CN209562017U - A tight pulley block device - Google Patents

A tight pulley block device Download PDF

Info

Publication number
CN209562017U
CN209562017U CN201920390171.8U CN201920390171U CN209562017U CN 209562017 U CN209562017 U CN 209562017U CN 201920390171 U CN201920390171 U CN 201920390171U CN 209562017 U CN209562017 U CN 209562017U
Authority
CN
China
Prior art keywords
wire
rope
pulley block
tightening
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920390171.8U
Other languages
Chinese (zh)
Inventor
张周
秦川
吴穹
刘磊
王飞
朱永利
叶添添
张乾隆
袁祎
刘爱辉
李捷
胡俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Power Transmission Engineering Co Ltd
State Grid Corp of China SGCC
Original Assignee
Hubei Power Transmission Engineering Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Power Transmission Engineering Co Ltd, State Grid Corp of China SGCC filed Critical Hubei Power Transmission Engineering Co Ltd
Priority to CN201920390171.8U priority Critical patent/CN209562017U/en
Application granted granted Critical
Publication of CN209562017U publication Critical patent/CN209562017U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a kind of snatch block group devices, including cross-arm, releasing pulley, grounded-line, 180kN rotator, traction rope, construction hole, pulley blocks, gripper, wirerope, adjustment plate, strain insulator string, idler wheel, stringing rope and strain clamp.Strain insulator string pulls pulley blocks to be swung in the side of cross-arm by stringing rope, it can be consistent with grounded-line Impact direction, utilize pulley blocks labour-saving principle, the stress of Work tool can be greatly lowered, reduce construction load, Construction of Tension Stringing operation can be completed by used Work tool, it is in tighten or ease out connection between gripper and adjustment plate that pulley blocks are pulled by stringing rope, reduce the labor intensity of operating personnel, there are two gripper settings, and one of them is used for connecting steel wire ropes, another is for connecting pulley blocks, to providing safeguard measure in grounded-line tightening process, it avoids leading to falling off for grounded-line because pulley blocks are out of control, guarantee construction safety.

Description

一种紧线滑轮组装置A tight pulley block device

技术领域technical field

本实用新型涉及一种滑轮组,具体为一种紧线滑轮组装置,属于输变电线路工程技术领域。The utility model relates to a pulley block, in particular to a tight-wire pulley block device, which belongs to the technical field of power transmission and transformation line engineering.

背景技术Background technique

输电线路架设,在导地线展放完成后,需要对已架通的导地线进行紧挂线施工,需采用一种紧线滑轮组装置收紧导地线,将导地线的弛度值调整至设计弛度。For the erection of power transmission lines, after the laying of the ground wires is completed, it is necessary to carry out tight hanging construction on the erected ground wires. Adjust to design slack.

而对于现有的紧线滑轮组,其一、不便于调节耐张绝缘子串的角度,因此还需人力将耐张绝缘子串调整至与导地线受力方向一致,增大了作业人员的劳动强度,其二、在收紧时,往往只能改变钢丝绳的拉动方向,不能够降低钢丝绳受力,不便于完成紧线施工作业,其三、在导地线的拉动过程中,导地线容易因扭动产生扭矩力,进而使导地线出现打结的现象,影响对导地线弛度的调整,其四、缺乏保护措施,在拉动过程中会出现滑轮失控等情况,进而会导致导地线的脱落,具有一定的危险隐患。For the existing tension pulley block, first, it is not convenient to adjust the angle of the tension insulator string, so manpower is required to adjust the tension insulator string to be consistent with the force direction of the ground wire, which increases the labor intensity of the operators 2. When tightening, it is often only possible to change the pulling direction of the wire rope, which cannot reduce the stress on the wire rope, and is not convenient for completing the construction work of tightening the wire. Thirdly, during the pulling process of the ground wire, the ground wire is easily caused Twisting produces torque force, which will cause the ground wire to become knotted and affect the adjustment of the slack of the ground wire. Fourth, lack of protection measures will cause the pulley to lose control during the pulling process, which will lead to the ground wire The shedding of the thread has certain hidden dangers.

实用新型内容Utility model content

本实用新型的目的就在于为了解决上述问题而提供一种紧线滑轮组装置。The purpose of this utility model is just to provide a kind of tightening pulley block device in order to solve the above problems.

本实用新型通过以下技术方案来实现上述目的:一种紧线滑轮组装置,包括横担、放线滑车、导地线、180kN旋转器、牵引绳、施工孔、滑轮组、卡线器、钢丝绳、调整板、耐张绝缘子串、滚轮、紧线绳和耐张线夹;所述横担下方通过连接钢索安装有放线滑车,所述导地线设置在横担的一侧,且所述导地线的牵引端连接有180kN旋转器,所述牵引绳的一端与180kN旋转器进行连接,所述牵引绳的另一端连接至牵引车,且所述牵引绳缠绕在放线滑车上,所述施工孔通过焊接与横担的侧壁进行固定连接,所述滑轮组的一端通过连接钢索与卡线器进行连接,所述滑轮组的另一端通过连接钢索与调整板连接在一起,所述卡线器卡放在导地线上,所述钢丝绳连接在卡线器与施工孔之间,所述调整板安置在耐张绝缘子串的尾端,且所述耐张绝缘子串通过连接钢索与施工孔安置在一起,所述滚轮通过卸扣与施工孔进行连接,且所述滚轮上缠绕有紧线绳,且所述紧线绳的一端与滑轮组进行连接,所述耐张线夹安装在导地线与调整板之间。The utility model achieves the above object through the following technical solutions: a wire tightening pulley block device, including a crossarm, a wire release block, a ground wire, a 180kN rotator, a traction rope, a construction hole, a pulley block, a wire clamp, a steel wire rope, an adjustment plates, tension insulator strings, rollers, tight wire ropes and tension clamps; a pay-off pulley is installed under the cross-arm through connecting steel cables, the ground conductor is set on one side of the cross-arm, and the guide The traction end of the ground wire is connected with a 180kN rotator, one end of the traction rope is connected with the 180kN rotator, the other end of the traction rope is connected to the tractor, and the traction rope is wound on the pay-off tackle, the The construction hole is fixedly connected with the side wall of the cross arm by welding, one end of the pulley block is connected with the wire clip through the connecting cable, the other end of the pulley block is connected with the adjustment plate through the connecting cable, the clip The wire clamp is placed on the ground wire, the steel wire rope is connected between the wire clamp and the construction hole, the adjustment plate is placed at the tail end of the tension insulator string, and the tension insulator string is connected to the The construction holes are placed together, the rollers are connected with the construction holes through shackles, and a tight wire is wound on the rollers, and one end of the tight wire is connected with the pulley block, and the tension clamp is installed on the between the ground wire and the adjustment board.

优选的,为了便于调节耐张绝缘子串的角度,所述耐张绝缘子串通过紧线绳拉动滑轮组在横担的一侧进行摆动。Preferably, in order to facilitate the adjustment of the angle of the tension insulator string, the tension insulator string pulls the pulley block to swing on one side of the cross arm.

优选的,为了降低工器具的受力,减小施工负荷,所述滑轮组的滑车为160kN三轮滑车,且滑轮组的连接钢丝为Φ15钢丝绳。Preferably, in order to reduce the force on the tool and reduce the construction load, the pulley of the pulley block is a 160kN three-wheel pulley, and the connecting steel wire of the pulley block is a Φ15 steel wire rope.

优选的,为了便于导地线与耐张绝缘子串的连接或拆除,所述滑轮组通过紧线绳拉动在卡线器与调整板之间呈收紧或松出连接。Preferably, in order to facilitate the connection or removal of the ground wire and the tension insulator string, the pulley block is tightened or loosened between the wire clamp and the adjustment plate by pulling the tightening rope.

优选的,为了避免因产生扭矩力导致导地线以及牵引绳打结,所述导地线通过180kN旋转器与牵引绳组装在一起,且导地线与牵引绳呈转动连接。Preferably, in order to avoid knotting of the ground wire and the traction rope due to torque, the ground wire is assembled with the traction rope through a 180kN rotator, and the ground wire and the traction rope are rotationally connected.

优选的,为了对导地线收紧过程中提供保护措施,所述卡线器设置有两个,且其中一个用于连接钢丝绳,另一个用于连接滑轮组。Preferably, in order to provide protection measures during the tightening process of the ground wire, there are two wire clamps, one of which is used to connect the steel wire rope, and the other is used to connect the pulley block.

本实用新型的有益效果是:该紧线滑轮组装置设计合理,耐张绝缘子串通过紧线绳拉动滑轮组在横担的一侧进行摆动,便于调节耐张绝缘子串的角度,使其能够与导地线受力方向一致,滑轮组的滑车为160kN三轮滑车,且滑轮组的连接钢丝为Φ15钢丝绳,利用滑轮组省力的原理,能够大幅度降低工器具的受力,减小施工负荷,通过现用的工器具即可完成紧线施工作业,滑轮组通过紧线绳拉动在卡线器与调整板之间呈收紧或松出连接,便于导地线与耐张绝缘子串的连接或拆除,最大程度的降低作业人员的劳动强度,导地线通过180kN旋转器与牵引绳组装在一起,且导地线与牵引绳呈转动连接,在拉动过程中能够转动,避免因产生扭矩力导致导地线以及牵引绳打结,卡线器设置有两个,且其中一个用于连接钢丝绳,另一个用于连接滑轮组,对导地线收紧过程中提供保护措施,避免因滑轮组失控导致导地线的脱落,保证施工安全。The beneficial effect of the utility model is: the design of the tightening pulley block device is reasonable, and the tension insulator string pulls the pulley block to swing on one side of the crossarm through the tight wire rope, which is convenient for adjusting the angle of the tension insulator string so that it can be connected to the ground The force direction of the line is consistent. The pulley of the pulley block is a 160kN three-wheel pulley, and the connecting steel wire of the pulley block is a Φ15 steel wire rope. Using the principle of labor-saving pulley block, it can greatly reduce the force of the tool and reduce the construction load. The appliance can complete the wire tightening construction work, and the pulley block is pulled by the wire tightening rope to tighten or loosen the connection between the wire clamp and the adjustment plate, which is convenient for the connection or removal of the ground wire and the tension insulator string, and minimizes the The labor intensity of the operator, the ground wire is assembled with the traction rope through a 180kN rotator, and the ground wire and the traction rope are connected in rotation, and can rotate during the pulling process, so as to avoid the torque generated by the ground wire and the traction rope. Knotting, there are two clamps, and one of them is used to connect the wire rope, and the other is used to connect the pulley block, which provides protection measures for the ground wire tightening process, to avoid the fall of the ground wire due to the loss of control of the pulley block, to ensure construction safety.

附图说明Description of drawings

图1为本实用新型松线连接结构示意图;Fig. 1 is a schematic diagram of the utility model loose wire connection structure;

图2为本实用新型紧线连接结构示意图。Fig. 2 is a schematic diagram of the tight wire connection structure of the utility model.

图中:1、横担,2、放线滑车,3、导地线,4、180kN旋转器,5、牵引绳,6、施工孔,7、滑轮组,8、卡线器,9、钢丝绳,10、调整板,11、耐张绝缘子串,12、滚轮,13、紧线绳和14、耐张线夹。In the figure: 1. Cross arm, 2. Pay-off block, 3. Ground wire, 4. 180kN rotator, 5. Traction rope, 6. Construction hole, 7. Pulley block, 8. Wire clamp, 9. Steel wire rope, 10, adjustment plate, 11, tension insulator string, 12, roller, 13, tight wire rope and 14, tension clamp.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1~2,一种紧线滑轮组装置,包括横担1、放线滑车2、导地线3、180kN旋转器4、牵引绳5、施工孔6、滑轮组7、卡线器8、钢丝绳9、调整板10、耐张绝缘子串11、滚轮12、紧线绳13和耐张线夹14;所述横担1下方通过连接钢索安装有放线滑车2,所述导地线3设置在横担1的一侧,且所述导地线3的牵引端连接有180kN旋转器4,所述牵引绳5的一端与180kN旋转器4进行连接,所述牵引绳5的另一端连接至牵引车,且所述牵引绳5缠绕在放线滑车2上,所述施工孔6通过焊接与横担1的侧壁进行固定连接,所述滑轮组7的一端通过连接钢索与卡线器8进行连接,所述滑轮组7的另一端通过连接钢索与调整板10连接在一起,所述卡线器8卡放在导地线3上,所述钢丝绳9连接在卡线器8与施工孔6之间,所述调整板10安置在耐张绝缘子串11的尾端,且所述耐张绝缘子串11通过连接钢索与施工孔6安置在一起,所述滚轮12通过卸扣与施工孔6进行连接,且所述滚轮12上缠绕有紧线绳13,且所述紧线绳13的一端与滑轮组7进行连接,所述耐张线夹14安装在导地线3与调整板10之间。Please refer to Figures 1-2, a wire tightening pulley block device, including a cross arm 1, a wire payoff block 2, a ground wire 3, a 180kN rotator 4, a traction rope 5, a construction hole 6, a pulley block 7, a wire clamp 8, Steel wire rope 9, adjustment plate 10, tension insulator string 11, roller 12, tight wire rope 13 and tension clamp 14; the lower side of the cross arm 1 is installed with a pay-off block 2 through the connecting steel cable, and the ground wire 3 It is arranged on one side of the cross arm 1, and the traction end of the ground wire 3 is connected to a 180kN rotator 4, one end of the traction rope 5 is connected to the 180kN rotator 4, and the other end of the traction rope 5 is connected to to the tractor, and the traction rope 5 is wound on the pay-off block 2, the construction hole 6 is fixedly connected to the side wall of the cross arm 1 by welding, and one end of the pulley block 7 is connected to the wire clamp by connecting the steel cable 8 for connection, the other end of the pulley block 7 is connected with the adjustment plate 10 through a connecting steel cable, the wire clamp 8 is clamped on the ground wire 3, and the steel wire rope 9 is connected between the wire clamp 8 and the construction Between the holes 6, the adjustment plate 10 is placed at the tail end of the tension insulator string 11, and the tension insulator string 11 is placed together with the construction hole 6 through the connecting steel cable, and the roller 12 is connected by the shackle and the construction hole. The hole 6 is connected, and the tight wire rope 13 is wound on the roller 12, and one end of the tight wire rope 13 is connected with the pulley block 7, and the tension clamp 14 is installed on the ground wire 3 and the adjustment plate 10 between.

所述耐张绝缘子串11通过紧线绳13拉动滑轮组7在横担1的一侧进行摆动,便于调节耐张绝缘子串11的角度,使其能够与导地线3受力方向一致,所述滑轮组7的滑车为160kN三轮滑车,且滑轮组7的连接钢丝为Φ15钢丝绳,利用滑轮组7省力的原理,能够大幅度降低工器具的受力,减小施工负荷,通过现用的工器具即可完成紧线施工作业,所述滑轮组7通过紧线绳13拉动在卡线器8与调整板10之间呈收紧或松出连接,便于导地线3与耐张绝缘子串11的连接或拆除,最大程度的降低作业人员的劳动强度,所述导地线3通过180kN旋转器4与牵引绳5组装在一起,且导地线3与牵引绳5呈转动连接,在拉动过程中能够转动,避免因产生扭矩力导致导地线3以及牵引绳5打结,所述卡线器8设置有两个,且其中一个用于连接钢丝绳9,另一个用于连接滑轮组7,对导地线3收紧过程中提供保护措施,避免因滑轮组7失控导致导地线3的脱落,保证施工安全。The tension insulator string 11 pulls the pulley block 7 to swing on one side of the cross arm 1 through the tight wire rope 13, which is convenient for adjusting the angle of the tension insulator string 11 so that it can be consistent with the force direction of the ground wire 3. The pulley of the pulley block 7 is a 160kN three-wheel pulley, and the connecting steel wire of the pulley block 7 is a Φ15 steel wire rope. Using the labor-saving principle of the pulley block 7, it can greatly reduce the force of the tools and reduce the construction load. After the wire tightening construction work is completed, the pulley block 7 is pulled by the wire tightening rope 13 to tighten or loosen the connection between the wire gripper 8 and the adjustment plate 10, so as to facilitate the connection or removal of the ground wire 3 and the tension insulator string 11 , to reduce the labor intensity of the operator to the greatest extent, the ground wire 3 is assembled with the traction rope 5 through the 180kN rotator 4, and the ground wire 3 and the traction rope 5 are rotationally connected, and can rotate during the pulling process, To avoid knotting of the ground wire 3 and the traction rope 5 due to the generation of torque force, the wire clamp 8 is provided with two, and one of them is used to connect the steel wire rope 9, and the other is used to connect the pulley block 7, and the ground wire 3 Protective measures are provided during the tightening process to avoid falling off of the ground wire 3 due to the loss of control of the pulley block 7, thereby ensuring construction safety.

工作原理:在使用该紧线滑轮组装置时,临时锚固系统受力后,通过收紧机械绞磨紧线绳13,收紧紧线滑轮组7,使耐张绝缘子串11逐渐向导地线3方向提升,直至耐张绝缘子串11和导地线3受力方向一致,然后将耐张线夹14与耐张绝缘子串11连接,随后逐根收紧其他子导线,需要拆出时,松出紧线滑轮组7,使耐张绝缘子串11逐渐呈垂直松弛状态,然后将耐张线夹14与耐张绝缘子串11解除连接,随后逐根拆除其他子导线即可。Working principle: When using the tightening pulley block device, after the temporary anchoring system is stressed, the tightening wire rope 13 is tightened by mechanical twisting, and the tightening pulley block 7 is tightened, so that the tension insulator string 11 is gradually lifted in the direction of the ground wire 3 , until the stress direction of the strain insulator string 11 and the ground wire 3 are consistent, then connect the strain clamp 14 with the strain insulator string 11, and then tighten the other sub-conductors one by one. When it needs to be removed, loosen the tight wire The pulley block 7 makes the tension insulator string 11 gradually in a vertically loose state, then the tension clamp 14 is disconnected from the tension insulator string 11, and then other sub-conductors are removed one by one.

对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It is obvious to those skilled in the art that the present invention is not limited to the details of the above-mentioned exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from all points of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to fall within the scope of the claims All changes within the meaning and range of equivalents of the required elements are included in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only includes an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.

Claims (6)

1.一种紧线滑轮组装置,其特征在于:包括横担(1)、放线滑车(2)、导地线(3)、180kN旋转器(4)、牵引绳(5)、施工孔(6)、滑轮组(7)、卡线器(8)、钢丝绳(9)、调整板(10)、耐张绝缘子串(11)、滚轮(12)、紧线绳(13)和耐张线夹(14);所述横担(1)下方通过连接钢索安装有放线滑车(2),所述导地线(3)设置在横担(1)的一侧,且所述导地线(3)的牵引端连接有180kN旋转器(4),所述牵引绳(5)的一端与180kN旋转器(4)进行连接,所述牵引绳(5)的另一端连接至牵引车,且所述牵引绳(5)缠绕在放线滑车(2)上,所述施工孔(6)通过焊接与横担(1)的侧壁进行固定连接,所述滑轮组(7)的一端通过连接钢索与卡线器(8)进行连接,所述滑轮组(7)的另一端通过连接钢索与调整板(10)连接在一起,所述卡线器(8)卡放在导地线(3)上,所述钢丝绳(9)连接在卡线器(8)与施工孔(6)之间,所述调整板(10)安置在耐张绝缘子串(11)的尾端,且所述耐张绝缘子串(11)通过连接钢索与施工孔(6)安置在一起,所述滚轮(12)通过卸扣与施工孔(6)进行连接,且所述滚轮(12)上缠绕有紧线绳(13),且所述紧线绳(13)的一端与滑轮组(7)进行连接,所述耐张线夹(14)安装在导地线(3)与调整板(10)之间。1. A wire tightening pulley block device is characterized in that: comprise cross arm (1), pay-off tackle (2), ground wire (3), 180kN rotator (4), traction rope (5), construction hole ( 6), pulley block (7), wire clamp (8), steel wire rope (9), adjustment plate (10), strain insulator string (11), roller (12), tight wire rope (13) and strain clamp (14); the lower side of the cross arm (1) is equipped with a pay-off block (2) through the connecting steel cable, the ground guide wire (3) is arranged on one side of the cross arm (1), and the ground guide wire The traction end of (3) is connected with 180kN rotator (4), and one end of described traction rope (5) is connected with 180kN rotator (4), and the other end of described traction rope (5) is connected to tractor, and The traction rope (5) is wound on the pay-off block (2), the construction hole (6) is fixedly connected to the side wall of the cross arm (1) by welding, and one end of the pulley block (7) is connected by a connecting steel The cable is connected with the wire clamp (8), the other end of the pulley block (7) is connected with the adjustment plate (10) through the connecting steel cable, and the wire clamp (8) is clamped on the ground wire (3 ), the steel wire rope (9) is connected between the wire clamp (8) and the construction hole (6), the adjustment plate (10) is placed at the tail end of the tension insulator string (11), and the The insulator string (11) is placed together with the construction hole (6) through the connecting steel cable, the roller (12) is connected with the construction hole (6) through a shackle, and a tight wire is wound on the roller (12) Rope (13), and one end of the tightening rope (13) is connected with the pulley block (7), and the tension clamp (14) is installed between the ground wire (3) and the adjustment plate (10). 2.根据权利要求1所述的一种紧线滑轮组装置,其特征在于:所述耐张绝缘子串(11)通过紧线绳(13)拉动滑轮组(7)在横担(1)的一侧进行摆动。2. A tightening pulley block device according to claim 1, characterized in that: the tension insulator string (11) pulls the pulley block (7) on one side of the cross arm (1) through the tightening rope (13) Make a swing. 3.根据权利要求1所述的一种紧线滑轮组装置,其特征在于:所述滑轮组(7)的滑车为160kN三轮滑车,且滑轮组(7)的连接钢丝为Φ15钢丝绳。3. A kind of tightening pulley block device according to claim 1, characterized in that: the block of the block pulley (7) is a 160kN three-wheel block, and the connecting steel wire of the block block (7) is a Φ15 steel wire rope. 4.根据权利要求1所述的一种紧线滑轮组装置,其特征在于:所述滑轮组(7)通过紧线绳(13)拉动在卡线器(8)与调整板(10)之间呈收紧或松出连接。4. A wire tightening pulley block device according to claim 1, characterized in that: the pulley block (7) is pulled between the wire clamp (8) and the adjustment plate (10) by the wire tightening rope (13). Tighten or loosen connections. 5.根据权利要求1所述的一种紧线滑轮组装置,其特征在于:所述导地线(3)通过180kN旋转器(4)与牵引绳(5)组装在一起,且导地线(3)与牵引绳(5)呈转动连接。5. A kind of tightening pulley block device according to claim 1, characterized in that: the ground wire (3) is assembled with the traction rope (5) through a 180kN rotator (4), and the ground wire ( 3) be rotationally connected with the traction rope (5). 6.根据权利要求1所述的一种紧线滑轮组装置,其特征在于:所述卡线器(8)设置有两个,且其中一个用于连接钢丝绳(9),另一个用于连接滑轮组(7)。6. A wire tightening pulley block device according to claim 1, characterized in that there are two wire grippers (8), one of which is used to connect the wire rope (9), and the other is used to connect the pulley block (7).
CN201920390171.8U 2019-03-26 2019-03-26 A tight pulley block device Active CN209562017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920390171.8U CN209562017U (en) 2019-03-26 2019-03-26 A tight pulley block device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920390171.8U CN209562017U (en) 2019-03-26 2019-03-26 A tight pulley block device

Publications (1)

Publication Number Publication Date
CN209562017U true CN209562017U (en) 2019-10-29

Family

ID=68311529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920390171.8U Active CN209562017U (en) 2019-03-26 2019-03-26 A tight pulley block device

Country Status (1)

Country Link
CN (1) CN209562017U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111478228A (en) * 2020-04-20 2020-07-31 广东电网能源发展有限公司 Butt joint method of multi-split large-section lead and strain insulator string

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111478228A (en) * 2020-04-20 2020-07-31 广东电网能源发展有限公司 Butt joint method of multi-split large-section lead and strain insulator string
CN111478228B (en) * 2020-04-20 2021-12-24 广东电网能源发展有限公司 Butt joint method of multi-split large-section lead and strain insulator string

Similar Documents

Publication Publication Date Title
CN105016184B (en) Vertical multirope friction winder process for replacing hoisting ropes
JP5812325B2 (en) Electric wire tension reduction device and electric wire tension reduction method
CN109167302B (en) A kind of wire end pulling method for tight-hanging construction of transmission line
CN110932168B (en) A method for replacing tensile insulators in UHV DC whole towers
CN104332890B (en) A portable manual wire collection device
CN101908739B (en) Trolley used for maintenance of electricity overhead power transmission line
CN209562017U (en) A tight pulley block device
CN103560437B (en) A kind of optical cable pulley based on single-wheel sister block hangs and annex installation method
CN107845978A (en) A kind of tight hanging wire stringing method in extra-high voltage transmission line high-altitude
CN209282719U (en) A kind of console mode wire tensioning device for transmission line of electricity
CN105610093A (en) An anchoring device and an anchoring method
CN205595695U (en) High altitude block system
CN102593759B (en) One-pulling-two expansion and construction process of large-section lead
CN203850726U (en) Wire lifter on 10 kV power distribution telegraph pole
CN102709849A (en) Manual multifunctional wire tightening device and wire tightening method
CN202550413U (en) Parallel bunched cable tightener
CN203233106U (en) High-voltage transmission line wiring pull device
CN107732789B (en) Overhead line wire-stringing device
CN102709855A (en) Tension method of phase conductor used in distribution wire
CN216403548U (en) Special tools for outdoor lifting of high-voltage cables
CN205595702U (en) High altitude block pulley
CN216016275U (en) Wire tightening device
CN101383491A (en) Wire free card
CN209805246U (en) A Lifting System Based on Insulator Strings
CN107465146A (en) Combination stringing instrument for line conductor stringing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant