CN209525598U CN201920001132.4U CN201920001132U CN209525598U CN 209525598 U CN209525598 U CN 209525598U CN 201920001132 U CN201920001132 U CN 201920001132U CN 209525598 U CN209525598 U CN 209525598U
Authority
CN
China
Prior art keywords
contact
connect
roof
case
movable case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920001132.4U
Other languages
Chinese (zh)
Inventor
陈飞
邓复鹏
陈腾辉
廖锦培
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhengda Construction Co Ltd
Original Assignee
Guangdong Zhengda Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhengda Construction Co Ltd filed Critical Guangdong Zhengda Construction Co Ltd
Priority to CN201920001132.4U priority Critical patent/CN209525598U/en
Application granted granted Critical
Publication of CN209525598U publication Critical patent/CN209525598U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

A kind of green building deep basal pit fluid level control device, it is related to foundation pit construction technical field, including foundation pit, drainage arrangement is equipped in foundation pit, fixed case is equipped at the top of foundation pit, fixed case is equipped with height adjustment device, height adjustment device is connect by connecting rod with movable case, movable plate is equipped in movable case, movable plate is connect with the carriage being located in movable case, and one end connection of movable plate and floating lever, the bottom wall that the other end of floating lever stretches out movable case is connect with floating ball, the roof of movable case is equipped with contact device A, and the bottom wall of movable case is equipped with contact device B.Movable case is put into the position that foundation pit is specified under water by height adjustment device by the device, reduce manpower, construction efficiency is improved, and improves the accuracy of construction, by movable plate and contact device A or contacts device B contact to realize the monitoring and control of liquid level.

Description

A kind of green building deep basal pit fluid level control device
Technical field:
The utility model relates to green building fields, and in particular to a kind of green building deep basal pit fluid level control device.
Background technique:
Green building is in construction, it is necessary first to dig deep basal pit and carry out supporting to deep basal pit, deep basal pit refers to that excavation is deep Degree be more than 5 meters (contain 5 meters) or three layers of basement or more (containing three layers) though or depth be less than 5 meters, geological conditions and surrounding ring Border and the especially complex engineering of underground utilities.According to People's Republic of China's house and town and country construction portion May ten 2009 The annexed document issued in " the biggish part-to-item project safety management method of risk " on the three, deep-foundation pit engineering are as follows: (one) Cutting depth is more than earth excavation, supporting, the dewatering project of the foundation pit (slot) of 5m (containing 5m).(2) though cutting depth is less than 5m, but geological conditions, ambient enviroment and underground utilities are complicated, or influence the soil that adjacent building (constructs) foundation pit (slot) of object safety Side excavation, supporting, dewatering project.It needs that the liquid level of deep basal pit is controlled and drained in Deep foundation Pit excavation, it is existing Deep basal pit draining mainly by water pump carry out, but specifically when need drain or when stop draining, can not It controls, the detection of water level is also using manual evaluation in foundation pit, and manual evaluation can have very big error, when the ground of deep basal pit Especially high to the water level requirement in foundation pit when matter is special, water level, which once goes beyond the limit, will cause to flow backward or collapse, to cause Safety accident.
Utility model content:
The purpose of this utility model is to overcome in place of above-mentioned the shortcomings of the prior art, and a kind of green is provided and is built Build deep basal pit fluid level control device.
The technical solution adopted in the utility model are as follows: a kind of green building deep basal pit fluid level control device, including foundation pit, base It is equipped with drainage arrangement in hole, fixed case is equipped at the top of foundation pit, fixed case is equipped with height adjustment device, height adjustment device and company Extension bar connection, connecting rod connect with movable case, and movable case is equipped with pulling device, one end connection of pulling device and traction rope, The other end of traction rope is protruded into movable case and is connect with movable plate, and movable plate is connect with the carriage being located in movable case, is moved The connection of one end of movable plate and floating lever, the bottom wall that the other end of floating lever stretches out movable case are connect with floating ball, the roof of movable case It is equipped with contact device A, the bottom wall of movable case is equipped with contact device B, and the bottom of the movable case is equipped with groove, groove top Wall is equipped with contact device C, is equipped with guiding device in groove, and one end of guiding device and support rod connects, support rod it is another End reaches outside groove, and the contact device C is located at the surface of support rod.
The drainage arrangement includes water pump and drainpipe, and the water pump is located at bottom of foundation ditch, water pump and drainpipe The other end of one end connection, drainpipe stretches out foundation pit.
The height adjustment device includes clamping A, motor A, shifting chute, screw rod, nut and fixture B, the electricity Motivation A is located on fixed case, and the output shaft of motor A is connect with screw rod, and screw rod is fixed on fixed case, and screw rod passes through with nut It is threadedly coupled, nut connect with the shifting chute being located on fixed case and nut and shifting chute is are slidably connected, nut and fixture B company It connects, fixture B clamps connecting rod, fixture B and fixture A is arranged in parallel and fixture B is located at the underface of fixture A, and fixture A is located at On fixed case, fixture A clamps connecting rod.
The pulling device includes protective shell, motor B and reel, and the protective shell is located on movable case, is protected Motor B, the output shaft of motor B and the input axis connection of reel, one end company of reel and traction rope are equipped in protective case It connects, the other end of traction rope protrudes into movable case and connect with movable plate.
The contact device A includes contact A, contact B, hemispherical flexible pocket and spring, the hemispherical flexible pocket It is located on the roof of movable case, hemispherical flexible pocket roof is equipped with contact A, and contact A is corresponding with the position of contact B, contact B On movable case roof and contact B is located in hemispherical flexible pocket, and the roof of hemispherical flexible pocket and one end of spring connect, The other end of spring and the roof of movable case connect.
The contact device B includes contact A, contact B, hemispherical flexible pocket and spring, the hemispherical flexible pocket It is located on the bottom wall of movable case, hemispherical flexible pocket roof is equipped with contact A, and contact A is corresponding with the position of contact B, contact B On movable case bottom wall and contact B is located in hemispherical flexible pocket, and the roof of hemispherical flexible pocket and one end of spring connect, The other end of spring and the bottom wall of movable case connect.
The contact device C includes contact A, contact B, hemispherical flexible pocket and spring, the hemispherical flexible pocket It being located on the roof of groove, hemispherical flexible pocket roof is equipped with contact A, and contact A is corresponding with the position of contact B, and contact B In on groove roof and contact B is located in hemispherical flexible pocket, the roof of hemispherical flexible pocket and one end of spring are connected, spring The other end and groove roof connect.
The carriage includes guide groove and directive wheel, and the guide groove is located on the inner wall of movable case, guiding Slot is connect with directive wheel and the two is to be slidably connected, and directive wheel is connect with movable plate.
The guiding device includes sliding rail and idler wheel, and the sliding rail is located in recess sidewall, and sliding rail is connect with idler wheel And the two is to be slidably connected, idler wheel is connect with support rod.
The fixture A is identical as the structure of fixture B, the fixture A include finger cylinder, limited block, gripping block A and Gripping block B, the finger cylinder are located on nut, and one of output rod of finger cylinder is connect with gripping block A, finger gas Another output rod of cylinder is connect with gripping block B, is equipped with limited block on gripping block A and gripping block B, the connecting rod is located at Between gripping block A and gripping block B.
It is specified under water the beneficial effects of the utility model are: movable case is put into foundation pit by height adjustment device by the device Position, reduce manpower, improve construction efficiency, and improve the accuracy of construction, by movable plate and contact device A or Contact device B contacts to realize the monitoring of liquid level, is matched, is realized to the water level in foundation pit by the starting with drainage arrangement It is controlled, the water level in foundation pit is made to remain at safe range, be convenient for foundation pit construction and supporting, while can also incite somebody to action The water of drainpipe discharge is delivered to construction site, realizes the recycling of water resource, reaches energy-saving and environment-friendly effect, meets green The requirement of construction and the safety coefficient for improving foundation pit construction.
Detailed description of the invention:
Fig. 1 is the utility model structure diagram.
Fig. 2 is the partial enlarged view in the utility model Fig. 1 at A.
Fig. 3 is the partial enlarged view in the utility model Fig. 1 at B.
Fig. 4 is the structural schematic diagram of the fixture A or fixture B in the utility model.
Specific embodiment:
Referring to each figure, a kind of green building deep basal pit fluid level control device, including foundation pit 18, foundation pit 18 is interior to be equipped with draining dress It sets, fixed case 4 is equipped at the top of foundation pit 18, fixed case 4 is equipped with height adjustment device, and height adjustment device is connect with connecting rod 8, Connecting rod 8 is connect with movable case 12, and movable case 12 is equipped with pulling device, and pulling device connect with one end of traction rope 30, leads The other end of messenger 30 is protruded into movable case 12 and is connect with movable plate 29, movable plate 29 and the carriage being located in movable case 12 Connection, movable plate 29 are connect with one end of floating lever 13, and the other end of floating lever 13 stretches out the bottom wall and floating ball 14 of movable case 12 Connection, the roof of movable case 12 are equipped with contact device A, and the bottom wall of movable case 12 is equipped with contact device B, the movable case 12 bottom is equipped with groove 24, and 24 roof of groove is equipped with contact device C, is equipped with guiding device in groove 24, guiding device with One end of support rod 15 connects, and the other end of support rod 15 reaches outside groove 24, and the contact device C is located at support rod 15 Surface.The quantity of the groove 24 of 12 bottom of movable case is four, is equipped with a guiding device in each groove 24, each Guiding device is connect with a support rod 15, and four support rods 15 are arranged in parallel and four support rods 15 are located at shifting At four angles of dynamic case 12, a contact device C is equipped at the top of each groove 24.
The drainage arrangement includes water pump 16 and drainpipe 17, and the water pump 16 is located at 18 bottom of foundation pit, water pump 16 It is connect with one end of drainpipe 17, the other end of drainpipe 17 stretches out foundation pit 18.Water pump 16 is immersible pump 16.
The height adjustment device includes fixture A1, motor A2, shifting chute 5, screw rod 7, nut 6 and fixture B19, institute The motor A2 stated is located on fixed case 4, and the output shaft of motor A2 is connect with screw rod 7, and screw rod 7 is fixed on fixed case 4, silk Bar 7 is connected through a screw thread with nut 6, and nut 6 is connect with the shifting chute 5 being located on fixed case 4 and nut 6 and shifting chute 5 are cunning Dynamic connection, nut 6 are connect with fixture B19, and fixture B19 clamps connecting rod 8, and fixture B19 and fixture A1 is arranged in parallel and presss from both sides Tool B19 is located at the underface of fixture A1, and fixture A1 is located on fixed case 4, and fixture A1 clamps connecting rod 8.
The pulling device includes protective shell 9, motor B10 and reel 11, and the protective shell 9 is located at movable case On 12, motor B10, the output shaft of motor B10 and the input axis connection of reel 11, reel 11 are equipped in protective shell 9 It is connect with one end of traction rope 30, the other end of traction rope 30 protrudes into movable case 12 and connect with movable plate 29.
The contact device A includes contact A 21, contact B20, hemispherical flexible pocket 25 and spring 26, the hemisphere Shape flexible pocket 25 is located on the roof of movable case 12, and 25 roof of hemispherical flexible pocket is equipped with contact A 21, contact A 21 and contact The position of B20 is corresponding, and contact B20 is located on 12 roof of movable case and contact B20 is located in hemispherical flexible pocket 25, hemispherical The roof of flexible pocket 25 is connect with one end of spring 26, and the other end of spring 26 is connect with the roof of movable case 12.
The contact device B includes contact A 21, contact B20, hemispherical flexible pocket 25 and spring 26, the hemisphere Shape flexible pocket 25 is located on the bottom wall of movable case 12, and 25 roof of hemispherical flexible pocket is equipped with contact A 21, contact A 21 and contact The position of B20 is corresponding, and contact B20 is located on 12 bottom wall of movable case and contact B20 is located in hemispherical flexible pocket 25, hemispherical The roof of flexible pocket 25 is connect with one end of spring 26, and the other end of spring 26 is connect with the bottom wall of movable case 12.
The contact device C includes contact A 21, contact B20, hemispherical flexible pocket 25 and spring 26, the hemisphere Shape flexible pocket 25 is located on the roof of groove 24, and 25 roof of hemispherical flexible pocket is equipped with contact A 21, contact A 21 and contact B20 Position it is corresponding, contact B20 is located on 24 roof of groove and contact B20 is located in hemispherical flexible pocket 25, and hemispherical is flexible The roof of capsule 25 is connect with one end of spring 26, and the other end of spring 26 is connect with the roof of groove 24.
The carriage includes guide groove 27 and directive wheel 28, and the guide groove 27 is located at the inner wall of movable case 12 On, guide groove 27 is connect with directive wheel 28 and the two is to be slidably connected, and directive wheel 28 is connect with movable plate 29.
The guiding device includes sliding rail 22 and idler wheel 23, and the sliding rail 22 is located on 24 side wall of groove, sliding rail 22 It is connect with idler wheel 23 and the two is to be slidably connected, idler wheel 23 is connect with support rod 15.
The fixture A1 is identical as the structure of fixture B19, and the fixture A1 includes finger cylinder 103, limited block 101, gripping block A102 and gripping block B104, the finger cylinder 103 are located on nut 6, finger cylinder 103 one of them Output rod is connect with gripping block A102, another output rod of finger cylinder 103 is connect with gripping block B104, gripping block A102 with Limited block 101 is equipped on gripping block B104, the connecting rod 8 is between gripping block A102 and gripping block B104.
Fixed case 4 is equipped with controller 3, and controller 3 is connect with water pump 16 by conducting wire, and controller 3 passes through conducting wire and electricity Motivation A2 connection, controller 3 are connect by conducting wire with motor B10, and controller 3 is connect by conducting wire with contact device A, are controlled Device 3 is connect by conducting wire with contact device B, and controller 3 is connect by conducting wire with contact device C.In order to accurately control movement The position of case 12 can be equipped with a liquid level sensor in the bottom of movable case 12, and liquid level sensor passes through conducting wire and controller 3 Connection.
Connecting rod 8 can lengthen its length by the way of screw thread docking.
Specific implementation process is as follows:, first will according to the depth of deep basal pit 18 when needing to monitor the water level in foundation pit 18 Connecting rod 8 is lengthened to the length of needs, and connecting rod 8 is clamped using fixture A1 and fixture B19, when needing to be put into movable case 12 18 depths of foundation pit it is underwater when, fixture A1 unclamp clamp, fixture B19 clamp connecting rod 8, start motor A2, motor A2 band Dynamic nut 6 drives movable case 12 to move downward along screw rod 7 and 5 slide downward of shifting chute and by connecting rod 8, when nut 6 moves When to the bottom end of screw rod 7, fixture A1 is clamped, and fixture B19, which unclamps, to be clamped, and motor A2 drives nut 6 to be moved to most by screw rod 7 Top clamps at this point, fixture A1 unclamps fixture B19 while clamping, then by height adjustment device by movable case 12 to moving down It is dynamic, it circuits sequentially, to realize that height adjustment device drives movable case 12 to move to the height needed under water, passes through Liquid level The position of the information that device 3 is fed back, the movable case 12 for controlling height adjustment device is more accurate, when movable case 12 is moved to properly Position when, due to the effect of buoyancy, floating ball 14 drives floating lever 13 to move upwards and squeeze with movable plate 29 and contacts dress A is set, contacts after the hemispherical flexible pocket 25 in device A is extruded and deforms, spring 26 is compressed, and contact A 21 connects with contact B20 Activation signal is simultaneously transferred to controller 3 by touching, circuit communication, and the control of controller 3 closes motor A2 and starts water pump 16, water pump 16 are drained, and water is discharged from foundation pit 18, and the water of discharge can be delivered to construction site for other aspects, realize water money The recycling in source, when the water level decreasing in foundation pit 18, floating ball 14 falls and movable plate 29 is driven to move downward, and works as movable plate 29 move to contact device B contact and make contact device B in contact A 21 and contact B20 contact when, activation signal is transmitted To controller 3, at this point, the control of controller 3 switches off the pump 16.
In addition, when if height adjustment device in the device drives movable case 12 to move to 18 bottom of foundation pit, in order to avoid Floating ball 14 is contacted with the mud of 18 bottom of foundation pit or mud enters in movable case 12, it is difficult to clear up, the movable case in the device Support rod 15 in 12 first contacts with mud and is supported movable case 12, and support rod 15 is moved and squeezed into groove 24 and connect Device C is touched, contacts the contact A 21 contacted in device C with contact B20, the control of controller 3 at this time starts motor B10, electronic Machine B10 drives reel 11 to rotate and be drawn to movable plate 29 by traction rope 30 and contacts with the roof of movable case 12, at this point, Floating ball 14 moves to the bottom of movable case 12, avoids floating ball 14 from contacting with the mud in mud, while mud being avoided to enter movement The inside of case 12 facilitates the device to be cleaned and safeguarded.
Movable case 12 is put into the position that foundation pit 18 is specified under water by height adjustment device by the device, reduces manpower, Improve construction efficiency, and improve the accuracy of construction, by movable plate 29 and contact device A or contact device B contact from And realize the monitoring of liquid level, it is matched by the starting with drainage arrangement, realization controls the water level in foundation pit 18, makes base Water level in hole 18 remains at safe range, convenient for the construction of foundation pit 18 and supporting, while can also be by drainpipe 17 The water of discharge is delivered to construction site, realizes the recycling of water resource, reaches energy-saving and environment-friendly effect, meets green building and applies The requirement of work.

Claims (10)

1. a kind of green building deep basal pit fluid level control device, including foundation pit, it is characterised in that: drainage arrangement is equipped in foundation pit, Fixed case is equipped at the top of foundation pit, fixed case is equipped with height adjustment device, and height adjustment device is connect with connecting rod, connecting rod and Movable case connection, movable case are equipped with pulling device, one end connection of pulling device and traction rope, and the other end of traction rope protrudes into It is connect in movable case with movable plate, movable plate is connect with the carriage being located in movable case, one end of movable plate and floating lever Connection, the bottom wall that the other end of floating lever stretches out movable case are connect with floating ball, and the roof of movable case is equipped with contact device A, are moved The bottom wall of dynamic case is equipped with contact device B, and the bottom of the movable case is equipped with groove, and groove roof is equipped with contact device C, Guiding device is equipped in groove, one end connection of guiding device and support rod, the other end of support rod reaches outside groove, described Contact device C be located at the surface of support rod.
2. green building deep basal pit fluid level control device according to claim 1, it is characterised in that: the drainage arrangement Including water pump and drainpipe, the water pump is located at bottom of foundation ditch, one end connection of water pump and drainpipe, the other end of drainpipe Stretch out foundation pit.
3. green building deep basal pit fluid level control device according to claim 1, it is characterised in that: the height adjustment Device includes fixture A, motor A, shifting chute, screw rod, nut and fixture B, and the motor A is located on fixed case, electronic The output shaft of machine A is connect with screw rod, and screw rod is fixed on fixed case, and screw rod is connected through a screw thread with nut, nut be located at it is solid Determining the shifting chute connection on case and nut is to be slidably connected with shifting chute, and nut is connect with fixture B, and fixture B clamps connecting rod, folder Tool B and fixture A is arranged in parallel and fixture B is located at the underface of fixture A, fixture A is located on fixed case, and fixture A clamps company Extension bar.
4. green building deep basal pit fluid level control device according to claim 1, it is characterised in that: the pulling device Including protective shell, motor B and reel, the protective shell is located on movable case, and motor B is equipped in protective shell, electronic One end of the output shaft of machine B and the input axis connection of reel, reel and traction rope connects, and the other end of traction rope protrudes into shifting Dynamic case is connect with movable plate.
5. green building deep basal pit fluid level control device according to claim 1, it is characterised in that: the contact device A includes contact A, contact B, hemispherical flexible pocket and spring, and the hemispherical flexible pocket is located on the roof of movable case, hemisphere Shape flexible pocket roof is equipped with contact A, and contact A is corresponding with the position of contact B, and contact B is located on movable case roof and contact B In hemispherical flexible pocket, one end of the roof of hemispherical flexible pocket and spring is connected, the other end of spring and movable case Roof connection.
6. green building deep basal pit fluid level control device according to claim 1, it is characterised in that: the contact device B includes contact A, contact B, hemispherical flexible pocket and spring, and the hemispherical flexible pocket is located on the bottom wall of movable case, hemisphere Shape flexible pocket roof is equipped with contact A, and contact A is corresponding with the position of contact B, and contact B is located on movable case bottom wall and contact B In hemispherical flexible pocket, one end of the roof of hemispherical flexible pocket and spring is connected, the other end of spring and movable case Bottom wall connection.
7. green building deep basal pit fluid level control device according to claim 1, it is characterised in that: the contact device C includes contact A, contact B, hemispherical flexible pocket and spring, and the hemispherical flexible pocket is located on the roof of groove, hemispherical Flexible pocket roof is equipped with contact A, and contact A is corresponding with the position of contact B, and contact B is located on groove roof and contact B is located at In hemispherical flexible pocket, the roof of hemispherical flexible pocket and one end of spring are connected, and the other end of spring and the roof of groove connect It connects.
8. green building deep basal pit fluid level control device according to claim 1, it is characterised in that: the carriage Including guide groove and directive wheel, the guide groove is located on the inner wall of movable case, and guide groove is connect with directive wheel and the two is It is slidably connected, directive wheel is connect with movable plate.
9. green building deep basal pit fluid level control device according to claim 1, it is characterised in that: the guiding device Including sliding rail and idler wheel, the sliding rail is located in recess sidewall, sliding rail connect with idler wheel and the two be slidably connected, idler wheel with Support rod connection.
10. green building deep basal pit fluid level control device according to claim 3, it is characterised in that: the fixture A with The structure of fixture B is identical, and the fixture A includes finger cylinder, limited block, gripping block A and gripping block B, the finger gas Cylinder is located on nut, and one of output rod of finger cylinder is connect with gripping block A, another output rod and folder of finger cylinder Be equipped with limited block on tight block B connection, gripping block A and gripping block B, the connecting rod be located at gripping block A and gripping block B it Between.
CN201920001132.4U 2019-01-02 2019-01-02 A kind of green building deep basal pit fluid level control device Expired - Fee Related CN209525598U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920001132.4U CN209525598U (en) 2019-01-02 2019-01-02 A kind of green building deep basal pit fluid level control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920001132.4U CN209525598U (en) 2019-01-02 2019-01-02 A kind of green building deep basal pit fluid level control device

Publications (1)

Publication Number Publication Date
CN209525598U true CN209525598U (en) 2019-10-22

Family

ID=68228219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920001132.4U Expired - Fee Related CN209525598U (en) 2019-01-02 2019-01-02 A kind of green building deep basal pit fluid level control device

Country Status (1)

Country Link
CN (1) CN209525598U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112414516A (en) * 2020-11-30 2021-02-26 河南富达电力集团有限公司 Reservoir safety monitoring and early warning device
CN115390592A (en) * 2022-09-09 2022-11-25 湖南真创环保科技有限公司 Mechanical passive long-distance double-liquid-level automatic control method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112414516A (en) * 2020-11-30 2021-02-26 河南富达电力集团有限公司 Reservoir safety monitoring and early warning device
CN115390592A (en) * 2022-09-09 2022-11-25 湖南真创环保科技有限公司 Mechanical passive long-distance double-liquid-level automatic control method

Similar Documents

Publication Publication Date Title
WO2021174449A1 (en) Water quality sampling device for environmental protection technology development
CN202024806U (en) Underground water level observation device
CN209525598U (en) A kind of green building deep basal pit fluid level control device
CN211652228U (en) A water quality sampling device developed by environmental protection technology
CN109490088A (en) A kind of pipe of cement resistance to compression force checking device
CN113567196B (en) Synchronous sampling device for layered mixed water samples
CN203114158U (en) Fully-revolving casing pipe drilling machine
CN213302188U (en) Wetland water quality detector
CN110907223B (en) Ultra-deep sampling device for critical liquid level high turbidity water and use method thereof
CN215857892U (en) Intelligent device for monitoring sudden surge of confined water in excavation of ultra-large and ultra-deep foundation pit
CN206876387U (en) A simulation test device for measuring the interaction between base plate drop and soil
CN205207213U (en) Colliery sump automatic drainage system
CN219871305U (en) Water quality detection equipment for water area
CN113027523B (en) Mining drainage equipment with intelligent detection system
CN216379605U (en) Basement precipitation well plugging device
CN221006937U (en) Groundwater exploration equipment
CN216746261U (en) Tunnel water inflow monitoring device
CN112813949A (en) Measuring device and method for deep foundation pit bottom detection
CN219527703U (en) Portable engineering water guide device
CN218116467U (en) Ground drilling slip casting plugging machine
CN203311269U (en) Liquid level control device for sewage collection pool
CN223410833U (en) Investigation drainage equipment
CN216978475U (en) Water sample collector for shallow water area
CN205954822U (en) A automatic pumping system for electric stove pit
CN213544222U (en) Electronic ring rigidity testing machine with good stability

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191022