CN209618717U - On-site test coring device-specific in road surface is assisted to load and unload hoisting machine - Google Patents
On-site test coring device-specific in road surface is assisted to load and unload hoisting machine Download PDFInfo
- Publication number
- CN209618717U CN209618717U CN201920318322.9U CN201920318322U CN209618717U CN 209618717 U CN209618717 U CN 209618717U CN 201920318322 U CN201920318322 U CN 201920318322U CN 209618717 U CN209618717 U CN 209618717U
- Authority
- CN
- China
- Prior art keywords
- boom
- column
- road surface
- hoisting machine
- coring device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 10
- 239000010959 steel Substances 0.000 claims abstract description 10
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims 2
- 238000000034 method Methods 0.000 abstract description 7
- 238000001514 detection method Methods 0.000 abstract description 5
- 238000010276 construction Methods 0.000 description 3
- 238000007689 inspection Methods 0.000 description 2
- 206010019345 Heat stroke Diseases 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
本实用新型公开了一种辅助路面现场检测取芯设备专用装卸吊装机,包括底座、立柱、吊臂和起吊系统;所述立柱由与所述底座焊接为一体的第一立柱、和下端动配合套装在所述第一立柱上端的第二立柱构成;所述吊臂由后端与所述第二立柱顶端销轴连接的第一吊臂、和动配合套装在所述第一吊臂前端的第二吊臂构成;第二立柱上端设置有定位板,定位板上开设有与第一吊臂后端定位孔销轴配合的销孔;底座通过螺栓固定在槽钢上,槽钢焊接在水平垫板的上表面。本实用新型专为解决桩基取芯设备搬运问题而设计。采用本实用新型后只需检测人员辅助便可将取芯设备平稳装车和安全落地,不仅规避了抬运过程中对取芯设备可能的损坏,同时也保证了检测人员的安全。
The utility model discloses a special loading and unloading hoisting machine for auxiliary road surface on-site detection coring equipment, which comprises a base, a column, a boom and a lifting system; The second column set on the upper end of the first column is composed of; the boom is composed of the first boom whose rear end is pinned to the top of the second column, and the first boom which is fitted in the front end of the first boom with a dynamic fit. The second boom is composed of; the upper end of the second column is provided with a positioning plate, and the positioning plate is provided with a pin hole that matches the pin shaft of the positioning hole at the rear end of the first boom; the base is fixed on the channel steel by bolts, and the channel steel is welded on the horizontal top surface of the pad. The utility model is specially designed to solve the handling problem of pile foundation coring equipment. After adopting the utility model, the coring equipment can be stably loaded and landed safely only with the assistance of the testing personnel, which not only avoids possible damage to the coring equipment during the lifting process, but also ensures the safety of the testing personnel.
Description
技术领域technical field
本实用新型涉及装卸吊装机,尤其是涉及辅助路面现场检测取芯设备专用装卸吊装机。The utility model relates to a loading and unloading hoisting machine, in particular to a special loading and unloading hoisting machine for auxiliary road surface on-site detection and coring equipment.
背景技术Background technique
在公路、桥梁路面施工过程中,现场桩基取芯检测一直是整个工序中较为重要的组成部分。夏季作为路面施工最有利的气候,试验室检测人员到现场进行桩基取芯检测常常要面临高温中暑的危险。为解决这一问题,人们采取将取芯设备通过施工运输车辆搬运到试验室进行桩基取芯检测。但是,由于取芯机较笨重,使得抬运、装卸车、推移需要四人操作完成,高频次的装卸过程中,不仅消耗大量的体力,而且极易出现抬不上去、抬不平衡、易碰撞等潜在的安全隐患。In the process of road and bridge pavement construction, on-site pile foundation coring inspection has always been an important part of the whole process. Summer is the most favorable climate for pavement construction, and laboratory inspectors often face the risk of high temperature and heatstroke when they go to the site to conduct pile foundation coring inspection. In order to solve this problem, people take the coring equipment to be transported to the laboratory by construction transport vehicles for pile foundation coring testing. However, due to the heavy weight of the coring machine, four people are required to complete the lifting, loading and unloading, and pushing. During the high-frequency loading and unloading process, not only consumes a lot of physical strength, but also easily fails to lift, unbalanced, and easy to lift. Potential safety hazards such as collisions.
发明内容Contents of the invention
本实用新型目的在于提供一种辅助路面现场检测取芯设备专用装卸吊装机。The purpose of the utility model is to provide a special loading and unloading hoisting machine for auxiliary road surface on-site detection and coring equipment.
为实现上述目的,本实用新型采取下述技术方案:In order to achieve the above object, the utility model takes the following technical solutions:
本实用新型所述的辅助路面现场检测取芯设备专用装卸吊装机,包括底座、立柱、吊臂和起吊系统;所述立柱由与所述底座焊接为一体的第一立柱、和下端动配合套装在所述第一立柱上端的第二立柱构成;所述吊臂由后端与所述第二立柱顶端销轴连接的第一吊臂、和动配合套装在所述第一吊臂前端的第二吊臂构成;第二立柱上端设置有定位板,所述定位板上开设有与第一吊臂后端定位孔销轴配合的销孔;底座通过螺栓固定在槽钢上,所述槽钢焊接在水平垫板的上表面。The special loading and unloading hoisting machine for auxiliary road surface on-site detection and coring equipment described in the utility model includes a base, a column, a boom and a lifting system; the column is composed of a first column welded with the base, and a lower end. The second column at the upper end of the first column is formed; the boom is composed of the first boom whose rear end is pinned to the top of the second column, and the first boom which is fitted in the front end of the first boom with a dynamic fit. It consists of two booms; the upper end of the second column is provided with a positioning plate, and the positioning plate is provided with a pin hole matching with the pin shaft of the positioning hole at the rear end of the first boom; the base is fixed on the channel steel by bolts, and the channel steel Welded to the upper surface of the horizontal backing plate.
所述起吊系统由直流卷扬机和吊钩装置组成;所述直流卷扬机设置在所述第一吊臂上,直流卷扬机的钢丝绳一端依次绕过设置在所述第二吊臂前端的定滑轮、所述吊钩装置的动滑轮与第二吊臂固定连接。The hoisting system is composed of a DC hoist and a hook device; the DC hoist is arranged on the first boom, and one end of the wire rope of the DC hoist turns around the fixed pulley arranged at the front end of the second boom, the The movable pulley of the hook device is fixedly connected with the second boom.
沿所述第二吊臂轴向间隔开设有定位孔,所述第一吊臂上开设有与第二吊臂上所述定位孔销轴配合的销孔。Positioning holes are arranged at intervals along the axial direction of the second boom, and pin holes cooperating with the pin shafts of the positioning holes on the second boom are opened on the first boom.
本实用新型优点在于专为解决桩基取芯设备搬运问题而设计。采用本实用新型后只需检测人员辅助便可将取芯设备平稳装车和安全落地,不仅规避了抬运过程中对取芯设备可能的损坏,同时也保证了检测人员的安全。同时,如图2所示,吊臂可变仰幅及伸缩,随意折叠便于收纳,结构紧凑不占用过多空间、操作简单安全可靠。The utility model has the advantage that it is specially designed for solving the handling problem of pile foundation coring equipment. After adopting the utility model, the coring equipment can be stably loaded and landed safely only with the assistance of the testing personnel, which not only avoids possible damage to the coring equipment during the lifting process, but also ensures the safety of the testing personnel. At the same time, as shown in Figure 2, the boom is variable in elevation and telescopic, and can be folded at will for easy storage. The structure is compact and does not take up too much space, and the operation is simple, safe and reliable.
附图说明Description of drawings
图1是本实用新型的结构示意图。Fig. 1 is a structural representation of the utility model.
图2是本实用新型折叠收起的状态示意图。Fig. 2 is a schematic diagram of the folded state of the utility model.
具体实施方式Detailed ways
下面结合附图对本发明的实施例作详细说明,本实施例在以本发明技术方案为前提下进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述实施例。The embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. This embodiment is implemented on the premise of the technical solution of the present invention, and detailed implementation methods and specific operating procedures are provided, but the scope of protection of the present invention is not limited to the following Described embodiment.
如图1所示,本实用新型所述的辅助路面现场检测取芯设备专用装卸吊装机,包括底座1、立柱、吊臂和起吊系统;立柱由与底座1焊接为一体的第一立柱2、和下端动配合套装在第一立柱2上端的第二立柱3构成,第一立柱2和第二立柱3通过双轴承4转动配合;吊臂由后端与第二立柱3顶端销连接的第一吊臂5、和动配合套装在第一吊臂5前端的第二吊臂6构成,沿第二吊臂6轴向间隔开设有定位孔7,第一吊臂5上开设有与第二吊臂6上定位孔7销轴配合的销孔8;第二立柱3上端设置有定位板9,定位板9上开设有与第一吊臂5后端定位孔销轴配合的销孔10;底座1通过螺栓固定在槽钢11上,槽钢11焊接在水平垫板12的上表面。As shown in Figure 1, the special loading and unloading hoisting machine for auxiliary road surface on-site detection and coring equipment described in the utility model includes a base 1, a column, a boom and a lifting system; the column is composed of a first column 2 welded with the base 1, It is composed of the second column 3 which is set on the upper end of the first column 2 in moving fit with the lower end. The first column 2 and the second column 3 are rotated and matched by double bearings 4; The boom 5 and the second boom 6 that is fitted in the front end of the first boom 5 in a moving fit are formed. Positioning holes 7 are arranged at intervals along the axial direction of the second boom 6 . The pin hole 8 matched with the pin shaft of the positioning hole 7 on the arm 6; the upper end of the second column 3 is provided with a positioning plate 9, and the positioning plate 9 is provided with a pin hole 10 matched with the pin shaft of the positioning hole pin at the rear end of the first boom 5; the base 1 is fixed on the channel steel 11 by bolts, and the channel steel 11 is welded on the upper surface of the horizontal backing plate 12.
起吊系统由直流卷扬机13和吊钩装置14组成;直流卷扬机13设置在第一吊臂5上,直流卷扬机13的钢丝绳15一端依次绕过设置在第二吊臂6前端的定滑轮、吊钩装置14的动滑轮与第二吊臂6固定连接。The hoisting system consists of a DC hoist 13 and a hook device 14; the DC hoist 13 is arranged on the first boom 5, and one end of the steel wire rope 15 of the DC hoist 13 passes around the fixed pulley and the hook device arranged at the front end of the second boom 6 in turn. The movable pulley of 14 is fixedly connected with the second boom 6.
本实用新型使用时,首先将水平垫板12放置在工程车(如运输皮卡车)上卡接牢固,然后通过螺栓将底座1固定在槽钢11上。根据现场情况,调整吊臂的长度和仰幅并通过销轴固定,通过旋转吊臂将吊钩装置至于取芯设备上方即可起吊装卸。When the utility model is used, at first the horizontal backing plate 12 is placed on the engineering vehicle (such as a pickup truck) and clamped firmly, and then the base 1 is fixed on the channel steel 11 by bolts. According to the site conditions, adjust the length and elevation of the boom and fix it through the pin shaft. By rotating the boom, place the hook device above the coring equipment to lift and unload.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920318322.9U CN209618717U (en) | 2019-03-14 | 2019-03-14 | On-site test coring device-specific in road surface is assisted to load and unload hoisting machine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920318322.9U CN209618717U (en) | 2019-03-14 | 2019-03-14 | On-site test coring device-specific in road surface is assisted to load and unload hoisting machine |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209618717U true CN209618717U (en) | 2019-11-12 |
Family
ID=68456667
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920318322.9U Active CN209618717U (en) | 2019-03-14 | 2019-03-14 | On-site test coring device-specific in road surface is assisted to load and unload hoisting machine |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209618717U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112299260A (en) * | 2020-11-23 | 2021-02-02 | 中铁十一局集团第三工程有限公司 | Crane |
-
2019
- 2019-03-14 CN CN201920318322.9U patent/CN209618717U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112299260A (en) * | 2020-11-23 | 2021-02-02 | 中铁十一局集团第三工程有限公司 | Crane |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205838386U (en) | A kind of lifting mobile device for delivery unit plate | |
| CN209618717U (en) | On-site test coring device-specific in road surface is assisted to load and unload hoisting machine | |
| CN207684753U (en) | Satellite turns over docking facilities | |
| CN203845719U (en) | Vehicle-mounted crane structure of transport vehicle | |
| CN106586805A (en) | Lifting appliance special for large component conveying frame | |
| CN204116057U (en) | A kind of small-sized forklift stabilizing tester | |
| CN106744385B (en) | Extra-high voltage series compensation platform device lifts portable repairing device | |
| CN110092217B (en) | Integral slag turning workbench for dumping slag soil in carriage of slag car in tunnel | |
| CN206645580U (en) | Container unloading tilting platform | |
| CN206511798U (en) | The special hanger of large-scale component pallet | |
| CN206705601U (en) | A kind of liftable moving cart | |
| CN204976157U (en) | Turning device of turntable bearing | |
| CN210914997U (en) | A folding door hanger | |
| CN105197079A (en) | Trolley integrating overhaul power supply and used for carrying equipment | |
| CN204727242U (en) | Quick and safe unloading device for gas cylinder | |
| CN222894271U (en) | Auxiliary installation device for sectional steel arch of tunnel | |
| CN116853333A (en) | Steel member transportation equipment | |
| CN210764035U (en) | Load self-propelled special crane | |
| JPH02275339A (en) | Soil-bearing-power measuring apparatus | |
| CN208700429U (en) | A kind of boom hoisting for drum equipment dismounting | |
| CN115452442A (en) | Telescopic trestle system strength test method | |
| CN205527399U (en) | A hoisting accessory for large -scale pressure steel pipe turn -over | |
| CN107804785A (en) | A kind of generator unit stator lifting steering and its method | |
| CN209878959U (en) | Hub motor test bed device for container tyre crane | |
| CN212683867U (en) | Anti-dumping device of large-scale hoisting hook pulley assembly |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20191230 Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Co-patentee after: THE THIRD ENGINEERING Co.,Ltd. OF THE HIGHWAY ENGINEERING BUREAU OF CCCC Patentee after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd. Address before: 101149 Beijing Tongzhou District Zhongguancun science and Technology Park Tongzhou garden Jinqiao Technology Industrial Base Jingsheng North Third Street 10 Patentee before: THE THIRD ENGINEERING Co.,Ltd. OF THE HIGHWAY ENGINEERING BUREAU OF CCCC |
|
| TR01 | Transfer of patent right |