CN209536789U - A kind of tunnel steel arch frame I-steel grabbing device - Google Patents

A kind of tunnel steel arch frame I-steel grabbing device Download PDF

Info

Publication number
CN209536789U
CN209536789U CN201920008011.2U CN201920008011U CN209536789U CN 209536789 U CN209536789 U CN 209536789U CN 201920008011 U CN201920008011 U CN 201920008011U CN 209536789 U CN209536789 U CN 209536789U
Authority
CN
China
Prior art keywords
steel
girder
walking beam
arch frame
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920008011.2U
Other languages
Chinese (zh)
Inventor
李涛
马社堂
徐现启
党永强
王稀田
梅日新
詹祥明
姜佩君
刘双冬
金普胜
朱洵
张毕兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201920008011.2U priority Critical patent/CN209536789U/en
Application granted granted Critical
Publication of CN209536789U publication Critical patent/CN209536789U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of tunnel steel arch frame I-steel grabbing devices, the walking beam of stretching motion including girder and on girder, girder and walking beam bottom are uniformly provided with several L shape hooks, girder and the L shape hook of walking beam bottom are oppositely arranged, when so that girder and walking beam relative motion are to a certain position, girder and the cooperation of the L shape hook of walking beam bottom, tunnel steel arch frame I-steel is picked up.The utility model is with light-weight, material utilization amount is small, operation is convenient, the features such as work efficiency is high, highly-safe, girder and walking beam being capable of relative motions, when so that girder and walking beam relative motion are to a certain position, girder and the cooperation of the L shape hook of walking beam bottom, tunnel steel arch frame I-steel is picked up, trouble when efficiently solving onsite moving I-steel, the deficiency factors such as low efficiency, safety coefficient be low improve the efficiency of I-steel carrying.

Description

A kind of tunnel steel arch frame I-steel grabbing device
Technical field
The utility model relates to a kind of grabbing device, especially a kind of tunnel steel arch frame I-steel grabbing device belongs to public affairs Road field of engineering technology.
Background technique
I-steel is a kind of common construction material, the entitled steelbeam of English, alternatively referred to as girder steel, is a kind of disconnected Face shape is I-shaped fashioned iron.I-steel is divided into common I-steel, lightweight I-beam and three kinds of H-type I-steel, uses extensively In industries such as various building structure, bridge, vehicle, bracket, machinery.
Tunnel I-steel is formed in steel bar meter field concentrated processing at present, and the carrying of live I-steel is mainly by several hoist cables Binding carrying is carried out, low efficiency is troublesome in poeration, seriously affects project progress.
Utility model content
To solve the above-mentioned problems, the utility model provides a kind of tunnel steel arch frame I-steel grabbing device, simple process, Light-weight, cost bottom is high-efficient, securely and reliably.The concrete scheme of the utility model is as follows:
A kind of tunnel steel arch frame I-steel grabbing device, the walking beam of stretching motion, girder including girder and on girder Several L shape hooks are uniformly provided with walking beam bottom, and the L shape hook of girder and walking beam bottom is oppositely arranged, so that girder and activity When beam relative motion is to a certain position, tunnel steel arch frame I-steel is picked up in the L shape hook cooperation of girder and walking beam bottom.
Further, girder includes two sides angle steel disposed in parallel, and angle steel bottom both ends are respectively arranged on connecting plate, connection Angle steel above plate is equipped with square steel, is equipped with baffle between square steel and angle steel middle part.
Further, it is connected between girder and walking beam by spring.
Further, walking beam includes two sides angle steel, and both ends are equipped with round steel between the angle steel of two sides, wherein near the round steel of side Angle steel be equipped with square steel, angle steel be set to connecting plate on, side round steel both ends both ends corresponding with the other side of the connecting plate are equipped with Spring, girder and walking beam are limited by round steel on the baffle and walking beam on girder and square steel.
Further, several lifting hole(eyelet)s are symmetrically arranged on girder and walking beam.
Further, L shape hook height is 25cm, and the maximum distance of girder and walking beam relative motion is 30cm.
Further, the angle steel height of girder is 120cm, and the angle steel height of walking beam is 100cm.
Further, the angle steel length of girder and walking beam is 1500cm, and the distance between angle steel of girder is 900cm, The distance between angle steel of walking beam is 790cm.
Compared with prior art, the utility model has the beneficial effect that
The utility model has the features such as light-weight, material utilization amount is small, and operation is convenient, and work efficiency is high, highly-safe, main Beam and walking beam can relative motion, when so that girder and walking beam relative motion are to a certain position, girder and walking beam bottom The cooperation of L shape hook, tunnel steel arch frame I-steel is picked up, trouble, low efficiency, safety when efficiently solving onsite moving I-steel The low equal deficiency factors of coefficient, improve the efficiency of I-steel carrying.
Detailed description of the invention
Fig. 1 is the top view of the utility model;
Fig. 2 is the side view of the utility model;
Fig. 3 is the front view of the utility model.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, the technical solution in the present embodiment is carried out it is clear, complete Site preparation description, it is clear that described embodiment is only the example to a part of example of the utility model, rather than whole.Base In the embodiments of the present invention, those of ordinary skill in the art institute obtained under that premise of not paying creative labor There are other embodiments, fall within the protection scope of the utility model.
As shown in Figure 1, the tunnel steel arch frame I-steel grabbing device of the present embodiment, including girder 1 and can on girder 1 The walking beam 2 of stretching motion is connected between girder 1 and walking beam 2 by spring 3.
As shown in Fig. 2, girder 1 and 2 bottom of walking beam are uniformly provided with several L shape hooks, the L shape hook 5 and walking beam 2 of girder 1 The L shape hook 4 of bottom is oppositely arranged, when so that girder and walking beam relative motion are to a certain position, 2 bottom of girder 1 and walking beam L shape hook cooperation, tunnel steel arch frame I-steel is picked up.
As shown in Figure 1, girder 1 includes two sides angle steel 1.1 disposed in parallel, 1.1 bottom both ends of angle steel are respectively arranged on connection On plate 1.2, the angle steel 1.1 of 1.2 top of connecting plate is equipped with square steel 1.3, and square steel 1.3 and angle steel are equipped with baffle between 1.2 middle part 1.4, as shown in Figure 1,3.
Walking beam 2 includes two sides angle steel 2.1, and both ends are equipped with round steel 2.2 between two sides angle steel 2.1, wherein side round steel 2.2 Neighbouring angle steel is equipped with square steel 2.4, and angle steel 2.1 moves on connecting plate 1.2, and side round steel both ends 2.3 are connect with the other side The corresponding both ends 1.5 of plate are equipped with spring 3, girder 1 and walking beam 2 and pass through on the baffle 1.4 and walking beam 2 on girder 1 The round steel 2.2 of side and the square steel 2.4 of the other side limit.
As shown in Fig. 2, being symmetrically arranged with several lifting hole(eyelet)s 1.6 on girder 1, it is symmetrically arranged with several lifting hole(eyelet)s 2.5 on walking beam 2, leads to Cross the lifting of hawser 6.
In the present embodiment, L shape hook height is 25cm, and the maximum distance of 2 relative motion of girder 1 and walking beam is 30cm.It is main 1.1 height of angle steel of beam 1 is 120cm, and 2.1 height of angle steel of walking beam 2 is 100cm.The angle steel length of girder 1 and walking beam 2 For 1500cm, the distance between the angle steel 1.1 of girder 1 is 900cm, and the distance between angle steel 2.1 of walking beam 2 is 790cm.This Steel plate used in embodiment is Q235 steel plate.
The manufacturing process of the utility model is as follows:
Two 1.5cm thickness connecting plates 1.2 are put to neat, length 120cm, centre distance 80cm side by side first;Then by two 1.1 12 × 10 × 1.5cm of ∠ of root angle steel is placed on connecting plate 1.2, and beyond angle steel 1.1 is shorter and 1.2 outside of connecting plate is right Together, it is then welded on connecting plate 1.2;L shape hook 5 is welded on 1.1 corner of angle steel simultaneously, middle centering distance is about 30cm。
After the completion of girder 1 welds, the assembling of walking beam 2 is carried out, 2 assembling mode of walking beam is with 1 mounting means of girder, wait live After dynamic beam angle steel 2.1,1.2 plates of connection and L shape hook 4 install, the welding of 2 upper end connecting cross beam of walking beam, connecting cross beam are carried out The round steel 2.2 of both ends 48 × 4mm of diameter, square steel 2.4 is having a size of 40 × 4mm in the outer part.Then walking beam 2 is placed under girder On portion's connecting plate 1.2, and two 1.3 40 × 4mm of square steel are welded on the angle steel 1.1 of girder 1, four block baffles 1.4 are distinguished It is welded on girder connecting plate 1.2 and top square steel 1.3, limits walking beam scope of activities.
Finally L shape hook 4, L shape hook 5 are welded on girder 1 and walking beam 2, and spring 3 installed, hole for hoist can thing It is first accomplished fluently with puncher to get the device of the utility model is arrived.
The implementation process of the utility model is as follows:
When lifting, examination is carried out first and is hung.After the device installs, hole for hoist is passed through with hawser 6, is placed in gantry crane hook On.At this point, the lower section device, when touching I-steel, with sticking up the outside tilting walking beam of rod, when between hook apart from width energy It when receiving I-steel, takes away and sticks up rod, at this point, firmly grasping I-steel under the action of spring and external force, after inspection is errorless, promote I-shaped Steel.Since in hoisting process, what hoist cable undertook is a slanting power, the power with level straight up can be analyzed to, And this horizontal power can make the hook mutual extrusion I-steel of girder and walking beam just, prevent I-steel from lifting process again In fall down, ensure that Hoisting Security.When carry terminate drop I-steel when, only need to agitate outward walking beam with crowbar, make its to Outer movement, at this moment hook unclamps, and promotes the device, at this moment I-steel drops success.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (8)

1. a kind of tunnel steel arch frame I-steel grabbing device, it is characterised in that: the work of stretching motion including girder and on girder Dynamic beam, girder and walking beam bottom are uniformly provided with several L shape hooks, and the L shape hook of girder and walking beam bottom is oppositely arranged, and make winner When beam and walking beam relative motion are to a certain position, the L shape hook cooperation of girder and walking beam bottom, by tunnel steel arch frame I-steel It picks up.
2. tunnel steel arch frame I-steel grabbing device according to claim 1, it is characterised in that: girder includes that two sides are parallel The angle steel of setting, angle steel bottom both ends are respectively arranged on connecting plate, and the angle steel above connecting plate is equipped with square steel, square steel and angle steel Baffle is equipped between middle part.
3. tunnel steel arch frame I-steel grabbing device according to claim 1, it is characterised in that: between girder and walking beam It is connected by spring.
4. tunnel steel arch frame I-steel grabbing device according to claim 2, it is characterised in that: walking beam includes two side angles Steel, both ends are equipped with round steel between the angle steel of two sides, and wherein the angle steel near the round steel of side is equipped with square steel, and angle steel is set to connecting plate On, side round steel both ends both ends corresponding with the other side of the connecting plate are equipped with spring, girder and walking beam and pass through the gear on girder Round steel and square steel limit on plate and walking beam.
5. tunnel steel arch frame I-steel grabbing device according to claim 1, it is characterised in that: right on girder and walking beam Claim to be equipped with several lifting hole(eyelet)s.
6. tunnel steel arch frame I-steel grabbing device according to claim 1, it is characterised in that: L shape hook height is 25cm, Girder and the maximum distance of walking beam relative motion are 30cm.
7. tunnel steel arch frame I-steel grabbing device according to claim 1, it is characterised in that: the angle steel height of girder is 120cm, the angle steel height of walking beam are 100cm.
8. tunnel steel arch frame I-steel grabbing device according to claim 1, it is characterised in that: the angle of girder and walking beam Steel length is 1500cm, and the distance between angle steel of girder is 900cm, and the distance between angle steel of walking beam is 790cm.
CN201920008011.2U 2019-01-03 2019-01-03 A kind of tunnel steel arch frame I-steel grabbing device Active CN209536789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920008011.2U CN209536789U (en) 2019-01-03 2019-01-03 A kind of tunnel steel arch frame I-steel grabbing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920008011.2U CN209536789U (en) 2019-01-03 2019-01-03 A kind of tunnel steel arch frame I-steel grabbing device

Publications (1)

Publication Number Publication Date
CN209536789U true CN209536789U (en) 2019-10-25

Family

ID=68268330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920008011.2U Active CN209536789U (en) 2019-01-03 2019-01-03 A kind of tunnel steel arch frame I-steel grabbing device

Country Status (1)

Country Link
CN (1) CN209536789U (en)

Similar Documents

Publication Publication Date Title
CN202400723U (en) Lifting tool type hanger frame for prefabricated parts
CN105129602B (en) Grow up vertical reinforcement monoblock type raising suspender
CN201172574Y (en) Precast beam reinforced bar hoisting rack
CN202575670U (en) Prefabricated member hoisting tool type lifting beam
CN209536789U (en) A kind of tunnel steel arch frame I-steel grabbing device
CN214783820U (en) Lifting point reinforced overweight underground continuous wall reinforcement cage
CN201703960U (en) Hoisting clamp of electric dust removal and collecting pole plate
CN210635599U (en) Prevent cracked steel bar truss concrete superimposed sheet hoist
CN208948679U (en) Assembled hanger
CN210505201U (en) Equipment for hoisting reinforcing steel bars in batches
CN209177844U (en) A kind of template lift up rapidly device
CN202296798U (en) Lifting sling for acceptance inspection of large-scale traveling crane
CN205637617U (en) Hoist and mount of many roof beams of girder steel construction cluster are put
CN215885996U (en) F-shaped prefabricated T-beam template hoisting device
CN212531961U (en) Spacing formula opening beam hoist
CN211393619U (en) Mixer maintenance gantry crane for lithium battery cathode coating material
CN213326310U (en) Device for quickly hoisting hexagonal prefabricated part
CN205346596U (en) Balanced type precast beam side form hoist device
CN216662217U (en) Simplified tool hanger
CN217555576U (en) Template lifting device that stability is strong
CN212769432U (en) Novel practical precast beam lifting device
CN219730267U (en) Shoulder pole beam for hoisting bridge deck reinforcing steel bar net sheet
CN211141270U (en) A lifting device for coincide assembled piping lane component
CN217398227U (en) Hot galvanizing pretreatment lifting appliance
CN219567249U (en) Channel steel type balance beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant