CN209522474U - A kind of hanging apparatus of tee girder template - Google Patents

A kind of hanging apparatus of tee girder template Download PDF

Info

Publication number
CN209522474U
CN209522474U CN201822092182.6U CN201822092182U CN209522474U CN 209522474 U CN209522474 U CN 209522474U CN 201822092182 U CN201822092182 U CN 201822092182U CN 209522474 U CN209522474 U CN 209522474U
Authority
CN
China
Prior art keywords
connecting plate
pin shaft
hole
pass
tee girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822092182.6U
Other languages
Chinese (zh)
Inventor
杨明波
徐红
荣祥峰
梁海滨
白代柱
何晴
李元
许传栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG TIEYING CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
SHANDONG TIEYING CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG TIEYING CONSTRUCTION ENGINEERING Co Ltd filed Critical SHANDONG TIEYING CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201822092182.6U priority Critical patent/CN209522474U/en
Application granted granted Critical
Publication of CN209522474U publication Critical patent/CN209522474U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a kind of hanging apparatus of tee girder template, including shoulder pole, fixture and pin shaft, the shoulder pole includes cross supporting frame and otic placode, the mounting hole that pin shaft may pass through is provided in the middle part of otic placode, otic placode two are one group, are set as multiple groups, are fixedly connected on the lower part of cross supporting frame;The fixture includes support tube, connecting plate and lower connecting plate, and the through-hole that pin shaft may pass through is provided on connecting plate, and the lower connecting plate setting is provided with the connecting hole that pin shaft may pass through on support tube front lower portion two sides, lower connecting plate;The fixture is extend between two otic placodes to form one group by connecting plate, connecting plate is detachably connected with otic placode by pin shaft, the bracket end of the tee girder template lifted is provided with the hole that pin shaft may pass through, and the bracket of tee girder template is detachably connected by pin shaft and lower connecting plate.The utility model can prevent tee girder formwork hoisting deform, have it is structurally reasonable, facilitate attended operation, lift stable feature.

Description

A kind of hanging apparatus of tee girder template
Technical field
The utility model relates to formwork hoisting technical fields, more specifically, in particular to a kind of lifting of tee girder template Device.
Background technique
Refer to that cross-sectional form is the beam of T-type.Two sides choose part and are known as the edge of a wing, and intermediate portion is known as beam rib or web. Since it is the equal of being formed after cutting out in rectangular beam to the inoperative concrete in tension zone of bending strength.With original square Shape bending strength is identical outer, but can not only save concrete, but also mitigate the self weight of component, improve span ability.Therefore, Tee girder is widely adopted in the constructions such as science of bridge building.Tee girder when building, be usually used tee girder pouring template and At then carrying out concrete casting again first by tee girder formwork hoisting to detail design position.Tee girder template volume is big, weight Heavy, there be a bracket or reinforcing bar much stretched out in edge part, and most brackets be not it is equally distributed, tradition lifting is using steel Cord is wound on the bracket at tee girder template both ends and is lifted by crane, and wirerope top is to slope inwardly during lifting, Since tee girder template volume is big, heavy, wirerope is easy inwardly to pull bracket, support force when lifting be it is inclined, because This bracket is easy to produce deformation, influences subsequent construction.The technical problems to be solved in the utility model is how to provide a kind of lifting T The hanging apparatus that its bracket is not deformed when ellbeam template.
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of structurally reasonable, facilitates attended operation, and lifting is steady Hanging apparatus that is fixed, preventing tee girder formwork hoisting from deforming.
The technical solution adopted in the utility model is: a kind of hanging apparatus of tee girder template, it is characterized in that: include shoulder pole, Fixture and pin shaft, the shoulder pole include cross supporting frame and otic placode, and hole for hoist, the otic placode middle part are provided in the middle part of cross supporting frame It is provided with the mounting hole that pin shaft may pass through, otic placode two are one group, multiple groups are set as, the lower part of cross supporting frame is fixedly connected on, The setting of two otic placode intervals and its mounting hole in every group is opposite;The fixture includes support tube, connecting plate and lower connecting plate, Support tube is set as the hollow body that section is rectangle, and connecting plate is two, after being separately positioned on support tube top front end in Portion is provided with the through-hole that pin shaft may pass through on connecting plate, and distribution is provided with multiple on the connecting plate of support tube middle and back The through-hole that pin shaft may pass through, the even axial direction along support tube of two connecting plates are arranged, and the lower connecting plate is two pieces, is separately positioned on Support tube front lower portion two sides are provided with the connecting hole that pin shaft may pass through on lower connecting plate;The fixture passes through connecting plate It extend between two otic placodes to form one group, and is detachably connected by pin shaft and otic placode, the tee girder template lifted Bracket end be provided with the hole that pin shaft may pass through, the bracket of tee girder template by pin shaft and the lower connecting plate of fixture lower part into Row is detachably connected.
As a kind of preferred structure of the utility model, the cross supporting frame includes crossbeam and stiffener plate, and crossbeam is T The two sides of crossbeam are arranged in shape structure, stiffener plate.
Compared with the prior art, the advantages of the utility model are:
1, the utility model devise shoulder pole as lifting rigidity supporting element, use the fixture of installation easy to disassemble as with The connector of tee girder template, in this way in hoisting process, the bracket being connect in tee girder template with hanging apparatus it is even for vertically by Power avoids stress deformation;
2, due to the weight of tee girder template two sides be it is non-uniform, the distribution of bracket be also it is non-uniform, this is practical new Otic placode is set multiple groups by type, sets multiple, it can be achieved that each group for the through-hole that connecting plate is set as on two and connecting plate Facilitate connection between piece installing, in addition, multiple through-holes are arranged on connecting plate can be also used for the tee girder template of adjustment its underpart connection Center of gravity, i.e., according to tee girder template self structure situation selection using different location through-hole and top otic placode connect, with true The tee girder template center of gravity for protecting fixture lower part is placed in the middle, prevents tee girder template during lifting from tilting, keeps hoisting process more stable.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of fixture;
Fig. 3 is the cross-sectional view of Fig. 2.
Fig. 4 is the cross-sectional view for the cross supporting frame that embodiment is T-shaped structure.
Specific embodiment
The preferred embodiment of the utility model is described in detail with reference to the accompanying drawing, so that the advantages of the utility model It can be easier to be readily appreciated by one skilled in the art with feature, to make the protection scope of the utility model apparent clear Define.
As shown in fig.1, the utility model provides a kind of hanging apparatus of tee girder template, including shoulder pole, 5 and of fixture Pin shaft 4, the shoulder pole include cross supporting frame 1 and otic placode 2, and hole for hoist 20 is provided in the middle part of cross supporting frame 1, which is used for It is attached with gantry crane, realizes lifting.The mounting hole 3 that pin shaft 4 may pass through, otic placode 2 two are provided in the middle part of the otic placode 2 It is one group, is set as multiple groups, is fixedly connected on the lower part of cross supporting frame 1, the setting of two otic placodes 2 interval and its peace in every group It is opposite to fill hole 3, i.e., otic placode 2 is longitudinally disposed, and for usual two otic placodes, 2 spacing distance generally in 950mm-3200mm, pin shaft 4 can be same When across each group of otic placode 2 mounting hole 3, connect for the fixture 5 with lower part.The fixture 5 includes support tube 9, connecting plate 7 With lower connecting plate 10, support tube 9 is set as the hollow body that section is rectangle, and connecting plate 7 is two, is separately positioned on support tube 9 tops front end and middle and back are provided with the through-hole 8 that pin shaft 4 may pass through, the connection positioned at 9 middle and back of support tube on connecting plate 7 Distribution is provided with the through-hole 8 that multiple pin shafts 4 may pass through on plate 7, i.e. the connecting plate 7 at rear portion is located on support tube 9 and is prolonged by middle part Rear end, the even axial direction setting along support tube 9 of two connecting plates 7 are reached, and is located at the position of center line of 9 top surface of support tube.It is described Lower connecting plate 10 is two pieces, is separately positioned on 9 front lower portion two sides of support tube, being provided with pin shaft 4 on lower connecting plate 10 can wear The connecting hole crossed.The fixture 5 is extend between two otic placodes 2 to form one group by connecting plate 7, connecting plate 7 and otic placode 2 It is detachably connected by pin shaft 4,6 end of bracket of the tee girder template lifted is provided with the hole that pin shaft 4 may pass through, T shape The bracket 6 of beam forms is extend between two lower connecting plates 10, is then detachably connected by pin shaft 4 with lower connecting plate 10. In this way, gantry crane is again by the hole for hoist 20 on shoulder pole to hanging apparatus and T after tee girder template is connect by fixture 5 with shoulder pole Ellbeam template carries out lifting construction.
Cross supporting frame 1 in the utility model can be box typed structure or plank frame, can also be T-shaped structure, this The cross supporting frame 1 of embodiment is T-shaped structure, including crossbeam 11, riser 12 and stiffener plate 13, and crossbeam 11 is rectangular tube structure, The setting of riser 12 forms inverted T-shaped structure on 11 top of crossbeam, and the two sides of crossbeam 11 and riser 12 are arranged in stiffener plate 13, lifts The setting of hole 20 is at 12 middle part of riser.The cross supporting frame 1 of T-shaped structure, which has, improves support strength.
The utility model can prevent tee girder formwork hoisting from deforming, and have structurally reasonable, facilitate attended operation, lifting is stablized The characteristics of.

Claims (2)

1. a kind of hanging apparatus of tee girder template, it is characterized in that: including shoulder pole, fixture and pin shaft, the shoulder pole includes horizontal support Frame and otic placode, cross supporting frame middle part are provided with hole for hoist, are provided with the mounting hole that pin shaft may pass through, otic placode in the middle part of the otic placode Two are one group, are set as multiple groups, are fixedly connected on the lower part of cross supporting frame, and two otic placode intervals in every group are arranged and it Mounting hole is opposite;The fixture includes support tube, connecting plate and lower connecting plate, and support tube is set as the hollow pipe that section is rectangle Body, connecting plate are two, are separately positioned on support tube top front end and middle and back, are provided with what pin shaft may pass through on connecting plate Through-hole, distribution is provided with the through-hole that multiple pin shafts may pass through, two even edges of connecting plate on the connecting plate of support tube middle and back The axial setting of support tube, the lower connecting plate are two pieces, are separately positioned on support tube front lower portion two sides, on lower connecting plate It is provided with the connecting hole that pin shaft may pass through;The fixture is extend between two otic placodes to form one group by connecting plate, and It being detachably connected by pin shaft and otic placode, the bracket end of the tee girder template lifted is provided with the hole that pin shaft may pass through, The bracket of tee girder template is detachably connected by pin shaft and the lower connecting plate of fixture lower part.
2. a kind of hanging apparatus of tee girder template according to claim 1, it is characterised in that: the cross supporting frame includes Crossbeam and stiffener plate, crossbeam are inverted T-shaped structure, and the two sides of crossbeam are arranged in stiffener plate.
CN201822092182.6U 2018-12-13 2018-12-13 A kind of hanging apparatus of tee girder template Active CN209522474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822092182.6U CN209522474U (en) 2018-12-13 2018-12-13 A kind of hanging apparatus of tee girder template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822092182.6U CN209522474U (en) 2018-12-13 2018-12-13 A kind of hanging apparatus of tee girder template

Publications (1)

Publication Number Publication Date
CN209522474U true CN209522474U (en) 2019-10-22

Family

ID=68226702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822092182.6U Active CN209522474U (en) 2018-12-13 2018-12-13 A kind of hanging apparatus of tee girder template

Country Status (1)

Country Link
CN (1) CN209522474U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118790864A (en) * 2024-09-11 2024-10-18 中铁二局集团有限公司 A shoulder beam for hoisting a main beam component and a main beam component hoisting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118790864A (en) * 2024-09-11 2024-10-18 中铁二局集团有限公司 A shoulder beam for hoisting a main beam component and a main beam component hoisting method

Similar Documents

Publication Publication Date Title
CN206521197U (en) A kind of adjustable balance hoisting beam
CN209583387U (en) Be used for adjustable hoist of assembled stair hoist and mount
CN213141129U (en) An adjustable multi-point parallel hoisting device suitable for flexible long-line hanging objects
CN206720558U (en) A kind of adjustable steel-reinforcement cage hanger
CN210150563U (en) Steel reinforcement framework lifting appliance suitable for lifting prefabricated section beam
CN211736322U (en) Climb a fabricated wall auxiliary device
CN113443546A (en) Lifting appliance suitable for special-shaped box girder
CN208981167U (en) Suspension type constructing tie beam device
CN204079226U (en) A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts
CN109305619A (en) A kind of building hoist guide rail bracket
CN207552941U (en) Tooth block tensioning equipment mobile formwork on roof box in a kind of cast-in-situ continuous beam
CN211499707U (en) Construction platform with adjustable elevartor shaft
CN205932904U (en) Lifting device is assisted to hanging beam
CN110683452A (en) Lower lifting point for integral lifting of steel structure corridor and use method thereof
CN108708281A (en) A kind of porous freely-supported approximation arch steel truss beam erection method
CN110436333B (en) Auxiliary force-applying structure and construction method for steel structure hoisting
CN204675726U (en) Purlin lifting auxiliary device
CN215210545U (en) Hoisting structure for UHPC (ultra high performance polycarbonate) short-rib prefabricated slab
CN205741935U (en) The mounting and positioning device of Wavelike steel webplate
CN211310536U (en) Web hoisting support for wind driven generator blade production
CN114572804B (en) A sling system and method of using the same
CN206872268U (en) T beams are revealed all the details suspender
CN220723303U (en) Lengthened steel plate hanging beam
CN206090314U (en) Steel anchor beam lifting sling
CN101457516A (en) Hanging method of multilayer horizontal inhaul cable and special catwalk

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant