CN209457363U - Building external climbing type building construction operation platform - Google Patents

Building external climbing type building construction operation platform Download PDF

Info

Publication number
CN209457363U
CN209457363U CN201920073214.XU CN201920073214U CN209457363U CN 209457363 U CN209457363 U CN 209457363U CN 201920073214 U CN201920073214 U CN 201920073214U CN 209457363 U CN209457363 U CN 209457363U
Authority
CN
China
Prior art keywords
platform
boom
pulley
locking screw
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920073214.XU
Other languages
Chinese (zh)
Inventor
冯陆军
张爱国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG INSTITUTE OF TECHNOLOGY
Original Assignee
NANTONG INSTITUTE OF TECHNOLOGY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG INSTITUTE OF TECHNOLOGY filed Critical NANTONG INSTITUTE OF TECHNOLOGY
Priority to CN201920073214.XU priority Critical patent/CN209457363U/en
Application granted granted Critical
Publication of CN209457363U publication Critical patent/CN209457363U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

本实用新型公开了一种建筑物外部爬升式建筑施工操作平台,包括活动平台一、限位块、连接平台、限位槽一、滑轮一、卷扬机一、滑轮二、活动平台二、限位槽二、限位块二、锁紧螺钉二、卡孔二、卡孔一、锁紧螺钉一、吊臂一、卷扬机二和吊臂二;本实用新型具有结构合理简单,这里可以根据需要调节活动平台一和活动平台二伸出的距离,从而提高了施工的面积,也就提高了施工的效率;本实用新型中设置的锁紧螺钉,能够对伸出后活动平台进行固定,从而提高了施工时候的安全性;本实用新型中的卷扬机一收紧拉绳,能够对本操作平台底部进行拉紧,从而保证了使用时本操作平台不会出现大幅晃动的现象,也就提高了施工的效率和效果。

The utility model discloses a building external climbing type construction operation platform, comprising a movable platform 1, a limit block, a connecting platform, a limit groove 1, a pulley 1, a hoist, a pulley 2, a movable platform 2, and a limit groove Two, limit block two, locking screw two, clamping hole two, clamping hole one, locking screw one, boom one, winch two and boom two; The extended distance between the first platform and the second movable platform increases the construction area and improves the construction efficiency; the locking screw provided in the utility model can fix the extended movable platform, thus improving the construction efficiency. When the hoist in the utility model tightens the pull rope, it can tighten the bottom of the operating platform, thereby ensuring that the operating platform will not shake greatly during use, and improving the efficiency and efficiency of construction. Effect.

Description

一种建筑物外部爬升式建筑施工操作平台A climbing type construction operation platform outside a building

技术领域:Technical field:

本实用新型涉及建筑施工设备技术领域,特别涉及一种建筑物外部爬升式建筑施工操作平台。The utility model relates to the technical field of building construction equipment, in particular to a climbing type building construction operation platform outside a building.

背景技术:Background technique:

建筑施工操作平台是一种能够替代传统脚手架,可减轻劳动强度,提高工作效率,并能够重复使用的新型高处作业设备,并且在高层多层高建筑的外墙施工、幕墙安装、保温施工和维修清洗等高空作业中得到广泛认可,而现有的建筑物外部操作平台功能比较简单,另外使用也比较麻烦,从而严重影响了施工的效率。The building construction operation platform is a new type of high-altitude operation equipment that can replace traditional scaffolding, reduce labor intensity, improve work efficiency, and can be reused. It is used in exterior wall construction, curtain wall installation, thermal insulation construction and It has been widely recognized in high-altitude operations such as maintenance and cleaning, but the existing external operating platforms of buildings have relatively simple functions and are cumbersome to use, which seriously affects the efficiency of construction.

实用新型内容:Utility model content:

本实用新型的目的就在于为了解决上述问题而提供一种建筑物外部爬升式建筑施工操作平台,解决了现有的建筑物外部操作平台功能比较简单,另外使用也比较麻烦,从而严重影响了施工效率的问题。The purpose of this utility model is to provide a climbing-type building construction operating platform outside the building in order to solve the above problems, which solves the problem that the existing operating platform outside the building has relatively simple functions and is troublesome to use, which seriously affects the construction. The problem of efficiency.

为了解决上述问题,本实用新型提供了一种技术方案:一种建筑物外部爬升式建筑施工操作平台,包括建筑物,其创新点在于:还包括活动平台一、限位块、连接平台、限位槽一、滑轮一、卷扬机一、滑轮二、活动平台二、限位槽二、限位块二、锁紧螺钉二、卡孔二、卡孔一、锁紧螺钉一、吊臂一、卷扬机二和吊臂二;所述活动平台一横向活动连接在连接平台左侧内部,所述活动平台一下侧中横向设有限位槽一,所述活动平台一上侧中横向设有数个卡孔一;所述限位块位于限位槽一中,所述限位块底部固定连接在连接平台内部底面左侧;所述滑轮一位于连接平台左下侧,所述滑轮一底部固定连接在地面上;所述滑轮二位于连接平台右下侧,所述滑轮二底部固定连接在地面上;所述卷扬机一位于滑轮一和滑轮二之间,所述卷扬机一底部固定连接在地面上,所述卷扬机一中的两个拉绳分别通过滑轮一和滑轮二与连接平台底部左右两侧相连接;所述活动平台二横向活动连接在连接平台内部右侧,所述活动平台二下侧中横向设有限位槽二,所述活动平台二上侧中横向设有数个卡孔二;所述限位块二位于限位槽二中,所述限位块二底部固定连接在连接平台内部底面右侧;所述锁紧螺钉二活动连接在连接平台右上侧竖向螺纹孔中,所述锁紧螺钉二底部与卡孔二相连;所述锁紧螺钉一活动连接在连接平台左上侧竖向螺纹孔中,所述锁紧螺钉一底部与卡孔一相连;所述吊臂一位于连接平台左上侧,所述吊臂一后侧固定连接在建筑物顶部上,所述吊臂一后侧上固定连接有卷扬机二;所述吊臂二位于连接平台右上侧,所述吊臂二后侧固定连接在建筑物顶部上;所述卷扬机二中的两个拉绳分别通过吊臂一和吊臂二中的导轮与连接平台顶部左右两侧相连接。In order to solve the above problems, the utility model provides a technical solution: a climbing type construction operation platform outside a building, including a building. Position slot 1, pulley 1, winch 1, pulley 2, movable platform 2, limit slot 2, limit block 2, locking screw 2, clamping hole 2, clamping hole 1, locking screw 1, boom 1, hoist Two and boom two; the movable platform one is horizontally movably connected to the left side of the connecting platform, the lower side of the movable platform is provided with a limit groove one horizontally, and the upper side of the movable platform one is horizontally provided with several clamping holes one The limiting block is located in the limiting groove one, and the bottom of the limiting block is fixedly connected to the left side of the inner bottom surface of the connection platform; the first pulley is located on the lower left side of the connecting platform, and the bottom of the first pulley is fixedly connected to the ground; The second pulley is located on the lower right side of the connecting platform, and the bottom of the second pulley is fixedly connected to the ground; The two stay ropes in the center are respectively connected to the left and right sides of the bottom of the connecting platform through the first pulley and the second pulley; the second movable platform is connected horizontally to the right side inside the connecting platform, and the lower side of the second movable platform is laterally provided with a limit Groove 2, several clamping holes 2 are arranged horizontally in the upper side of the movable platform 2; the limiting block 2 is located in the limiting groove 2, and the bottom of the limiting block 2 is fixedly connected to the right side of the inner bottom surface of the connecting platform; The second locking screw is movably connected in the vertical threaded hole on the upper right side of the connecting platform, and the bottom of the second locking screw is connected to the second locking hole; the first locking screw is movably connected in the vertical threaded hole on the upper left side of the connecting platform, The bottom of the locking screw is connected with the clamping hole one; the boom one is located on the upper left side of the connection platform, the rear side of the boom one is fixedly connected to the top of the building, and the rear side of the boom one is fixedly connected with Hoist two; said boom two is located on the upper right side of the connecting platform, and the rear side of said boom two is fixedly connected on the top of the building; the two stay ropes in said hoist two respectively pass through the booms in boom one and boom two. The guide wheels are connected with the left and right sides of the top of the connecting platform.

作为优选,所述卷扬机一和卷扬机二均为双卷筒卷扬机。Preferably, the first hoist and the second hoist are double-drum hoists.

作为优选,所述连接平台底部四角位置均设有支撑块。Preferably, support blocks are provided at the four corners of the bottom of the connecting platform.

作为优选,所述锁紧螺钉二和锁紧螺钉一的顶部均设有固定手柄。Preferably, the tops of the second locking screw and the first locking screw are provided with fixed handles.

作为优选,所述锁紧螺钉二和锁紧螺钉一的下侧均设有倒角。Preferably, the undersides of the second locking screw and the first locking screw are provided with chamfers.

作为优选,所述吊臂一和吊臂二的后侧均设有固定座。Preferably, the rear sides of the first boom and the second boom are both provided with fixing seats.

作为优选,所述吊臂一和吊臂二的内部前侧以及中央均设有导轮。Preferably, guide wheels are provided on the inner front side and the center of the first and second booms.

本实用新型的有益效果:The beneficial effects of the utility model:

(1)本实用新型具有结构合理简单、生产成本低、安装方便,功能齐全,这里可以根据需要调节活动平台一和活动平台二伸出的距离,从而提高了施工的面积,也就提高了施工的效率。(1) The utility model has the advantages of reasonable and simple structure, low production cost, convenient installation and complete functions. Here, the protruding distance of movable platform 1 and movable platform 2 can be adjusted according to needs, thereby increasing the construction area and improving the construction efficiency. s efficiency.

(2)本实用新型中设置的锁紧螺钉,能够对伸出后活动平台进行固定,从而提高了施工时候的安全性。(2) The locking screw provided in the utility model can fix the movable platform after stretching out, thereby improving the safety during construction.

(3)本实用新型中的卷扬机一收紧拉绳,能够对本操作平台底部进行拉紧,从而保证了使用时本操作平台不会出现大幅晃动的现象,也就提高了施工的效率和效果。(3) As soon as the hoist in the utility model tightens the stay rope, the bottom of the operating platform can be tightened, thereby ensuring that the operating platform does not shake greatly during use, and the efficiency and effect of construction are also improved.

附图说明:Description of drawings:

为了易于说明,本实用新型由下述的具体实施及附图作以详细描述。For ease of illustration, the utility model is described in detail by the following specific implementation and accompanying drawings.

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图2为本实用新型的局部侧视图。Fig. 2 is a partial side view of the utility model.

图3为本实用新型的局部俯视图。Fig. 3 is a partial top view of the utility model.

1-建筑物;2-活动平台一;3-限位块;4-连接平台;5-限位槽一;6-滑轮一;7-卷扬机一;8-滑轮二;9-活动平台二;10-限位槽二;11-限位块二;12-锁紧螺钉二;13-卡孔二;14-卡孔一;15-锁紧螺钉一;16-吊臂一;17-卷扬机二;18-吊臂二。1-building; 2-movable platform 1; 3-limiting block; 4-connecting platform; 5-limiting slot 1; 6-pulley 1; 7-hoisting machine 1; 8-pulley 2; 10-Limiting groove 2; 11-Limiting block 2; 12-Locking screw 2; 13-Clamping hole 2; 14-Clamping hole 1; ; 18 - boom two.

具体实施方式:Detailed ways:

如图1和图3所示,本具体实施方式采用以下技术方案:一种建筑物外部爬升式建筑施工操作平台,包括建筑物1,还包括活动平台一2、限位块3、连接平台4、限位槽一5、滑轮一6、卷扬机一7、滑轮二8、活动平台二9、限位槽二10、限位块二11、锁紧螺钉二12、卡孔二13、卡孔一14、锁紧螺钉一15、吊臂一16、卷扬机二17和吊臂二18;所述活动平台一2横向活动连接在连接平台4左侧内部,所述活动平台一2下侧中横向设有限位槽一5,所述活动平台一2上侧中横向设有数个卡孔一14;所述限位块3位于限位槽一5中,所述限位块3底部固定连接在连接平台4内部底面左侧;所述滑轮一6位于连接平台4左下侧,所述滑轮一6底部固定连接在地面上;所述滑轮二8位于连接平台4右下侧,所述滑轮二8底部固定连接在地面上;所述卷扬机一7位于滑轮一6和滑轮二8之间,所述卷扬机一7底部固定连接在地面上,所述卷扬机一7中的两个拉绳分别通过滑轮一6和滑轮二8与连接平台4底部左右两侧相连接;所述活动平台二9横向活动连接在连接平台4内部右侧,所述活动平台二9下侧中横向设有限位槽二10,所述活动平台二9上侧中横向设有数个卡孔二13;所述限位块二11位于限位槽二10中,所述限位块二11底部固定连接在连接平台4内部底面右侧;所述锁紧螺钉二12活动连接在连接平台4右上侧竖向螺纹孔中,所述锁紧螺钉二12底部与卡孔二13相连;所述锁紧螺钉一15活动连接在连接平台4左上侧竖向螺纹孔中,所述锁紧螺钉一15底部与卡孔一14相连;所述吊臂一16位于连接平台4左上侧,所述吊臂一16后侧固定连接在建筑物1顶部上,所述吊臂一16后侧上固定连接有卷扬机二17;所述吊臂二18位于连接平台4右上侧,所述吊臂二18后侧固定连接在建筑物1顶部上;所述卷扬机二17中的两个拉绳分别通过吊臂一16和吊臂二18中的导轮与连接平台4顶部左右两侧相连接。As shown in Fig. 1 and Fig. 3, this specific embodiment adopts the following technical solutions: a kind of building external climbing type construction operation platform, including building 1, also includes movable platform one 2, limit block 3, connecting platform 4 , limit groove one 5, pulley one 6, winch one 7, pulley two 8, movable platform two 9, limit groove two 10, limit block two 11, locking screw two 12, clamping hole two 13, clamping hole one 14. Locking screw one 15, boom one 16, winch two 17 and boom two 18; the movable platform one 2 is laterally movably connected to the left side of the connection platform 4, and the lower side of the movable platform one 2 is horizontally arranged Limiting slot one 5, several clamping holes one 14 are horizontally provided in the upper side of the movable platform one 2; the limiting block 3 is located in the limiting slot one 5, and the bottom of the limiting block 3 is fixedly connected to the connecting platform 4, the left side of the inner bottom surface; the first pulley 6 is located on the lower left side of the connection platform 4, and the bottom of the first pulley 6 is fixedly connected to the ground; the second pulley 8 is located on the lower right side of the connection platform 4, and the bottom of the second pulley 8 is fixed Connected on the ground; the hoist one 7 is located between the first pulley 6 and the second pulley 8, the bottom of the hoist one 7 is fixedly connected on the ground, and the two stay ropes in the hoist one 7 pass through the first pulley 6 and the second pulley respectively. The two 8 pulleys are connected with the left and right sides of the bottom of the connecting platform 4; the movable platform 2 9 is laterally movably connected to the right side of the connecting platform 4 inside, and the movable platform 2 9 is horizontally provided with a limiting groove 2 10 in the lower side of the movable platform 9, and the The upper side of the movable platform 9 is horizontally provided with several clamping holes 2 13; the limiting block 2 11 is located in the limiting groove 2 10, and the bottom of the limiting block 2 11 is fixedly connected to the right side of the inner bottom surface of the connecting platform 4; The second locking screw 12 is movably connected in the vertical threaded hole on the upper right side of the connecting platform 4, the bottom of the second locking screw 12 is connected with the second hole 13; the first locking screw 15 is movably connected on the upper left side of the connecting platform 4 In the side vertical threaded hole, the bottom of the locking screw one 15 is connected with the clamping hole one 14; the boom one 16 is located on the upper left side of the connection platform 4, and the rear side of the boom one 16 is fixedly connected to the top of the building 1 Above, the hoist two 17 is fixedly connected to the rear side of the first boom 16; the second boom 18 is located on the upper right side of the connection platform 4, and the rear side of the second boom 18 is fixedly connected to the top of the building 1; Two stay ropes in the winch two 17 are connected with the left and right sides of the top of the connecting platform 4 by guide wheels in the boom one 16 and the boom two 18 respectively.

其中,所述卷扬机一7和卷扬机二17均为双卷筒卷扬机;所述连接平台4底部四角位置均设有支撑块;所述锁紧螺钉二12和锁紧螺钉一15的顶部均设有固定手柄;所述锁紧螺钉二12和锁紧螺钉一15的下侧均设有倒角;所述吊臂一16和吊臂二18的后侧均设有固定座;所述吊臂一16和吊臂二18的内部前侧以及中央均设有导轮。Wherein, the first hoist 7 and the second hoist 17 are both double-drum hoists; the four corners of the bottom of the connecting platform 4 are provided with support blocks; the tops of the second locking screw 12 and the first locking screw 15 are provided with Fix the handle; the underside of the locking screw 12 and the locking screw 15 are provided with chamfers; the rear sides of the boom 16 and the boom 18 are provided with fixing seats; the boom 1 16 and the inner front side of boom two 18 and the center are all provided with guide wheel.

本实用新型的使用状态为:本实用新型具有结构合理简单、生产成本低、安装方便,功能齐全,使用时,工人首先进入到连接平台4内部,而后根据需要调节活动平台一2和活动平台二9伸出的距离,从而提高了施工的面积,也就提高了施工的效率,而设置的锁紧螺钉,能够对伸出后活动平台进行固定,从而提高了施工时候的安全性,而后卷扬机一7松开拉绳从而便于卷扬机二17直接对本操作平台进行升降移动,这里卷扬机一7收紧拉绳,能够对本操作平台底部进行拉紧,从而保证了使用时本操作平台不会出现大幅晃动的现象,也就提高了施工的效率和效果。The usage state of the utility model is: the utility model has the advantages of reasonable and simple structure, low production cost, convenient installation and complete functions. When in use, the worker first enters the inside of the connecting platform 4, and then adjusts the movable platform one 2 and the movable platform two according to needs. 9 The extended distance increases the construction area and improves the construction efficiency, and the set locking screw can fix the movable platform after the extension, thereby improving the safety during construction, and then the hoist 7 Loosen the stay rope so that the winch 2 17 can directly lift and move the operating platform. Here, the winch 1 7 tightens the stay rope to tighten the bottom of the operating platform, thereby ensuring that the operating platform does not shake greatly during use. Phenomenon, it also improves the efficiency and effect of construction.

在本实用新型的描述中,需要理解的是,术语“同轴”、“底部”、“一端”、“顶部”、“中部”、“另一端”、“上”、“一侧”、“顶部”、“内”、“前部”、“中央”、“两端”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present utility model, it should be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", " The orientation or positional relationship indicated by "top", "inner", "front", "central", "both ends" etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the utility model and simplifying the description , rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as limiting the utility model.

在本实用新型中,除非另有明确的规定和限定,术语“安装”、“设置”、“连接”、“固定”、“旋接”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定,对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In this utility model, unless otherwise clearly specified and limited, terms such as "installation", "setting", "connection", "fixation" and "rotation" should be understood in a broad sense, for example, it may be a fixed connection, It can also be detachable connection, or integrated; it can be mechanical connection or electrical connection; it can be directly connected or indirectly connected through an intermediary, and it can be the internal communication of two components or the interaction of two components Unless otherwise clearly defined, those skilled in the art can understand the specific meanings of the above terms in the present utility model according to specific situations.

以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点,本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内,本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present utility model and the advantages of the present utility model have been shown and described above. Those skilled in the art should understand that the present utility model is not limited by the above-mentioned embodiments. What are described in the above-mentioned embodiments and description are only illustrations The principle of the utility model, under the premise of not departing from the spirit and scope of the utility model, the utility model also has various changes and improvements, and these changes and improvements all fall within the scope of the utility model claimed for protection. The desired protection is defined by the appended claims and their equivalents.

Claims (7)

1.一种建筑物外部爬升式建筑施工操作平台,包括建筑物(1),其特征在于:还包括活动平台一(2)、限位块(3)、连接平台(4)、限位槽一(5)、滑轮一(6)、卷扬机一(7)、滑轮二(8)、活动平台二(9)、限位槽二(10)、限位块二(11)、锁紧螺钉二(12)、卡孔二(13)、卡孔一(14)、锁紧螺钉一(15)、吊臂一(16)、卷扬机二(17)和吊臂二(18);1. A building external climbing type building construction operation platform, comprising a building (1), is characterized in that: also comprises movable platform one (2), limit piece (3), connecting platform (4), limit groove One (5), one pulley (6), one hoist (7), two pulleys (8), two movable platforms (9), two limiting grooves (10), two limiting blocks (11), two locking screws (12), clamping hole two (13), clamping hole one (14), locking screw one (15), boom one (16), winch two (17) and boom two (18); 所述活动平台一(2)横向活动连接在连接平台(4)左侧内部,所述活动平台一(2)下侧中横向设有限位槽一(5),所述活动平台一(2)上侧中横向设有数个卡孔一(14);Described movable platform one (2) is laterally movably connected in the left side of connecting platform (4), and horizontally is provided with limit groove one (5) in the lower side of described movable platform one (2), and described movable platform one (2) There are several clamping holes 1 (14) in the middle and horizontal direction on the upper side; 所述限位块(3)位于限位槽一(5)中,所述限位块(3)底部固定连接在连接平台(4)内部底面左侧;The limiting block (3) is located in the first limiting groove (5), and the bottom of the limiting block (3) is fixedly connected to the left side of the inner bottom surface of the connecting platform (4); 所述滑轮一(6)位于连接平台(4)左下侧,所述滑轮一(6)底部固定连接在地面上;The first pulley (6) is located on the lower left side of the connecting platform (4), and the bottom of the first pulley (6) is fixedly connected to the ground; 所述滑轮二(8)位于连接平台(4)右下侧,所述滑轮二(8)底部固定连接在地面上;The second pulley (8) is located on the lower right side of the connection platform (4), and the bottom of the second pulley (8) is fixedly connected to the ground; 所述卷扬机一(7)位于滑轮一(6)和滑轮二(8)之间,所述卷扬机一(7)底部固定连接在地面上,所述卷扬机一(7)中的两个拉绳分别通过滑轮一(6)和滑轮二(8)与连接平台(4)底部左右两侧相连接;Described winch one (7) is positioned between pulley one (6) and pulley two (8), and described winch one (7) bottom is fixedly connected on the ground, and two stay ropes in described winch one (7) respectively Connect with the left and right sides of the bottom of the connecting platform (4) through pulley one (6) and pulley two (8); 所述活动平台二(9)横向活动连接在连接平台(4)内部右侧,所述活动平台二(9)下侧中横向设有限位槽二(10),所述活动平台二(9)上侧中横向设有数个卡孔二(13);The two movable platforms (9) are laterally movably connected to the inner right side of the connecting platform (4), and the lower sides of the movable platforms two (9) are horizontally provided with two limit grooves (10), and the two movable platforms (9) Several clamping holes 2 (13) are arranged laterally on the upper side; 所述限位块二(11)位于限位槽二(10)中,所述限位块二(11)底部固定连接在连接平台(4)内部底面右侧;The second limiting block (11) is located in the second limiting groove (10), and the bottom of the second limiting block (11) is fixedly connected to the right side of the inner bottom surface of the connecting platform (4); 所述锁紧螺钉二(12)活动连接在连接平台(4)右上侧竖向螺纹孔中,所述锁紧螺钉二(12)底部与卡孔二(13)相连;The second locking screw (12) is movably connected in the vertical threaded hole on the upper right side of the connection platform (4), and the bottom of the second locking screw (12) is connected to the second clamping hole (13); 所述锁紧螺钉一(15)活动连接在连接平台(4)左上侧竖向螺纹孔中,所述锁紧螺钉一(15)底部与卡孔一(14)相连;The locking screw one (15) is movably connected in the vertical threaded hole on the upper left side of the connecting platform (4), and the bottom of the locking screw one (15) is connected with the clamping hole one (14); 所述吊臂一(16)位于连接平台(4)左上侧,所述吊臂一(16)后侧固定连接在建筑物(1)顶部上,所述吊臂一(16)后侧上固定连接有卷扬机二(17);Described boom one (16) is positioned at connecting platform (4) left upper side, and described boom one (16) rear side is fixedly connected on the building (1) top, and described boom one (16) rear side is fixed Connected with winch two (17); 所述吊臂二(18)位于连接平台(4)右上侧,所述吊臂二(18)后侧固定连接在建筑物(1)顶部上;The second boom (18) is located on the upper right side of the connection platform (4), and the rear side of the second boom (18) is fixedly connected to the top of the building (1); 所述卷扬机二(17)中的两个拉绳分别通过吊臂一(16)和吊臂二(18)中的导轮与连接平台(4)顶部左右两侧相连接。Two stay ropes in the hoist two (17) are connected with the left and right sides of the top of the connecting platform (4) by guide wheels in the boom one (16) and the boom two (18) respectively. 2.根据权利要求1所述的一种建筑物外部爬升式建筑施工操作平台,其特征在于:所述卷扬机一(7)和卷扬机二(17)均为双卷筒卷扬机。2. A climbing type construction operation platform outside a building according to claim 1, characterized in that: the first hoist (7) and the second hoist (17) are both double-drum hoists. 3.根据权利要求1所述的一种建筑物外部爬升式建筑施工操作平台,其特征在于:所述连接平台(4)底部四角位置均设有支撑块。3. A climbing type building construction operation platform outside a building according to claim 1, characterized in that: support blocks are provided at the four corners of the bottom of the connecting platform (4). 4.根据权利要求1所述的一种建筑物外部爬升式建筑施工操作平台,其特征在于:所述锁紧螺钉二(12)和锁紧螺钉一(15)的顶部均设有固定手柄。4. A climbing type building construction operation platform outside a building according to claim 1, characterized in that: the tops of the second locking screw (12) and the first locking screw (15) are provided with fixed handles. 5.根据权利要求1所述的一种建筑物外部爬升式建筑施工操作平台,其特征在于:所述锁紧螺钉二(12)和锁紧螺钉一(15)的下侧均设有倒角。5. A climbing-type building construction operation platform outside a building according to claim 1, characterized in that: the undersides of the second locking screw (12) and the first locking screw (15) are provided with chamfers . 6.根据权利要求1所述的一种建筑物外部爬升式建筑施工操作平台,其特征在于:所述吊臂一(16)和吊臂二(18)的后侧均设有固定座。6. A climbing type construction operation platform outside a building according to claim 1, characterized in that: the rear sides of the first boom (16) and the second boom (18) are both provided with fixing seats. 7.根据权利要求1所述的一种建筑物外部爬升式建筑施工操作平台,其特征在于:所述吊臂一(16)和吊臂二(18)的内部前侧以及中央均设有导轮。7. A climbing type building construction operation platform outside a building according to claim 1, characterized in that: the inner front side and the center of the first boom (16) and the second boom (18) are provided with guide rails. wheel.
CN201920073214.XU 2019-01-17 2019-01-17 Building external climbing type building construction operation platform Expired - Fee Related CN209457363U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920073214.XU CN209457363U (en) 2019-01-17 2019-01-17 Building external climbing type building construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920073214.XU CN209457363U (en) 2019-01-17 2019-01-17 Building external climbing type building construction operation platform

Publications (1)

Publication Number Publication Date
CN209457363U true CN209457363U (en) 2019-10-01

Family

ID=68044727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920073214.XU Expired - Fee Related CN209457363U (en) 2019-01-17 2019-01-17 Building external climbing type building construction operation platform

Country Status (1)

Country Link
CN (1) CN209457363U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111302253A (en) * 2020-03-28 2020-06-19 福州狸堡科技有限公司 Hoisting device for construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111302253A (en) * 2020-03-28 2020-06-19 福州狸堡科技有限公司 Hoisting device for construction
CN111302253B (en) * 2020-03-28 2020-10-27 南京鑫茂电力工程有限公司 Hoisting device for construction

Similar Documents

Publication Publication Date Title
CN204152209U (en) A kind of power of unloading, securing device for construction elevator
CN209457363U (en) Building external climbing type building construction operation platform
CN212249184U (en) An electric climbing formwork device for building construction
CN221917027U (en) Hoisting device for assembled building components
CN221987947U (en) A water conservancy and hydropower lifting equipment
CN211687924U (en) Assembled wall body hoist and mount auxiliary device
CN208964436U (en) A kind of small members promotion lifting apparatus
CN112850459A (en) Hoisting equipment for efficient assembly type building prefabricated part
CN209308381U (en) An easy-to-install climbing frame with slide-in protective net
CN220245368U (en) Electric hoist gantry crane
CN214570290U (en) Concrete column hangs gets device for building engineering
CN209161428U (en) A kind of auxiliary support frame for communication engineering
CN208869123U (en) A kind of novel villa ladder steel structure derrick
CN116044139A (en) Non-elevation operation hanging basket construction device and implementation method
CN212053828U (en) Steel construction engineering component rotating device
CN214659903U (en) A cat ladder for safety engineering
CN110723647A (en) Movable hoisting device capable of being accurately matched for bridge construction
CN222743945U (en) An assembled building hoisting device
CN216638755U (en) A hoisting structure for prefabricated columns of recycled coarse aggregate for concrete
CN216276806U (en) Novel integral lifting type operation platform for elevator shaft construction
CN221878751U (en) A hanging basket for construction
CN206487128U (en) A kind of Guiding Support Elevating Scaffold
CN218809904U (en) Balanced hoist of prefabricated plate hoist and mount usefulness of prefabricated building entirely
CN221761422U (en) A PC hanging board installation and positioning device
CN208563949U (en) A kind of high stability high-lift operation hanging cradle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191001

CF01 Termination of patent right due to non-payment of annual fee