- CN209637198U CN209637198U CN201821569584.4U CN201821569584U CN209637198U CN 209637198 U CN209637198 U CN 209637198U CN 201821569584 U CN201821569584 U CN 201821569584U CN 209637198 U CN209637198 U CN 209637198U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- plate connector
- frame body
- connector
- hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及一种钩挂式安全防倾装置,尤其适合在拆除整体钢平台悬挑式内筒架时使用。The utility model relates to a hook-type safety anti-tilt device, which is especially suitable for use when dismantling a cantilevered inner barrel frame of an integral steel platform.
背景技术Background technique
整体钢平台模架是超高层建筑建造的核心技术,当建筑物核心筒混凝土结构施工完毕后,整体钢平台模架停止爬升并对其进行拆除,此时模架停留在几百米高空,对拆除作业带来很大难度,保证拆除过程中模架结构的稳定及施工人员的安全是整个拆除工作的重点和难点。例如对于悬挑式内筒架的拆除,基于核心筒的复杂结构,设计时核心筒中的内筒架支撑结构为单边支撑,内筒架上部结构拆除后(第1~6步拆除),留存的最后一吊架体(内筒架第7步)一边离墙体500mm另一边悬空。为了防止架体在拆除过程中倾翻,按以往的拆除方案,如图1所示,通过钢丝绳8斜拉的方式,这种方式在施工人员拆除作业时,难以控制架体7在作业过程中晃动,因此也无法真正保证架体平衡,存在一定的安全隐患。The integral steel platform formwork is the core technology of super high-rise building construction. After the construction of the concrete structure of the core tube of the building is completed, the integral steel platform formwork stops climbing and is removed. At this time, the formwork stays at a height of several hundred meters. The demolition operation brings great difficulties, and ensuring the stability of the formwork structure and the safety of the construction personnel during the demolition process is the focus and difficulty of the entire demolition work. For example, for the removal of the cantilevered inner cylinder frame, based on the complex structure of the core tube, the support structure of the inner cylinder frame in the core tube is unilaterally supported during design. One side of the last hanger body (step 7 of the inner barrel frame) is 500mm away from the wall and the other side is suspended in the air. In order to prevent the frame body from tipping over during the demolition process, according to the previous demolition scheme, as shown in Figure 1, the steel wire rope 8 is used to pull it obliquely. In this way, it is difficult for the construction personnel to control the frame body 7 during the operation process. Shaking, so the balance of the frame cannot be truly guaranteed, and there are certain potential safety hazards.
实用新型内容Utility model content
本实用新型所要解决的技术问题在于提供一种钩挂式安全防倾装置,在架体拆除过程中,能够将架体与墙体相互连接,确保架体的稳定平衡。The technical problem to be solved by the utility model is to provide a hook-type safety anti-tilt device, which can connect the frame and the wall to ensure the stability and balance of the frame during the frame removal process.
为了解决上述问题,本实用新型采用的技术方案如下:In order to solve the above problems, the technical scheme adopted by the utility model is as follows:
一种钩挂式安全防倾装置,包括呈L形的第一钢板连接件和呈倒置的L 形的第二钢板连接件,所述第一钢板连接件的水平段与墙体固接,所述第二钢板连接件的水平段与架体固接,A hook-type safety anti-rolling device, comprising an L-shaped first steel plate connector and an inverted L-shaped second steel plate connector, the horizontal section of the first steel plate connector is fixedly connected to the wall, and the The horizontal section of the second steel plate connector is fixedly connected to the frame body,
所述第一钢板连接件和第二钢板连接件钩挂在一起,所述第一钢板连接件的竖直段与第二钢板连接件的竖直段分别开设有连接孔,两个连接孔通过螺栓固定连接。The first steel plate connector and the second steel connector are hooked together, the vertical section of the first steel connector and the vertical segment of the second steel connector are respectively provided with connecting holes, and the two connecting holes pass through Bolted connection.
进一步,所述第一钢板连接件与墙体埋件焊接为一体。Further, the first steel plate connector is welded integrally with the wall embedded part.
进一步,所述架体为悬挑式内筒架。Further, the frame body is a cantilevered inner barrel frame.
进一步,所述第二钢板连接件的水平段固接一用于卡置在悬挑式内筒架上的卡口部,所述卡口部包括连接板以及固接在连接板两侧的侧板,两个侧板的相应位置沿水平方向开设有长槽孔,两侧板的长槽孔之间安装有双头螺栓。Further, the horizontal section of the second steel plate connector is fixedly connected to a bayonet part for clamping on the cantilevered inner cylinder frame, and the bayonet part includes a connecting plate and side parts fixed on both sides of the connecting plate. The corresponding positions of the two side plates are provided with long slotted holes along the horizontal direction, and stud bolts are installed between the long slotted holes of the two side plates.
进一步,所述第一钢板连接件及第二钢板连接件在水平段的外侧分别焊接有加强筋。Further, the first steel plate connector and the second steel plate connector are respectively welded with reinforcing ribs on the outside of the horizontal section.
本实用新型的工作原理是,架体上部的吊点由吊装设备固定,架体靠墙的一侧通过两个钢板连接件之间相互钩挂及螺栓固定与架体连接。当搁置牛腿缩回后,两个钢板连接件之间拉紧,确保架体在拆除过程中的稳定平衡。架体拆除时,先拆除两个钢板连接件之间的螺栓,然后吊装设备将架体垂直起吊,第一钢板连接件与第二钢板连接件脱离,实现架体的顺利拆除。第二钢板连接件采用卡口部,并在两侧板上开设长槽孔,长槽孔间安装双头螺栓的结构方式,可将卡口部固定于悬挑式内筒架的方管上。The working principle of the utility model is that the hanging point on the upper part of the frame body is fixed by the hoisting equipment, and the side of the frame body against the wall is connected with the frame body through mutual hooking and bolt fixing between two steel plate connectors. When the shelving corbel is retracted, the two steel plate connectors are tensioned to ensure the stable balance of the frame body during the dismantling process. When dismantling the frame body, first remove the bolts between the two steel plate connectors, and then lift the frame body vertically by the hoisting equipment, and the first steel plate connector is separated from the second steel plate connector to realize the smooth removal of the frame body. The second steel plate connector adopts a bayonet part, and slotted holes are set on the two side plates, and the stud bolts are installed between the long slot holes, so that the bayonet part can be fixed on the square tube of the cantilevered inner cylinder frame .
与现有技术相比,本实用新型的有益效果在于:Compared with the prior art, the utility model has the beneficial effects of:
本实用新型能够有效防止悬挑式内筒架向内倾翻,保证架体在拆除过程中的平衡,防止安全事故的发生,确保施工人员安全。The utility model can effectively prevent the cantilevered inner barrel frame from tipping inward, ensure the balance of the frame body during the dismantling process, prevent safety accidents, and ensure the safety of construction personnel.
附图说明Description of drawings
图1为现有技术的防止架体倾翻的结构。Fig. 1 is the structure for preventing the rack body from tipping in the prior art.
图2为本实用新型一优选实施例的结构示意图。Fig. 2 is a schematic structural diagram of a preferred embodiment of the present invention.
图3为本实用新型一优选实施例的局部放大图。Fig. 3 is a partially enlarged view of a preferred embodiment of the present invention.
图4为本实用新型一优选实施例中第一钢板连接件的主视图。Fig. 4 is a front view of the first steel plate connector in a preferred embodiment of the present invention.
图5为本实用新型一优选实施例中第一钢板连接件的俯视图。Fig. 5 is a top view of the first steel plate connector in a preferred embodiment of the present invention.
图6为本实用新型一优选实施例中第二钢板连接件的主视图。Fig. 6 is a front view of the second steel plate connector in a preferred embodiment of the present invention.
图7为本实用新型一优选实施例中第二钢板连接件的俯视图。Fig. 7 is a top view of the second steel plate connector in a preferred embodiment of the present invention.
具体实施方式Detailed ways
以下结合附图和具体实施例对本实用新型做进一步的详细说明。根据下面的说明,本实用新型的目的、技术方案和优点将更加清楚。需要说明的是,所描述的实施例是本实用新型的优选实施例,而不是全部的实施例。Below in conjunction with accompanying drawing and specific embodiment the utility model is described in further detail. According to the following description, the purpose, technical solution and advantages of the utility model will be more clear. It should be noted that the described embodiments are preferred embodiments of the present utility model, but not all embodiments.
结合图2和图3所示,一种钩挂式安全防倾装置,包括呈L形的第一钢板连接件2和呈倒置的L形的第二钢板连接件3,所述第一钢板连接件2的水平段通过焊接在墙体埋件4上与墙体1连接。所述第二钢板连接件3的水平段与架体7固接,所述第一钢板连接件2和第二钢板连接件3钩挂在一起。参考图4和图6,第一钢板连接件2的竖直段与第二钢板连接件3的竖直段分别开设有连接孔8,两个连接孔通过螺栓6固定连接。As shown in Figure 2 and Figure 3, a hook-type safety anti-rolling device includes an L-shaped first steel plate connector 2 and an inverted L-shaped second steel plate connector 3, the first steel plate connected The horizontal section of the part 2 is connected with the wall body 1 by welding on the wall body embedded part 4 . The horizontal section of the second steel plate connector 3 is fixedly connected to the frame body 7, and the first steel plate connector 2 and the second steel plate connector 3 are hooked together. Referring to Fig. 4 and Fig. 6, the vertical section of the first steel plate connector 2 and the vertical section of the second steel plate connector 3 respectively have connection holes 8, and the two connection holes are fixedly connected by bolts 6.
结合图6和图7所示,当所述架体7为悬挑式内筒架时,所述第二钢板连接件3的水平段固接一用于卡置在悬挑式内筒架上的卡口部5,所述卡口部5包括连接板5a以及固接在连接板5a两侧的侧板5b,两个侧板5b的相应位置沿水平方向开设有长槽孔5c,两侧板的长槽孔之间安装有双头螺栓9。As shown in Figure 6 and Figure 7, when the frame body 7 is a cantilevered inner barrel frame, the horizontal section of the second steel plate connector 3 is fixedly connected to a cantilevered inner barrel frame The bayonet part 5 includes a connecting plate 5a and side plates 5b fixed on both sides of the connecting plate 5a. The corresponding positions of the two side plates 5b are provided with long slots 5c along the horizontal direction. Stud bolts 9 are installed between the slotted holes of the plates.
结合图4和图6,所述第一钢板连接件2及第二钢板连接件3在水平段的外侧分别焊接有加强筋10。Referring to FIG. 4 and FIG. 6 , the first steel plate connector 2 and the second steel plate connector 3 are respectively welded with reinforcing ribs 10 on the outside of the horizontal section.
结合图2和图3,本实用新型的工作原理是,架体7上部的吊点由吊装设备固定,架体7靠墙的一侧通过两个钢板连接件之间钩挂及螺栓6固定与架体连接。当搁置牛腿(图中未表示)缩回后,两个钢板连接件之间拉紧,确保架体7在拆除过程中的稳定平衡。架体拆除时,先拆除两个钢板连接件之间的螺栓6,然后吊装设备将架体垂直起吊,第一钢板连接件2与第二钢板连接件3脱离,实现架体7的顺利拆除。第二钢板连接件3采用卡口部5的两个侧板5b卡住悬挑式内筒架的方管,通过长槽孔5c与双头螺栓9的配合方式,将卡口部5固定于悬挑式内筒架的方管上。In conjunction with Fig. 2 and Fig. 3, the working principle of the present utility model is that the lifting point on the upper part of the frame body 7 is fixed by the hoisting equipment, and the side of the frame body 7 against the wall is fixed by hooking between two steel plate connectors and bolts 6. Frame connection. When the shelving corbel (not shown in the figure) is retracted, the two steel plate connectors are tensioned to ensure the stable balance of the frame body 7 during the dismantling process. When the frame body is dismantled, the bolt 6 between the two steel plate connectors is first removed, and then the hoisting equipment lifts the frame body vertically, and the first steel plate connector 2 is separated from the second steel plate connector 3 to realize the smooth removal of the frame body 7. The second steel plate connector 3 uses the two side plates 5b of the bayonet part 5 to clamp the square tube of the cantilevered inner cylinder frame, and fixes the bayonet part 5 to the On the square tube of the cantilevered inner barrel frame.
以上所述,仅是本实用新型优选实施例的描述说明,并非对本实用新型保护范围的限定,显然,任何熟悉本领域的技术人员基于上述实施例,可轻易想到替换或变化以获得其他实施例,这些均应涵盖在本实用新型的保护范围之内。The above is only a description of the preferred embodiments of the present invention, and is not a limitation of the protection scope of the present invention. Obviously, any person skilled in the art can easily think of replacements or changes based on the above embodiments to obtain other embodiments. , these should be covered within the protection scope of the present utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821569584.4U CN209637198U (en) | 2018-09-26 | 2018-09-26 | A hook-type safety anti-tilt device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821569584.4U CN209637198U (en) | 2018-09-26 | 2018-09-26 | A hook-type safety anti-tilt device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209637198U true CN209637198U (en) | 2019-11-15 |
Family
ID=68471160
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201821569584.4U Expired - Fee Related CN209637198U (en) | 2018-09-26 | 2018-09-26 | A hook-type safety anti-tilt device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209637198U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114888507A (en) * | 2022-05-24 | 2022-08-12 | 广东韶钢工程技术有限公司 | Device for welding box body and using method |
-
2018
- 2018-09-26 CN CN201821569584.4U patent/CN209637198U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114888507A (en) * | 2022-05-24 | 2022-08-12 | 广东韶钢工程技术有限公司 | Device for welding box body and using method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205476401U (en) | Elevator well type steel protection construction platform | |
| CN205932941U (en) | A device for handling of precast box girder template | |
| CN206267139U (en) | A kind of pile foundation steel bar cage positioning and concrete pouring support | |
| CN207727953U (en) | A kind of suspended operating platform of slip | |
| CN211368423U (en) | Stay cable tower top lifting traction operation platform | |
| CN203255914U (en) | Unit-typed curtain wall lifting device | |
| CN105952129B (en) | Elevator shaft combined type integral lifting operation platform and construction method thereof | |
| CN207363238U (en) | A kind of main frame of universal elevating scaffold | |
| CN209637198U (en) | A hook-type safety anti-tilt device | |
| CN206667042U (en) | Bridge expanssion joint installation and adjustment instrument | |
| CN209145256U (en) | Prefabricated building special climbing frame | |
| CN115788012A (en) | Hydraulic climbing formwork integral climbing and sliding device and method suitable for inclined wall construction | |
| CN202920859U (en) | Slot type safety belt hanger | |
| CN106522541B (en) | A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system | |
| CN205316526U (en) | Outer quick -witted support frame of fixed air conditioner suspends in midair | |
| CN205316527U (en) | Novel suspension type air conditioner outer quick -witted fixed knot construct | |
| CN211173007U (en) | Novel tripod of encorbelmenting | |
| CN209855192U (en) | A stereotyped elevator hoistway automatic lifting frame | |
| CN110205939A (en) | Trolley and method for mobile dismounting formwork of bridge rail | |
| CN105060124B (en) | Intra-frame portal crane system and hoisting use method thereof | |
| CN103758334A (en) | Scaffold structure for building external wall construction | |
| CN205116854U (en) | Coal scuttle is portable platform for aggregate erection | |
| CN209323948U (en) | A frame body safety anti-tilt device | |
| CN204357138U (en) | Simple steel structure hoisting frame | |
| CN204038917U (en) | Detachable external hanging type operating platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191115 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |