CN209636826U - Water-stop structure of foundation pit in water-rich sand and gravel stratum - Google Patents

Water-stop structure of foundation pit in water-rich sand and gravel stratum Download PDF

Info

Publication number
CN209636826U
CN209636826U CN201920151366.7U CN201920151366U CN209636826U CN 209636826 U CN209636826 U CN 209636826U CN 201920151366 U CN201920151366 U CN 201920151366U CN 209636826 U CN209636826 U CN 209636826U
Authority
CN
China
Prior art keywords
water
stop
foundation
grouting
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920151366.7U
Other languages
Chinese (zh)
Inventor
黄河
尹鸿达
李检保
胡勇
曾霄
王观次
佘岳军
许可
任子坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yueyang Road And Bridge Capital Construction Corp
Original Assignee
Yueyang Road And Bridge Capital Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yueyang Road And Bridge Capital Construction Corp filed Critical Yueyang Road And Bridge Capital Construction Corp
Priority to CN201920151366.7U priority Critical patent/CN209636826U/en
Application granted granted Critical
Publication of CN209636826U publication Critical patent/CN209636826U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本申请涉及一种富水砂砾石地层基坑止水结构,设置于地层的基坑中,富水砂砾石地层基坑止水结构包括设置于基坑中侧壁外周的竖向止水帷幕;以及设置于基坑中底部的水平向止水帷幕;竖向止水帷幕包括复合桩基及竖向袖阀管注浆体,复合桩基包围于基坑中侧壁的外周,并通过竖向袖阀管注浆体搭接。本申请提供的富水砂砾石地层基坑止水结构,采用竖向止水帷幕和水平向止水帷幕结合的方案,可有效解决悬挂式止水帷幕和坑内降水方案难以满足富水砂砾石地层基坑开挖和周边建筑物安全的需要;同时,复合桩基与竖向袖阀管注浆体形成的竖向联合止水帷幕,施工简便,止水效果好;此外,高压旋喷桩与微型钢管联合形成的复合桩基可同时起到止水帷幕和基坑支护的作用,不需要另外单独施做支护结构。

The present application relates to a water-stop structure for a foundation pit in a water-rich sandy gravel stratum, which is arranged in the foundation pit of the stratum. And the horizontal water-stop curtain arranged at the bottom of the foundation pit; the vertical water-stop curtain includes a composite pile foundation and a vertical sleeve valve pipe grouting body, the composite pile foundation surrounds the outer periphery of the side wall of the foundation pit, and passes through the vertical Sleeve valve pipe grouting body overlap. The water-stop structure of foundation pits in water-rich sand and gravel strata provided by this application adopts a combination of vertical water-stop curtains and horizontal water-stop curtains, which can effectively solve the problem that the suspended water-stop curtains and pit precipitation schemes cannot meet the requirements of water-rich sand and gravel strata. The excavation of the foundation pit and the safety of surrounding buildings; at the same time, the vertical combined water-stop curtain formed by the composite pile foundation and the vertical sleeve valve pipe grouting body is easy to construct and has a good water-stop effect; in addition, the high-pressure rotary grouting pile and The composite pile foundation formed by the combination of micro-steel pipes can simultaneously play the role of water-stop curtain and foundation pit support, and does not need to be separately constructed as a support structure.

Description

富水砂砾石地层基坑止水结构Water-stop structure of foundation pit in water-rich sand and gravel stratum

技术领域technical field

本实用新型涉及建筑施工技术领域,特别涉及一种富水砂砾石地层基坑止水结构。The utility model relates to the technical field of building construction, in particular to a water-stop structure for foundation pits in water-rich sand and gravel strata.

背景技术Background technique

随着我国城市化进程的加快及人民对居住区环境、风景要求不断提高,在过去荒废的湖区和古河道滩涂地区现在成为人居建设工程项目的优先选地。通常湖区及古河道等地区地下水非常丰富,而且有深厚的砂砾或卵石层等,富水砂砾石地层具有结构松散、空隙率大、高渗透性的特点,在其上施做建筑物需对地层进行防排水及加固处理。With the acceleration of my country's urbanization process and the continuous improvement of people's requirements for the environment and scenery of residential areas, lake areas and ancient river tidal flat areas that were abandoned in the past have now become the preferred locations for residential construction projects. Generally, the groundwater in lake areas and ancient rivers is very rich, and there are deep gravel or pebble layers. Carry out waterproofing and drainage and reinforcement treatment.

对于富水砂砾石地层基坑,按照传统施工方法,施工时需要在基坑内降水,由于基底砂砾石土层结构比较松散,渗透性强,如果不对基底进行加固处理,则基坑开挖时基底易发生涌水或渗透破坏等问题,同时过度减低地下水也会导致周边土体产生较大的固结沉降,影响建筑物的安全使用。For foundation pits in water-rich sand and gravel strata, according to the traditional construction method, it is necessary to dewater in the foundation pit during construction. Since the foundation sand and gravel soil layer structure is relatively loose and has strong permeability, if the foundation is not reinforced, the foundation pit will be excavated. Problems such as water gushing or seepage damage are prone to occur. At the same time, excessive reduction of groundwater will also cause large consolidation and settlement of the surrounding soil, which will affect the safe use of buildings.

实用新型内容Utility model content

基于此,提供一种保证基坑开挖安全性的富水砂砾石地层基坑止水结构。Based on this, a water-stopping structure for a foundation pit in a water-rich sandy gravel stratum is provided to ensure the safety of foundation pit excavation.

一种富水砂砾石地层基坑止水结构,设置于地层的基坑中,所述富水砂砾石地层基坑止水结构包括:A foundation pit water-stopping structure of water-rich sand and gravel stratum is arranged in the foundation pit of the stratum, and the water-stop structure of foundation pit of water-rich sand and gravel stratum comprises:

设置于所述基坑中侧壁外周的竖向止水帷幕;以及a vertical water-stop curtain arranged on the outer periphery of the side wall in the foundation pit; and

设置于所述基坑中底部的水平向止水帷幕;A horizontal water-stop curtain arranged at the bottom of the foundation pit;

其中,所述竖向止水帷幕包括复合桩基及竖向袖阀管注浆体,所述复合桩基包围于所述基坑中侧壁的外周,并通过所述竖向袖阀管注浆体搭接。Wherein, the vertical water-stop curtain includes a composite pile foundation and a vertical sleeve valve pipe grouting body. Slurry lap.

在其中一个实施例中,所述水平向止水帷幕构造为通过袖阀管注浆形成的水平袖阀管注浆体联合。In one of the embodiments, the horizontal water-stop curtain is configured as a combination of horizontal sleeve valve pipe grouting bodies formed by sleeve valve pipe grouting.

在其中一个实施例中,所述竖向止水帷幕与所述水平向止水帷幕通过各自的所述竖向袖阀管注浆体和所述水平袖阀管注浆体搭接,形成所述基坑的封闭止水系统。In one of the embodiments, the vertical water-stop curtain and the horizontal water-stop curtain are overlapped by the respective vertical sleeve valve pipe grouting body and the horizontal sleeve valve pipe grouting body to form the The closed water stop system of the foundation pit.

在其中一个实施例中,所述复合桩基构造为高压旋喷桩与微型钢管的联合。In one of the embodiments, the composite pile foundation is constructed as a combination of high-pressure jet spray piles and micro-steel pipes.

在其中一个实施例中,所述复合桩基构造为采用三重管高压旋喷注浆施做高压旋喷桩,并在所述高压旋喷桩中打入微型钢管。In one of the embodiments, the composite pile foundation is constructed as a high-pressure rotary grouting pile using triple tube high-pressure rotary grouting grouting, and micro steel pipes are driven into the high-pressure rotary grouting pile.

在其中一个实施例中,所述微型钢管构造为沿所述高压旋喷桩长度方向布置在所述高压旋喷桩中心的无缝钢管。In one of the embodiments, the micro-steel pipe is configured as a seamless steel pipe arranged at the center of the high-pressure jet-spray pile along the length direction of the high-pressure jet-spray pile.

在其中一个实施例中,所述竖向袖阀管注浆体搭接于相邻两个所述高压旋喷桩之间的间隙内。In one of the embodiments, the grouting body of the vertical sleeve valve pipe overlaps in the gap between two adjacent high-pressure jet grouting piles.

在其中一个实施例中,所述竖向袖阀管注浆体和所述水平袖阀管注浆体在注浆中的袖阀管为柔性塑胶管。In one embodiment, the sleeve valve tubes of the vertical sleeve valve tube grouting body and the horizontal sleeve valve tube grouting body are flexible plastic tubes.

在其中一个实施例中,所述水平向止水帷幕构造为对所述基坑的底部以梅花形布置的若干静压灌浆孔灌浆形成。In one of the embodiments, the horizontal water-stop curtain is configured to be formed by grouting several static pressure grouting holes arranged in a quincunx shape at the bottom of the foundation pit.

在其中一个实施例中,所述富水砂砾石地层基坑止水结构设置于富水砂砾石地层的所述基坑中In one of the embodiments, the water-stopping structure of the foundation pit of the water-rich sand and gravel formation is set in the foundation pit of the water-rich sand and gravel formation

本申请提供的富水砂砾石地层基坑止水结构,采用竖向止水帷幕和水平向止水帷幕结合的方案,可有效解决悬挂式止水帷幕和坑内降水方案难以满足富水砂砾石地层基坑开挖和周边建筑物安全的需要;同时,复合桩基与竖向袖阀管注浆体形成的竖向联合止水帷幕,施工简便,止水效果好,可节省工期,降低造价;此外,高压旋喷桩与微型钢管联合形成的复合桩基可同时起到止水帷幕和基坑支护的作用,不需要另外单独施做支护结构。The water-stop structure of foundation pits in water-rich sand and gravel strata provided by this application adopts a combination of vertical water-stop curtains and horizontal water-stop curtains, which can effectively solve the problem that the suspended water-stop curtains and pit precipitation schemes cannot meet the requirements of water-rich sand and gravel strata. The excavation of the foundation pit and the safety of surrounding buildings; at the same time, the vertical combined water-stop curtain formed by the composite pile foundation and the vertical sleeve valve pipe grouting body is easy to construct and has a good water-stop effect, which can save construction time and reduce construction costs; In addition, the composite pile foundation formed by the combination of high-pressure rotary grouting piles and micro-steel pipes can simultaneously play the role of water-stop curtain and foundation pit support, and does not need to be separately constructed as a support structure.

附图说明Description of drawings

图1为本实用新型一实施例中基坑施工的结构剖面图;Fig. 1 is the structural sectional view of foundation pit construction in an embodiment of the utility model;

图2为图1所示基坑施工的结构平面图。Fig. 2 is a structural plan view of the foundation pit construction shown in Fig. 1 .

具体实施方式Detailed ways

为了便于理解本实用新型,下面将参照相关附图对本实用新型进行更全面的描述。附图中给出了本实用新型的较佳实施例。但是,本实用新型可以以许多不同的形式来实现,并不限于本文所描述的实施例。相反地,提供这些实施例的目的是使对本实用新型的公开内容的理解更加透彻全面。In order to facilitate the understanding of the utility model, the utility model will be described more fully below with reference to the relevant drawings. Preferred embodiments of the utility model are provided in the accompanying drawings. However, the invention can be embodied in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present utility model more thorough and comprehensive.

需要说明的是,当元件被称为“固定于”另一个元件,它可以直接在另一个元件上或者也可以存在两者之间的元件。当一个元件被认为是“连接”另一个元件,它可以是直接连接到另一个元件或者可能同时存在两者之间的元件。It should be noted that when an element is said to be "fixed" to another element, it may be directly on the other element or there may be an element in between. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or there may be both elements in between.

除非另有定义,本文所使用的所有的技术和科学术语与属于本实用新型的技术领域的技术人员通常理解的含义相同。本文中在本实用新型的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本实用新型。本文所使用的术语“及/或”包括一个或多个相关的所列项目的任意的和所有的组合。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the technical field of this invention. The terminology used in the description of the utility model herein is only for the purpose of describing specific embodiments, and is not intended to limit the utility model. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.

此外,在说明书中,短语“平面示意图”是指当从上方观察目标部分时的附图。且附图并不是1:1的比例绘制,并且各元件的相对尺寸在附图中仅以示例地绘制,而不一定按照真实比例绘制。Also, in the specification, the phrase "schematic plan view" refers to a drawing when a target portion is viewed from above. And the drawings are not drawn in a 1:1 scale, and the relative sizes of the elements are drawn in the drawings for example only, not necessarily drawn in true scale.

基坑是在基础设计位置按基底标高和基础平面尺寸所开挖的土坑。开挖前应根据地质水文资料,结合现场附近建筑物情况,决定开挖方案,并作好防水排水工作。The foundation pit is an earth pit excavated at the foundation design position according to the base level and foundation plane size. Before excavation, the excavation plan should be determined according to the geological and hydrological data, combined with the conditions of the nearby buildings, and the waterproof and drainage work should be done well.

特别地,针对土层结构比较松散、渗透性强的地层(例如富水砂砾石地层)进行基坑施工时,通常采用的悬挂式止水帷幕和坑内降水方案难以满足基坑开挖和周边建筑物安全的需要,且落底式止水帷幕耗资大,施工质量、止水效果不能保证。In particular, when carrying out foundation pit construction for strata with loose soil structure and strong permeability (such as water-rich sandy gravel stratum), the commonly used hanging water-stop curtain and the precipitation scheme in the pit are difficult to meet the needs of foundation pit excavation and surrounding buildings. The need for material safety, and the cost of the bottom-type water-stop curtain is high, and the construction quality and water-stop effect cannot be guaranteed.

因此,有必要提供一种保证基坑开挖安全性的富水砂砾石地层基坑止水结构。Therefore, it is necessary to provide a water-stop structure for foundation pits in water-rich sand and gravel strata that ensures the safety of foundation pit excavation.

下面以富水砂砾石地层为例,对本申请中基坑的止水结构进行详细说明。本实施例仅用以作为范例说明,并不会限制本申请的技术范围。再者实施例中的图式亦省略不必要的组件,以清楚显示本申请的技术特点。可以理解地,在其它一些实施例中,本申请中的富水砂砾石地层基坑止水结构亦可用于其它松散地层的施工,在此不作限定。Taking the water-rich sand and gravel stratum as an example, the water-stop structure of the foundation pit in this application will be described in detail below. This embodiment is only used as an example for illustration, and does not limit the technical scope of this application. Furthermore, unnecessary components are omitted in the drawings of the embodiments to clearly show the technical features of the present application. It can be understood that, in some other embodiments, the water-stop structure for foundation pits in water-rich sand and gravel formations in the present application can also be used in the construction of other loose formations, which is not limited here.

在对本申请进行详细说明之前,首先对本申请中的一些内容进行解释,以便于更清楚地理解本申请的技术方案。Before describing the application in detail, some content in the application is explained first, so as to understand the technical solution of the application more clearly.

止水帷幕是一个概念,是工程主体外围止水系列的总称,用于阻止或减少基坑侧壁及基坑底地下水流入基坑而采取的连续止水体。The water-stop curtain is a concept, which is the general term for the water-stop series around the main body of the project. It is a continuous water-stop body used to prevent or reduce the groundwater on the side wall of the foundation pit and the groundwater at the bottom of the foundation pit from flowing into the foundation pit.

下面,将参照附图详细描述本申请实施例中的富水砂砾石地层基坑止水结构。Hereinafter, the water-stopping structure for foundation pits in water-rich sand and gravel formations in the embodiments of the present application will be described in detail with reference to the accompanying drawings.

图1示出了本实用新型一实施例中基坑施工的结构剖面图;图2示出了本实用新型一实施例中基坑施工的结构平面图;为便于描述,附图仅示出了与本申请实施例相关的结构。Fig. 1 has shown the structural sectional view of foundation pit construction in an embodiment of the present utility model; Fig. 2 has shown the structural plan view of foundation pit construction in an embodiment of the present utility model; For ease of description, accompanying drawing has only shown and The structure related to the embodiment of this application.

请参看图1及图2,本实用新型一实施例中富水砂砾石地层基坑止水结构100设置于富水砂砾石地层200的基坑300中,以形成包围于基坑300外周的全封闭的止水体系,并同时构成基坑300的支护体系。Please refer to Fig. 1 and Fig. 2, in an embodiment of the utility model, the water-stopping structure 100 of the foundation pit of the water-rich gravel stratum 200 is arranged in the foundation pit 300 of the water-rich gravel stratum 200, so as to form a fully enclosed surrounding around the periphery of the foundation pit 300 The water stop system, and at the same time constitute the support system of the foundation pit 300.

基坑300包括底部301及包围于底部301四周的侧壁303。富水砂砾石地层基坑止水结构100包括设置于基坑300中侧壁303外周的竖向止水帷幕10及设置于基坑300中底部301的水平向止水帷幕30。The foundation pit 300 includes a bottom 301 and sidewalls 303 surrounding the bottom 301 . The foundation pit water-stop structure 100 in water-rich sand and gravel stratum includes a vertical water-stop curtain 10 arranged on the outer periphery of the side wall 303 of the foundation pit 300 and a horizontal water-stop curtain 30 arranged on the bottom 301 of the foundation pit 300 .

具体地,竖向止水帷幕10包括复合桩基11及竖向袖阀管注浆体13。复合桩基11包围于侧壁303的外周,并通过竖向袖阀管注浆体13搭接。水平向止水帷幕30通过袖阀管注浆形成的水平袖阀管注浆体31。同时,竖向止水帷幕10与水平向止水帷幕30通过各自的竖向袖阀管注浆体13和水平袖阀管注浆体31搭接,形成基坑300的封闭止水系统。Specifically, the vertical water-stop curtain 10 includes a composite pile foundation 11 and a vertical sleeve valve pipe grouting body 13 . The composite pile foundation 11 surrounds the outer periphery of the side wall 303 and is overlapped by the vertical sleeve valve pipe grouting body 13 . The horizontal sleeve valve pipe grouting body 31 is formed by grouting the sleeve valve pipe horizontally to the water-stop curtain 30 . At the same time, the vertical water-stop curtain 10 and the horizontal water-stop curtain 30 are overlapped by respective vertical sleeve valve pipe grouting body 13 and horizontal sleeve valve pipe grouting body 31 to form a closed water-stop system of the foundation pit 300 .

在本具体实施例中,竖向止水帷幕10中复合桩基11为高压旋喷桩110与微型钢管112的联合。在施工过程中,采用三重管高压旋喷注浆施做高压旋喷桩110后,在高压旋喷桩110中打入微型钢管112。具体地,微型钢管112沿高压旋喷桩110长度方向布置在高压旋喷桩110中心,且微型钢管112为直径为108mm,壁厚为6mm的无缝钢管。可以理解地,在其它一些实施例中,复合桩基11可为其它桩结构的复合结构,在此不作限定。In this specific embodiment, the composite pile foundation 11 in the vertical water-stop curtain 10 is a combination of a high-pressure rotary grouting pile 110 and a micro steel pipe 112 . In the construction process, after the high-pressure rotary grouting pile 110 is constructed by triple-pipe high-pressure rotary grouting grouting, micro steel pipes 112 are driven into the high-pressure rotary grouting pile 110 . Specifically, the micro steel pipe 112 is arranged at the center of the high pressure rotary grouting pile 110 along the length direction of the high pressure rotary grouting pile 110, and the micro steel pipe 112 is a seamless steel pipe with a diameter of 108 mm and a wall thickness of 6 mm. Understandably, in some other embodiments, the composite pile foundation 11 may be a composite structure of other pile structures, which is not limited here.

水平向止水帷幕30在本具体实施例中为,在施工时于基坑300底部以梅花形布置若干静压灌浆孔,当若干静压灌浆孔灌浆结束后,共同联合形成。具体地,每相邻两个静压灌浆孔之间的间距为1.5m,且袖阀管采用直径为76mm的柔性塑胶管。The horizontal water-stop curtain 30 in this specific embodiment is that several static pressure grouting holes are arranged in a quincunx shape at the bottom of the foundation pit 300 during construction, and when the grouting of the several static pressure grouting holes is completed, they are jointly formed. Specifically, the distance between every two adjacent static pressure grouting holes is 1.5m, and the sleeve valve pipe adopts a flexible plastic pipe with a diameter of 76mm.

在施工时,在富水砂砾石地层200中基坑300周围放出高压旋喷桩110的具体桩位,反复测量高压旋喷桩110的孔位,用标记物将桩位标出,测量每根钻杆长度,并按序用红油漆编号,在最上一根钻杆壁上用红油漆标出深度控制红线。During construction, release the specific pile positions of the high-pressure jet grouting piles 110 around the foundation pit 300 in the water-rich sand and gravel formation 200, repeatedly measure the hole positions of the high-pressure jet grouting piles 110, mark the pile positions with markers, measure each The length of the drill pipe is numbered sequentially with red paint, and the depth control red line is marked with red paint on the wall of the uppermost drill pipe.

移动三重管高压旋喷桩机到指定桩位,将钻头对准高压旋喷桩110的孔位中心,钻杆的垂直度偏差控制在1%~1.5%以内,钻头在预定桩位钻孔至设计标高,钻孔孔径为150mm;同时,高压旋喷桩110的孔位沿着基坑300均匀布置,孔深低于基坑300底部3012.0m,待高压旋喷桩110施工完毕后在高压旋喷桩110中心打入直径为108mm,厚度为6mm的无缝钢管,形成微型钢管112桩芯,每节钢管长度3m,接头采用丝扣连接,长度为200mm,相邻钢管接头错开布置,从而形成复合桩基11。Move the triple tube high-pressure rotary grouting pile machine to the designated pile position, align the drill bit with the center of the hole position of the high-pressure rotary grouting pile 110, control the verticality deviation of the drill pipe within 1% to 1.5%, and drill the drill bit at the predetermined pile position to The design elevation, the bore hole diameter is 150mm; at the same time, the hole positions of the high-pressure jet grouting piles 110 are evenly arranged along the foundation pit 300, and the hole depth is 3012.0m lower than the bottom of the foundation pit 300. A seamless steel pipe with a diameter of 108mm and a thickness of 6mm is driven into the center of the spray pile 110 to form a micro-steel pipe 112 pile core. The length of each steel pipe is 3m. Composite pile foundation 11.

接着沿基坑300中高压旋喷桩110的外侧布置静压灌浆孔,且相邻两个静压灌浆孔之间间距为1.0m;在灌浆结束后,竖向袖阀管注浆体13位于相邻两个高压旋喷桩110的间隙之间,并与相邻两个高压旋喷桩110间隔搭接布置。如此,形成位于基坑300中侧壁303外周的竖向止水帷幕10。Then arrange the static pressure grouting holes along the outside of the high-pressure rotary grouting pile 110 in the foundation pit 300, and the distance between two adjacent static pressure grouting holes is 1.0m; after the grouting is completed, the vertical sleeve valve pipe grouting body 13 is located Between the gaps between two adjacent high-pressure rotary grouting piles 110 , and overlapping with two adjacent high-pressure rotary grouting piles 110 at intervals. In this way, the vertical waterproof curtain 10 located on the outer periphery of the side wall 303 in the foundation pit 300 is formed.

在基坑300的底部301采用梅花形布置若干静压灌浆孔,且相邻两个静压灌浆孔之间的间距为1.5m,在开钻前利用吊锤钻头和钻孔的垂直度进行检测,并在钻进2m时及以后每加1节钻杆均需对钻机调平校正,要求钻孔的倾斜度≤1%;同时,袖阀管采用直径为76mm的柔性塑胶管,注浆区(即基坑300的底部301)采用有溢浆孔花管,非注浆区(即基坑300的内部)采用无溢浆孔非花管,当单孔灌浆量达到设计灌浆量或灌浆压力达到设计值并稳压20min后,以上达到袖阀灌浆结束条件的其中一个即可作为单孔灌浆结束标准。如此,形成位于基坑300底部301的水平向止水帷幕;且竖向止水帷幕10与水平向止水帷幕30搭接,形成基坑300的联合止水系统。At the bottom 301 of the foundation pit 300, several static pressure grouting holes are arranged in a quincunx shape, and the distance between two adjacent static pressure grouting holes is 1.5m. , and when drilling 2m and after that, the drilling rig needs to be leveled and corrected for every additional section of drill pipe, and the inclination of the drill hole is required to be ≤1%. At the same time, the sleeve valve pipe adopts a flexible plastic pipe with a diameter of 76mm. (that is, the bottom 301 of the foundation pit 300) adopts flower tubes with overflow holes, and the non-grouting area (that is, the inside of the foundation pit 300) adopts non-flower tubes without overflow holes. After reaching the design value and stabilizing the pressure for 20 minutes, one of the above conditions for the end of sleeve valve grouting can be used as the end standard of single hole grouting. In this way, a horizontal water-stop curtain at the bottom 301 of the foundation pit 300 is formed; and the vertical water-stop curtain 10 overlaps with the horizontal water-stop curtain 30 to form a joint water-stop system of the foundation pit 300 .

本申请中提供的富水砂砾石地层基坑止水结构100,具有以下有益效果:The water-stop structure 100 for foundation pits in water-rich sand and gravel strata provided in this application has the following beneficial effects:

1、采用竖向止水帷幕10和水平向止水帷幕30结合的方案,可有效解决悬挂式止水帷幕和坑内降水方案难以满足富水砂砾石地层基坑开挖和周边建筑物安全的需要,而落底式止水帷幕耗资大,施工质量、止水效果不能保证等一系列难题;1. The scheme of combining the vertical water-stop curtain 10 and the horizontal water-stop curtain 30 can effectively solve the problem that the suspended water-stop curtain and the precipitation scheme in the pit cannot meet the needs of excavation of foundation pits in water-rich sand and gravel strata and the safety of surrounding buildings , but the bottom-type water-stop curtain is costly, and a series of problems such as construction quality and water-stop effect cannot be guaranteed;

2、复合桩基11与竖向袖阀管注浆体13形成的竖向联合止水帷幕,施工简便,止水效果好,可节省工期,降低造价;2. The vertical joint water-stop curtain formed by the composite pile foundation 11 and the vertical sleeve valve pipe grouting body 13 is easy to construct and has a good water-stop effect, which can save the construction period and reduce the cost;

3、高压旋喷桩110与微型钢管112联合形成的复合桩基可同时起到止水帷幕和基坑300支护的作用,不需要另外单独施做支护结构;3. The composite pile foundation formed by the combination of high-pressure rotary grouting pile 110 and micro-steel pipe 112 can play the role of water-stop curtain and foundation pit 300 support at the same time, and does not need to be used as a separate support structure;

4、针对高压注浆(高压旋喷注浆)适合砂性土、粘性土、淤泥质土等地层,静压注浆(袖阀管注浆)适合中粗砂及砂砾石、破碎岩石等地质条件,而实际地层通常是以某一岩土层为主,多种岩土层、多种地质条件共同存在,现有单一的注浆法难以同时满足各类地层的特征,采用动静联合注浆方法(高压旋喷桩注浆与袖阀管静压注浆),可有效改善注浆加固等效果。4. For high-pressure grouting (high-pressure rotary jet grouting), it is suitable for sandy soil, cohesive soil, silty soil and other strata, and static pressure grouting (sleeve valve grouting) is suitable for medium-coarse sand, gravel, broken rock and other geology However, the actual stratum is usually dominated by a certain rock-soil layer, and various rock-soil layers and various geological conditions coexist. It is difficult for the existing single grouting method to meet the characteristics of various strata at the same time. Combined dynamic and static grouting The method (high-pressure rotary grouting pile grouting and sleeve valve pipe static pressure grouting) can effectively improve the effect of grouting reinforcement.

以上所述实施例仅表达了本实用新型的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。因此,本实用新型专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express several implementations of the utility model, and the description thereof is relatively specific and detailed, but it should not be construed as limiting the patent scope of the utility model. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the scope of protection of the utility model patent should be based on the appended claims.

Claims (10)

1.一种富水砂砾石地层基坑止水结构,设置于地层的基坑中,其特征在于,所述富水砂砾石地层基坑止水结构包括:1. A water-stop water-stop structure for a foundation pit in a water-rich sandy gravel formation, which is arranged in the foundation pit of the formation, is characterized in that, the water-stop structure for a foundation pit in a water-rich sandy gravel formation comprises: 设置于所述基坑中侧壁外周的竖向止水帷幕;以及a vertical water-stop curtain arranged on the outer periphery of the side wall in the foundation pit; and 设置于所述基坑中底部的水平向止水帷幕;A horizontal water-stop curtain arranged at the bottom of the foundation pit; 其中,所述竖向止水帷幕包括复合桩基及竖向袖阀管注浆体,所述复合桩基包围于所述基坑中侧壁的外周,并通过所述竖向袖阀管注浆体搭接。Wherein, the vertical water-stop curtain includes a composite pile foundation and a vertical sleeve valve pipe grouting body. Slurry lap. 2.根据权利要求1所述的富水砂砾石地层基坑止水结构,其特征在于,所述水平向止水帷幕构造为通过袖阀管注浆形成的水平袖阀管注浆体联合。2. The water-stop structure for foundation pits in water-rich sand and gravel formations according to claim 1, wherein the horizontal water-stop curtain is constructed as a combination of horizontal sleeve valve pipe grouting bodies formed by sleeve valve pipe grouting. 3.根据权利要求2所述的富水砂砾石地层基坑止水结构,其特征在于,所述竖向止水帷幕与所述水平向止水帷幕通过各自的所述竖向袖阀管注浆体和所述水平袖阀管注浆体搭接,形成所述基坑的封闭止水系统。3. The water-stop structure for foundation pits in water-rich sand and gravel strata according to claim 2, wherein the vertical water-stop curtain and the horizontal water-stop curtain are injected through the respective vertical sleeve valve pipes. The grout overlaps with the grouting body of the horizontal sleeve valve pipe to form a closed water-stop system for the foundation pit. 4.根据权利要求1所述的富水砂砾石地层基坑止水结构,其特征在于,所述复合桩基构造为高压旋喷桩与微型钢管的联合。4. The water-stop structure for foundation pits in water-rich sand and gravel strata according to claim 1, characterized in that, the composite pile foundation structure is a combination of high-pressure rotary grouting piles and micro-steel pipes. 5.根据权利要求1所述的富水砂砾石地层基坑止水结构,其特征在于,所述复合桩基构造为采用三重管高压旋喷注浆施做高压旋喷桩,并在所述高压旋喷桩中打入微型钢管。5. The water-stop structure for foundation pits in water-rich sand and gravel strata according to claim 1, wherein the composite pile foundation is constructed as a high-pressure rotary grouting pile using triple tube high-pressure rotary jet grouting, and the Micro-steel pipes are driven into high-pressure rotary grouting piles. 6.根据权利要求4或5任意一项所述的富水砂砾石地层基坑止水结构,其特征在于,所述微型钢管构造为沿所述高压旋喷桩长度方向布置在所述高压旋喷桩中心的无缝钢管。6. The water-stop structure for foundation pits in water-rich sand and gravel strata according to any one of claims 4 or 5, wherein the micro-steel pipes are configured to be arranged on the high-pressure rotary grouting pile along the length direction of the high-pressure rotary grouting pile. Seamless steel pipe in the center of the spray pile. 7.根据权利要求4或5任意一项所述的富水砂砾石地层基坑止水结构,其特征在于,所述竖向袖阀管注浆体搭接于相邻两个所述高压旋喷桩之间的间隙内。7. The water-stop structure for foundation pits in water-rich sand and gravel formations according to any one of claims 4 or 5, wherein the vertical sleeve valve pipe grouting body overlaps two adjacent high-pressure rotary In the gap between spray piles. 8.根据权利要求2所述的富水砂砾石地层基坑止水结构,其特征在于,所述竖向袖阀管注浆体和所述水平袖阀管注浆体在注浆中的袖阀管为柔性塑胶管。8. The water-stopping structure for foundation pits in water-rich sand and gravel strata according to claim 2, characterized in that the sleeves of the vertical sleeve valve pipe grouting body and the horizontal sleeve valve pipe grouting body during grouting The valve tube is a flexible plastic tube. 9.根据权利要求1所述的富水砂砾石地层基坑止水结构,其特征在于,所述水平向止水帷幕构造为对所述基坑的底部以梅花形布置的若干静压灌浆孔灌浆形成。9. The foundation pit water-stop structure in water-rich sand and gravel stratum according to claim 1, characterized in that, the horizontal water-stop curtain is configured as several static pressure grouting holes arranged in a quincunx shape on the bottom of the foundation pit Grout formed. 10.根据权利要求1所述的富水砂砾石地层基坑止水结构,其特征在于,所述富水砂砾石地层基坑止水结构设置于富水砂砾石地层的所述基坑中。10. The water-stop structure for foundation pits in water-rich sand and gravel formations according to claim 1, characterized in that the water-stop structure for foundation pits in water-rich sand and gravel formations is set in the foundation pits in water-rich sand and gravel formations.
CN201920151366.7U 2019-01-29 2019-01-29 Water-stop structure of foundation pit in water-rich sand and gravel stratum Expired - Fee Related CN209636826U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920151366.7U CN209636826U (en) 2019-01-29 2019-01-29 Water-stop structure of foundation pit in water-rich sand and gravel stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920151366.7U CN209636826U (en) 2019-01-29 2019-01-29 Water-stop structure of foundation pit in water-rich sand and gravel stratum

Publications (1)

Publication Number Publication Date
CN209636826U true CN209636826U (en) 2019-11-15

Family

ID=68479710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920151366.7U Expired - Fee Related CN209636826U (en) 2019-01-29 2019-01-29 Water-stop structure of foundation pit in water-rich sand and gravel stratum

Country Status (1)

Country Link
CN (1) CN209636826U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112081125A (en) * 2020-10-09 2020-12-15 北京中岩大地科技股份有限公司 Bottom sealing structure and construction technology of foundation pit in submerged sand and pebble stratum
CN112227379A (en) * 2020-09-02 2021-01-15 浙江中正岩土技术有限公司 Construction method of high-water-level sand bed rigid-flexible combined pile full-section waterproof curtain
CN112855072A (en) * 2021-02-04 2021-05-28 河南理工大学 Device and method for multistage plugging of surrounding rock fracture water by utilizing slurry and microbial mineralization
CN113846646A (en) * 2021-10-12 2021-12-28 中铁七局集团郑州工程有限公司 Composite water-stopping support method for bearing platform foundation pit of water-rich gravel or gravel soil layer bridge
CN113882411A (en) * 2021-10-14 2022-01-04 中国建筑土木建设有限公司 Method for recycling drainage water of deep foundation pit in water-rich area
CN114658013A (en) * 2020-12-23 2022-06-24 北京中岩大地科技股份有限公司 Submersible sandy gravel stratum foundation pit bottom sealing structure and construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112227379A (en) * 2020-09-02 2021-01-15 浙江中正岩土技术有限公司 Construction method of high-water-level sand bed rigid-flexible combined pile full-section waterproof curtain
CN112081125A (en) * 2020-10-09 2020-12-15 北京中岩大地科技股份有限公司 Bottom sealing structure and construction technology of foundation pit in submerged sand and pebble stratum
CN114658013A (en) * 2020-12-23 2022-06-24 北京中岩大地科技股份有限公司 Submersible sandy gravel stratum foundation pit bottom sealing structure and construction method
CN112855072A (en) * 2021-02-04 2021-05-28 河南理工大学 Device and method for multistage plugging of surrounding rock fracture water by utilizing slurry and microbial mineralization
CN112855072B (en) * 2021-02-04 2022-10-28 河南理工大学 Device and method for mineralizing and multistage blocking surrounding rock fracture water by using slurry and microorganisms
CN113846646A (en) * 2021-10-12 2021-12-28 中铁七局集团郑州工程有限公司 Composite water-stopping support method for bearing platform foundation pit of water-rich gravel or gravel soil layer bridge
CN113882411A (en) * 2021-10-14 2022-01-04 中国建筑土木建设有限公司 Method for recycling drainage water of deep foundation pit in water-rich area

Similar Documents

Publication Publication Date Title
CN209636826U (en) Water-stop structure of foundation pit in water-rich sand and gravel stratum
CN102705005B (en) Technology for plugging water bursting in mine by directional diversion grouting
CN108060908A (en) Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN111119940B (en) Grouting construction treatment method
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN101560764B (en) Method for calking exploratory hole by intermittent high-pressure rotary jet grouting
CN108999195B (en) It is a kind of block the larger water burst of deep-foundation side wall stratum in the safe grouting construction process of step heap weir formula
CN106638669A (en) System and method for reinforcing envelop enclosure for shield tunneling beneath existing subway station
CN102286981A (en) Waterproof curtain and construction method thereof
CN105927231A (en) Circulating induction curtain grouting method for inclined shaft to pass through water-rich compact quicksand layer
CN110541422A (en) A construction method for a tunnel passing through a biased landslide zone at the entrance
CN112482364A (en) Construction process of rotary digging cast-in-place pile under strong corrosive soft geological conditions in coastal region
CN202194148U (en) Waterproof curtain
CN109944600B (en) Reinforcing construction method of shield receiving end
CN107060821A (en) A kind of many lithology method for protecting support of face
CN115787693A (en) Water stopping method for water gushing in deep foundation pit under riverside slow-dip interbed
CN102535490A (en) Method for dewatering foundation pit by using bored cast-in-place pile
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN202194149U (en) Waterproof curtain
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN102995647B (en) A Groundwater Control Method for Pile Hole Grouting and Seepage Isolation
CN112081125A (en) Bottom sealing structure and construction technology of foundation pit in submerged sand and pebble stratum
CN206467684U (en) Existing subway station building enclosure hardened system is worn under a kind of shield

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191115