动化程度高,符合实际生产的需求。The utility model aims at the problems of low loading and unloading efficiency of existing equipment, high labor intensity of employees, and low degree of automation, and designs an automatic transfer and exchange system for electroplating hangers, which effectively releases labor force, reduces operating intensity, and has a high degree of automation. To sum up, the utility model has high integration degree and high automation degree, and meets the demand of actual production.
以下将结合附图和实施例,对本实用新型进行较为详细的说明。The utility model will be described in detail below in conjunction with the accompanying drawings and embodiments.
附图说明Description of drawings
图1为交换箱体位于第一传送部时,升降式自动交换机的主视图。Fig. 1 is a front view of the lift-type automatic switchboard when the switch box is located at the first conveying part.
图2为交换箱体位于第二传送部时,升降式自动交换机的主视图。Fig. 2 is a front view of the lift-type automatic switchboard when the switch box is located in the second conveying part.
图3为交换箱体位于第一传送部时,本实用新型的侧视图。Fig. 3 is a side view of the utility model when the exchange box is located in the first conveying part.
图4为交换箱体位于第二传送部时,本实用新型的侧视图。Fig. 4 is a side view of the utility model when the exchange box is located in the second conveying part.
图5为交换箱体的结构示意图。Fig. 5 is a schematic diagram of the structure of the exchange box.
图6为初始状态时,第一传送部、交换部的结构示意图。Fig. 6 is a schematic structural diagram of the first transmission unit and the exchange unit in an initial state.
图7为图6基础上,第一横移机构步进运动一个工位后,第一传送部、交换部的结构示意图。Fig. 7 is a schematic diagram of the structure of the first transfer part and the exchange part after the first traverse mechanism moves one station step by step on the basis of Fig. 6 .
图8为图7基础上,第一升降机构向下运动到位后,第一传送部、交换部的结构示意图。FIG. 8 is a schematic diagram of the structure of the first transmission part and the exchange part after the first lifting mechanism moves downward on the basis of FIG. 7 .
图9为图8基础上,升降式自动交换机将交换部处挂架卸挂、放挂的结构示意图。Fig. 9 is a schematic structural diagram of unhooking and hanging the hanger at the switching part of the lifting automatic switchboard based on Fig. 8 .
图10为图9基础上,第一升降机构向上运动到位后,第一传送部、交换部的结构示意图。FIG. 10 is a schematic diagram of the structure of the first transmission part and the exchange part after the first lifting mechanism moves upwards to the position on the basis of FIG. 9 .
图11为升降式自动交换机在第二传送部放挂、卸挂前,第二传送部的结构示意图,图中方框部示意了升降式自动交换机所在的位置。Fig. 11 is a schematic diagram of the structure of the second transmission unit before the second transmission unit puts and unhooks the lift-type automatic switchboard. The box part in the figure shows the position of the lift-type automatic switchboard.
图12为升降式自动交换机在第二传送部放挂、卸挂后,第二传送部的结构示意图。Fig. 12 is a schematic diagram of the structure of the second transmission part after the lifting automatic switchboard is put on and unhooked by the second transmission part.
图13为图12基础上,第二横移机构步进运动一个工位后,第二传送部的结构示意图。FIG. 13 is a schematic diagram of the structure of the second transmission part after the second traversing mechanism moves one station step by step on the basis of FIG. 12 .
具体实施方式Detailed ways
实施例,Example,
请参阅图1至3,一种电镀挂具自动搬运交换系统,包括:第一传送部1、交换部2、第二传送部3、和升降式自动交换机4。Please refer to FIGS. 1 to 3 , an automatic transfer and exchange system for electroplating racks, including: a first transfer unit 1 , an exchange unit 2 , a second transfer unit 3 , and an elevating automatic switch 4 .
其中,第一传送部1,具有架体,若干个间隔、且可沿竖直方向运动的第一升降机构11,以及用于将所有第一升降机构11沿水平方向步进运动的第一横移机构12;所述第一升降机构11上安装有悬臂13,悬臂13的自由端处安置有用于悬挂电镀挂具103的挂架104;在第一升降机构的下部设有电镀槽14。所述挂架104可活动地安置在悬臂13上,且与机械手交换提钩46相适配。Wherein, the first conveying part 1 has a frame body, a plurality of first lifting mechanisms 11 that are spaced apart and can move in the vertical direction, and a first transverse mechanism for stepping and moving all the first lifting mechanisms 11 in the horizontal direction. Moving mechanism 12; Cantilever 13 is installed on the first lifting mechanism 11, and the free end place of cantilever 13 is arranged with the hanger 104 that is used for hanging electroplating hanger 103; The hanger 104 is movably arranged on the cantilever 13 and is adapted to the manipulator exchange hook 46 .
交换部2,具有固定在架体上、且朝第一横移机构下游侧方向而设置的工作台21,以及固定在工作台21上分别与两第一升降机构的悬臂相配合的限位座22。当第一升降机构11下降时,对应两相邻第一升降机构11上的悬臂被限制在限位座22上,其余第一升降机构上的悬臂通过挂架将电镀挂具103浸入电镀槽14内。The exchange part 2 has a workbench 21 fixed on the frame body and arranged toward the downstream side of the first traverse mechanism, and a limit seat fixed on the workbench 21 to cooperate with the cantilevers of the two first lifting mechanisms respectively twenty two. When the first lifting mechanism 11 descends, the cantilevers on the corresponding two adjacent first lifting mechanisms 11 are restricted on the limit seat 22, and the cantilevers on the other first lifting mechanisms immerse the electroplating hanger 103 into the electroplating tank 14 through the hanger Inside.
第二传送部3,设置在第一传送部1的竖直方向,其具有沿水平方向步进运动的第二横移机构31,所述第二横移机构31上间隔设置有若干个挂钩32,该挂钩32与挂架104相配合,将电镀处理后的电镀挂具向下游侧搬运。The second transmission part 3 is arranged in the vertical direction of the first transmission part 1, and it has a second traverse mechanism 31 that moves step by step in the horizontal direction, and several hooks 32 are arranged at intervals on the second traverse mechanism 31 , the hook 32 cooperates with the hanger 104 to transport the electroplating hanger after the electroplating treatment to the downstream side.
升降式自动交换机4,将用于电镀处理的第一传送部101上的电镀挂具103移转到下游第二传送部102上,所述第一传送部101与第二传送部102分别处于不同的竖直高度上。电镀挂具103悬挂在挂架104上。The lifting type automatic switch 4 is used to transfer the electroplating hanger 103 on the first conveying part 101 for electroplating to the downstream second conveying part 102, and the first conveying part 101 and the second conveying part 102 are respectively in different positions. on the vertical height. The electroplating hanger 103 is suspended on the hanger 104 .
其包括:机架41,安装在机架41上、用于将电镀完毕的挂具从第一传送部移转到第二传送部的交换箱体42,以及驱动所述交换箱体42沿竖直方向运动的第二升降机构43。It includes: a frame 41, installed on the frame 41, used to transfer the electroplated hanger from the first transfer part to the exchange box 42 of the second transfer part, and driving the exchange box 42 along the vertical direction. The second elevating mechanism 43 of straight direction motion.
交换箱体42包括可正反转的减速电机44,设置在减速电机44左右两侧的扁心轮45,以及分别安装在两扁心轮上的机械手交换提钩46。该机械手交换提钩与挂架104相适配,并将挂架104可活动的安置在机械手交换提钩上。The exchange box 42 includes a reversible geared motor 44, flat heart wheels 45 arranged on the left and right sides of the geared motor 44, and manipulator exchange hooks 46 respectively installed on the two flat heart wheels. The manipulator exchange hook is adapted to the hanger 104, and the hanger 104 is movably placed on the manipulator exchange hook.
当交换箱体42分别位于第一传送部101和第二传送部102所在高度时,减速电机44的转动方向彼此相反,并且两机械手交换提钩46在同一时间内的转动方向彼此相反。When the exchange box 42 is located at the height of the first transmission part 101 and the second transmission part 102 respectively, the rotation directions of the geared motors 44 are opposite to each other, and the rotation directions of the two manipulator exchange hooks 46 are opposite to each other at the same time.
第二升降机构43包括:固定在机架上的升降减速机47,与升降减速机47相连的传动轴48,安装在传动轴上、且与交换箱体相连的升降圈带49,以及设置在升降圈带远离交换箱体一侧的配重块410。The second elevating mechanism 43 comprises: the elevating speed reducer 47 that is fixed on the frame, the power transmission shaft 48 that links to each other with the elevating speed reducer 47, is installed on the power transmission shaft, and the elevating hoop belt 49 that links to each other with the exchange box, and is arranged on The lifting ring belt is away from the counterweight 410 on one side of the exchange box body.
在机架41的两侧上还设有与交换箱体42相配合的升降导轨。On the both sides of frame 41, also be provided with the lifting guide rail that cooperates with exchange box body 42.
1)初始状态时,悬挂电镀挂具的挂架安置在第一升降机构的悬臂上,第一升降机构向下运动,进而带动电镀挂具浸入电镀槽中,待电镀处理完毕后,第一升降机构带动电镀挂具向上运动;接着,第一横移机构带动所有的第一升降机构沿水平方向移动一个工位,此时位于交换部上方的两第一升降机构的悬臂上分别为空和悬挂有电镀处理后的电镀挂具的挂架;当第一升降机构再次向下运动时,位于交换部上方的悬臂被限制在限位座上,其余第一升降机构上的悬臂向下运动带动电镀挂具进入电镀槽中。1) In the initial state, the hanger for hanging the electroplating hanger is placed on the cantilever of the first lifting mechanism, and the first lifting mechanism moves downward to drive the electroplating hanger to immerse in the electroplating tank. After the electroplating process is completed, the first lifting The mechanism drives the electroplating hanger to move upward; then, the first traversing mechanism drives all the first lifting mechanisms to move one station in the horizontal direction. There is a hanger for the electroplating hanger after electroplating; when the first lifting mechanism moves downward again, the cantilever above the exchange part is restricted on the limit seat, and the cantilever on the rest of the first lifting mechanism moves downward to drive the electroplating The hanger enters the electroplating tank.
2)当位于交换部上方的悬臂被限制在限位座上时,升降式自动交换机的交换箱体运动到第一传送部所在的平面,减速电机控制两机械手交换提钩分别正转、反转,进而将悬挂有电镀处理后的电镀挂具的挂架从限位座上其中一个悬臂上卸下,并将另一个挂架放置在另一个悬臂上;接着,第二升降机构控制交换箱体运动到第二传送部所在的平面,减速电机控制两机械手交换提钩分别反转、正转,进而将先前卸下的挂架放置在第二传送部的其中一个挂钩上,并从另一个挂钩处卸下另一个挂架。2) When the cantilever located above the exchange part is restricted on the limit seat, the exchange box of the lifting automatic switchboard moves to the plane where the first transmission part is located, and the deceleration motor controls the exchange hooks of the two manipulators to rotate forward and reverse respectively. , and then unload the hanger with the electroplating hanger after electroplating treatment from one of the cantilevers on the limit seat, and place the other hanger on the other cantilever; then, the second lifting mechanism controls the exchange box Move to the plane where the second transmission part is located, the deceleration motor controls the two manipulators to exchange the lifting hooks to reverse and forward respectively, and then place the previously unloaded hanger on one of the hooks of the second transmission part, and from the other hook Remove the other hanger.
3)当升降式自动交换机的交换箱体在第一传送部所在的平面放挂、卸挂完成后,第一升降机构再次向上运动,并带动交换部上的两悬臂脱离限位座。3) After the exchange box of the lift-type automatic switchboard is hung and unhung on the plane where the first transmission part is located, the first lifting mechanism moves upward again and drives the two cantilever arms on the exchange part to break away from the limit seat.
4)当升降式自动交换机的交换箱体在第二传送部所在的平面放挂、卸挂完成后,第二横移机构带动所有的挂钩沿水平方向移动至下一个工位。4) After the exchange box of the lift-type automatic exchange is hung and unhung on the plane where the second transmission part is located, the second traverse mechanism drives all the hooks to move horizontally to the next station.
以上所述仅是对实用新型的较佳实施例,并非对实用新型的范围进行限定,故在不脱离本实用新型设计精神的前提下,本领域普通技术人员对本实用新型所述的构造、特征及原理所做的等效变化或装饰,均应落入本实用新型的保护范围内。The above descriptions are only preferred embodiments of the utility model, and are not intended to limit the scope of the utility model. Therefore, without departing from the design spirit of the utility model, those of ordinary skill in the art will understand the structure and features described in the utility model. And the equivalent changes or decorations made by the principles should fall within the protection scope of the present utility model.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920307123.8U CN209652467U (en) | 2019-03-12 | 2019-03-12 | An automatic transfer and exchange system for electroplating hangers |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920307123.8U CN209652467U (en) | 2019-03-12 | 2019-03-12 | An automatic transfer and exchange system for electroplating hangers |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209652467U true CN209652467U (en) | 2019-11-19 |
Family
ID=68526575
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920307123.8U Expired - Fee Related CN209652467U (en) | 2019-03-12 | 2019-03-12 | An automatic transfer and exchange system for electroplating hangers |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209652467U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109706511A (en) * | 2019-03-12 | 2019-05-03 | 苏州台祥机电设备有限公司 | A kind of automatic transporting exchange system of Electropolating hangers |
-
2019
- 2019-03-12 CN CN201920307123.8U patent/CN209652467U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109706511A (en) * | 2019-03-12 | 2019-05-03 | 苏州台祥机电设备有限公司 | A kind of automatic transporting exchange system of Electropolating hangers |
| CN109706511B (en) * | 2019-03-12 | 2024-06-25 | 苏州台祥机电设备有限公司 | Automatic carrying and exchanging system of electroplating hanger |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109706510B (en) | Automatic carrying method of electroplating hanger | |
| WO2024197996A1 (en) | Automatic cyclic transfer apparatus for rack plating | |
| CN104911681A (en) | A double row continuous electroplating production line for soft board | |
| CN209652467U (en) | An automatic transfer and exchange system for electroplating hangers | |
| CN105926009A (en) | Cathode plate gap adjusting device and method | |
| CN217572876U (en) | Automatic hanging-changing manipulator for gantry line | |
| CN206359646U (en) | Electroplating device with automatic stripping and hanging system | |
| CN115161749A (en) | Multilayer nickel electroplating device for improving corrosion resistance of plated part | |
| CN107326317B (en) | Double-station intelligent circulation feeding and discharging device | |
| CN108385134B (en) | Multi-lift electrolysis travelling crane and method for lifting cathode plate | |
| CN209652466U (en) | A kind of lift automatic switch-board for realizing Electropolating hangers transfer | |
| CN109706511B (en) | Automatic carrying and exchanging system of electroplating hanger | |
| CN103114322B (en) | Conveying mechanism for electroplated workpiece | |
| CN208087162U (en) | Lift quickly carries extension wagon transferred from one yard to another | |
| CN207987336U (en) | A kind of automatic disengaging slot device | |
| CN109706512B (en) | Lifting type automatic exchanger for realizing electroplating hanger transferring | |
| CN212739745U (en) | Electroplating processing conveyor | |
| CN216514236U (en) | A new type of water line | |
| CN216141619U (en) | Automatic production circulating device for single FPC (flexible printed circuit) nickel-gold section vertical hanging rack of horizontal nickel-gold wire | |
| CN111825002A (en) | a lifting device | |
| CN112714556B (en) | Full-automatic circuit board level heavy copper line VCP electroplates device | |
| CN212895070U (en) | Lifting type automatic switch for transferring electroplating hanger | |
| CN216514209U (en) | Conveyer belt switch | |
| CN203112954U (en) | Electroplating workpiece conveying mechanism | |
| CN224119152U (en) | Electroplating processing equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191119 |