CN209425311U - A kind of water pipeline support connection structure for hydraulic engineering - Google Patents
A kind of water pipeline support connection structure for hydraulic engineering Download PDFInfo
- Publication number
- CN209425311U CN209425311U CN201920149039.8U CN201920149039U CN209425311U CN 209425311 U CN209425311 U CN 209425311U CN 201920149039 U CN201920149039 U CN 201920149039U CN 209425311 U CN209425311 U CN 209425311U
- Authority
- CN
- China
- Prior art keywords
- splint
- threaded rod
- clamping plate
- fixed plate
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
本实用新型公开了一种用于水利工程的水利管道支撑连接结构,包括底座和夹板,所述夹板包括第一夹板和第二夹板,所述底座上安装有伸缩杆,所述伸缩杆上安装有锁紧螺栓,所述伸缩杆远离底座的一端安装有第一夹板,所述第一夹板远离伸缩杆的一端安装有第二夹板,所述第一夹板与第二夹板之间安装有连接装置。本实用新型在第一夹板合第二夹板两侧分别安装了第一固定板和第二固定板,通过第二螺纹杆将第一固定板和第二固定板连接起来,操作简单,提高了安装的效率,其次,第二夹板上的第一螺纹杆带动限位板紧紧压在管道上配合第一夹板内侧壁上的橡皮垫,使得管道在夹板之间更加稳定,也提高了安装了安全性。
The utility model discloses a water conservancy pipeline support connection structure for water conservancy projects, comprising a base and a splint, the splint includes a first splint and a second splint, a telescopic rod is installed on the base, and a There is a locking bolt, a first splint is installed on the end of the telescopic rod away from the base, a second splint is installed on the end of the first splint away from the telescopic rod, and a connecting device is installed between the first splint and the second splint . The utility model installs the first fixing plate and the second fixing plate respectively on both sides of the first splint and the second splint, and connects the first fixing plate and the second fixing plate through the second threaded rod, which is easy to operate and improves the installation efficiency. Secondly, the first threaded rod on the second splint drives the limit plate to press tightly on the pipe to cooperate with the rubber pad on the inner wall of the first splint, making the pipe more stable between the splints and improving the safety of installation sex.
Description
技术领域technical field
本实用新型涉及水利工程技术领域,尤其涉及一种用于水利工程的水利管道支撑连接结构。The utility model relates to the technical field of water conservancy engineering, in particular to a supporting connection structure for water conservancy pipelines used in water conservancy projects.
背景技术Background technique
水利工程建筑物受水作用,工作条件复杂,施工难度大,各地的水文、气象、地形和地质等自然条件有差异,水文和气象状况存在或然性,因此大型水利工程的设计,总是各有特点,难于划一,大型水利工程投资大和工期较长,由于水利工程具有自身的特点,以及社会各部门对水利事业日益提出更多和更高的要求,促使水利学科在二十世纪上半叶逐渐形成为独立的科学。The water conservancy project buildings are affected by water, the working conditions are complex, and the construction is difficult. The natural conditions such as hydrology, meteorology, topography and geology are different in different places, and there are probabilities in the hydrology and meteorological conditions. It has its own characteristics, but it is difficult to be uniform. Large-scale water conservancy projects have large investment and long construction period. Due to the characteristics of water conservancy projects and the increasing and higher requirements of various departments of society for water conservancy, the discipline of water conservancy has been promoted in the first half of the 20th century. Gradually formed into an independent science.
在水利工程铺设管道时需要用到管道支撑连接机构,现有的管道支撑连接机构操作复杂,且连接不稳定,这样就导致工人在铺设管道时的效率较低。Pipeline supporting and connecting mechanisms are needed when laying pipelines in water conservancy projects. The existing pipeline supporting and connecting mechanisms are complex in operation and unstable in connection, which leads to low efficiency of workers when laying pipelines.
实用新型内容Utility model content
本实用新型的目的是为了解决现有技术中操作复杂,连接不稳定的问题,而提出的一种用于水利工程的水利管道支撑连接结构。The purpose of the utility model is to solve the problems of complex operation and unstable connection in the prior art, and propose a water conservancy pipeline support connection structure for water conservancy projects.
为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种用于水利工程的水利管道支撑连接结构,包括底座和夹板,所述夹板包括第一夹板和第二夹板,所述底座上安装有伸缩杆,所述伸缩杆上安装有锁紧螺栓,所述伸缩杆远离底座的一端安装有第一夹板,所述第一夹板远离伸缩杆的一端安装有第二夹板,所述第一夹板与第二夹板之间安装有连接装置。A water conservancy pipeline support connection structure for water conservancy projects, including a base and a splint, the splint includes a first splint and a second splint, a telescopic rod is installed on the base, and a locking bolt is installed on the telescopic rod, A first splint is installed on the end of the telescopic rod away from the base, a second splint is installed on the end of the first splint away from the telescopic rod, and a connecting device is installed between the first splint and the second splint.
优选地,所述第二夹板远离第一夹板的一侧外壁上螺纹安装有第一螺纹杆,所述第一螺纹杆贯穿第二夹板的外壁,所述第一螺纹杆靠近第一夹板的一端安装有限位板。Preferably, a first threaded rod is threaded on the outer wall of the second splint away from the first splint, the first threaded rod runs through the outer wall of the second splint, and one end of the first threaded rod is close to the first splint Install the limit plate.
优选地,所述连接装置包括第二螺纹杆、螺母和卡杆,所述第一夹板两侧外壁上对称安装有两个第一固定板,所述第二夹板两侧外壁上对称安装有两个第二固定板,所述第一固定板和第二固定板上均开设有孔,位于同一侧的所述第一固定板和第二固定板共同插设有第二螺纹杆,所述第二螺纹杆靠近第二固定板的一端螺纹安装有螺母,所述第二螺纹杆靠近第一固定板的一端对称活动安装有两个卡杆。Preferably, the connection device includes a second threaded rod, a nut and a clamping rod, two first fixing plates are symmetrically installed on the outer walls on both sides of the first clamping plate, and two first fixing plates are symmetrically installed on the outer walls on both sides of the second clamping plate. A second fixing plate, holes are opened on the first fixing plate and the second fixing plate, the first fixing plate and the second fixing plate on the same side are inserted with a second threaded rod, and the first fixing plate and the second fixing plate are inserted with a second threaded rod. One end of the two threaded rods close to the second fixing plate is threaded with a nut, and the end of the second threaded rod close to the first fixing plate is symmetrically and movably mounted with two clamping rods.
优选地,所述第二螺纹杆靠近第二固定板的一端活动套设有第一弹簧,且第一弹簧位于第二固定板与螺母之间,所述第二螺纹杆靠近第二固定板一端安装有垫圈,且垫圈位于螺母和第一弹簧之间。Preferably, the end of the second threaded rod close to the second fixing plate is movably sleeved with a first spring, and the first spring is located between the second fixing plate and the nut, and the end of the second threaded rod close to the second fixing plate A washer is installed and is located between the nut and the first spring.
优选地,所述第二螺纹杆靠近第一固定板的外壁上开设有安装槽,所述安装槽两个开口处均设有卡杆,两个所述卡杆相互靠近的两个外壁之间连接有第二弹簧。Preferably, the outer wall of the second threaded rod close to the first fixing plate is provided with a mounting groove, and two openings of the mounting groove are provided with clamping rods. A second spring is connected.
优选地,所述第一夹板的内侧壁上设有橡皮垫。Preferably, a rubber pad is provided on the inner side wall of the first splint.
与现有技术相比,本实用新型的有益效果在于:Compared with the prior art, the utility model has the beneficial effects of:
1、本实用新型将夹板一分为二,并在第一夹板和第二夹板的两侧方便安装了第一固定板和第二固定板,位与一侧的第一固定板和第二固定板之间安装了连接装置,且只需将第二螺纹杆插设到两个固定板之间即可,操作简单方便,大大提高了工人铺设管道的效率;1. The utility model divides the splint into two, and conveniently installs the first fixing plate and the second fixing plate on both sides of the first splint and the second splint, and is located on one side of the first fixing plate and the second fixing plate A connecting device is installed between the plates, and only the second threaded rod needs to be inserted between the two fixed plates, which is easy to operate and greatly improves the efficiency of workers in laying pipes;
2、本实用新型在第二夹板上安装了第一螺纹杆。通过转动第一螺纹杆将限位板紧紧贴合在管道上,对其进行固定,且第一夹板的内侧壁上设有橡皮垫,橡皮垫与管道之间摩擦力大,使得在安装时,管道不易从夹板中滑落,增加了安装的安全性。2. The utility model installs the first threaded rod on the second splint. By turning the first threaded rod, the limit plate is tightly attached to the pipe to fix it, and a rubber pad is provided on the inner wall of the first splint, and the friction between the rubber pad and the pipe is large, so that when installing , The pipe is not easy to slip from the splint, which increases the safety of the installation.
综上所述,本实用新型在第一夹板合第二夹板两侧分别安装了第一固定板和第二固定板,通过第二螺纹杆将第一固定板和第二固定板连接起来,操作简单,提高了安装的效率,其次,第二夹板上的第一螺纹杆带动限位板紧紧压在管道上配合第一夹板内侧壁上的橡皮垫,使得管道在夹板之间更加稳定,也提高了安装了安全性。In summary, the utility model installs the first fixed plate and the second fixed plate on both sides of the first splint and the second splint respectively, and connects the first fixed plate and the second fixed plate through the second threaded rod. It is simple and improves the efficiency of installation. Secondly, the first threaded rod on the second splint drives the limit plate to press tightly on the pipe to cooperate with the rubber pad on the inner wall of the first splint, making the pipe more stable between the splints and also Improved installation security.
附图说明Description of drawings
图1为本实用新型提出的一种用于水利工程的水利管道支撑连接结构的正视图;Fig. 1 is a front view of a water conservancy pipeline supporting connection structure for water conservancy projects proposed by the utility model;
图2为本实用新型提出的一种用于水利工程的水利管道支撑连接结构的侧视图;Fig. 2 is a side view of a water conservancy pipeline support connection structure for water conservancy projects proposed by the utility model;
图3为本实用新型提出的一种用于水利工程的水利管道支撑连接结构A部分结构的放大图。Fig. 3 is an enlarged view of part A of a supporting and connecting structure of a water conservancy pipeline used in a water conservancy project proposed by the utility model.
图中:1底座、2伸缩杆、3锁紧螺栓、4第一夹板、5第二夹板、6第一螺纹杆、7第二螺纹杆、8螺母、9第一固定板、10第二固定板、11限位板、12橡皮垫、13垫圈、14第一弹簧、15安装槽、16卡杆、17第二弹簧。In the figure: 1 base, 2 telescopic rod, 3 locking bolt, 4 first splint, 5 second splint, 6 first threaded rod, 7 second threaded rod, 8 nut, 9 first fixed plate, 10 second fixed Plate, 11 limit plate, 12 rubber pads, 13 washers, 14 first springs, 15 mounting grooves, 16 clamping rods, 17 second springs.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example.
在本实用新型的描述中,需要理解的是,术语“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In describing the present utility model, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", The orientation or positional relationship indicated by "outside" is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation , are constructed and operated in a specific orientation and therefore cannot be construed as limiting the invention.
参照图1-3,一种用于水利工程的水利管道支撑连接结构,包括包括底座1和夹板,夹板包括第一夹板4和第二夹板5,底座1上安装有伸缩杆2,伸缩杆2上安装有锁紧螺栓3,伸缩杆2远离底座1的一端安装有第一夹板4,第一夹板4的内侧壁上设有橡皮垫12,第一夹板4远离伸缩杆2的一端安装有第二夹板5,第二夹板5远离第一夹板4的一侧外壁上螺纹安装有第一螺纹杆6,第一螺纹杆6贯穿第二夹板5的外壁,第一螺纹杆6靠近第一夹板4的一端安装有限位板11,第一夹板4与第二夹板5之间安装有连接装置,值得注意的是,橡皮垫12可以增大摩擦力,防止在放置管道时发生管道滑脱,避免了安全事故的发生,限位板11可以对管道进行限位,使其安装更加稳定。Referring to Figures 1-3, a water conservancy pipeline support connection structure for water conservancy projects includes a base 1 and a splint, the splint includes a first splint 4 and a second splint 5, a telescopic rod 2 is installed on the base 1, and the telescopic rod 2 A locking bolt 3 is installed on the top, a first splint 4 is installed on the end of the telescopic rod 2 away from the base 1, a rubber pad 12 is provided on the inner wall of the first splint 4, and a first splint 4 is installed on the end of the first splint 4 away from the telescopic rod 2. Two splints 5, the second splint 5 is screwed with the first threaded rod 6 on the side outer wall away from the first splint 4, the first threaded rod 6 runs through the outer wall of the second splint 5, and the first threaded rod 6 is close to the first splint 4 A limiting plate 11 is installed at one end of the first clamping plate 4 and a connecting device is installed between the second clamping plate 5. It is worth noting that the rubber pad 12 can increase the frictional force and prevent the pipeline from slipping when the pipeline is placed, avoiding safety hazards. In the event of an accident, the limiting plate 11 can limit the position of the pipeline, making its installation more stable.
连接装置包括第二螺纹杆7、螺母8和卡杆16,第一夹板4两侧外壁上对称安装有两个第一固定板9,第二夹板5两侧外壁上对称安装有两个第二固定板10,第一固定板9和第二固定板10上均开设有孔,位于同一侧的第一固定板9和第二固定板10共同插设有第二螺纹杆7,第二螺纹杆7靠近第二固定板10的一端螺纹安装有螺母8,第二螺纹杆7靠近第一固定板9的一端对称活动安装有两个卡杆16,第二螺纹杆7靠近第一固定板9的外壁上开设有安装槽15,安装槽15两个开口处均设有卡杆16,两个卡杆16相互靠近的两个外壁之间连接有第二弹簧17,第二螺纹杆7靠近第二固定板10的一端活动套设有第一弹簧14,且第一弹簧14位于第二固定板10与螺母8之间,第二螺纹杆7靠近第二固定板10一端安装有垫圈13,且垫圈13位于螺母8和第一弹簧14之间,值得注意的是,插设时,第二螺纹杆7两侧的卡杆16受到第一固定板9和第二固定板10上孔内壁的压力,被压进安装槽15中,此时第二弹簧17被压缩变形,待到卡杆16完全穿过第一固定板9和第二固定板10后,在第二弹簧17的弹力作用下,被弹出安装槽15,卡在第一固定板10的外壁上,此时第一弹簧14被压缩变形,可以通过转动螺母8来继续压缩弹簧14,转动螺母8时,推动垫圈13向下运动压缩第一弹簧14,使得第一固定板9和第二固定板10之间贴合更加紧密,此结构简单,易操作,增加安装效率。The connecting device includes a second threaded rod 7, a nut 8 and a clamping rod 16. Two first fixing plates 9 are symmetrically installed on the outer walls on both sides of the first clamping plate 4, and two second fixing plates 9 are symmetrically installed on the outer walls on both sides of the second clamping plate 5. The fixed plate 10, the first fixed plate 9 and the second fixed plate 10 are provided with holes, the first fixed plate 9 and the second fixed plate 10 on the same side are inserted with the second threaded rod 7, the second threaded rod 7. A nut 8 is threadedly installed near one end of the second fixed plate 10, and two clamping rods 16 are installed symmetrically on the end of the second threaded rod 7 near the first fixed plate 9. The second threaded rod 7 is close to the end of the first fixed plate 9. The outer wall is provided with a mounting groove 15, and the two openings of the mounting groove 15 are provided with clamping rods 16. A second spring 17 is connected between the two external walls where the two clamping rods 16 are close to each other. The second threaded rod 7 is close to the second One end movable sleeve of fixed plate 10 is provided with first spring 14, and first spring 14 is positioned between second fixed plate 10 and nut 8, and second threaded rod 7 is equipped with washer 13 near second fixed plate 10 one end, and washer 13 is located between the nut 8 and the first spring 14. It is worth noting that when inserted, the clamping rods 16 on both sides of the second threaded rod 7 are pressed by the inner walls of the holes on the first fixing plate 9 and the second fixing plate 10, Pressed into the installation groove 15, the second spring 17 is compressed and deformed at this time, after the clamping rod 16 passes through the first fixed plate 9 and the second fixed plate 10 completely, under the elastic force of the second spring 17, it is The installation groove 15 pops up and is stuck on the outer wall of the first fixing plate 10. At this time, the first spring 14 is compressed and deformed, and the spring 14 can be further compressed by turning the nut 8. When the nut 8 is turned, the washer 13 is pushed to move downward to compress the first spring 14. A spring 14 makes the fit between the first fixing plate 9 and the second fixing plate 10 tighter. This structure is simple, easy to operate, and increases installation efficiency.
本实用新型的工作原理为:将管道放在两个或多个第一夹板4上,再将第二夹板5放置到第一夹板4,通过第二螺纹杆7第一夹板4和第二夹板紧密连接。The working principle of the utility model is: put the pipeline on two or more first splints 4, then place the second splint 5 on the first splint 4, pass the second threaded rod 7, the first splint 4 and the second splint tight connection.
第二螺纹杆7插设到第一固定板9和第二固定板10中,插设时,第二螺纹杆7两侧的卡杆16受到第一固定板9和第二固定板10上孔内壁的压力,被压进安装槽15中,此时第二弹簧17被压缩变形,待到卡杆16完全穿过第一固定板9和第二固定板10后,在第二弹簧17的弹力作用下,被弹出安装槽15,卡在第一固定板10的外壁上,此时第一弹簧14被压缩变形,可以通过转动螺母8来继续压缩弹簧14,使得第一固定板9和第二固定板10之间贴合更加紧密。The second threaded rod 7 is inserted into the first fixed plate 9 and the second fixed plate 10. During insertion, the clamping rods 16 on both sides of the second threaded rod 7 are received by the holes on the first fixed plate 9 and the second fixed plate 10. The pressure of the inner wall is pressed into the installation groove 15, and the second spring 17 is compressed and deformed at this time. Under the action, the installation groove 15 is ejected and stuck on the outer wall of the first fixed plate 10. At this time, the first spring 14 is compressed and deformed, and the spring 14 can be continuously compressed by turning the nut 8, so that the first fixed plate 9 and the second fixed plate The fit between the fixing plates 10 is tighter.
连接完毕后,转动第一螺纹杆6使限位板11向管道外壁运动,并紧紧压在管道外壁上。After the connection is completed, the first threaded rod 6 is rotated to move the limiting plate 11 to the outer wall of the pipeline and press it tightly against the outer wall of the pipeline.
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内,不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from all points of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to be included in the claims All changes within the meaning and range of equivalency of the required elements are embraced in the present invention, and any reference sign in a claim shall not be construed as limiting the claim concerned.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only contains an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920149039.8U CN209425311U (en) | 2019-01-28 | 2019-01-28 | A kind of water pipeline support connection structure for hydraulic engineering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920149039.8U CN209425311U (en) | 2019-01-28 | 2019-01-28 | A kind of water pipeline support connection structure for hydraulic engineering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209425311U true CN209425311U (en) | 2019-09-24 |
Family
ID=67977761
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920149039.8U Expired - Fee Related CN209425311U (en) | 2019-01-28 | 2019-01-28 | A kind of water pipeline support connection structure for hydraulic engineering |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209425311U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111043401A (en) * | 2019-12-21 | 2020-04-21 | 谢虹 | Improved water conservancy pipeline supporting and connecting structure for water conservancy project |
| CN112720331A (en) * | 2020-12-28 | 2021-04-30 | 扬州大学 | Pipeline support connecting device for hydraulic engineering and using method thereof |
-
2019
- 2019-01-28 CN CN201920149039.8U patent/CN209425311U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111043401A (en) * | 2019-12-21 | 2020-04-21 | 谢虹 | Improved water conservancy pipeline supporting and connecting structure for water conservancy project |
| CN112720331A (en) * | 2020-12-28 | 2021-04-30 | 扬州大学 | Pipeline support connecting device for hydraulic engineering and using method thereof |
| CN112720331B (en) * | 2020-12-28 | 2024-02-27 | 扬州大学 | A pipe support connection device for water conservancy projects and its use method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204554072U (en) | A kind of civil building Pipe installing auxiliary bracket | |
| CN209425311U (en) | A kind of water pipeline support connection structure for hydraulic engineering | |
| CN204062168U (en) | The double-deck anti-bending suspension device of City Buried Pipeline | |
| CN209430865U (en) | A new type of pipe hanger | |
| CN211370931U (en) | A detachable large size expansion bolt | |
| CN204573800U (en) | A kind of lamp affixed to the ceiling adopting one-bolt fastening | |
| CN211312887U (en) | Metal deformation joint device | |
| CN208074288U (en) | A kind of pressure pipeline sectional shelf-unit | |
| CN206309718U (en) | It is easy-to-mount to lock screw | |
| CN207062922U (en) | Ground structure and its static penetrometer with the structure | |
| CN212156073U (en) | A construction engineering water supply pipe fixing device | |
| CN205558246U (en) | Scaffold fastener | |
| CN204164607U (en) | A kind of para-seismic support of building interior electromechanical equipment | |
| CN103233542A (en) | Inverted supporting hanging rod and construction method thereof | |
| CN203177879U (en) | Quick support frame | |
| CN210032539U (en) | Overhanging type operating platform | |
| CN210462127U (en) | Sleeve supporting component for pipe position | |
| CN210050247U (en) | Combined type damping device for mounting automobile controller | |
| CN108167534A (en) | A high-efficiency anti-loosening support and suspension device that is convenient for pipeline installation and adjustment | |
| CN219510290U (en) | An anti-seismic support connection device | |
| CN209066739U (en) | A kind of frame-free glass component installation structure | |
| CN207599056U (en) | Gas safe valve housing | |
| CN212613923U (en) | Constructional engineering frame roof beam reinforcing apparatus | |
| CN216289991U (en) | An adjustable anti-vibration support for environmentally friendly buildings | |
| CN216892374U (en) | A construction pile for construction engineering |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190924 |