CN209453494U - An adjustable wall hammer for construction - Google Patents
An adjustable wall hammer for construction Download PDFInfo
- Publication number
- CN209453494U CN209453494U CN201821826569.3U CN201821826569U CN209453494U CN 209453494 U CN209453494 U CN 209453494U CN 201821826569 U CN201821826569 U CN 201821826569U CN 209453494 U CN209453494 U CN 209453494U
- Authority
- CN
- China
- Prior art keywords
- hammer
- handle
- wall
- thread
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 238000013016 damping Methods 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 230000003139 buffering effect Effects 0.000 abstract description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Percussive Tools And Related Accessories (AREA)
Abstract
本实用新型公开了建筑施工技术领域的一种建工用可调节砸墙锤,所述锤体的底部内腔插接有锤头,所述锤头的顶部与锤体底部内腔的顶部之间连接有减震弹簧,所述锤体的顶部内腔螺纹连接有配重块,所述锤体的右侧连接有锤把,所述锤把的外壁右端设置有第一螺纹,所述锤把的右端连接有加长把,所述加长把的外壁左端设置有第一连接螺纹,通过减震弹簧的设置,可以在施工人员砸墙时起到缓冲作用,减少锤头的反弹力,通过配重块的设置,可以在施工人员砸较厚的墙体时,增加抡锤的惯性,提高砸墙力度,通过锤把、加长把、第一连接螺杆、把柄和第二连接螺杆的配合设置,可以调节锤把手的长度,方便施工人员使用,并且方便拆卸携带。
The utility model discloses an adjustable wall hammer for construction in the technical field of construction. A hammer head is inserted into a bottom cavity of the hammer body, and the top of the hammer head and the top of the bottom cavity of the hammer body are connected to each other. A shock-absorbing spring is connected between the hammer bodies, a counterweight is threadedly connected to the top inner cavity of the hammer body, a hammer handle is connected to the right side of the hammer body, and the right end of the outer wall of the hammer handle is provided with a first thread, and the hammer body is provided with a first thread. The right end of the handle is connected with an extension handle, and the left end of the outer wall of the extension handle is provided with a first connection thread. The setting of the shock-absorbing spring can play a buffering role when the construction personnel hit the wall and reduce the rebound force of the hammer head. The setting of the heavy block can increase the inertia of the hammer when the construction personnel hit the thick wall, and improve the strength of the wall. The length of the hammer handle can be adjusted, which is convenient for construction personnel to use and easy to disassemble and carry.
Description
技术领域technical field
本实用新型涉及建筑施工技术领域,具体为一种建工用可调节砸墙锤。The utility model relates to the technical field of building construction, in particular to an adjustable wall hammer for construction.
背景技术Background technique
在建筑施工中,当需要砸墙时,一般都会用到砸墙锤,目前现有的砸墙锤一般功能比较简单,而且携带不方便,为此,我们提出了一种建工用可调节砸墙锤。In construction, when it is necessary to smash walls, wall smashing hammers are generally used. At present, the existing wall smashing hammers generally have simple functions and are inconvenient to carry. Therefore, we propose an adjustable smashing hammer for construction workers. wall hammer.
实用新型内容Utility model content
本实用新型的目的在于提供一种建工用可调节砸墙锤,以解决上述背景技术中提出的现有砸墙锤一般功能比较简单,而且携带不方便的问题。The purpose of the present invention is to provide an adjustable wall-smashing hammer for construction, so as to solve the problems that the conventional wall-smashing hammer proposed in the above-mentioned background art has relatively simple functions and is inconvenient to carry.
为实现上述目的,本实用新型提供如下技术方案:一种建工用可调节砸墙锤,包括锤体,所述锤体的底部内腔插接有锤头,所述锤头的顶部与锤体底部内腔的顶部之间连接有减震弹簧,所述锤体的顶部内腔螺纹连接有配重块,所述锤体的右侧连接有锤把,所述锤把的外壁右端设置有第一螺纹,所述锤把的右端连接有加长把,所述加长把的外壁左端设置有第一连接螺纹,所述第一连接螺纹的外壁套接有第一连接环,所述加长把的左端设置有第一连接螺杆,所述加长把通过第一连接螺杆与锤把的右端连接,所述加长把的外壁右端设置有第二螺纹,所述加长把的右端连接有把柄,所述把柄的外壁左端设置有第二连接螺纹,所述第二连接螺纹的外壁套接有第二连接环,所述把柄的左端设置有第二连接螺杆,所述把柄通过第二连接螺杆与加长把的右端连接。In order to achieve the above purpose, the present utility model provides the following technical solutions: an adjustable wall hammer for construction, comprising a hammer body, a hammer head is inserted into the bottom cavity of the hammer body, and the top of the hammer head is connected to the hammer. A shock-absorbing spring is connected between the top of the inner cavity at the bottom of the body, a counterweight is threadedly connected to the inner cavity of the hammer body, a hammer handle is connected to the right side of the hammer body, and the right end of the outer wall of the hammer handle is provided with a counterweight block. The first thread, the right end of the hammer handle is connected with an extension handle, the left end of the outer wall of the extension handle is provided with a first connection thread, the outer wall of the first connection thread is sleeved with a first connection ring, and the extension handle is The left end is provided with a first connecting screw, the extended handle is connected with the right end of the hammer handle through the first connecting screw, the right end of the outer wall of the extended handle is provided with a second thread, the right end of the extended handle is connected with a handle, the handle The left end of the outer wall of the handle is provided with a second connection thread, the outer wall of the second connection thread is sleeved with a second connection ring, the left end of the handle is provided with a second connection screw, and the handle is connected to the extension handle through the second connection screw. Right end connection.
优选的,所述锤体、锤头、锤把、加长把和把柄均为钢结构。Preferably, the hammer body, the hammer head, the hammer handle, the elongated handle and the handle are all steel structures.
优选的,所述锤把、加长把和把柄的直径相同。Preferably, the hammer handle, the extension handle and the handle have the same diameter.
优选的,所述把柄的右侧设置有圆锥头。Preferably, the right side of the handle is provided with a conical head.
与现有技术相比,本实用新型的有益效果是:通过减震弹簧的设置,可以在施工人员砸墙时起到缓冲作用,减少锤头的反弹力,通过配重块的设置,可以在施工人员砸较厚的墙体时,增加抡锤的惯性,提高砸墙力度,通过锤把、加长把、第一连接螺杆、把柄和第二连接螺杆的配合设置,可以调节锤把手的长度,方便施工人员使用,并且方便拆卸携带,通过第一螺纹、第一连接螺纹、第一连接环、第二螺纹、第二连接螺纹和第二连接环的设置,可以加固锤把手的连接效果,使锤把手不易掉落。Compared with the prior art, the beneficial effect of the present utility model is that: through the setting of the shock-absorbing spring, it can play a buffering role when the construction personnel hit the wall, reducing the rebound force of the hammer head; When the construction workers hit a thick wall, the inertia of the hammer is increased, and the force of the wall is improved. It is convenient for construction personnel to use, and easy to disassemble and carry. Through the arrangement of the first thread, the first connection thread, the first connection ring, the second thread, the second connection thread and the second connection ring, the connection effect of the hammer handle can be strengthened, so that the hammer handle can be reinforced. The hammer handle is not easy to fall off.
附图说明Description of drawings
图1为本实用新型结构示意图。Figure 1 is a schematic structural diagram of the utility model.
图中:1锤体、2锤头、3减震弹簧、4配重块、5锤把、6第一螺纹、7加长把、8第一连接螺纹、9第一连接环、10第一连接螺杆、11第二螺纹、12把柄、13第二连接螺纹、14第二连接环、15第二连接螺杆。In the figure: 1 hammer body, 2 hammer head, 3 damping spring, 4 counterweight, 5 hammer handle, 6 first thread, 7 extension handle, 8 first connecting thread, 9 first connecting ring, 10 first connection Screw, 11 second thread, 12 handle, 13 second connection thread, 14 second connection ring, 15 second connection screw.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
请参阅图1,本实用新型提供一种技术方案:一种建工用可调节砸墙锤,包括锤体1,所述锤体1的底部内腔插接有锤头2,所述锤头2的顶部与锤体1底部内腔的顶部之间连接有减震弹簧3,所述锤体1的顶部内腔螺纹连接有配重块4,所述锤体1的右侧连接有锤把5,所述锤把5的外壁右端设置有第一螺纹6,所述锤把5的右端连接有加长把7,所述加长把7的外壁左端设置有第一连接螺纹8,所述第一连接螺纹8的外壁套接有第一连接环9,所述加长把7的左端设置有第一连接螺杆10,所述加长把7通过第一连接螺杆10与锤把5的右端连接,所述加长把7的外壁右端设置有第二螺纹11,所述加长把7的右端连接有把柄12,所述把柄12的外壁左端设置有第二连接螺纹13,所述第二连接螺纹13的外壁套接有第二连接环14,所述把柄12的左端设置有第二连接螺杆15,所述把柄12通过第二连接螺杆15与加长把7的右端连接。Please refer to FIG. 1 , the present invention provides a technical solution: an adjustable wall hammer for construction, comprising a hammer body 1, and a hammer head 2 is inserted into the inner cavity of the bottom of the hammer body 1, and the hammer head A damping spring 3 is connected between the top of the hammer body 1 and the top of the inner cavity of the bottom of the hammer body 1, the top inner cavity of the hammer body 1 is threadedly connected with a counterweight 4, and the right side of the hammer body 1 is connected with a hammer handle 5. The right end of the outer wall of the hammer handle 5 is provided with a first thread 6, the right end of the hammer handle 5 is connected with an extension handle 7, and the left end of the outer wall of the extension handle 7 is provided with a first connection thread 8, the first The outer wall of the connecting thread 8 is sleeved with a first connecting ring 9, the left end of the elongated handle 7 is provided with a first connecting screw 10, and the elongated handle 7 is connected with the right end of the hammer handle 5 through the first connecting screw 10. The right end of the outer wall of the extension handle 7 is provided with a second thread 11, the right end of the extension handle 7 is connected with a handle 12, the left end of the outer wall of the handle 12 is provided with a second connection thread 13, and the outer wall of the second connection thread 13 is sleeved A second connecting ring 14 is connected, the left end of the handle 12 is provided with a second connecting screw 15 , and the handle 12 is connected to the right end of the elongated handle 7 through the second connecting screw 15 .
其中,所述锤体1、锤头2、锤把5、加长把7和把柄12均为钢结构,强度高,使用寿命久,所述锤把5、加长把7和把柄12的直径相同,方便施工人员双手把握,所述把柄12的右侧设置有圆锥头,方便施工人员敲一些零碎墙体。Among them, the hammer body 1, the hammer head 2, the hammer handle 5, the extension handle 7 and the handle 12 are all steel structures, with high strength and long service life, and the hammer handle 5, the extension handle 7 and the handle 12 have the same diameter, It is convenient for construction personnel to grasp with both hands, and the right side of the handle 12 is provided with a conical head, which is convenient for construction personnel to knock some fragmentary walls.
工作原理:第一螺纹6、第一连接螺纹8、第二螺纹11和第二连接螺纹13的螺纹相同,第一连接环9和第二连接环14的内径相同,使用时,先握住加长把7,将第一连接螺杆10插在锤把5右侧开设的螺纹孔内,并螺纹连接好,再转动第一连接环9,使第一连接环9螺纹连接在第一螺纹6和第一连接螺纹8之间,加强锤把5和加长把7之间的连接,如果需要再加长锤把手时,可握住把柄12,将第二连接螺杆15插在加长把7右侧开设的螺纹孔内,并螺纹连接好,再转动第二连接环14,使第二连接环14螺纹连接在第二螺纹11和第二连接螺纹13之间,加强加长把7和把柄12之间的连接,根据砸墙的需求,可将配重块4螺纹连接在锤体1的顶部内腔,增加抡锤的惯性,提高砸墙力度,砸墙时,锤头2与墙体接触,快速砸开墙体,减震弹簧3可以在施工人员砸墙时起到缓冲作用,减少锤头2的反弹力。Working principle: the threads of the first thread 6, the first connecting thread 8, the second thread 11 and the second connecting thread 13 are the same, and the inner diameter of the first connecting ring 9 and the second connecting ring 14 are the same. 7. Insert the first connecting screw 10 into the threaded hole opened on the right side of the hammer handle 5, and screw it together, and then turn the first connecting ring 9, so that the first connecting ring 9 is threadedly connected to the first thread 6 and the second thread. Between a connecting thread 8, strengthen the connection between the hammer handle 5 and the extension handle 7. If the hammer handle needs to be extended, hold the handle 12 and insert the second connecting screw 15 into the thread opened on the right side of the extension handle 7. The second connecting ring 14 is rotated, so that the second connecting ring 14 is threaded between the second thread 11 and the second connecting thread 13, and the connection between the extension handle 7 and the handle 12 is strengthened. According to the needs of smashing the wall, the counterweight 4 can be threadedly connected to the top cavity of the hammer body 1 to increase the inertia of the hammer and improve the smashing force. The shock-absorbing spring 3 can play a buffering role when the construction personnel hit the wall, reducing the rebound force of the hammer head 2.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821826569.3U CN209453494U (en) | 2018-11-07 | 2018-11-07 | An adjustable wall hammer for construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821826569.3U CN209453494U (en) | 2018-11-07 | 2018-11-07 | An adjustable wall hammer for construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209453494U true CN209453494U (en) | 2019-10-01 |
Family
ID=68037942
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201821826569.3U Expired - Fee Related CN209453494U (en) | 2018-11-07 | 2018-11-07 | An adjustable wall hammer for construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209453494U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112692791A (en) * | 2020-12-30 | 2021-04-23 | 赵晓芳 | Functional hammer |
-
2018
- 2018-11-07 CN CN201821826569.3U patent/CN209453494U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112692791A (en) * | 2020-12-30 | 2021-04-23 | 赵晓芳 | Functional hammer |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104191418B (en) | A kind of damping sledge hammer | |
| CN203077235U (en) | Heterogeneous double-hammer knocking hammer | |
| CN203197856U (en) | Novel hammer | |
| CN205310187U (en) | Novel hammer -axe that can assemble and freely increase weight | |
| CN203163954U (en) | Heavy hammer device for testing concrete structure frequency | |
| CN207830324U (en) | A kind of stud | |
| CN207278670U (en) | A kind of new special oil circuit screw rod | |
| CN204195707U (en) | A kind of engineering tool hammer | |
| CN211171963U (en) | An improved piling hammer | |
| CN204053977U (en) | Multifunctional hammer | |
| CN211103769U (en) | Bearing extractor | |
| CN209918816U (en) | Pneumatic tamping machine for tamping sand | |
| CN210550959U (en) | Multifunctional hammer with screwdriver function | |
| CN205116558U (en) | Shock attenuation steel construction stand | |
| CN206010987U (en) | A kind of safety and shock-absorption hammer | |
| CN204935572U (en) | A kind of laborsaving hardware hammer | |
| CN205224648U (en) | Laborsaving wall hammer of pounding | |
| CN205600650U (en) | Multi -functional hammer | |
| CN204621983U (en) | Carbon fiber lever is hammered into shape | |
| CN206280425U (en) | A kind of Drilling derrick light fixture suspended shock damper | |
| CN205394445U (en) | Multi -functional five metals hammer that conveniently carries | |
| CN205712103U (en) | A kind of building site is with pounding pile monkey | |
| CN203906629U (en) | Suspension type resonance-free vibration isolator | |
| CN218254985U (en) | Indoor decoration is with pounding hammer | |
| CN204976547U (en) | Geological engineering hammer |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191001 Termination date: 20201107 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |