CN209566288U - A kind of prefabricated case beam bulkhead template - Google Patents

A kind of prefabricated case beam bulkhead template Download PDF

Info

Publication number
CN209566288U
CN209566288U CN201822056416.1U CN201822056416U CN209566288U CN 209566288 U CN209566288 U CN 209566288U CN 201822056416 U CN201822056416 U CN 201822056416U CN 209566288 U CN209566288 U CN 209566288U
Authority
CN
China
Prior art keywords
template
shaft
cushion block
floor
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822056416.1U
Other languages
Chinese (zh)
Inventor
贺方圆
彭岸
占滢
易强
苏亮亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCFEB Civil Engineering Co Ltd
Original Assignee
CCFEB Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCFEB Civil Engineering Co Ltd filed Critical CCFEB Civil Engineering Co Ltd
Priority to CN201822056416.1U priority Critical patent/CN209566288U/en
Application granted granted Critical
Publication of CN209566288U publication Critical patent/CN209566288U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of prefabricated case beam bulkhead templates, including main template body and template connecting piece, it is characterised in that: the main template body includes mainboard, upper floor, the lower floor being welded on mainboard;The upper floor, lower floor both ends are provided with several through-holes;The template connecting piece includes upper cushion block, one end is separately positioned on a pair of of upper junction plate that cushion block or more two sides, the other end are provided with several through-holes, sleeve, lower cushion block, one end is separately positioned on a pair of of lower connecting plate that lower cushion block or more two sides, the other end are provided with several through-holes, the fixed baffle of shaft bottom end is arranged in shaft, and the locking member on shaft top is arranged in.The utility model assembling flexibly, dismantles angle change different between simply adapting to template, improves the service efficiency of template, saves the cost for making template repeatedly.

Description

A kind of prefabricated case beam bulkhead template
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of prefabricated case beam bulkhead template.
Background technique
After the completion of the bulkhead of prefabricated case beam refers to that prefabricated case beam is prefabricated, for can after blocking end, being aided with mortar-chalked joint Prevent crossbeam cast-in-place concrete from leaking into chamber and prefabricated concrete slab when pouring.Template used when bulkhead is poured at present Usually use steel plate site welding, the template size made in this way is uneven, and using when be easily deformed, therefore often lead to give birth to There are dimensional discrepancys for the bulkhead of production, and then cause jointing width uneven, and mortar is easy cracking, influences final presentation quality. On the other hand, the template welded together also results in cleaning difficulty, cannot be used repeatedly, while also bringing not to demoulding Just.Therefore need that a kind of production specification, assembling are simple, it is convenient to remove, recycle efficiently, can improve the prefabricated quality of bulkhead with Efficiency saves the new type formwork product of cost.
Utility model content
In view of the above-mentioned problems, the utility model provides a kind of prefabricated case beam bulkhead template, flexibly, disassembly is simple for assembling It is single, different angle changes between template is adapted to, the service efficiency of template is improved, saves the cost for making template repeatedly.
The utility model is achieved through the following technical solutions.
A kind of prefabricated case beam bulkhead template, including main template body and template connecting piece, it is characterised in that: the template master Body includes mainboard, upper floor, the lower floor being welded on mainboard;The upper floor, lower floor both ends are provided with several through-holes;
The template connecting piece includes upper cushion block, if one end is separately positioned on cushion block, two sides, the other end are provided with up and down A pair of of upper junction plate of dry through-hole, sleeve, lower cushion block, if one end is separately positioned on lower cushion block, two sides, the other end are provided with up and down The fixed baffle of shaft bottom end is arranged in a pair of of lower connecting plate of dry through-hole, shaft, and the locking member on shaft top is arranged in;Institute It states shaft and sequentially passes through cushion block, upper junction plate, sleeve, lower cushion block, lower connecting plate, make upper junction plate, lower connecting plate that can rotate Axis is freely rotated, and is limited by locking member to upper junction plate, lower connecting plate;The pair of upper junction plate respectively with it is adjacent The upper floor of two of main template body passes through upper junction plate by bolt, the through-hole of upper floor is connected and fixed;The pair of lower connection Plate passes through lower connecting plate by bolt with two lower floors of adjacent forms main body respectively, the through-hole of lower floor is connected and fixed.
As optimal technical scheme, the upper junction plate, lower connecting plate are made of steel plate.
As optimal technical scheme, the shaft top is equipped with screw thread, and the locking member is the spiral shell that shaft top is arranged in Cap.
As optimal technical scheme, the locking member is eccentric clamping structure comprising is turned with shaft top by pivot pin The eccentric wheel of dynamic connection and the handle being connect with eccentric wheel.
The utility model beneficial effect is: the utility model makes template assemblies more by the setting of template connecting piece Flexibly, different angle changes between template is adapted to, makes to dismantle more convenient, the service efficiency of template is improved, saves anti- The cost that template is made in duplication improves the rigidity of template by the setting of floor, reduces template deformation, makes bulkhead template Prefabricated more standards and specifications ensure that bulkhead prefabricated quality and production efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model prefabricated case beam plug template die;
Fig. 2 is the structural schematic diagram of main template body in the utility model prefabricated case beam bulkhead template;
Fig. 3 is the structural schematic diagram of template connecting piece in the utility model prefabricated case beam bulkhead template;
Fig. 4 is structural schematic diagram when locking member is nut in the utility model prefabricated case beam bulkhead template;
Fig. 5 is structural representation when locking member is eccentric clamping structure in the utility model prefabricated case beam bulkhead template Figure;
The meaning respectively identified in above-mentioned figure are as follows: 1- main template body, 2- template connecting piece, 11- mainboard, the upper floor of 12-, 13- Lower floor, 2- template connecting piece, 21- upper junction plate, 22- lower connecting plate, 23- sleeve, 24- locking member, 241- nut, 242- are inclined Heart wheel, 243- handle, the upper cushion block of 25-, 26- lower cushion block, 27- shaft, 28- fixed baffle.
Specific embodiment
The utility model is described further in the form of specific embodiment with reference to the accompanying drawing, it is pointed out that with Lower embodiment is only the indicative explaination that the form to enumerate does the utility model, but the protection scope of the utility model It is not limited to that, all those skilled in the art equivalent are replaced with the spirit of the utility model to what the utility model was done It changes and each falls within the protection scope of the utility model.
Embodiment
A kind of prefabricated case beam bulkhead template please refers to Fig. 1, Fig. 2, Fig. 3, including main template body 1 and template connecting piece 2, Wherein main template body 1 includes mainboard 11, upper floor 12, the lower floor 13 being welded on mainboard 11;Upper floor 12, lower floor 13 Both ends are provided with several through-holes;Template connecting piece 2 include upper cushion block 25, one end be separately positioned on about 25 two sides of cushion block, The other end is provided with a pair of of upper junction plate 21 of several through-holes, and sleeve 23, lower cushion block 26, one end is separately positioned on lower cushion block 26 Lower two sides, the other end are provided with a pair of of lower connecting plate 22 of several through-holes, and the fixed baffle of 27 bottom end of shaft is arranged in shaft 27 28, the locking member 24 on 27 top of shaft is set;Shaft 27 sequentially passes through cushion block 25, upper junction plate 21, sleeve 23, lower cushion block 26, upper junction plate 21, lower connecting plate 22 is freely rotated can 27 around the shaft in lower connecting plate 22, and by locking member 24 to upper company Fishplate bar 21, lower connecting plate 22 are limited;A pair of of upper junction plate 21 passes through with two upper floors 12 of adjacent forms main body 1 respectively Bolt passes through upper junction plate 21, the through-hole of upper floor 12 is connected and fixed;A pair of of lower connecting plate 22 respectively with adjacent forms main body 1 Two lower floors 13 pass through lower connecting plate 22 by bolt, the through-hole of lower floor 13 is connected and fixed.
It further, is the bonding strength for guaranteeing main template body 1 and template connecting piece 2, in the present embodiment, upper junction plate 21, lower connecting plate 22 is made of steel plate.
Further, in order to which the main template body 1 of connection adjacent when pouring will not relatively rotate, referring to Fig. 4, this In embodiment, 27 top of shaft is equipped with screw thread, and locking member 24 is the nut 241 that 27 top of shaft is arranged in, and can be passed through in this way Tightening nuts 241 limit upper junction plate 21 and lower connecting plate 22, to prevent the main template body 1 of adjacent connection from relatively rotating.
Further, in order to which the main template body 1 of connection adjacent when pouring will not relatively rotate, at the same it is laborsaving, just Locking upper junction plate 21, the lower connecting plate 22 of victory, referring to Fig. 5, locking member 24 is eccentric clamping structure in the present embodiment, Including the eccentric wheel 242 being rotatablely connected with 27 top of shaft by pivot pin and the handle 243 being connect with eccentric wheel 242.
When the utility model is used, the inner surface to mainboard 11 is needed to polish first, connected later with template connecting piece 2 Adjacent forms main body 1 is connect, after the angle for adjusting adjacent forms main body 1, by locking member 24 to upper junction plate 21, lower connecting plate 22 limits, be freely rotated template connecting piece 2 can not, after main template body 1 surrounds firm bulkhead profile, template are placed On the film of ground, and carry out 11 inner surface of mainboard release agent brush, to bulkhead reinforcement installation after, can be by construction Process pours plug board concrete.It generally uses when concreting and manually vibrates, should be noted that when vibrating and gently insert, is how slotting, close slotting, When concrete is no longer obviously emerged bubble, surface bleeding and when basically forming horizontal plane, illustrate vibration compacting.In concrete until Concrete setting, when needing demoulding, it is only necessary to unload next template connecting piece 2, then unclamp the locking member of remaining template connecting piece 2 24, it is turned out main template body 1, the dismounting of template can be completed.The maintenance of concrete generally uses nature watering to support after demoulding Shield, and covered with heat preservation or moisturizing material, watering number is sufficiently humidified so as to be advisable to be able to maintain concrete surface, the moisture-keeping maintaining time It is 14 days.Bulkhead is lifted to prefabricated case beam beam-ends using equipment such as cranes later, and is fixed temporarily with timber wedge etc., then With mortar-chalked joint, the installation of bulkhead is completed.
Since the utility model is assembled template, by replacing the main template body 1 of different length, and adjusting template is connected Part 2 is formed by angle, so that it may which the bulkhead for adapting to all sizes in an engineering pours.

Claims (4)

1. a kind of prefabricated case beam bulkhead template, including main template body (1) and template connecting piece (2), it is characterised in that:
The main template body (1) includes mainboard (11), upper floor (12), the lower floor (13) being welded on mainboard (11);It is described Upper floor (12), lower floor (13) both ends be provided with several through-holes;
The template connecting piece (2) includes upper cushion block (25), and one end is separately positioned on cushion block (25), and two sides, the other end are equal up and down It is provided with a pair of of upper junction plate (21) of several through-holes, sleeve (23), lower cushion block (26), one end is separately positioned on lower cushion block (26) Lower two sides, the other end are provided with a pair of of lower connecting plate (22) of several through-holes, and consolidating in shaft (27) bottom end is arranged in shaft (27) Determine baffle (28), the locking member (24) on shaft (27) top is set;The shaft (27) sequentially passes through cushion block (25), upper company Fishplate bar (21), sleeve (23), lower cushion block (26), lower connecting plate (22) make upper junction plate (21), lower connecting plate (22) can be around the shaft (27) it is freely rotated, and upper junction plate (21), lower connecting plate (22) is limited by locking member (24);The pair of upper company Fishplate bar (21) passes through upper junction plate (21), upper floor by bolt with two upper floor (12) of adjacent forms main body (1) respectively (12) through-hole is connected and fixed;The pair of lower connecting plate (22) respectively with two lower floors (13) of adjacent forms main body (1) Lower connecting plate (22) are passed through by bolt, the through-hole of lower floor (13) is connected and fixed.
2. a kind of prefabricated case beam bulkhead template as described in claim 1, it is characterised in that the upper junction plate (21), lower company Fishplate bar (22) is made of steel plate.
3. a kind of prefabricated case beam bulkhead template as described in claim 1~2 is any, which is characterized in that the shaft (27) Top is equipped with screw thread, and the locking member (24) is nut (241) of the setting on shaft (27) top.
4. a kind of prefabricated case beam bulkhead template as described in claim 1~2 is any, which is characterized in that the locking member (24) be eccentric clamping structure comprising the eccentric wheel (242) that is rotatablely connected with shaft (27) top by pivot pin and with bias Take turns the handle (243) of (242) connection.
CN201822056416.1U 2018-12-08 2018-12-08 A kind of prefabricated case beam bulkhead template Active CN209566288U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822056416.1U CN209566288U (en) 2018-12-08 2018-12-08 A kind of prefabricated case beam bulkhead template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822056416.1U CN209566288U (en) 2018-12-08 2018-12-08 A kind of prefabricated case beam bulkhead template

Publications (1)

Publication Number Publication Date
CN209566288U true CN209566288U (en) 2019-11-01

Family

ID=68321762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822056416.1U Active CN209566288U (en) 2018-12-08 2018-12-08 A kind of prefabricated case beam bulkhead template

Country Status (1)

Country Link
CN (1) CN209566288U (en)

Similar Documents

Publication Publication Date Title
CN205604088U (en) But bent cap quick adjustment support
CN209304757U (en) Prefabricated beam mould
CN205977242U (en) Be used for two lining platform truck end steel limit waterstop anchor clamps in tunnel
CN105803946A (en) Quickly adjustable bracket for cap beam and construction method of quickly adjustable bracket for cap beam
CN110616838A (en) Assembled composite floor slab with height limiting device and production process thereof
CN207959949U (en) A kind of unwrapping wire hole closure quick template supporting bracing means
CN209566288U (en) A kind of prefabricated case beam bulkhead template
CN203462754U (en) Free-disassembly suspension template
CN204983649U (en) Big inclination cylinder steel form
CN204570393U (en) A kind of double-block type bed plate limited impression builds servicing unit
CN202831624U (en) Template for deformation joint of shear wall
CN208830444U (en) Inspection shaft steel combined template
CN208267362U (en) A kind of constructing device of deformation joint concrete wall formwork
CN206091297U (en) Board assembly typical forms falls
CN207920070U (en) It can prevent the hoistway formwork system of the swollen mould of inner corner trim
CN206158756U (en) Tunnel concrete floor and low wall pour template device
KR101908811B1 (en) Concrete form for bridge
CN105463995B (en) Formwork for bridge pier seam construction and use method thereof
CN109386129A (en) The reinforcement means of large-diameter concrete column-form
CN212052342U (en) Construction auxiliary tool is transversely widened to prestressed concrete T roof beam of scalable regulation
CN206693618U (en) A kind of simple lintel cast-in-place mould
CN104453235B (en) Current conversion station fire wall construction technology
CN207813014U (en) It can turnover type multi-ribbed plate plastics putamina joint treatment device
CN207727982U (en) A kind of building wall corner Constructional Col-umn Construction template
CN206495681U (en) The practical end steel formwork of Tunnel Second Lining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant