CN209523268U - It is a kind of to be responsible for the automatic device for removing pipeline deposit suitable for multichannel - Google Patents
It is a kind of to be responsible for the automatic device for removing pipeline deposit suitable for multichannel Download PDFInfo
- Publication number
- CN209523268U CN209523268U CN201821613303.0U CN201821613303U CN209523268U CN 209523268 U CN209523268 U CN 209523268U CN 201821613303 U CN201821613303 U CN 201821613303U CN 209523268 U CN209523268 U CN 209523268U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- forebay
- pump group
- deposit
- multichannel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
- Cleaning In General (AREA)
Abstract
The utility model discloses a kind of device that automatic removing pipeline deposit is responsible for suitable for multichannel, including the Forebay of Pumping Station in municipal drainage pumping plant, section dirty pump group, rainwater pump group, Forebay of Pumping Station is connected with multiple drainage system general pipeline, Forebay of Pumping Station is respectively connected to cut dirty pump group and rainwater pump group by pipeline, and withdrawal of currency from circulation water pipe is additionally provided between Forebay of Pumping Station and rainwater pump group;One access well of setting, the access well are connect by adding row pressure hydraulic piping with water pipe is steam again on each drainage system general pipeline;It is equipped with washing control valve door between described plus row pressure hydraulic piping and access well, the second control valve is equipped between the withdrawal of currency from circulation water pipe and the Forebay of Pumping Station, third control valve door is equipped between the rainwater pump group and river.The utility model reduces pumping plant by way of cutting down pipeline deposit and puts river, solves the problems, such as that river is black smelly from the root, and with strong points applied to the drainage system of various systems, construction investment is few, can realize effective control that river pollution is put to pumping plant in a short time.
Description
Technical field
The utility model category black-odor riverway Treatment process field is related to a kind of automatic method and dress for removing pipeline deposit
It sets, is responsible for the automatic device for removing pipeline deposit suitable for multichannel more particularly to a kind of.
Background technique
As rapid urban and the density of population are continuously increased, river water environmental problems are increasingly highlighted, most cities
Black-odor riverway is developed into river.Black-odor riverway problem seriously affects nearby residents quality of life, city image generation.River
The black smelly origin cause of formation is other than leading to river channel ecology system destruction due to urban construction, and most importantly pollutant directly enters river and causes
External source pollution.
In existing black-odor riverway Treatment process, sewage interception along river, bed mud dredging, restoration of the ecosystem, the technologies such as clean water diversion
It is widely used, but since each technological means is there are respective limitation, is difficult to solve the problems, such as that river is black smelly in a short time.
Sewage interception along river, which refers to, lays wastewater interception pipe along river two sides, by it is originally in line enter river sewage access cut dirty pipe
Road, and it is delivered to sewage treatment plant, mitigate the in line impact to river water quality of sewage.But interception project implement engineering cost compared with
Height, implementation cycle are longer.After the completion of interception project, since the sewage of rain dirt hybrid junction accumulation is in rain in combined sewage and municipal pipeline
It can put river by pumping plant driving and enter river, influence river quality of water environment again.
Bed mud dredging is to blow the mud for depositing river bed using mechanical equipment to stir into the watery of muddiness, and transport extraction.Clearly
Deposit technique can reduce the endogenous pollution in river, but improper for the sludge handling of extraction be easy to cause secondary pollution.
River corridor restoration refers in river land-based area control line, is meeting the rivers basic training such as flood control, water drainage and diversion
On the basis of energy, urban river water ecosystem restoration is promoted by artificial reclamation activities, constructs healthy, complete, stable urban river water
The activity of the ecosystem.But the technology to black-odor riverway renovating effect there are limitation, rainfall day put river with pumping plant, pollute
Object can destroy river channel ecology system back into river.
Clean water diversion is to introduce polluted river channel upstream or neighbouring cleaning by the regulation of water conservancy projects (such as gate, pumping plant)
Water source enhances the diffusion, purification and output of water pollutant to improve the hydrodynamic conditions in river, being capable of rapid recovery water body
It is black smelly, but can not achieve the improvement steady in a long-term of black-odor riverway water quality.
For the black-odor riverway Treatment process applied at this stage there are long construction period, investment is big, and the limitation such as can not take effect in short term
Property.In addition, often river as before, it is clear long to cannot achieve Changzhi again multiple " black " after heavy rain.Tracing it to its cause is pollutant warp
Over long distances, it deposits to form mud in tube bottom after low flow velocity conveying, when catchment occurs, pumping plant rainwater pump group is opened, pipeline
Interior deposit is washed into water body.For combined flow system, when pipe diameter determing, considers that (pipeline is set for 2 ~ 5 times of interception ratio
The flow of meter is 3 ~ 6 times of dry flow sewage amount), flow velocity is lower in pipeline when dry days sewage transport, and dirty water pollutant can be in pipe
It is deposited in road.For separate flow system, the problems such as due to rain dirt hybrid junction, dry flow sewage enters storm sewer, and sewage passes through rainwater
The dirty pump that cuts of pumping plant is delivered to sewerage;Many drainage systems are in high water level operational mode, and rain pipe caliber is pressed 3 ~ 5 years
Return period designs (i.e. pipe design conveying capacity is tens times of dry flow sewage amount or more), and caliber is larger, and dry flow sewage is in rain
Flow velocity is lower in waterpipe, and polluter is deposited in tube bottom.
Since system high water level is run, tradition connects impulsive force that interim water pipe rinses and has been consumed at the pipeline access in 1m
Damage, mud is difficult to be washed, even if origin or beginning can also be deposited again by the deposit that instantaneous flow takes up in subsequent main pipe;It is external
It is only 100m that high-pressure water pipeline flushing device maximum, which rinses range, and Chinese large-sized sewerage system main pipe length is generally more than
1km, as Shanghai City large size drains conveying main pipe longest up to 55km.Therefore, a kind of automatic side for removing pipeline deposit is developed
Method and device, which put river pollution to reduction pumping plant, positive meaning, is to realize that black-odor riverway improvement Changzhi is necessary hand clearly long
Section.
Utility model content
The purpose of this utility model is just to provide a kind of device that automatic removing pipeline deposit is responsible for suitable for multichannel, leads to
The deposit cut down in municipal pipeline is crossed, the reduction rainy day puts the total amount of pollutant that river enters river by pumping plant, solves from source
The certainly black smelly problem in river, the effect for maintaining black-odor riverway to administer realize that Changzhi is clear long.
In order to achieve the above object, the technical solution of the utility model is as follows: one kind being suitable for the automatic removing of multichannel supervisor
The device of pipeline deposit, including in municipal drainage pumping plant Forebay of Pumping Station, cut dirty pump group, rainwater pump group, Forebay of Pumping Station and more
A drainage system general pipeline is connected, and Forebay of Pumping Station is respectively connected to cut dirty pump group and rainwater pump group, Forebay of Pumping Station and rain by pipeline
Withdrawal of currency from circulation water pipe is additionally provided between water pump group;It is characterized in that at least one access well, institute are arranged on each drainage system general pipeline
Access well is stated to connect by adding row pressure hydraulic piping with water pipe is steam again;It is equipped between described plus row pressure hydraulic piping and access well and rinses control
Valve processed is equipped with the second control valve, is equipped between the rainwater pump group and river between the withdrawal of currency from circulation water pipe and the Forebay of Pumping Station
Third control valve door.
Further, described plus row pressure hydraulic piping is pumped using closed steel pipe, ductile iron pipe, plastic tube etc. according to rainwater
Length, caliber and the buried depth of the parameter adjustment pipeline of group water pump.Pumping plant high for configuration pump head, flow is big, adds row pressure
Hydraulic piping length is long, caliber is relatively large;For configuring pump head is small, flow is small pumping plant, add row pressure hydraulic piping length it is shorter,
Caliber is relatively small;Buried depth of pipeline can be according to adding discharge pipe performance to be adjusted.
Further, it accesses toxic and harmful gas when setting deodorization device prevents the circulatory system from running in well and dissipates and overflow.
For according to drainage system actual conditions, multiple access wells are set in the different location of drainage system general pipeline, and set
Setting multichannel adds row pressure hydraulic piping to realize to drainage system multichannel supervisor simultaneously to the multiple access well by the control of valve
Or the flushing of timesharing, cut down deposit in pipeline.
Further, installation deposit monitors system in access well, to monitor thickness of deposits in drainage system general pipeline.
Further, it accesses in well and the refluence that anti-water recovery apparatus avoids circulating flushing wash water is set, guarantee flushing water for silt
Mud deposit is washed away.
Further, water quality monitoring system is installed in Forebay of Pumping Station, to monitor the water quality of Forebay of Pumping Station.
Further, when drainage system general pipeline caliber is larger, submersible agitator is installed in the inspection shaft of drainage system general pipeline,
Promote deposit to wash away, accelerates circulation flushing process.Various ways, including vertical installation, opposite peace can be used in blender installation
Be filled with and misorientation installation etc..
The utility model is followed using the draining pump and withdrawal of currency from circulation drainage facility of built Municipal pumping stations by adding to arrange all the way (or multichannel)
Ring flushing pipe forms pipeline hydraulic rinse-system, increases the flow velocity in pipeline, and realization is responsible for drainage system to multichannel is possessed
Pipeline deposit washes away, so that the river of putting for reducing rainy day pumping plant is polluted.The automatic removing pipeline deposit of the utility model fills
Set, dry days simulate the rainy day drive to put river when drainage system general pipeline in high flow rate scour process, tube bottom deposit is in dry days quilt
Reduction is washed away, the driving of rainy day pumping plant is greatly reduced and puts river and cause to pollute the risk into river.Described plus discharge pipe length, caliber can
It is designed according to drainage system general pipeline caliber and rainwater pump group device parameter.The circle irrigation system can sink according in pipeline
Product situation is flexibly run, and saves operating cost.
The method that reduction pipeline deposit provided by the utility model realizes that pumping plant puts pollution river reduction has the advantage that
(1) efficiently using existing facility, engineering measure is few, and investment for trnasforming urban land is small.
(2) operating method is simple, convenient for management.
(3) removal of pipeline deposit is obvious, and it is good to put river contamination control effect to pumping plant, quick.
(4) different system drainage systems, method wide application be can adapt to.
Detailed description of the invention
Fig. 1 is the process flow chart of the method and device of the automatic removing pipeline deposit of the utility model.
Fig. 2 circulation flushing operational mode schematic diagram.
The anti-water recovery apparatus schematic diagram of Fig. 3 Large Diameter Pipeline system superintendent.
The anti-water recovery apparatus schematic diagram of Fig. 4 small diameter tube system superintendent.
Specific embodiment
Specific embodiment of the present utility model is further described below in conjunction with attached drawing.
The utility model realizes that pumping plant puts the pipeline formed in the method for polluting river reduction by cutting down pipeline deposit
Rinse-system, as shown in Figure 1, the system includes:
Forebay of Pumping Station 11, section dirty pump group 12 in municipal drainage pumping plant 1, rainwater pump group 13, the withdrawal of currency from circulation water pipe 14, intelligent control
System and the additional row pressure hydraulic piping 51(52 ... 5n of pumping plant), the access well 61(62 ... 6n of reconstruction) and drainage system general pipeline 21
(22 ... 2n);Increase control valve 15 and control valve 16 after the withdrawal of currency from circulation water pipe 14 is engineered;Described plus row pressure hydraulic piping
51(52 ... 5n) be connected to steam again water pipe 14, and access drainage system general pipeline 21(22 ... 2n) on access well 6(62 ... 6n);It is described
1 control room of municipal drainage pumping plant increase intelligence control system, access well 6(62 ... 6n) in installation deposit monitor system, pumping plant
Water quality monitoring system is installed in forebay 11.
Washing control valve door 15 and the second control valve 16 for switching rainfall pumping station test run mode, pumping plant puts river mode and
Pipe flushing mode.The washing control valve door 15 is closed, when the second control valve 16 is opened and third control valve door 17 is closed,
Enter the test run mode of pumping plant daily maintenance when rainwater 13 turn on pump of pump group;Washing control valve door 15 is closed, the second control valve 16
It closes, third control valve door 17 enters rainy day pumping plant when opening and puts river mode;Washing control valve door 15 is opened, the second control valve
16 close, and third control valve door 17 enters pipe flushing mode when closing.
Add row pressure hydraulic piping 51,52,5n quoted from steaming again water pipe 14 in municipal drainage pumping plant 1, and adds row pressure hydraulic piping
51, switch valve 52, is installed respectively on 5n;Described plus row pressure hydraulic piping 51(52 ... 5n) it connects and steams again water pipe 14 and drainage system
General pipeline 21(22 ... 2n) on access well 61(62 ... 6n);The access well 61(62 ... 6n) it is drainage system general pipeline 21(22 ...
Inspection shaft on 2n) accesses after engineered and adds row pressure hydraulic piping 51(52 ... 5n), access well 61(62 ... 6n) according to deodorizing facility
Prevent foul smell during circulation flushing scattered excessive.
Rainwater, combined sewage, hybrid junction sewage in plot and branch pipe import drainage system general pipeline 21(22 ... 2n), and convey
To the Forebay of Pumping Station 11 of municipal drainage pumping plant 1.The siltation in pipeline forms pipeline deposition to pollutant in water during transportation
Object, the wastewater pollutants concentration for reaching Forebay of Pumping Station 11 is lower, cuts dirty pump group 12 and sewage of low concentration is only delivered to sewerage.
When municipal drainage pumping plant 1, which opens rainy day pumping plant, puts river mode, deposit can enter river with current scour in pipeline;
After pipe flushing mode starts, rainwater pump group 13 extracts the water in Forebay of Pumping Station 11, by steaming again water pipe 14 and adding
Row pressure hydraulic piping 51(52 ... 5n), be delivered to drainage system general pipeline 21(22 ... 2n) on access well 61(62 ... 6n), to mention
Rise access well 61(62 ... 6n) flow velocity into the pipeline of 11 drainage system general pipeline 21(22 ... 2n of Forebay of Pumping Station), tube bottom is deposited
Object is washed away, and pollutant concentration quickly increases in pipeline, and pollutant flows through Forebay of Pumping Station → withdrawal of currency from circulation water pipe → plus row with water flow
Pressure pipeline → drainage system general pipeline circulation;It cuts dirty pump group 12 and keeps continuous service, high-concentration sewage is delivered to city dirt
Water system;Access well 61(62 ... 6n) sewage of low concentration of upstream is supplemented into circle irrigation system and continues to wash away.
It can realize and drainage system general pipeline 21,22 ... 2n are rinsed simultaneously by the switching of control valve, it can also be with
Drainage system general pipeline 21,22 ... 2n are rinsed in realization stage by stage.
It is comprised the following steps using the method that the reduction pipeline deposit of the utility model realizes that pumping plant puts pollution river reduction:
Step 1, (ratio can be according to system actual conditions tune when thickness of deposits reaches the 20% of duct height in pipeline
It is whole), intelligence control system starts flushing process, and opening controlling valve door 15, closing control valve 16, closing control valve 17 opens
Open 1 ~ 2,13 moderate rain water pump of rainwater pump group.
Step 2, it cuts dirty pump group 12 and opens normal operation, continue Forebay of Pumping Station middle and high concentration sewage transport to municipal sewage
System.
Step 3, it after 11 water quality of Forebay of Pumping Station is gradually decreased and tended towards stability, can be selected according to deposit situation in pipeline
The rainwater pump for closing rainwater pump group 13, terminates to rinse;Cutting dirty pump group can choose whether to continue to run according to water level in system.
Drainage system general pipeline 21,22 ... 2n can be rinsed simultaneously by the switching of control valve, it can also be to row
Water system general pipeline 21,22 ... 2n are rinsed stage by stage, are realized the synchronous developing be responsible for drainage system multichannel and are alternately rinsed.
In the utility model, the Municipal pumping stations rainwater pump group, section dirty pump group, Forebay of Pumping Station are general Municipal pumping stations base
This facility can be applied to pipeline hydraulic rinse-system without transformation.The Municipal pumping stations rainwater pump group cuts dirty pump group, pumping plant
The matched equipment in forebay can be used directly, without transformation.
It is described to steam again the basic facilities that water pipe is general pumping plant, it is applied to pipeline hydraulic rinse-system after engineered.It is described
It steams again water pipe and adds the second control valve at access Forebay of Pumping Station, and increase bypass for connection plus row pressure hydraulic piping.It is described
Multichannel add row pressure hydraulic piping to lay from pumping plant to the access well on each road general pipeline of drainage system;Buried depth of pipeline, Guan Weike according to
Actual conditions freely adjust.The access well is the inspection shaft on drainage system general pipeline, and selection is closed with pumping plant distance, transformation difficulty
Suitable inspection shaft is transformed, access plus row pressure hydraulic piping, and in well indoor location deodorizing facility, when preventing rinse-system from running
Foul smell, which dissipates, to overflow.
Each road supervisor caliber of the drainage system of the multichannel supervisor is generally different, and the Municipal pumping stations of the end are generally arranged
Rainwater pump of different sizes, small pump lift is big, flow is small, opens small pump impulse and washes the lesser system superintendent of caliber, rinse distance compared with
It is long;Big pump lift is small, flow is big, to rinse the biggish system manifold of caliber, rinses apart from relatively short.
In the access well, back-flow preventer 7 can be installed in access plus row pressure hydraulic piping end.The back-flow preventer 7
Applied in the access well of Large Diameter Pipeline system manifold, the back-flow preventer arranges different pore size apopore (71 hole of large aperture hole
Diameter > in 72 apertures of pore > small size pores, 73 aperture), upper layer be arranged large aperture hole 71, guarantee conveyance capacity, middle layer sets mesoporous
Small size pores 73 are arranged in diameter hole 72, lower layer, increase lower layer's water discharge speed, play souring to tube bottom deposit, raising is washed away
Efficiency;The back-flow preventer 8 is applied to small diameter tube system manifold (general caliber≤DN1000), is not influencing area of passage
Under the premise of prevent circulating flushing wash water flow back.Row pressure hydraulic piping end is being added to form oblique angle, the nozzle height of the nearly borehole wall is lower than remote
Nozzle height from the borehole wall.
The intelligence control system includes deposit monitoring, Forebay of Pumping Station water quality monitoring system etc. in pipeline.The intelligence
The system of can control can automatically turn on according to pipeline deposition, terminate flushing process.
Deposit monitoring system is mostly installed in system superintendent in the pipeline, for monitoring thickness of deposits, to pipe
Deposit reaches certain proportion in road, opens circle irrigation system.
Carrying out pipe flushing in dry days is to carry out pipe flushing using idle rainwater pump group in non-rainfall day;The rainwater
Pump group configuration rainwater pump can be steam again on water pipe and newly-built pressure pipeline access general pipeline from drawing water and passing through in Forebay of Pumping Station
Inspection shaft realizes the flushing to deposit in access well to Forebay of Pumping Station segment pipe;The rainwater pump conveying energy of the rainwater pump group
Power is strong, can increase pipe flow speed in drainage system general pipeline, is conducive to washing away for deposit in pipeline.
Circulation flushing refers to that deposit can uniformly mix after washing away in pipeline in pipeline, and defeated via drainage system general pipeline
It send to Forebay of Pumping Station;Water in the Forebay of Pumping Station is taken by rainwater pump group rainwater pumping, defeated via withdrawal of currency from circulation water pipe and pressure pipeline
It send to access well.It moves in circles through this, Forebay of Pumping Station water pollutant concentration increases;Described section of dirty pump group continuous service, will be high
Concentration sewage transport is to urban sewage system, and low concentration of water enters back into the circulatory system before accessing well;By long-play, follow
Concentration of wastewater gradually reduces in ring rinse-system;Pipeline deposit is washed completely substantially in system manifold after access well.
After Forebay of Pumping Station water quality tends towards stability, i.e., deposit can stop recycling after washing away completely in pipeline after access well
System operation, energy saving;If long-time Municipal pumping stations rainwater pump group does not drive to put river, intelligent control after circulation flushing
System will restart flushing process.
Pipeline deposition fraction is lower when opening rinse-system, and the open frequency of automated development is higher, and deposit cuts down effect
Fruit is more preferable, but energy consumption is higher;Pipeline deposition fraction is higher when opening rinse-system, and the open frequency of automated development is lower, energy
Consumption is lower, but deposit reduction effect is weaker.
Described plus row pressure hydraulic piping is laid to the access well on each road general pipeline of drainage system, can be with by valve transfer
It realizes that multiloop loop system general pipeline is rinsed simultaneously, each road supervisor also may be implemented and alternately rinse.
The pipe flushing system is adapted to separate sewage system and combined drainage system.For separate system system
System, can be by the conveying capacity of shut off in amplification pumping plant facility scale and facility back end line (including sewage treatment facility
Processing capacity etc.), accelerate the speed that forebay water quality tends towards stability, reduce the time of flushing process, reduces energy consumption.Combined flow system
The facility scale that shuts off is larger, and this problem is not present.
The utility model realizes that pumping plant is put the reduced method maximum possible of river pollution and is utilized by cutting down pipeline deposit
Built urban operating mechanism, avoid tearing open greatly build in large scale under the premise of, strive realizing put pumping plant in a short time with smaller project inputs
River pollution control effectively.For caliber DN3600, the system manifold that about 1.6 kilometers of length passes through 10 hours or so pipes
Road rinse, can cut down wash away in range 80% or more pipeline deposit.
It is discussed in detail although the content of the utility model has passed through above preferred embodiment, but it should be appreciated that on
The description stated is not considered as limitations of the present invention.After those skilled in the art have read above content, for
A variety of modifications and substitutions of the utility model all will be apparent.Therefore, the protection scope of the utility model should be by appended
Claim limit.
Claims (7)
1. a kind of be responsible for the automatic device for removing pipeline deposit suitable for multichannel, before the pumping plant in municipal drainage pumping plant
Dirty pump group, rainwater pump group are cut in pond, and Forebay of Pumping Station is connected with multiple drainage system general pipeline, and Forebay of Pumping Station is separately connected by pipeline
To dirty pump group and rainwater pump group is cut, withdrawal of currency from circulation water pipe is additionally provided between Forebay of Pumping Station and rainwater pump group;It is characterized in that in each row
One access well of setting, the access well are connect by adding row pressure hydraulic piping with water pipe is steam again on water system general pipeline;Described plus row pressure
It is equipped with washing control valve door between hydraulic piping and access well, the second control valve is equipped between the withdrawal of currency from circulation water pipe and the Forebay of Pumping Station
Door is equipped with third control valve door between the rainwater pump group and river.
2. as described in claim 1 suitable for the automatic device for removing pipeline deposit of multichannel supervisor, which is characterized in that described
Add row pressure hydraulic piping using steel pipe, ductile iron pipe, plastic tube.
3. as described in claim 1 suitable for the automatic device for removing pipeline deposit of multichannel supervisor, which is characterized in that access
Deodorization device is set in well, and toxic and harmful gas, which dissipates, when preventing the circulatory system from running overflows.
4. as described in claim 1 suitable for the automatic device for removing pipeline deposit of multichannel supervisor, which is characterized in that arranging
Multiple access wells are arranged in the different location of water system general pipeline, and multichannel is arranged and adds row pressure hydraulic piping to the multiple access well, lead to
It crosses the control of valve, realizes to drainage system multichannel supervisor simultaneously or the flushing of timesharing, cut down deposit in pipeline.
5. as described in claim 1 suitable for the automatic device for removing pipeline deposit of multichannel supervisor, which is characterized in that draining
Submersible agitator is installed in the inspection shaft of system manifold.
6. as described in claim 1 suitable for the automatic device for removing pipeline deposit of multichannel supervisor, which is characterized in that access
Installation deposit monitors system in well, to monitor thickness of deposits in drainage system general pipeline.
7. as claimed in claim 6 suitable for the automatic device for removing pipeline deposit of multichannel supervisor, which is characterized in that pumping plant
Water quality monitoring system is installed, to monitor the water quality of Forebay of Pumping Station in forebay.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821613303.0U CN209523268U (en) | 2018-09-30 | 2018-09-30 | It is a kind of to be responsible for the automatic device for removing pipeline deposit suitable for multichannel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821613303.0U CN209523268U (en) | 2018-09-30 | 2018-09-30 | It is a kind of to be responsible for the automatic device for removing pipeline deposit suitable for multichannel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209523268U true CN209523268U (en) | 2019-10-22 |
Family
ID=68212535
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821613303.0U Active CN209523268U (en) | 2018-09-30 | 2018-09-30 | It is a kind of to be responsible for the automatic device for removing pipeline deposit suitable for multichannel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209523268U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235605A (en) * | 2018-09-30 | 2019-01-18 | 上海市政工程设计研究总院(集团)有限公司 | It is a kind of to be responsible for the automatic device for removing pipeline deposit suitable for multichannel |
-
2018
- 2018-09-30 CN CN201821613303.0U patent/CN209523268U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235605A (en) * | 2018-09-30 | 2019-01-18 | 上海市政工程设计研究总院(集团)有限公司 | It is a kind of to be responsible for the automatic device for removing pipeline deposit suitable for multichannel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109235602A (en) | A kind of pipeline deposit automatic clearing apparatus steaming again water pipe by pumping plant | |
CN206859397U (en) | The flushing desilting system of gravity stream sewage pipe in pipe gallery | |
CN104196118B (en) | A kind of pond automatic vacuum rinses Accrete clearing device and method | |
CN107761900A (en) | It is a kind of to carry the double shunting wells of flap gate including the drainage system of the shunting well and water discharge control method | |
CN109629657A (en) | A kind of multiple-effect multiplication storage pond | |
CN203684373U (en) | Equipment for improving urban waterlogging prevention standard and controlling water pollution | |
CN105178425B (en) | Cities and towns water drainage, moisturizing, water-change pump station hinge | |
CN104975648A (en) | Combined system underground initial rainwater storage tank | |
CN106545069A (en) | Method for treating urban black and odorous water by serially connecting sewage interception and collection pipes | |
CN106223455A (en) | A kind of drainage pipeline automatic dash turnover panel dams flusher | |
CN103669547A (en) | Method and equipment for raising urban water-logging prevention standard and controlling water pollution | |
CN114045915B (en) | System that dams that has function of washing to rain sewage deposit in pipe network | |
CN109235604A (en) | A method of automatic removing pipeline deposit is responsible for suitable for multichannel | |
CN209523268U (en) | It is a kind of to be responsible for the automatic device for removing pipeline deposit suitable for multichannel | |
CN107605005A (en) | A kind of drainage system and water discharge control method arranged with waterpower non-return weir gate and pump | |
CN204753798U (en) | Confluence system underground initial stage rainwater regulation pond | |
CN109235605A (en) | It is a kind of to be responsible for the automatic device for removing pipeline deposit suitable for multichannel | |
CN206245390U (en) | A kind of culvert pipe water channeling type pumping plant | |
CN109235603A (en) | A method of water pipe is steam again by pumping plant and realizes automatic removing pipeline deposit | |
CN209523269U (en) | A kind of pipeline deposit automatic clearing apparatus steaming again water pipe by pumping plant | |
CN109629656A (en) | A method of realizing that municipal drainage pumping plant puts river contamination control using storage pond | |
CN207760985U (en) | A kind of band surges the drainage system of bottom-open type weir gate and pump row | |
CN207436244U (en) | A kind of pipe flushing system | |
CN106592748A (en) | Storage and utilization system for underwater initial rainwater | |
CN210857472U (en) | Bury formula dispersion regulation storage battery system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |