CN209538241U - Road inspection well cover construction equipment - Google Patents
Road inspection well cover construction equipment Download PDFInfo
- Publication number
- CN209538241U CN209538241U CN201920073685.0U CN201920073685U CN209538241U CN 209538241 U CN209538241 U CN 209538241U CN 201920073685 U CN201920073685 U CN 201920073685U CN 209538241 U CN209538241 U CN 209538241U
- Authority
- CN
- China
- Prior art keywords
- cover body
- construction equipment
- side plate
- manhole cover
- road inspection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及道路工程领域,具体而言,涉及一种道路检查井井盖施工设备。The utility model relates to the field of road engineering, in particular to construction equipment for road inspection well covers.
背景技术Background technique
道路检查井的井盖及井座安装是目前道路施工的通病,严重影响行车舒适性以及安全性。施工时,先将井座安装在设定位置,然后将井盖置于井座上,井座在水稳基层及第一层沥青铺设完成后反开挖再进行安装。The installation of manhole covers and well seats for road inspection wells is a common problem in road construction at present, which seriously affects driving comfort and safety. During construction, the well base is first installed at the set position, and then the well cover is placed on the well base. The well base is excavated after the water-stabilized base and the first layer of asphalt are laid, and then installed.
传统的安装方式是人工将铸铁井座采用混凝土垫块垫高至设计标高,内部安装内模,完成后进行混凝土浇筑。或者分两次浇筑混凝土,第一次浇筑至井座底部,安装完井座后再浇筑至设计标高。The traditional installation method is to manually raise the cast iron well base to the design level with concrete pads, install the inner mold inside, and pour concrete after completion. Or pour concrete twice, pouring to the bottom of the well base for the first time, and then pouring to the design elevation after the well base is installed.
设计者在研究中发现,现有的井座安装至少存在如下缺点:The designer found in the research that the existing well block installation has at least the following disadvantages:
1、井座标高控制难度大,垫块控制不精确;2、井座自重大,施工现场无法做到精确安装;3、传统的施工方式效率低,施工周期长,增加了施工成本;4、井座与路面标高无法精确控制在同一平面内,或者满足设计高度差。1. It is difficult to control the elevation of the well base, and the pad control is inaccurate; 2. The well base is self-heavy, and the construction site cannot be installed accurately; 3. The traditional construction method is inefficient, and the construction period is long, which increases the construction cost; 4. The elevation of the well base and the road surface cannot be precisely controlled in the same plane, or meet the design height difference.
实用新型内容Utility model content
本实用新型的目的在于提供一种道路检查井井盖施工设备,便于调节井盖本体的高度,安装完成后可以使井盖本体的高度与路面的高度最大程度吻合,提高行车舒适性,且省时省力,安装效率高。The purpose of the utility model is to provide a road inspection well cover construction equipment, which is convenient to adjust the height of the manhole cover body. After the installation is completed, the height of the manhole cover body can match the height of the road surface to the greatest extent, improve driving comfort, and save time and effort. High installation efficiency.
本实用新型是采用以下技术方案实现的:The utility model is realized by adopting the following technical solutions:
基于上述目的,本实用新型实施例提供了一种道路检查井井盖施工设备,适用于安装井盖本体,包括支撑系统以及夹持系统,所述夹持系统安装于所述支撑系统上,所述夹持系统用于夹持所述井盖本体,所述支撑系统或者/和所述夹持系统的高度可调,以调整所述井盖本体的高度。Based on the above purpose, the embodiment of the utility model provides a road inspection well cover construction equipment, which is suitable for installing the manhole cover body, including a support system and a clamping system, the clamping system is installed on the support system, and the clamp The holding system is used to clamp the well cover body, and the height of the support system or/and the clamping system is adjustable to adjust the height of the well cover body.
可选的,所述支撑系统包括支撑架以及可调高度的支撑腿,所述支撑腿安装于所述支撑架上;Optionally, the support system includes a support frame and height-adjustable support legs, and the support legs are installed on the support frame;
所述夹持系统安装于所述支撑架上。The clamping system is installed on the support frame.
可选的,所述支撑腿螺接于所述支撑架上。Optionally, the supporting legs are screwed to the supporting frame.
可选的,所述支撑架包括两根主支撑臂以及至少一根连接臂,所述两根主支撑臂相对设置,所述连接臂的两端分别连接于所述两根主支撑臂;Optionally, the support frame includes two main support arms and at least one connection arm, the two main support arms are arranged opposite to each other, and the two ends of the connection arms are respectively connected to the two main support arms;
所述支撑腿包括螺杆主体、操作手柄以及垫块,所述操作手柄以及所述垫块均安装于所述螺杆主体上,所述垫块具备支撑平面,所述螺杆主体螺接于所述主支撑臂上。The supporting leg includes a screw body, an operating handle and a spacer, the operating handle and the spacer are installed on the screw body, the spacer has a support plane, and the screw body is screwed to the main body. on the support arm.
可选的,所述支撑系统还包括水平检测仪,所述水平检测仪安装于所述支撑架上。Optionally, the support system further includes a level detector, and the level detector is installed on the support frame.
可选的,所述夹持系统包括拉杆以及夹持组件,所述夹持组件具备用于夹持所述井盖本体的夹持口,所述拉杆的一端安装于所述夹持组件上,所述拉杆的另一端安装于所述支撑系统上。Optionally, the clamping system includes a pull rod and a clamping assembly, the clamping assembly is provided with a clamping port for clamping the manhole cover body, one end of the pull rod is installed on the clamping assembly, the The other end of the pull rod is installed on the support system.
可选的,所述拉杆滑动连接于所述支撑系统上。Optionally, the pull rod is slidably connected to the support system.
可选的,所述夹持组件包括夹具以及锁紧螺杆,所述夹具包括主板、第一侧板以及第二侧板,所述第一侧板和第二侧板相对设置且均安装于所述主板上,所述第一侧板和第二侧板之间限定出所述夹持口,所述锁紧螺杆螺接于所述第一侧板上,所述锁紧螺杆的端部伸入所述夹持口。Optionally, the clamping assembly includes a clamp and a locking screw, the clamp includes a main board, a first side plate, and a second side plate, and the first side plate and the second side plate are oppositely arranged and are installed on the On the main board, the clamping opening is defined between the first side plate and the second side plate, the locking screw is screwed on the first side plate, and the end of the locking screw extends into the clamping port.
可选的,所述夹持组件还包括垫板,所述垫板安装于所述第二侧板朝向所述第一侧板的板面上,所述垫板朝向所述第一侧板的板面为弧形面。Optionally, the clamping assembly further includes a backing plate, the backing plate is installed on the surface of the second side plate facing the first side plate, and the backing plate faces the side of the first side plate The board surface is an arc surface.
可选的,还包括内模,所述内模用于可拆卸地与所述井盖本体连接。Optionally, an inner mold is also included, and the inner mold is used for detachably connecting with the well cover body.
与现有技术相比,本实用新型的较佳实施例提供的道路检查井井盖施工设备的有益效果包括:Compared with the prior art, the beneficial effects of the road inspection well cover construction equipment provided by the preferred embodiment of the utility model include:
本实用新型提供的道路检查井井盖施工设备,将井盖本体安装在夹持系统上,然后将支撑系统架设在待安装井盖的道路上,夹持系统将井盖本体固定。施工过程中,通过调节夹持系统或者/和支撑系统相对于路面的高度,进而实现井盖本体的高度的调节,根据道路的路面高度来相应调整井盖本体的高度,最大程度保证井盖本体的高度和路面的高度相匹配,使两者位于同一平面内,井盖本体的安装位置准确,安装质量高,利于车辆和行人的通行。在调节井盖本体时,只需要操作夹持系统或者支撑系统,不需要来回移动井盖本体,操作便捷,省时省力。In the road inspection well cover construction equipment provided by the utility model, the well cover body is installed on the clamping system, and then the support system is erected on the road where the well cover is to be installed, and the clamping system fixes the well cover body. During the construction process, the height of the manhole cover body is adjusted by adjusting the height of the clamping system or/and the support system relative to the road surface, and the height of the manhole cover body is adjusted according to the height of the road surface to ensure the height of the manhole cover body to the greatest extent. The height of the road surface is matched, so that the two are located in the same plane, the installation position of the manhole cover body is accurate, the installation quality is high, and it is beneficial to the passage of vehicles and pedestrians. When adjusting the manhole cover body, only the clamping system or the support system needs to be operated, and there is no need to move the manhole cover body back and forth. The operation is convenient, time-saving and labor-saving.
此外,在本实用新型的实施例中,通过将夹持系统和支撑系统均设置为可调高度的结构,可以先通过路面情况来调节支撑系统,使支撑系统所在平面与路面平行,然后在通过调节夹持系统来调节井盖本体相对于路面的高度,调节准确可靠。In addition, in the embodiment of the present utility model, by setting both the clamping system and the support system as height-adjustable structures, the support system can be adjusted according to the road conditions first, so that the plane where the support system is located is parallel to the road surface, and then passed Adjust the clamping system to adjust the height of the manhole cover body relative to the road surface, and the adjustment is accurate and reliable.
在施工过程中,井盖本体安装在夹持系统上,将内模安装在井盖本体上,内模与待安装位置处的井筒密封配合,直接在内模外侧以及井盖本体外侧浇筑混凝土后,依次浇筑即可完成井盖本体的施工,提高施工效率,浇筑完成后,将内模、支撑系统和夹持系统取出,可以重复使用,节省成本。此外,可以制造多套施工设备,同时进行多个井盖本体的安装。During the construction process, the manhole cover body is installed on the clamping system, and the inner mold is installed on the manhole cover body. The inner mold is sealed and matched with the shaft at the position to be installed. After pouring concrete directly on the outside of the inner mold and the manhole cover body, pouring in sequence The construction of the manhole cover body can be completed, and the construction efficiency is improved. After the pouring is completed, the inner mold, support system and clamping system can be taken out, which can be reused and cost saved. In addition, multiple sets of construction equipment can be manufactured, and multiple manhole cover bodies can be installed at the same time.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本实用新型的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图也属于本实用新型的保护范围。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following drawings will be briefly introduced in the embodiments. It should be understood that the following drawings only show some embodiments of the present invention. Therefore, it should not be regarded as a limitation on the scope. For those of ordinary skill in the art, on the premise of not paying creative work, other related drawings can also be obtained according to these drawings, which also belong to the protection scope of the present utility model .
图1为本实施例提供的道路检查井井盖施工设备的示意图;Fig. 1 is the schematic diagram of the road inspection well cover construction equipment provided by the present embodiment;
图2为图1中的局部放大的示意图;Fig. 2 is a partially enlarged schematic diagram in Fig. 1;
图3为本实施例提供的夹持系统的示意图;3 is a schematic diagram of the clamping system provided in this embodiment;
图4为本实施例提供的夹具的示意图;Fig. 4 is the schematic diagram of the clamp provided in this embodiment;
图5为本实施例提供的道路检查井井盖施工设备的应用示意图。Fig. 5 is a schematic diagram of the application of the road inspection well cover construction equipment provided in this embodiment.
图标:001-井盖本体;002-支撑系统;100-支撑架;101-主支撑臂;102-连接臂;103-螺帽;110-支撑腿;111-螺杆主体;112-操作手柄;113-垫块;003-夹持系统;300-拉杆;310-夹持组件;311-夹具;3111-主板;3112-第一侧板;3113-第二侧板;312-锁紧螺杆;313-垫板;320-锁紧螺母;004-内模;400-挂钩;410-拉手。Icons: 001-manhole cover body; 002-support system; 100-support frame; 101-main support arm; 102-connecting arm; 103-nut; 110-support leg; 111-screw body; 112-operating handle; 113- Block; 003-clamping system; 300-tie rod; 310-clamping assembly; 311-clamp; 3111-main board; 3112-first side plate; 3113-second side plate; 312-locking screw; 313-pad plate; 320-lock nut; 004-inner mold; 400-hook; 410-handle.
具体实施方式Detailed ways
传统的井盖安装方式是人工将铸铁井座采用混凝土垫块垫高至设计标高,内部安装内模,完成后进行混凝土浇筑。或者分两次浇筑混凝土,第一次浇筑至井座底部,安装完井座后再浇筑至设计标高。存在安装位置精确度低,效率低,成本高的问题。The traditional manhole cover installation method is to manually raise the cast iron well base to the design level with concrete pads, install the inner mold inside, and pour concrete after completion. Or pour concrete twice, pouring to the bottom of the well base for the first time, and then pouring to the design elevation after the well base is installed. There are problems of low installation position accuracy, low efficiency and high cost.
鉴于此,设计人设计了一种道路检查井井盖施工设备,便于调节井盖本体001的高度,安装完成后可以使井盖本体001的高度与路面的高度最大程度吻合,提高行车舒适性,且省时省力,安装效率高。In view of this, the designer designed a road inspection well cover construction equipment, which is convenient to adjust the height of the manhole cover body 001. After the installation is completed, the height of the manhole cover body 001 can match the height of the road surface to the greatest extent, improving driving comfort and saving time. Labor saving, high installation efficiency.
为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本实用新型实施例的组件可以以各种不同的配置来布置和设计。因此,以下对在附图中提供的本实用新型的实施例的详细描述并非旨在限制要求保护的本实用新型的范围,而是仅仅表示本实用新型的选定实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the utility model more clear, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the utility model. Obviously, the described The embodiments are some embodiments of the present utility model, but not all embodiments. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.
在本实用新型的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该实用新型产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”、“第三”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" The orientation or positional relationship indicated by etc. is based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship that is usually placed when the product of the utility model is used. It is only for the convenience of describing the utility model and simplifying the description, rather than Any indication or implication that a referenced device or element must have a particular orientation, be constructed, and operate in a particular orientation should not be construed as limiting the invention. In addition, the terms "first", "second", "third", etc. are only used for distinguishing descriptions, and should not be construed as indicating or implying relative importance.
在本实用新型的描述中,还需要说明的是,除非另有明确的规定和限定,术语“设置”、“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should also be noted that, unless otherwise clearly stipulated and limited, the terms "setting", "installation", "connection" and "connection" should be understood in a broad sense, for example, it may be a fixed connection , can also be detachably connected, or integrally connected; can be mechanically connected, can also be electrically connected; can be directly connected, can also be indirectly connected through an intermediary, and can be internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.
需要说明的是,在不冲突的情况下,本实用新型中的实施例及实施例中的特征可以相互组合。It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
实施例1Example 1
本实施例提供了一种道路检查井井盖施工设备,适用于安装井盖本体001,将井盖本体001安装在道路上的设定位置,具有井盖本体001安装位置准确、与路面配合好、施工效率高以及施工成本低的优点。This embodiment provides a road inspection well cover construction equipment, which is suitable for installing the manhole cover body 001. The manhole cover body 001 is installed at a set position on the road, and has the advantages of accurate installation position of the manhole cover body 001, good coordination with the road surface, and high construction efficiency. And the advantage of low construction cost.
请参阅图1,本实施例中,道路检查井井盖施工设备包括支撑系统002以及夹持系统003,夹持系统003安装于支撑系统002上,夹持系统003用于夹持井盖本体001,支撑系统002或者/和夹持系统003的高度可调,以调整井盖本体001的高度。Please refer to Fig. 1, in the present embodiment, the road inspection well cover construction equipment includes a support system 002 and a clamping system 003, the clamping system 003 is installed on the support system 002, and the clamping system 003 is used for clamping the manhole cover body 001, supporting The height of the system 002 and/or the clamping system 003 is adjustable to adjust the height of the manhole cover body 001 .
本实用新型提供的道路检查井井盖施工设备,将井盖本体001安装在夹持系统003上,然后将支撑系统002架设在待安装井盖的道路上,夹持系统003将井盖本体001固定。现场施工过程中,通过调节夹持系统003或者/和支撑系统002相对于路面的高度,进而实现井盖本体001的高度的调节,根据道路的路面高度来相应调整井盖本体001的高度,最大程度保证井盖本体001的高度和路面的高度相匹配,使两者位于同一平面内,井盖本体001的安装位置准确,安装质量高,利于车辆和行人的通行。在调节井盖本体001时,只需要操作夹持系统003或者支撑系统002,不需要来回移动井盖本体001,操作便捷,省时省力。In the road inspection well cover construction equipment provided by the utility model, the well cover body 001 is installed on the clamping system 003, and then the support system 002 is erected on the road where the well cover is to be installed, and the clamping system 003 fixes the well cover body 001. During the on-site construction process, the height of the manhole cover body 001 is adjusted by adjusting the height of the clamping system 003 or/and the support system 002 relative to the road surface, and the height of the manhole cover body 001 is adjusted accordingly according to the road surface height to ensure maximum protection The height of the well cover body 001 matches the height of the road surface, so that they are located in the same plane, the installation position of the well cover body 001 is accurate, the installation quality is high, and it is beneficial to the passage of vehicles and pedestrians. When adjusting the manhole cover body 001, only the clamping system 003 or the support system 002 needs to be operated, and there is no need to move the manhole cover body 001 back and forth, which is convenient to operate and saves time and effort.
本实施例中可选的,支撑系统002包括支撑架100以及四根支撑腿110,四根支撑腿110均滑动安装在支撑架100上,通过滑动支撑腿110来调节支撑架100相对于路面的高度以及倾斜度。Optionally in this embodiment, the support system 002 includes a support frame 100 and four support legs 110. The four support legs 110 are all slidably installed on the support frame 100, and the support frame 100 is adjusted relative to the road surface by sliding the support legs 110. height and slope.
可选的,支撑架100包括有两根条形的主支撑臂101、两根条形的连接臂102以及四颗螺帽103,主支撑臂101可以是矩形杆,两根主支撑臂101平行设置,两根主支撑臂101之间安装有两根连接臂102,每根连接臂102的两端分别固定在两根主支撑臂101上,两根连接臂102均垂直于主支撑臂101。四颗螺帽103分为两组,一组包括有两颗螺帽103,一组螺帽103安装在主支撑臂101的两端,另一组螺帽103安装在另一根主支撑臂101的两端。螺帽103的螺孔的中轴线垂直于主支撑臂101和连接臂102限定出的平面,换句话说,螺帽103的中轴线、主支撑臂101和连接臂102两两垂直。Optionally, the support frame 100 includes two strip-shaped main support arms 101, two strip-shaped connecting arms 102 and four nuts 103, the main support arms 101 can be rectangular rods, and the two main support arms 101 are parallel Set, two connecting arms 102 are installed between the two main supporting arms 101, the two ends of each connecting arm 102 are respectively fixed on the two main supporting arms 101, and the two connecting arms 102 are all perpendicular to the main supporting arms 101. The four nuts 103 are divided into two groups, one group includes two nuts 103, one group of nuts 103 is installed on the two ends of the main support arm 101, and the other group of nuts 103 is installed on the other main support arm 101 both ends. The central axis of the screw hole of the nut 103 is perpendicular to the plane defined by the main support arm 101 and the connecting arm 102 , in other words, the central axis of the nut 103 , the main support arm 101 and the connecting arm 102 are perpendicular to each other.
实际安装时,连接臂102和主支撑臂101可以采用焊接固定。During actual installation, the connecting arm 102 and the main supporting arm 101 may be fixed by welding.
显然,在其他实施中,主支撑臂101、连接臂102和螺帽103的数量可以按需调整,主支撑臂101可以设置为至少两根。连接臂102可以设置为至少两根。螺帽103可以设置为至少三个。Obviously, in other implementations, the number of main support arms 101 , connecting arms 102 and nuts 103 can be adjusted as required, and there can be at least two main support arms 101 . There can be at least two connecting arms 102 . There can be at least three nuts 103 .
请参阅图2,可选的,支撑腿110设置有四根,四根支撑腿110分别螺接在四颗螺帽103上。进一步的,支撑腿110包括有螺杆主体111、操作手柄112以及垫块113,操作手柄112为操作杆,操作手柄112以及垫块113均安装于螺杆主体111上,操作手柄112垂直于螺杆主体111,螺杆主体111垂直于垫块113,垫块113为矩形块,垫块113具备支撑平面,螺杆主体111螺接于螺帽103上,螺杆主体111垂直于主连接臂102。Please refer to FIG. 2 , optionally, there are four supporting legs 110 , and the four supporting legs 110 are respectively screwed to the four nuts 103 . Further, the supporting leg 110 includes a screw main body 111, an operating handle 112 and a pad 113, the operating handle 112 is an operating rod, the operating handle 112 and the pad 113 are installed on the screw main body 111, and the operating handle 112 is perpendicular to the screw main body 111 , the screw body 111 is perpendicular to the spacer 113 , the spacer 113 is a rectangular block, the spacer 113 has a supporting plane, the screw body 111 is screwed on the nut 103 , and the screw body 111 is perpendicular to the main connecting arm 102 .
实际使用时,通过转动操作手柄112,进而带动螺杆主体111转动,改变螺杆主体111的高度,实现支撑架100的高度的调节,可以使支撑架100所在平面与路面平行,便于后续调整井盖本体001与路面的位置。In actual use, by turning the operating handle 112, the screw main body 111 is driven to rotate, the height of the screw main body 111 is changed, and the height adjustment of the support frame 100 is realized, so that the plane where the support frame 100 is located is parallel to the road surface, which is convenient for subsequent adjustment of the manhole cover body 001 and pavement location.
可选的,支撑系统002还包括水平检测仪,水平检测仪安装于支撑架100上。水平检测仪的数量按需设置,在此不进行具体限定。通过结合水平检测仪来调整支撑架100相对于路面的平整度,调节更加准确可靠。Optionally, the support system 002 further includes a level detector, which is installed on the support frame 100 . The number of level detectors is set as required, and is not specifically limited here. By combining the level detector to adjust the flatness of the support frame 100 relative to the road surface, the adjustment is more accurate and reliable.
本实施例中可选的,夹持系统003设置有四个,四个夹持系统003分布在同一圆周上,该圆周与井盖本体001的端口所在圆同圆心设置。Optionally in this embodiment, four clamping systems 003 are provided, and the four clamping systems 003 are distributed on the same circle, which is concentric with the circle where the port of the well cover body 001 is located.
请参阅图4-图5,每个夹持系统003包括拉杆300、锁紧螺母320以及夹持组件310,夹持组件310具备用于夹持井盖本体001的夹持口,拉杆300的一端安装于夹持组件310上,拉杆300滑动安装于主支撑臂101上。进一步的,在主支撑臂101上设置有四个螺纹孔,四根拉杆300分别螺接在四个螺纹孔内,拉杆300与主支撑臂101垂直设置,拉杆300与螺杆主体111平行设置。锁紧螺母320螺接在拉杆300上,锁紧螺母320用于限制拉杆300沿其中轴线方向朝向井盖本体001滑动。通过旋拧拉杆300来调节夹持组件310的高度,进而调节井盖本体001的高度。Please refer to Fig. 4-Fig. 5, each clamping system 003 includes a tie rod 300, a lock nut 320 and a clamping assembly 310, the clamping assembly 310 has a clamping port for clamping the manhole cover body 001, and one end of the pull rod 300 is installed On the clamping assembly 310 , the pull rod 300 is slidably installed on the main support arm 101 . Further, four threaded holes are provided on the main support arm 101 , and four tie rods 300 are respectively screwed into the four threaded holes. The lock nut 320 is screwed on the pull rod 300 , and the lock nut 320 is used to limit the pull rod 300 to slide toward the well cover body 001 along its central axis. The height of the clamping assembly 310 is adjusted by twisting the pull rod 300 , thereby adjusting the height of the well cover body 001 .
可选的,夹持组件310包括夹具311、锁紧螺杆312以及垫板313。夹具311包括矩形板状的主板3111、矩形板状的第一侧板3112以及矩形板状的第二侧板3113,第一侧板3112和第二侧板3113相对设置且均安装于主板3111的相对的两侧面上,第一侧板3112和第二侧板3113之间限定出夹持口,锁紧螺杆312螺接于第一侧板3112上,锁紧螺杆312的端部伸入夹持口。垫板313安装于第二侧板3113朝向第一侧板3112的板面上,垫板313朝向第一侧板3112的板面为弧形面。通过旋拧锁紧螺杆312可以改变锁紧螺杆312伸入夹持口的端面与垫板313的内侧板面之间的距离,进而夹紧位于锁紧螺杆312和垫板313之间的井盖本体001。由于垫板313具备弧形面,该弧形面与井盖本体001的外周面匹配,增大垫板313与井盖本体001的接触面积,夹持更加稳固。Optionally, the clamping assembly 310 includes a clamp 311 , a locking screw 312 and a backing plate 313 . The fixture 311 includes a rectangular plate-shaped main board 3111, a rectangular plate-shaped first side plate 3112 and a rectangular plate-shaped second side plate 3113, the first side plate 3112 and the second side plate 3113 are arranged opposite and are installed on the main plate 3111 On the opposite two sides, a clamping opening is defined between the first side plate 3112 and the second side plate 3113, the locking screw 312 is screwed on the first side plate 3112, and the end of the locking screw 312 extends into the clamping mouth. The backing plate 313 is installed on the surface of the second side plate 3113 facing the first side plate 3112 , and the surface of the backing plate 313 facing the first side plate 3112 is an arc surface. By turning the locking screw 312, the distance between the end face of the locking screw 312 extending into the clamping port and the inner surface of the backing plate 313 can be changed, thereby clamping the well cover body between the locking screw 312 and the backing plate 313 001. Since the backing plate 313 has an arc-shaped surface, and the arc-shaped surface matches the outer peripheral surface of the well cover body 001, the contact area between the backing plate 313 and the well cover body 001 is increased, and the clamping is more stable.
需要说明的是,在其他实施例中,夹持系统003的数量可以不是四个,例如可以为三个、五个、六个等,在此不进行一一列举。It should be noted that, in other embodiments, the number of clamping systems 003 may not be four, for example, may be three, five, six, etc., which will not be listed here.
在其他实施例中,可以在拉杆300上设置刻度线,缩短多根拉杆300调节的时间,多根拉杆300调节精度更高。In other embodiments, scale marks can be set on the pull rods 300 to shorten the adjustment time of the multiple pull rods 300 , and the adjustment accuracy of the multiple pull rods 300 is higher.
本实施例中可选的,道路检查井井盖施工设备还包括内模004,内模004为两端敞口的圆筒状,内模004上安装有挂钩400,内模004的内壁上安装有拉手410。在井盖本体001现场施工过程中,内模004插接在井盖本体001内,挂钩400悬挂在井盖本体001上,内模004的端部插接在待安装位置的井筒内。待井盖本体001的高度调节完成后,在井盖本体001外部以及内模004外部填充混凝土,待混凝土凝结后,拆除内模004、支撑系统002和夹持系统003即可。Optionally in this embodiment, the road inspection well cover construction equipment also includes an inner mold 004, the inner mold 004 is a cylindrical shape with two ends open, the inner mold 004 is equipped with a hook 400, and the inner wall of the inner mold 004 is installed with a Handle 410. During the on-site construction of the well cover body 001, the inner mold 004 is plugged into the well cover body 001, the hook 400 is suspended on the well cover body 001, and the end of the inner mold 004 is plugged into the wellbore at the position to be installed. After the height adjustment of the manhole cover body 001 is completed, fill the outside of the manhole cover body 001 and the inner mold 004 with concrete, and after the concrete sets, remove the inner mold 004, the support system 002 and the clamping system 003.
需要说明的是,图1中和图5中显示有阴影区域,其为螺纹槽,该螺纹槽的结构从图2和图3中能够反映出来。It should be noted that there are shaded areas shown in FIG. 1 and FIG. 5 , which are screw grooves, and the structure of the screw grooves can be reflected from FIG. 2 and FIG. 3 .
实施例2Example 2
本实施例提供了一种道路检查井井盖施工工艺,适用于上述实施例1提到的道路检查井井盖施工设备,该施工工艺包括如下步骤:This embodiment provides a construction process for road inspection well covers, which is suitable for the construction equipment for road inspection well covers mentioned in the above-mentioned embodiment 1. The construction process includes the following steps:
将悬挂有内模004的井盖本体001安装于夹持系统003上;Install the manhole cover body 001 with the inner mold 004 suspended on the clamping system 003;
将支撑系统002支撑在道路的路面上;supporting the support system 002 on the pavement of the road;
调节夹持系统003或者/和支撑系统002以调节井盖本体001相对于路面的高度;Adjust the clamping system 003 or/and the supporting system 002 to adjust the height of the manhole cover body 001 relative to the road surface;
浇筑混凝土;pouring concrete;
待混凝土凝结后将内模004和夹持系统003从井盖本体001上拆除。After the concrete is set, the inner mold 004 and the clamping system 003 are removed from the manhole cover body 001.
以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. For those skilled in the art, the present utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920073685.0U CN209538241U (en) | 2019-01-16 | 2019-01-16 | Road inspection well cover construction equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920073685.0U CN209538241U (en) | 2019-01-16 | 2019-01-16 | Road inspection well cover construction equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209538241U true CN209538241U (en) | 2019-10-25 |
Family
ID=68270046
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920073685.0U Active CN209538241U (en) | 2019-01-16 | 2019-01-16 | Road inspection well cover construction equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209538241U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109629605A (en) * | 2019-01-16 | 2019-04-16 | 中交公局海威工程建设有限公司 | Road inspection well well lid construction equipment and construction technology |
| CN110984234A (en) * | 2019-12-18 | 2020-04-10 | 上海柯泷化工科技有限公司 | A manhole cover installation device |
| CN111535364A (en) * | 2020-05-09 | 2020-08-14 | 宁夏第三建筑有限公司 | Multifunctional well circle elevation control frame |
-
2019
- 2019-01-16 CN CN201920073685.0U patent/CN209538241U/en active Active
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109629605A (en) * | 2019-01-16 | 2019-04-16 | 中交公局海威工程建设有限公司 | Road inspection well well lid construction equipment and construction technology |
| CN110984234A (en) * | 2019-12-18 | 2020-04-10 | 上海柯泷化工科技有限公司 | A manhole cover installation device |
| CN110984234B (en) * | 2019-12-18 | 2024-05-07 | 昆山市大禄化工科技有限公司 | Manhole cover installation device |
| CN111535364A (en) * | 2020-05-09 | 2020-08-14 | 宁夏第三建筑有限公司 | Multifunctional well circle elevation control frame |
| CN111535364B (en) * | 2020-05-09 | 2025-01-10 | 宁夏第三建筑有限公司 | Multifunctional well circle elevation control frame |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109629605A (en) | Road inspection well well lid construction equipment and construction technology | |
| CN107700533B (en) | A kind of construction technology of box-type quick assembly and disassembly mould pipe gallery | |
| CN209025439U (en) | A kind of height-adjustable Wedge device | |
| CN101875162A (en) | Nuclear power plant reactor cavity water gate welding assembly platform | |
| CN107130793A (en) | Form frame system with exactly vertical elevation and horizontal location function | |
| CN112064665B (en) | Embedded screw positioning device and using method thereof | |
| CN106891126A (en) | A positioning device for multi-angle welding of elevator lower beam casing | |
| CN109546559B (en) | Installation auxiliary device for isolating switch operating mechanism | |
| CN203768941U (en) | Fast installation mould for foundation bolt set | |
| CN205419600U (en) | A base steel construction for constructing tower crane base accurate positioning installation | |
| CN220013678U (en) | Street lamp foundation pouring auxiliary tool | |
| CN214996176U (en) | Municipal administration public facilities built-in fitting mounting tool | |
| CN211475089U (en) | A pipeline support device for municipal construction | |
| CN207944962U (en) | A kind of tunnel arch jacking regulating device | |
| CN115853138A (en) | Adjustable purlin holds in palm system | |
| CN216281238U (en) | Horizontal calibration support for installing embedded lamp base | |
| CN110126063A (en) | A kind of tower crane counterweight producing device | |
| CN210588948U (en) | Pipeline positioning support for water supply and drainage engineering | |
| CN212505789U (en) | Road prosthetic devices for municipal works | |
| CN210512903U (en) | A convenient surveying and mapping auxiliary device | |
| CN203180383U (en) | Mechanism case installation special device | |
| CN218523154U (en) | Pipeline supporting structure for municipal engineering construction | |
| CN218440972U (en) | Large-scale pre-buried steel casing pipe installing support | |
| CN207862787U (en) | A kind of pin-connected panel slideway | |
| CN215179337U (en) | Municipal works building material detection device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20191223 Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Co-patentee after: HAIWEI ENGINEERING CONSTRUCTION CO LTD OF FIRST HIGHWAY ENGINEERING Co.,Ltd. OF CCCC Patentee after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd. Address before: 101100 Beijing City, Tongzhou District Road No. 568 Building No. 1 Xu Patentee before: HAIWEI ENGINEERING CONSTRUCTION CO LTD OF FIRST HIGHWAY ENGINEERING Co.,Ltd. OF CCCC |
|