CN209603092U - Dam gate sediment outflow device - Google Patents
Dam gate sediment outflow device Download PDFInfo
- Publication number
- CN209603092U CN209603092U CN201822187481.8U CN201822187481U CN209603092U CN 209603092 U CN209603092 U CN 209603092U CN 201822187481 U CN201822187481 U CN 201822187481U CN 209603092 U CN209603092 U CN 209603092U
- Authority
- CN
- China
- Prior art keywords
- gate
- dam
- dam gate
- sand
- sand discharge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Barrages (AREA)
Abstract
Description
技术领域technical field
本实用新型属于水利水电工程技术领域,具体是涉及一种水坝闸门排沙装置。The utility model belongs to the technical field of water conservancy and hydropower engineering, in particular to a sand discharge device for a dam gate.
背景技术Background technique
目前水电工程弧形闸室前面一般设置事故闸门,为弧形闸门提供检修维护条件,而在检修维护过程中,事故闸门和弧形闸室之间洞段要经历充水和放水的过程,充水时一般直接通过充水管把库水充入此洞段,库水在流动过程中极易携带泥沙,通过充水管在该洞段淤积,若淤积于事故闸门井底部,很容易造成闸门无法正常运行,影响结构安全稳定。At present, emergency gates are generally installed in front of the arc lock chambers of hydropower projects to provide inspection and maintenance conditions for the arc gates. When the water is filled, the reservoir water is usually filled into this cave section directly through the water-filling pipe. The reservoir water is very easy to carry sediment during the flow process, and deposits in the cave section through the water-filling pipe. If it is deposited at the bottom of the accident gate well, it is easy to cause the gate to fail Normal operation affects the safety and stability of the structure.
实用新型内容Utility model content
为解决上述技术问题,本实用新型提供了一种水坝闸门排沙装置。In order to solve the above technical problems, the utility model provides a sand discharge device for a dam gate.
本实用新型是通过如下技术方案予以实现的。The utility model is realized through the following technical solutions.
本实用新型提供了一种水坝闸门排沙装置,包括沉沙池和接沙池,地面以下挖掘有隧洞,所述隧洞之上设置有水坝闸门系统,所述水坝闸门系统包括闸墙和闸门,所述闸墙以内设置有闸井,所述闸门可沿着闸井上下往复运动使所述河道水流导通或阻截,所述沉沙池和接沙池均设置于与所述闸墙相邻近的位置,所述沉沙池侧壁通过充水管与所述闸井连通,所述沉沙池侧壁还通过进水管接入水源,所述沉沙池底部通过排沙管与所述接沙池连通。The utility model provides a sand discharge device for a dam gate, which comprises a sedimentation tank and a sand receiving tank. A tunnel is excavated below the ground, and a dam gate system is arranged above the tunnel. The dam gate system includes a gate wall and a gate. There is a gate well inside the gate wall, and the gate can reciprocate up and down along the gate well to conduct or block the water flow in the river. The side wall of the grit chamber is connected to the gate well through the water-filled pipe, the side wall of the grit chamber is also connected to the water source through the water inlet pipe, and the bottom of the grit chamber is connected to the gate well through the sand discharge pipe. The sand pool is connected.
所述充水管布置于所述进水管的上方。The water filling pipe is arranged above the water inlet pipe.
所述沉沙池布置高度大于所述水坝闸门系统之前上游水位高度。The arrangement height of the grit chamber is greater than the upstream water level before the dam gate system.
所述充水管之上安装有控制闸阀A。A control gate valve A is installed on the water filling pipe.
所述充水管末端伸入所述隧洞底部接近的位置。The end of the water-filled pipe extends into a position close to the bottom of the tunnel.
所述排沙管之上安装有控制闸阀B。A control gate valve B is installed on the sand discharge pipe.
所述沉沙池底面设置为沿着河水流向向下倾斜的斜坡面,所述沉沙池与排沙管连接处位于所述斜坡面的末端。The bottom surface of the grit chamber is set as a slope surface that slopes downward along the flow of the river, and the connection between the grit chamber and the sand discharge pipe is located at the end of the slope surface.
所述沉沙池布置位置高度大于所述接沙池布置位置高度。The height of the arrangement position of the grit chamber is greater than the height of the arrangement position of the sand receiving tank.
所述水坝闸门系统还包括溢水廊道,溢水廊道的一端与所述水坝闸门系统之前上游河道连通,溢水廊道的另一端与所述水坝闸门系统之前下游隧洞连通,所述排沙管还与溢水廊道连通。The dam gate system also includes an overflow corridor, one end of the overflow corridor communicates with the upstream channel before the dam gate system, the other end of the overflow corridor communicates with the downstream tunnel before the dam gate system, and the sand discharge pipe also Connected with overflow corridor.
所述隧洞底部还安装有防冲垫,防冲垫布置位置对应于所述充水管末端正下方。An anti-scour pad is also installed at the bottom of the tunnel, and the location of the anti-scour pad corresponds to the position directly below the end of the water-filled pipe.
本实用新型的有益效果在于:采用本实用新型的技术方案,当含有泥沙的水流流经水坝闸门系统时,通过进水管进入沉沙池以内进行沉淀,沉淀出来的泥沙碎屑等则定期通过启用排沙管,使输入水源将这些泥沙碎屑经由排沙管冲刷至接沙室内集中存储,以便于集中进行处理,而在对水坝闸门系统进行检修作业时,还可通过充水管将沉沙池内的清澈水注入闸井以内,以保持水坝闸门系统前后的水压平衡,采用本实用新型的技术方案,避免了泥沙碎屑沉积于水坝闸门系统底部,使水流在隧洞内保持通畅,保障了水坝闸门系统对河流的正常导通或阻断,保证了水坝闸门系统的安全稳定运行。The beneficial effects of the utility model are: adopting the technical scheme of the utility model, when the water flow containing sediment flows through the dam gate system, it enters the sedimentation tank through the water inlet pipe for sedimentation, and the sediment debris etc. By using the sand discharge pipe, the input water source will wash these sediment debris through the sand discharge pipe to the sand receiving room for centralized storage, so as to facilitate centralized processing, and when the dam gate system is overhauled, it can also be discharged through the water filling pipe. The clear water in the sedimentation tank is injected into the gate well to maintain the water pressure balance before and after the dam gate system. The technical scheme of the utility model is adopted to avoid the deposition of sediment and debris at the bottom of the dam gate system, so that the water flow remains unobstructed in the tunnel , to ensure the normal conduction or blocking of the dam gate system to the river, and to ensure the safe and stable operation of the dam gate system.
附图说明Description of drawings
图1是本实用新型与水坝闸门系统的连接结构示意图;Fig. 1 is the connection structure schematic diagram of the utility model and dam gate system;
图2是本实用新型的连接结构示意图。Fig. 2 is a schematic diagram of the connection structure of the present invention.
图中:1-沉沙池,2-充水管,3-进水管,4-排沙管,5-接沙池,8-隧洞,9-水坝闸门系统,12-控制闸阀A,16-防冲垫,19-控制闸阀B,20-溢水廊道,21-控制闸阀C,901-闸墙,902-闸门,903-闸井。In the figure: 1-sand sink, 2-water filling pipe, 3-water inlet pipe, 4-sand discharge pipe, 5-sand receiving tank, 8-tunnel, 9-dam gate system, 12-control gate valve A, 16-anti-corrosion Wash pad, 19-control gate valve B, 20-overflow corridor, 21-control gate valve C, 901-gate wall, 902-gate, 903-gate well.
具体实施方式Detailed ways
下面结合附图进一步描述本实用新型的技术方案,但要求保护的范围并不局限于所述。The technical solution of the utility model is further described below in conjunction with the accompanying drawings, but the scope of protection is not limited to the description.
本实用新型提供了一种水坝闸门排沙装置,如图1、图2所示,包括沉沙池1和接沙池5,地面以下挖掘有隧洞8,隧洞8之上设置有水坝闸门系统9,水坝闸门系统9包括闸墙901和闸门902,闸墙901以内设置有闸井903,闸门902可沿着闸井903上下往复运动使河道水流导通或阻截,沉沙池1和接沙池5均设置于与闸墙901相邻近的位置,沉沙池1侧壁通过充水管2与闸井903连通,沉沙池1侧壁还通过进水管3接入水源,沉沙池1底部通过排沙管4与接沙池5连通。The utility model provides a sand discharge device for a dam gate, as shown in Figure 1 and Figure 2, comprising a grit chamber 1 and a sand receiving pond 5, a tunnel 8 is excavated below the ground, and a dam gate system 9 is arranged above the tunnel 8 The dam gate system 9 includes a gate wall 901 and a gate 902. A gate well 903 is arranged inside the gate wall 901. The gate 902 can reciprocate up and down along the gate well 903 to conduct or block the river flow. The desilting tank 1 and the sand receiving tank 5 are all arranged at the position adjacent to the gate wall 901, the side wall of the grit chamber 1 is connected with the gate well 903 through the water filling pipe 2, the side wall of the grit chamber 1 is also connected to the water source through the water inlet pipe 3, and the bottom of the grit chamber 1 It communicates with the sand receiving pool 5 through the sand discharge pipe 4 .
采用本实用新型的技术方案,当含有泥沙的水流流经水坝闸门系统时,通过进水管进入沉沙池以内进行沉淀,沉淀出来的泥沙碎屑等则定期通过启用排沙管,使输入水源将这些泥沙碎屑经由排沙管冲刷至接沙室内集中存储,以便于集中进行处理,而在对水坝闸门系统进行检修作业时,还可通过充水管将沉沙池内的清澈水注入闸井以内,以保持水坝闸门系统前后的水压平衡,采用本实用新型的技术方案,避免了泥沙碎屑沉积于水坝闸门系统底部,使水流在隧洞内保持通畅,保障了水坝闸门系统对河流的正常导通或阻断,保证了水坝闸门系统的安全稳定运行。Adopting the technical solution of the utility model, when the water flow containing sediment flows through the dam gate system, it enters the sedimentation tank through the water inlet pipe for sedimentation, and the sediment debris etc. that are deposited are regularly activated through the sand discharge pipe to make the input The water source washes these sediment debris through the sand discharge pipe to the sand receiving room for centralized storage, so as to facilitate centralized treatment, and when the dam gate system is overhauled, the clear water in the sedimentation tank can also be injected into the gate through the water filling pipe In the well, in order to maintain the water pressure balance before and after the dam gate system, the technical scheme of the utility model is adopted to avoid the deposition of sediment and debris at the bottom of the dam gate system, so that the water flow in the tunnel is kept smooth, and the protection of the dam gate system from the river is guaranteed. The normal conduction or blocking of the dam gate system ensures the safe and stable operation of the dam gate system.
进一步地,充水管2布置于进水管3的上方。沉沙池1布置高度大于水坝闸门系统9之前上游水位高度。充水管2之上安装有控制闸阀A12。充水管2末端伸入隧洞8底部接近的位置。排沙管4之上安装有控制闸阀B19。进水管3之上还安装有控制阀门C21。把沉淀好的清水通过所述充水管(2)输送到结构内部,保证结构内部的水压平衡,通过控制闸阀A12、控制闸阀B19和控制阀门C21,可分别对充水管2、排沙管4和进水管3的启闭以及流量进行控制,以满足用户的使用需求。Further, the water filling pipe 2 is arranged above the water inlet pipe 3 . The arrangement height of the grit chamber 1 is greater than the height of the upstream water level before the dam gate system 9 . A control gate valve A12 is installed on the water filling pipe 2 . The end of the water-filling pipe 2 stretches into the position close to the bottom of the tunnel 8 . A control gate valve B19 is installed on the sand discharge pipe 4 . A control valve C21 is also installed on the water inlet pipe 3 . Transport the settled clear water to the inside of the structure through the water filling pipe (2) to ensure the water pressure balance inside the structure. and the opening and closing of the water inlet pipe 3 and the flow are controlled to meet the needs of users.
此外,优选沉沙池1底面设置为沿着河水流向向下倾斜的斜坡面,沉沙池1与排沙管4连接处位于斜坡面的末端。沉沙池1布置位置高度大于接沙池5布置位置高度。In addition, it is preferable that the bottom surface of the grit chamber 1 is set as a slope surface sloping downward along the flow of the river, and the connection between the grit chamber 1 and the sand discharge pipe 4 is located at the end of the slope surface. The height of the arrangement position of the grit chamber 1 is greater than the height of the arrangement position of the sand receiving pond 5 .
进一步地,水坝闸门系统9还包括溢水廊道20,溢水廊道20的一端与水坝闸门系统9之前上游河道连通,溢水廊道20的另一端与水坝闸门系统9之前下游隧洞8连通,排沙管4还与溢水廊道20连通。采用该技术方案,便于及时将沉积的泥沙沿着水流排出,避免泥沙对水坝闸门系统造成冲击,保护了水坝闸门系统的安全。Further, the dam gate system 9 also includes an overflow corridor 20, one end of the overflow corridor 20 communicates with the upstream channel before the dam gate system 9, and the other end of the overflow corridor 20 communicates with the downstream tunnel 8 before the dam gate system 9, and discharges sand The pipe 4 also communicates with the overflow gallery 20 . The adoption of the technical solution facilitates timely discharge of the deposited sediment along the water flow, avoids the impact of the sediment on the gate system of the dam, and protects the safety of the gate system of the dam.
进一步地,隧洞底部还安装有防冲垫16,防冲垫16布置位置对应于充水管2末端正下方。采用该技术方案,由于充水管2伸入隧洞以内,使水流能量在该区域内造成部分集中,为避免充水管或水坝闸门系统底部受到较大的水流冲击,优选在该区域设置相应的防冲垫16,已提升水坝闸门系统和充水管的耐冲击性能。Further, an anti-scour pad 16 is also installed at the bottom of the tunnel, and the location of the anti-scour pad 16 is corresponding to just below the end of the water-filled pipe 2 . With this technical scheme, since the water filling pipe 2 extends into the tunnel, the water flow energy is partially concentrated in this area. In order to avoid the large water flow impact on the water filling pipe or the bottom of the dam gate system, it is preferable to set up corresponding anti-scouring in this area. Pad 16, has improved the impact resistance of the dam gate system and water-filled pipes.
此外,优选进水管3接入水源来自于消防用水池、水泵房、施工用水池或露营用水池中的一种,接入水源应就近取用,避免水资源浪费。In addition, it is preferable that the water source connected to the water inlet pipe 3 comes from one of fire-fighting pools, pump houses, construction pools or camping pools, and the connected water sources should be taken nearby to avoid waste of water resources.
本申请的技术方案由中国电建集团贵阳勘测设计研究院有限公司投入实施应用,在实施中,受华能科技项目HNKJ15-H12的资助、贵州省科技支撑计划科技项目黔科合支撑[2019]201970966703X20907的资助,在实施后,取得了上述有益的技术效果,同时社会效益良好。The technical solution of this application was put into implementation and application by PowerChina Guiyang Survey and Design Research Institute Co., Ltd. During the implementation, it was funded by Huaneng Science and Technology Project HNKJ15-H12 and supported by Guizhou Science and Technology Support Program Science and Technology Project Qiankehe [2019] 201970966703X20907 After the implementation, the above-mentioned beneficial technical effects have been achieved, and the social benefits are good at the same time.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822187481.8U CN209603092U (en) | 2018-12-25 | 2018-12-25 | Dam gate sediment outflow device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822187481.8U CN209603092U (en) | 2018-12-25 | 2018-12-25 | Dam gate sediment outflow device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209603092U true CN209603092U (en) | 2019-11-08 |
Family
ID=68398244
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201822187481.8U Active CN209603092U (en) | 2018-12-25 | 2018-12-25 | Dam gate sediment outflow device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209603092U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109469028A (en) * | 2018-12-25 | 2019-03-15 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of sand removal device for dam gate system |
| CN110374062A (en) * | 2019-06-06 | 2019-10-25 | 赵晓霞 | A kind of compound bottom gate with sand discharge function |
| CN113062439A (en) * | 2021-03-30 | 2021-07-02 | 希阿埃(广州)有限公司 | Integrated pump gate and application thereof |
| CN115075203A (en) * | 2022-05-25 | 2022-09-20 | 中国电建市政建设集团有限公司 | Novel guide plug type sand flushing gate |
-
2018
- 2018-12-25 CN CN201822187481.8U patent/CN209603092U/en active Active
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109469028A (en) * | 2018-12-25 | 2019-03-15 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of sand removal device for dam gate system |
| CN109469028B (en) * | 2018-12-25 | 2023-10-27 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of sand discharge device for dam gate system |
| CN110374062A (en) * | 2019-06-06 | 2019-10-25 | 赵晓霞 | A kind of compound bottom gate with sand discharge function |
| CN110374062B (en) * | 2019-06-06 | 2021-05-25 | 赵永宪 | Compound bottom hole gate with sand discharging function |
| CN113062439A (en) * | 2021-03-30 | 2021-07-02 | 希阿埃(广州)有限公司 | Integrated pump gate and application thereof |
| CN115075203A (en) * | 2022-05-25 | 2022-09-20 | 中国电建市政建设集团有限公司 | Novel guide plug type sand flushing gate |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104480974B (en) | Reverse seepage drain system suitable for upstream type tailings pond and upstream type tailings pond | |
| CN104612237B (en) | Rainfall flood regulating system | |
| CN205116250U (en) | Sediment removal device of reservoir among hydraulic engineering | |
| CN103938591A (en) | Method for reducing heavily silt-carrying river reservoir deposition | |
| CN104878829B (en) | Anti-clogging inverted siphon sewage pipe system | |
| CN106049390B (en) | A kind of sand setting suitable for river controlling projects blocks dirty integrated apparatus | |
| CN108203907B (en) | A kind of town road discharge structure | |
| CN207392122U (en) | It is a kind of that there is the key water control project of desilting | |
| CN113233525A (en) | Underground water flow field-based pyrite mountain land sewage pollution remediation and treatment method | |
| CN104975648B (en) | Combined system underground Rainwater Storage Tank | |
| CN201596384U (en) | Farmland low-pressure pipeline forebay self-draining grit chamber device | |
| CN209227737U (en) | A kind of Multifunctional rain storage pond | |
| CN204753798U (en) | Confluence system underground initial stage rainwater regulation pond | |
| CN209339233U (en) | A kind of simple water-fetching mouth | |
| CN104963383B (en) | A kind of pressure conduit inverted siphon hydraulic automatism erosion and deposition device | |
| CN110258471A (en) | Riverbed water intaking mouth structure for the water intaking of power station forward direction | |
| CN104963379B (en) | For the water intaking structure on mountain channel | |
| CN109469028B (en) | A kind of sand discharge device for dam gate system | |
| CN205189031U (en) | High pressure rivers wash mud device clearly | |
| CN108677894A (en) | It is a kind of to utilize pipeline type karstic ground water electricity generation system and design method | |
| CN215858009U (en) | Water supply system using underground water of super-long tunnel as water source of fire pool in tunnel | |
| CN103614986B (en) | It a kind of is applicable to the pressure free current inlet method that Tailings Dam drains off floodwaters | |
| CN109868856A (en) | The box feed ditch sand discharge apparatus of small reservoir | |
| CN214033574U (en) | Storage-regulating pressure-regulating automatic silt-flushing non-pressure hole structure | |
| CN112647466B (en) | Sediment management method suitable for sandy river hydropower station |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |