CN209624733U - A current clamp mounting rod - Google Patents

A current clamp mounting rod Download PDF

Info

Publication number
CN209624733U
CN209624733U CN201920071466.9U CN201920071466U CN209624733U CN 209624733 U CN209624733 U CN 209624733U CN 201920071466 U CN201920071466 U CN 201920071466U CN 209624733 U CN209624733 U CN 209624733U
Authority
CN
China
Prior art keywords
current clamp
pulley
take
rod
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920071466.9U
Other languages
Chinese (zh)
Inventor
王啸峰
陈滔
张凯
兰炜
刘慧娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Zhuhai Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Zhuhai Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Zhuhai Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201920071466.9U priority Critical patent/CN209624733U/en
Application granted granted Critical
Publication of CN209624733U publication Critical patent/CN209624733U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型属于电力高压开关特性试验领域,特别是涉及一种电流钳安装杆,包括由若干节绝缘杆组成的杆体,所述杆体的顶部设有电流钳连接头,该安装杆还设有拉动机构,电流钳的一侧把手与所述电流钳连接头固定连接,电流钳的另一侧把手与所述拉动机构连接,所述拉动机构可使电流钳的钳口撑开。本实用新型提供的电流钳安装杆,可以直接在地面上通过本安装杆可将电流钳钳入高压电缆上,无需在进行高空作业的方式进行,使此项工作变得简单、安全、便携。

The utility model belongs to the field of electric high-voltage switch characteristic test, in particular to a current clamp installation rod, which includes a rod body composed of several insulating rods, the top of the rod body is provided with a current clamp connector, and the installation rod is also provided with a pulling One handle of the current clamp is fixedly connected to the connection head of the current clamp, and the other handle of the current clamp is connected to the pulling mechanism, and the pulling mechanism can open the jaws of the current clamp. The current clamp installation rod provided by the utility model can directly clamp the current clamp into the high-voltage cable through the installation rod on the ground, without the need for high-altitude operations, making this work simple, safe and portable.

Description

一种电流钳安装杆A current clamp mounting rod

技术领域technical field

本实用新型属于电力高压开关特性试验领域,特别是涉及一种电流钳安装杆。The utility model belongs to the field of electric high-voltage switch characteristic test, in particular to a current clamp installation rod.

背景技术Background technique

在对高压开关断路器特性测试时,当开关两侧地刀同时接地时,传统的单端接地开关特性测试仪将无法正常测试,此时要求使用双端接地开关特性测试仪来测试开关特性。使用双端接地开关特性测试仪需要安装电磁感应电流钳到断路器两侧的高压电缆上,目前一般是采用高空作业的方式进行安装上述电流钳,在高空作业时由于变电站断路器上没有相应的防坠落安全带悬挂点,给工作人员带来安全引患,增加工作难度及准备时间,在实际的作业中非常不便利。When testing the characteristics of high-voltage switch circuit breakers, when the ground blades on both sides of the switch are grounded at the same time, the traditional single-ended grounding switch characteristic tester will not be able to test normally. At this time, it is required to use a double-ended grounding switch characteristic tester to test the switch characteristics. To use the double-terminal grounding switch characteristic tester, it is necessary to install electromagnetic induction current clamps on the high-voltage cables on both sides of the circuit breaker. At present, the above-mentioned current clamps are usually installed by working at heights. When working at heights, there is no corresponding clamp on the circuit breaker of the substation. The suspension point of the anti-fall seat belt brings safety hazards to the staff, increases work difficulty and preparation time, and is very inconvenient in actual operations.

实用新型内容Utility model content

为了解决上述问题,本实用新型提供一种用于开关特性测试仪的电流钳安装杆,可以直接在地面上通过本安装杆可将电流钳钳入高压电缆上,无需在进行高空作业的方式进行,使此项工作变得简单、安全、便携。In order to solve the above problems, the utility model provides a current clamp installation rod for the switch characteristic tester, which can directly clamp the current clamp to the high-voltage cable through the installation rod on the ground, without the need to carry out high-altitude operations. , making this job easy, safe and portable.

本实用新型的技术方案是;一种电流钳安装杆,包括由若干节绝缘杆组成的杆体,所述杆体的顶部设有电流钳连接头,该安装杆还设有拉动机构,电流钳的一侧把手与所述电流钳连接头固定连接,电流钳的另一侧把手与所述拉动机构连接,所述拉动机构可使电流钳的钳口撑开。The technical scheme of the utility model is: a current clamp installation rod, including a rod body composed of several insulating rods, the top of the rod body is provided with a current clamp connector, and the installation rod is also provided with a pulling mechanism. The side handle is fixedly connected to the connecting head of the current clamp, and the other side handle of the current clamp is connected to the pulling mechanism, and the pulling mechanism can open the jaws of the current clamp.

电流钳的一侧把手通过电流钳连接头固定在杆体顶端,杆体的高度可由若干节绝缘杆进行拼接调整,同时通过拉动机构拉动电流钳的另一侧把手使电流钳的钳口打开可挂接在高压电缆上。利用该安装杆,无需高空作业,即可省时省力、快速地将电流钳安装在高压电缆上。The handle on one side of the current clamp is fixed on the top of the rod body through the connection head of the current clamp. The height of the rod body can be spliced and adjusted by several sections of insulating rods. At the same time, the handle on the other side of the current clamp is pulled by the pulling mechanism to open the jaws of the current clamp. on high voltage cables. Using the mounting rod, the current clamp can be quickly and time-savingly installed on the high-voltage cable without working at heights.

进一步,拉动机构包括收线轮、滑轮、拉绳,所述滑轮固定在所述电流钳连接头的一侧,所述收线轮固定在所述杆体的底部一侧,所述拉绳的一端与电流钳的一侧把手固定连接,所述拉绳的另一端跨过所述滑轮缠绕在所述收线轮上,所述收线轮的一侧设有手柄用于转动回收所述拉绳使电流钳钳口撑开。利用滑轮与收线轮的滑轮机构,通过手柄拉动拉绳对电流钳的一侧把手进行拉动,可快速使电流钳的钳口打开安装在高压电缆上。其中滑轮用于改变拉绳方向,减少摩擦力,便于用拉绳将电流钳拉开。Further, the pulling mechanism includes a take-up wheel, a pulley, and a pull rope, the pulley is fixed on one side of the current clamp connector, the take-up wheel is fixed on the bottom side of the rod body, and one end of the pull rope It is fixedly connected with the handle on one side of the current clamp, and the other end of the pull rope is wound on the take-up wheel across the pulley, and a handle is provided on one side of the take-up wheel for rotating and recovering the pull rope Stretch the jaws of the current clamp. Utilize the pulley mechanism of the pulley and the take-up wheel, pull the pull rope through the handle to pull the handle on one side of the current clamp, so that the jaw of the current clamp can be quickly opened and installed on the high-voltage cable. Wherein the pulley is used to change the direction of the stay rope to reduce the frictional force, so that the current clamp can be pulled apart by the stay rope.

进一步,收线轮设有固定架,所述收线轮通过所述固定架固定在所述杆体上,可根据高度要求改变固定架在杆体的安装位置。Further, the take-up wheel is provided with a fixing frame, and the line taking-up wheel is fixed on the rod body through the fixing frame, and the installation position of the fixing frame on the rod body can be changed according to the height requirement.

进一步,收线轮设有限位销和限位孔,所述固定架设有通孔,所述限位销依次插入所述通孔和所述限位孔中可对所述收线轮进行限位,使其不能转动。限位销通过细铁链焊接在固定架的一侧悬挂,在通过摇动手柄使拉绳拉动使电流钳的钳口打开时,利用限位销可使收线轮不能转动,保持电流钳的钳口打开状态,直至电流钳安装在高压电缆上后,取下限位销,电流钳的钳口由于电流钳本身的扭簧作用力而复位闭合,使拉绳拉动收线轮回转复位。Further, the take-up wheel is provided with a limit pin and a limit hole, and the fixed frame is provided with a through hole, and the limit pin is sequentially inserted into the through hole and the limit hole to limit the position of the take-up wheel , making it impossible to rotate. The limit pin is welded on one side of the fixed frame through a thin iron chain and hung. When the pull rope is pulled by shaking the handle to open the jaw of the current clamp, the limit pin can prevent the take-up wheel from rotating and keep the clamp of the current clamp. Open the mouth until the current clamp is installed on the high-voltage cable, remove the limit pin, the jaw of the current clamp is reset and closed due to the force of the torsion spring of the current clamp itself, so that the pull rope pulls the take-up wheel to rotate and reset.

进一步,滑轮与所述收线轮固定安装在同一竖直方向上,减少摩擦,便于操作人员可快速摇动手柄拉动拉绳使电流钳的钳口打开。Further, the pulley and the take-up pulley are fixedly installed in the same vertical direction to reduce friction and facilitate the operator to quickly shake the handle and pull the pull cord to open the jaws of the current clamp.

进一步,电流钳连接头的一端设有方孔用于插入电流钳的把手,所述电流钳连接头的另一端设有第一螺纹孔用于与所述绝缘杆连接,所述方孔的一侧设有第二螺纹孔,所述电流钳连接头还设有梅花螺杆,所述梅花螺杆穿过所述第二螺纹孔将电流钳的把手锁紧在所述方孔内。利用梅花螺杆将电流钳的一侧把手锁紧在方孔内,使电流钳稳固地安装在电流钳连接头内。Further, one end of the connection head of the current clamp is provided with a square hole for inserting the handle of the current clamp, and the other end of the connection head of the current clamp is provided with a first threaded hole for connecting with the insulating rod, one of the square holes is There is a second threaded hole on the side, and the connecting head of the current clamp is also provided with a torx screw, and the torx screw passes through the second threaded hole to lock the handle of the current clamp in the square hole. Use the Torx screw to lock one side handle of the current clamp in the square hole, so that the current clamp is firmly installed in the connection head of the current clamp.

进一步,绝缘杆的一端设有第三螺纹孔,所述绝缘杆的另一端设有螺柱,若干节所述绝缘杆通过首尾相连组成所述杆体。可根据实际需要安装电流钳的电缆高度,采用合适数量的绝缘杆进行拼接为杆体,同时在不进行使用时可进行拆卸,便于携带和收纳。Further, one end of the insulating rod is provided with a third threaded hole, the other end of the insulating rod is provided with a stud, and several sections of the insulating rod are connected end to end to form the rod body. The cable height of the current clamp can be installed according to actual needs, and a suitable number of insulating rods can be used to splice the rod body. At the same time, it can be disassembled when not in use, so it is easy to carry and store.

本实用新型的有益效果是;本实用新型的电流钳安装杆通过巧妙的设计,使电流钳安装在安装杆的电流钳连接头上,可利用绝缘杆的拼接调整杆体的高度,工作人员举高该安装杆的杆体,并通过拉动机构可将电流钳打开快速安装在高压电缆上,整个过程由原来的多人协助,变成可单人完成,无需进行任何的高空作业,使用及安装省时省力,大大提高工作效率及工作人员的人生安全,并且制造成本低廉,值得在大力推广。The beneficial effects of the utility model are: the current clamp installation rod of the utility model is cleverly designed so that the current clamp is installed on the current clamp connection head of the installation rod, and the height of the rod body can be adjusted by splicing the insulating rod, and the staff can lift the The rod body of the installation rod, and the current clamp can be opened and quickly installed on the high-voltage cable through the pulling mechanism. The whole process is assisted by the original multi-person, and can be completed by a single person without any high-altitude operations, saving time in use and installation. It is labor-saving, greatly improves work efficiency and the life safety of the staff, and the manufacturing cost is low, so it is worthy of vigorous promotion in the world.

附图说明Description of drawings

图1是电流钳钳口闭合状态示意图。Fig. 1 is a schematic diagram of the closed state of the jaws of the current clamp.

图2是电缆钳钳口打开状态示意图。Fig. 2 is a schematic diagram of the opening state of the jaws of the cable clamp.

具体实施方式Detailed ways

附图仅用于示例性说明,不能理解为对本专利的限制;为了更好说明本实施例,附图某些部件会有省略、放大或缩小,并不代表实际产品的尺寸;对于本领域技术人员来说,附图中某些公知结构及其说明可能省略是可以理解的。附图中描述位置关系仅用于示例性说明,不能理解为对本专利的限制。The accompanying drawings are for illustrative purposes only, and should not be construed as limitations on this patent; in order to better illustrate this embodiment, certain components in the accompanying drawings will be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art It is understandable that some well-known structures and descriptions thereof may be omitted in the drawings. The positional relationship described in the drawings is for illustrative purposes only, and should not be construed as a limitation on this patent.

实施例1:Example 1:

如图1和图2所示,绝缘杆的一端设有第三螺纹孔,所述绝缘杆的另一端设有螺柱,若干节绝缘杆通过首尾相连组成杆体1,杆体1的顶部设有电流钳连接头2,电流钳连接头2的一端设有方孔11用于插入电流钳的一侧把手,电流钳连接头2的另一端设有第一螺纹孔用于与首节绝缘杆的螺柱连接,方孔11的一侧设有第二螺纹孔,电流钳连接头2还设有梅花螺杆12,梅花螺杆12穿过第二螺纹孔将电流钳的把手锁紧在方孔11内;电流钳的另一侧把手与拉动机构连接,拉动机构包括收线轮3、滑轮4、拉绳5,滑轮4通过螺丝固定在电流钳连接头2的一侧,收线轮3设有固定架7,固定架7通过螺栓固在杆体1的底部,收线轮3通过转轴固定在固定架7内,滑轮4与收线轮3固定安装在同一竖直方向上,拉绳5的一端系在电流钳的一侧把手的固定环内,拉绳5的另一端跨过滑轮4缠绕在收线轮3上,收线轮3的一侧设有手柄6用于转动回收拉绳5使电流钳钳口撑开;收线轮3设有限位销8和限位孔9,固定架7设有通孔10,限位销8依次插入通孔10和限位孔9中可对收线轮3进行限位,使其不能转动。As shown in Figures 1 and 2, one end of the insulating rod is provided with a third threaded hole, the other end of the insulating rod is provided with a stud, and several sections of insulating rods are connected end to end to form a rod body 1, and the top of the rod body 1 is provided with a current Clamp connector 2, one end of the current clamp connector 2 is provided with a square hole 11 for inserting the handle on one side of the current clamp, and the other end of the current clamp connector 2 is provided with a first threaded hole for connecting with the first section of the insulating rod. Column connection, one side of the square hole 11 is provided with a second threaded hole, the current clamp connector 2 is also provided with a torx screw 12, and the torx screw 12 passes through the second threaded hole to lock the handle of the current clamp in the square hole 11; The handle on the other side of the current clamp is connected to the pulling mechanism. The pulling mechanism includes a take-up pulley 3, a pulley 4, and a pull rope 5. The pulley 4 is fixed on one side of the current clamp connector 2 by screws, and the take-up pulley 3 is provided with a fixing frame. 7. The fixed frame 7 is fixed on the bottom of the rod body 1 by bolts, and the take-up wheel 3 is fixed in the fixed frame 7 through the rotating shaft. In the fixed ring of the handle on one side of the current pliers, the other end of the stay rope 5 is wound on the take-up pulley 3 across the pulley 4, and one side of the take-up pulley 3 is provided with a handle 6 for rotating and recovering the stay rope 5 to make the current pliers The jaws are stretched; the take-up wheel 3 is provided with a limit pin 8 and a limit hole 9, and the fixed frame 7 is provided with a through hole 10, and the limit pin 8 is inserted into the through hole 10 and the limit hole 9 in turn to adjust the take-up wheel 3 Limit it so that it cannot rotate.

使用时,先将开关特性测试仪通过导线与电流钳本身自带的信号输出口连接,再逆时针转动收线轮3的手柄6,使拉绳5拉动电流钳的一侧把手向下,即可将电流钳的钳口撑开,此时收线轮3上的限位孔9与固定架7的通孔10对准,插入限位销8进行限位,使收线轮3不能转动,电流钳的钳口保持张开状态,如图2所示,便可通过杆体1举起并将电流钳的钳口钳入高压线缆,最后取下限位销8,电流钳的钳口由于电流钳本身的扭簧作用力将自动闭合,使拉绳5拉动收线轮3顺时针回转复位,如图1所示,对高压开关断路器特性测试完成后,按相同的方法再次打开电流钳的钳口即可轻松取下电流钳。When in use, first connect the switch characteristic tester with the signal output port of the current clamp itself through the wire, and then turn the handle 6 of the take-up wheel 3 counterclockwise, so that the pull rope 5 pulls the handle on one side of the current clamp downward, that is The jaws of the current clamp can be stretched open. At this time, the limit hole 9 on the take-up wheel 3 is aligned with the through hole 10 of the fixed frame 7, and the limit pin 8 is inserted to limit the position so that the take-up wheel 3 cannot rotate. The jaws of the current clamp remain open, as shown in Figure 2, the rod body 1 can be used to lift the jaws of the current clamp into the high-voltage cable, and finally the limit pin 8 is removed. The force of the torsion spring of the clamp itself will automatically close, so that the pull rope 5 pulls the take-up wheel 3 and turns clockwise to reset, as shown in Figure 1. After the test of the characteristics of the high-voltage switch circuit breaker is completed, open the current clamp again in the same way. The current clamp can be easily removed from the jaws.

整个过程可单人完成,无需进行任何的高空作业,使用及安装省时省力,同时在使用完毕后,可将扭动梅花螺杆12将电流钳拆卸,同时将电流钳连接头2和绝缘杆分离、绝缘杆之间进行分离,拆卸方便,利于携带和进行收纳。The whole process can be completed by one person without any high-altitude operations, saving time and effort in use and installation. At the same time, after use, the current clamp can be disassembled by twisting the torx screw 12, and the current clamp connector 2 can be separated from the insulating rod. , The insulation rods are separated, easy to disassemble, and convenient to carry and store.

显然,本实用新型的上述实施例仅仅是为清楚地说明本实用新型所作的举例,而并非是对本实用新型的实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型权利要求的保护范围之内。Apparently, the above-mentioned embodiments of the present utility model are only examples for clearly illustrating the present utility model, rather than limiting the implementation manner of the present utility model. For those of ordinary skill in the art, other changes or changes in different forms can be made on the basis of the above description. It is not necessary and impossible to exhaustively list all the implementation manners here. All modifications, equivalent replacements and improvements made within the spirit and principles of the utility model shall be included in the protection scope of the claims of the utility model.

Claims (7)

1. a kind of current clamp mounting rod, which is characterized in that including the body of rod (1) being made of several section insulating bars, the body of rod (1) Top be equipped with current clamp connector (2), which is additionally provided with pulling mechanism, the side grip and the current clamp of current clamp Connector (2) is fixedly connected, and another side grip of current clamp is connect with the pulling mechanism, and the pulling mechanism can make current clamp Jaw strut.
2. a kind of current clamp mounting rod according to claim 1, which is characterized in that the pulling mechanism includes take-up pulley (3), pulley (4), drawstring (5), the pulley (4) are fixed on the side of the current clamp connector (2), the take-up pulley (3) It is fixed on the bottom side of the body of rod (1), one end of the drawstring (5) is fixedly connected with a side grip of current clamp, described The other end of drawstring (5) is wrapped on the take-up pulley (3) across the pulley (4), and the side of the take-up pulley (3) is equipped with hand Handle (6) struts current clamp jaw for rotating the recycling drawstring (5).
3. a kind of current clamp mounting rod according to claim 2, which is characterized in that the take-up pulley (3) is equipped with fixed frame (7), the take-up pulley (3) is fixed on the body of rod (1) by the fixed frame (7).
4. a kind of current clamp mounting rod according to claim 3, which is characterized in that the take-up pulley (3) is equipped with spacer pin (8) and limit hole (9), the fixed frame (7) is equipped with through-hole (10), the spacer pin (8) be sequentially inserted into the through-hole (10) and The take-up pulley (3) can be limited in the limit hole (9), be able to rotate it not.
5. a kind of current clamp mounting rod according to claim 2, which is characterized in that the pulley (4) and the take-up pulley (3) it is fixedly mounted on same vertical direction.
6. a kind of current clamp mounting rod according to claim 1, which is characterized in that the one of the current clamp connector (2) End is equipped with the handle that square hole (11) are used to be inserted into current clamp, and the other end of the current clamp connector (2) is equipped with the first threaded hole For connecting with the insulating bar, the side of the square hole (11) is equipped with the second threaded hole, and the current clamp connector (2) also sets Have plum blossom screw rod (12), the plum blossom screw rod (12) passes through second threaded hole and the handle of current clamp is locked at the square hole (11) in.
7. a kind of current clamp mounting rod according to claim 1, which is characterized in that one end of the insulating bar is equipped with third Threaded hole, the other end of the insulating bar are equipped with stud, and insulating bar described in several sections forms the body of rod by joining end to end.
CN201920071466.9U 2019-01-16 2019-01-16 A current clamp mounting rod Active CN209624733U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920071466.9U CN209624733U (en) 2019-01-16 2019-01-16 A current clamp mounting rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920071466.9U CN209624733U (en) 2019-01-16 2019-01-16 A current clamp mounting rod

Publications (1)

Publication Number Publication Date
CN209624733U true CN209624733U (en) 2019-11-12

Family

ID=68450188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920071466.9U Active CN209624733U (en) 2019-01-16 2019-01-16 A current clamp mounting rod

Country Status (1)

Country Link
CN (1) CN209624733U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110277713A (en) * 2018-12-26 2019-09-24 国网浙江省电力有限公司衢州供电公司 A kind of jointing clamp for high-altitude electrical test
CN112858739A (en) * 2021-01-27 2021-05-28 国网上海市电力公司 Portable intelligent current clamp device convenient to support
CN113671216A (en) * 2020-05-15 2021-11-19 陕西中兴祥林电子科技有限公司 Be applied to electrified detection device of arrester
CN114088988A (en) * 2021-10-15 2022-02-25 国网辽宁省电力有限公司朝阳供电公司 Portable high-altitude equipment measuring combination device and using method
CN115902450A (en) * 2022-09-23 2023-04-04 广西电网有限责任公司钦州供电局 A live detection device for distribution network arrester
CN117498053A (en) * 2023-12-04 2024-02-02 国网湖北省电力有限公司随州供电公司 A kind of universal high voltage grounding clamp

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110277713A (en) * 2018-12-26 2019-09-24 国网浙江省电力有限公司衢州供电公司 A kind of jointing clamp for high-altitude electrical test
CN110277713B (en) * 2018-12-26 2020-11-03 国网浙江省电力有限公司衢州供电公司 A wiring pliers for high-altitude electrical testing
CN113671216A (en) * 2020-05-15 2021-11-19 陕西中兴祥林电子科技有限公司 Be applied to electrified detection device of arrester
CN113671216B (en) * 2020-05-15 2023-10-27 陕西华添聚能科技有限公司 A charging detection device used in lightning arresters
CN112858739A (en) * 2021-01-27 2021-05-28 国网上海市电力公司 Portable intelligent current clamp device convenient to support
CN114088988A (en) * 2021-10-15 2022-02-25 国网辽宁省电力有限公司朝阳供电公司 Portable high-altitude equipment measuring combination device and using method
CN115902450A (en) * 2022-09-23 2023-04-04 广西电网有限责任公司钦州供电局 A live detection device for distribution network arrester
CN117498053A (en) * 2023-12-04 2024-02-02 国网湖北省电力有限公司随州供电公司 A kind of universal high voltage grounding clamp

Similar Documents

Publication Publication Date Title
CN205027821U (en) Capacitor bank monomer capacitance test line changing instrument
CN209730201U (en) ground wire ground rod
CN205426971U (en) Multi -functional retractable electric power high altitude test pincers
CN205543313U (en) Hand -operated power cable overhauls and uses earth clamp
CN211238572U (en) ground clip
CN106299764B (en) A kind of wired earth wire clamp with double hanging wire modes
CN104062470A (en) High-voltage switch characteristic test auxiliary wire connection tool
CN115436669A (en) Lead clamp for direct current resistance test of transformer
CN116008612A (en) High-altitude test wiring device
CN106207885A (en) The short circuit fixture of charged for replacement 220kV pipe bus telescoping wire clamp and method
CN107425309A (en) The electric test fixture of terrestrial operation eminence wiring
CN115832735B (en) A quick and safe unlocking device and unlocking method for wiring clamp
CN205944481U (en) Portable high altitude jointing clamp
CN219226657U (en) Quick and safe unlocking device for power connection wire clamp
CN219226658U (en) Monitoring alarm device capable of observing state of wire connection clamp in real time
CN205159932U (en) Power line arc adjustment tool that hangs down
CN110716067A (en) Device and method for fast and safe wiring of auxiliary high-voltage circuit breaker
CN110702951B (en) A push-pull locking high-altitude wiring device
CN112578158A (en) Multifunctional telescopic high-voltage test insulating rod
CN211348324U (en) High altitude test point quick termination
CN118197866A (en) A energized anti-disassembly circuit breaker
CN202583245U (en) High-order wiring device used for high-voltage electrical device
CN113113792B (en) High-voltage self-locking wiring clamp set
CN210778287U (en) Insulating rod
CN109932609A (en) Rural area low-voltage power supply platform area failure leakage current measuring tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant