CN209408849U - Building concrete wallboard prefabricated components production line curing kilns - Google Patents

Building concrete wallboard prefabricated components production line curing kilns Download PDF

Info

Publication number
CN209408849U
CN209408849U CN201821339566.7U CN201821339566U CN209408849U CN 209408849 U CN209408849 U CN 209408849U CN 201821339566 U CN201821339566 U CN 201821339566U CN 209408849 U CN209408849 U CN 209408849U
Authority
CN
China
Prior art keywords
curing kilns
prefabricated components
ontology
blower
constant temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821339566.7U
Other languages
Chinese (zh)
Inventor
顾平圻
孙诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Entertest Co Ltd
Square Worker Peasant Construction Polytron Technologies Inc
Zheng Fang Limin (tian Zhen) Construction Industrialization Co Ltd
Original Assignee
Beijing Entertest Co Ltd
Square Worker Peasant Construction Polytron Technologies Inc
Zheng Fang Limin (tian Zhen) Construction Industrialization Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Entertest Co Ltd, Square Worker Peasant Construction Polytron Technologies Inc, Zheng Fang Limin (tian Zhen) Construction Industrialization Co Ltd filed Critical Beijing Entertest Co Ltd
Priority to CN201821339566.7U priority Critical patent/CN209408849U/en
Application granted granted Critical
Publication of CN209408849U publication Critical patent/CN209408849U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of building concrete wallboard prefabricated components production line curing kilns, including both ends open, horizontal extension and the curing kilns ontology with closed side wall, the both ends open is respectively inlet and outlet, curing kilns chamber body between inlet and outlet is the channel passed through for prefabricated components to be conserved, curing kilns ontology is disposed with warming-up section from its import to its outlet, constant temperature zone, temperature descending section, temp and humidity regulator and Temperature Humidity Sensor are provided in curing kilns ontology, the temp and humidity regulator includes heater heating device, steam conveying pipe and blower with nozzle.The utility model is by by curing kilns horizontal extension, the organic linking with prefabricated components transportation system is realized, conserves prefabricated components in traveling, the vertical material eliminated in conventional production methods carries link, the whole production cycle is shortened, the production efficiency of production line is improved.

Description

Building concrete wallboard prefabricated components production line curing kilns
Technical field
It uses and supports the utility model relates to building field more particularly to a kind of building concrete wallboard prefabricated components production line Protect kiln.
Background technique
Concrete walls plate prefabricated member is then transported using concrete as the basic material building element made of factory in advance It transports to building site and carries out prefabricated construction, to reduce construction cost, the shortening construction period provides a great convenience, therefore It is widely used in construction.
As shown in Figure 1, existing concrete wallboard prefabricated components production line generallys use three-dimensional curing kilns shown in A in figure With platform mould mobile device shown in B in figure, platform mould C is placed on the mobile device B for lining up two column, and is driven by these mobile devices Dynamic platform mould realizes the transfer in production line between each station.
The inside of three-dimensional curing kilns A is divided into multilayer from top to bottom, and places respectively in each layer prefabricated with to be conserved The platform mould of component is achieved in the multiple batches of maintenance of the more than one piece of prefabricated components.Because of the usual more than ten meters of height of three-dimensional curing kilns A, because And in order to realize that the layering of platform mould is sent into and is taken out, stacking machine is respectively set in the outside need of curing kilns inlet side and outlet side D realizes disengaging of the platform mould in curing kilns by the descending operation of stacking machine.Moreover, because of the institute for doing maintenance processing in curing kilns There are prefabricated components to be in the same space, thus, in order to maintain the stabilization of care environments in curing kilns, curing kilns platform mould into Outlet is also respectively provided with the overhead door of cooperation stacking machine work, so that curing kilns keep closed state under normal conditions.
When work, the overhead door of curing kilns outlet side, which rises, to be opened, and the prefabricated components for completing maintenance are moved out to this with platform mould It on the stacking machine of side, and is placed on platform mould mobile device B by stacking machine, the overhead door of outlet side, which declines, closes;Then, it conserves Kiln inlet side, prefabricated components to be conserved are sent by platform mould mobile device B to the stacking machine of the side with platform mould, curing kilns inlet side Overhead door, which rises, to be opened, and platform mould thereon is sent on the position vacated in curing kilns by stacking machine, curing kilns inlet side overhead door Decline is closed;The platform mould for removing curing kilns is sent to subsequent processing, is loaded with the platform mould of prefabricated components to be conserved in curing kilns import The opening next time of side waiting curing kilns.
The unlatching of curing kilns is waited since each mould will stop when advancing at curing kilns, curing kilns will be stopped The time for passing in and out operation, it will be detached from original travelling route, correspondingly, the various processes of curing kilns upstream and downstream will also reserve The corresponding platform mould residence time, therefore, above-mentioned existing prefabricated components production line cannot achieve real streamlined production operation, respectively The work of procedure can only carry out under the rhythm of a time broadly, and can not be according to necessary to various processes when segmentum intercalaris Bat is connected, and thus causes the production efficiency of production line low.
Since three-dimensional curing kilns need to be equipped with special stacking machine, curing kilns itself need to be arranged corresponding spacer structure and Door open/close machine is gone up and down, curing kilns inlet side needs placement place and the Tai Mo mobile device of reserved platform mould, causes in production line Equipment it is more, redundancy place is big, increases the cost and operating cost of production line.
Since the inside of three-dimensional curing kilns is an interconnected space, heating that each prefabricated components to be undergone, Constant temperature, three maintenance stages of cooling all carry out within this space, and with the opening and closing of curing kilns inlet and outlet overhead door, which is also wanted By the impact of outside atmosphere, thus, the maintenance parameter of each prefabricated components can only carry out wider range of control, three maintenance ranks The time of section does extension correspondingly, and This further reduces the production efficiencys of curing kilns, reduces the production efficiency of production line, The maintenance effect for also influencing prefabricated components simultaneously, influences the quality of prefabricated components.
Utility model content
In view of the problems of the existing technology, the purpose of this utility model is to provide a kind of building coagulations of plane Cob wall plate prefabricated member production line curing kilns, the curing kilns can match with the prefabricated components platform mould moved horizontally well It closes, so that platform mould is advanced directly in curing kilns and conserved in traveling, really realize the streamlined production of prefabricated components production line Operation.
To achieve the above object, technical solutions of the utility model are as follows:
A kind of building concrete wallboard prefabricated components production line curing kilns, including both ends open, horizontal extension and tool There is the curing kilns ontology of closed side wall, the both ends open is respectively inlet and outlet, the curing kilns sheet between inlet and outlet Intracoelomic cavity is the channel passed through for prefabricated components to be conserved, and curing kilns ontology is disposed with heating from its import to its outlet Section, constant temperature zone, temperature descending section are provided with temp and humidity regulator and Temperature Humidity Sensor, the temperature and humidity tune in curing kilns ontology Regulating device includes heater heating device, steam conveying pipe and blower with nozzle.
Further, the blower be separately positioned on the warming-up section and the constant temperature zone separated place and the constant temperature zone with The separated place of the temperature descending section, also, the blower of warming-up section and constant temperature zone separated place is from the air draught of warming-up section side to constant temperature zone one Lateral supply, the blower of constant temperature zone and temperature descending section separated place is from the air draught of temperature descending section side to one Lateral supply of constant temperature zone.
Further, two separated places are respectively arranged with the partition extended downwardly from the roof of the curing kilns ontology, The blower is arranged at the partition or is close to partition setting.
Further, the blower of the external air draft to the curing kilns ontology is additionally provided on the roof of the constant temperature zone.
Further, the lower part of the curing kilns chamber body is arranged in the heater heating device.
Further, the heater heating device is that steam heating heat exchanger or hot water heating heat exchanger and/or electric heating are changed Hot device.
Further, the steam pressure of the steam conveying pipe is 0.2-0.4MPaG.
Further, it is provided with platform mould mobile device on the bottom surface of the inner cavity of the curing kilns ontology, be loaded with prefabricated wait conserve The platform mould of component is carried by the mobile device and is driven across the inner cavity of curing kilns ontology, and completes prefabricated components on the move Maintenance.
Further, track is provided on the bottom surface of the inner cavity of the curing kilns ontology, prefabricated components to be conserved are by with row The Tai Moche carrying for walking wheel moves through the inner cavity of curing kilns ontology along the track, and completes supporting for prefabricated components on the move Shield.
The utility model is by realizing curing kilns horizontal extension the organic linking with prefabricated components transportation system, making Prefabricated components conserve in traveling, and the vertical material eliminated in conventional production methods carries link, shorten whole production Period improves the production efficiency of production line.
The horizontal-extending curing kilns of the utility model can conveniently set up warming-up section, constant temperature zone and temperature descending section, more accurately Ground regulates and controls three sections of maintenance parameter, and prefabricated components is made to obtain more accurately conserving, and has not only guaranteed the maintenance effect of prefabricated components, but also drop Low energy expenditure.
The utility model curing kilns eliminate traditional complicated stacking machine, and curing kilns itself are sealed up a door without setting And its complex appts such as elevating mechanism, reduce the number of devices of production line, reduces the overall cost of production line, reduce and set Standby maintenance cost and operating cost are the big of building concrete wallboard prefabricated components production line moreover, being also more easier to implement Scale popularization and application create condition.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the curing kilns of prefabricated components solid and mobile device in the prior art;
Fig. 2 is building concrete wallboard prefabricated components production line transportation system horizontal layout signal in the utility model Figure;
Fig. 3 is the top view of building concrete wallboard prefabricated components production line curing kilns in the utility model;
Fig. 4 is the side view of building concrete wallboard prefabricated components production line curing kilns in the utility model.
Specific embodiment
For the design philosophy for clearly demonstrating the utility model, the utility model is illustrated below with reference to example.
In example as shown in Figure 3-4, the building concrete wallboard prefabricated components production line of the utility model is conserved Kiln include both ends open, horizontal extension and with closed side wall curing kilns ontology 6-1, both ends open be respectively curing kilns into The curing kilns inner cavity ontology 6-1 between mouth 6-11 and outlet 6-12, import 6-11 and outlet 6-12 is for prefabricated components to be conserved The channel passed through, curing kilns ontology 6-1 export 6-12 to it from its import 6-11 and are disposed with warming-up section 6-13, constant temperature zone 6- 14, temp and humidity regulator 6-2 and Temperature Humidity Sensor 6-4, temperature and humidity are provided in temperature descending section 6-15, curing kilns ontology 6-1 Regulating device 6-2 includes steam heating heat exchanger 6-21, steam conveying pipe 6-22 and blower 6-25 with nozzle 6-24.It steams Vapour Heat supply and heat exchange device 6-21 is mainly that the maintenance of prefabricated components provides heat source;Steam conveying pipe 6-22 by nozzle 6-24 to support It is passed through low-pressure steam in shield kiln, to moisture-keeping function is played in kiln body, steam plays the effect of heat preservation to curing kilns simultaneously.Curing kilns The track 2 that the inner chamber bottom surface setting horizontal linear of ontology 6-1 extends, 2 top of track is provided with running wheel and along 2 row of track The platform mould vehicle 1 walked, platform mould vehicle 1 carry prefabricated components to be conserved, under 3 draw of traction device of 2 end of track setting Across the inner cavity of curing kilns ontology 6-1, the maintenance on the move for completing prefabricated components.Traction device 3, platform mould vehicle 1 and level are straight The track 2 that line extends constitutes the transportation system of prefabricated components.What needs to be explained here is that horizontal-extending curing kilns are not only wrapped The curing kilns ontology for including horizontal linear extension further includes the diversified forms such as horizontal curvature extension or horizontal circle extension.
It, will be in curing kilns ontology by the way that three-dimensional curing kilns in the prior art are converted into horizontal-extending plane form Chamber as the horizontal perforative channel of prefabricated components maintenance processes, fundamentally changed prefabricated components needed in maintenance it is vertical and Transporting pattern in horizontal both direction makes prefabricated components in level by the combination of the transportation system with prefabricated components Maintenance can be realized in walking process, reduce equipment investment, greatly improve the production efficiency of prefabricated components production line.
Blower 6-25 be separately positioned on warming-up section 6-13 and constant temperature zone 6-14 separated place and constant temperature zone 6-14 and cooling The separated place position Liang Ge of section 6-15.In course of normal operation, the blower of warming-up section 6-13 and the separated place constant temperature zone 6-14 will be risen Hot-air sucking in temperature section 6-13, send hot wind to constant temperature zone 6-14;The blower of constant temperature zone 6-14 and the separated place temperature descending section 6-15 By the cold air sucking in temperature descending section 6-15, cold wind is sent to constant temperature zone 6-14, above-mentioned hot wind and cold wind respectively refer to warming-up section 6-13 And temperature descending section 6-15 is with respect to hot cold air described in constant temperature zone 6-14.Other than conveying air, also to the inner cavity curing kilns ontology 6-1 Steam carry out conveying distribution in three different temperature zones, be illustrated herein.By adjusting blower 6-25 to different maintenances Section fills into or withdraws from hot and cold air and steam, and the temperature and humidity of warming-up section 6-13, constant temperature zone 6-14 and temperature descending section 6-15 distinguish meeting It is more obvious, by the dynamic transmission of air and steam between three different temperature zones, after running for a period of time, form each support The stable care environments of section relative quiescent are protected, can effectively ensure that prefabricated components are in respectively individually in maintenance processes, it is relatively quiet Steady maintenance section, meets curing requirements.
In warming-up section 6-13 and the separated place of constant temperature zone 6-14 and the separated place of constant temperature zone 6-14 and temperature descending section 6-15, divide The partition 6-3 that She Zhi not be extended downwardly from the roof 6-5 of curing kilns ontology 6-1, the blower 6-25 difference of two sides in curing kilns body It is mounted on the position partition 6-3, and the inlet and outlet 6-12 of blower 6-25 is located at the two sides of partition 6-3.It need to be noted that It is that, by installing partition 6-3 in different maintenance section spaced-apart locations, the physical space of section, constant temperature zone and temperature descending section can be will heat up It is effectively isolated, keeps three maintenance sections more independent.There is the taxis moved upwards in view of hot-air and steam, partition 6-3's Mounting height is extended downwardly as far as possible under the premise of meeting carrying prefabricated components platform mould vehicle 1 and running along track 2, be can achieve every In a maintenance section, regardless of being attained by relatively uniform distribution effects from temperature or humidity.So that respectively in maintenance section, to pre- The control of component conservation temperature and humidity processed is more accurate.The inlet and outlet of blower 6-25 are located at the two sides of partition 6-3, make sky Gas, steam more directly efficiently can reach brighter to the control effect of temperature and humidity in curing kilns in the transmission of different maintenance sections Aobvious technical purpose.Blower 6-25 can be also arranged in addition to being mounted on partition 6-3 close to partition 6-3, need to meet and support to difference Protect effective conveying requirement of air and steam between section.
On the roof 6-5 of constant temperature zone 6-14, it is additionally provided with the blower 6-25 to air draft outside curing kilns ontology 6-1.On State it has already been indicated that due to hot-air and steam be easy curing kilns ontology 6-1 internal upper part assemble, and horizontal curing kilns there is only into Two approach for carrying out heat exchange with the external world of mouth 6-11 and outlet 6-12 influence pre- in order to avoid constant temperature zone 6-14 temperature is excessively high The normal maintenance of component processed, need constant temperature zone 6-14 top be arranged blower 6-25, the main function of blower 6-25 be by The hot-air and steam for being gathered in the top constant temperature zone 6-14 are outwardly discharged in time, obtain the temperature of constant temperature zone 6-14 and humidity Effectively control.
The Temperature Humidity Sensor 6-4 being arranged in curing kilns ontology 6-1 is located at warming-up section 6-13, constant temperature zone in curing kilns The middle part of 6-14 and temperature descending section 6-15 extend downward into the height flushed with the bottom surface partition 6-3 from curing kilns ontology 6-1 roof 6-5 Degree.By Temperature Humidity Sensor 6-4 to the temperature and humidity real time monitoring, formation temperature and humidity two in curing kilns ontology 6-1 The control loop of a parameter, when temperature and humidity is more than or is lower than preset value, control system meeting automatic trigger interlocking, to blower 6- The 25 electrically operated valve 6-23 perhaps on steam conveying pipe carries out manipulation adjusting to heat source or cooling is augmented in curing kilns, protects Demonstrate,prove the maintenance quality of prefabricated components.
In the lower part of the inner cavity curing kilns ontology 6-1, steam heating heat exchanger 6-21 is provided between the track 2 that ground is laid with And steam conveying pipe 6-22, nozzle 6-24 is set at the top surface interval of steam conveying pipe 6-22, due to temperature descending section 6-15 For natural cooling, therefore nozzle 6-24 is mounted on the steam conveying pipe 6-22 being laid in warming-up section 6-13 and constant temperature zone 6-14. The steam that pressure is 0.2MPaG is passed through in steam heating heat exchanger and steam conveying pipe in the utility model.Steam passes through The opening and closing of electrically operated valve 6-23 and nozzle 6-24 are sprayed into kiln to adjust temperature and humidity, and what is more focused on is the tune to humidity Section, and curing temperature needed for steam heating heat exchanger mainly maintenance prefabricated components.The control that steam is passed through in kiln is mainly led to The electrically operated valve that is turned on or off on steam conveying pipe is crossed to realize, electrically operated valve is as thermostatic one Point, Temperature and Humidity Control circuit in curing kilns ontology is formed with Temperature Humidity Sensor and blower, passes through the real time monitoring pair of sensor Blower and electrically operated valve, which are formed, to be automatically controlled, and entire control manipulation is reliable for operation, this is also the normal of existing temperature and humidity auto-control Rule setting, is no longer repeated.
In addition to the steam of above-mentioned pressure, the steam of 0.4MPaG also can be selected.For the form of heater heating device, in addition to Steam heating heat exchanger can also be hot water heating heat exchanger or electric heating heat exchanger.In view of the heat provided for curing kilns, When a kind of heat exchanger can not meet curing temperature requirement merely, the combination of a variety of heat exchangers may also be configured to.
It is detailed in Fig. 2, the maintenance of prefabricated components is completed to realize prefabricated components in the curing kilns inner cavity ontology 6-1 is mobile, The transportation system of prefabricated components mainly includes the track 2 and traction device 3 of platform mould vehicle 1, horizontal linear extension.Multiple mould vehicles 1 According to enter curing kilns precedence, be arranged successively along track 2, and be connected with each other be in one group of platform mould car team, traction device 3 It is connected in one end of track 2, and with the platform mould vehicle 1 of platform mould car team end, traction permutation platform mould vehicle 1 is movably walking along track 2.Tool Body is into the utility model, and the platform mould vehicle 1 for carrying prefabricated components, which is flowed along track 2 in curing kilns chamber body, walks, traction dress 3 outlet ends for being located at curing kilns ontology are set, the platform mould vehicle 1 each entered from input end is the tail end of platform mould car team, passes through traction 3 pairs of platform mould car team front ends of device carry out tethered sliding, complete maintenance processes on the move.Herein it may be noted that prefabricated components Transportation system be not limited to the linear extension form that above-mentioned example provides, consider transportation system arrangement when, need comprehensive Close the diversified forms such as the horizontal layout for considering curing kilns, such as linear, S bending, circular shape.In addition, referring to fig. 2, conserving , can be by curing kilns separately as a steam-cured line 6 in kiln and the organic linking of prefabricated components transportation system, and prefabricated components are raw Such as demoulding of the other processes of production, ties up muscle and pours, and the processes such as plucking can be used as a prewire 4, steam-cured line 6 and 4 liang of prewire Production line is made of the platform mould car team walked along track 2, passes through the 3 traction table mould car team of traction device of respective tip position Complete the constant flow walking of platform mould vehicle 1.It, will by the ferry device 5 of the setting table mould vehicle 1 between curing line and prewire 4 Prefabricated components after the completion of prefabricated ferry modified line to steam-cured line 6 from prewire 4, and by the prefabricated components after the completion of maintenance from steaming It supports line 6 and ferries modified line to prewire 4, the production system of the continuous continuous productive process of prefabricated components can be formed.
It needs exist for stressing, the maintenance processes constant temperature zone of prefabricated components is key link, due to concrete structure Part absorbs a large amount of water before carrying out steam curing, and when temperature is higher, moisture will be evaporated and be expanded.If thermostat temperature mistake When high and heating rate is very fast, concrete will form " steamed bun " shape, this will make concrete component become waste product.In the utility model The setting of blower mainly has from the aspect of two the control of constant temperature zone temperature: 1, steam is since itself has the trend moved upwards Property, the higher hot-air of temperature is easier aggregation upwards, when the temperature of constant temperature zone has been more than set temperature, by being mounted on steel knot The hot-air of aggregation is discharged in time for the blower of structure frame roof, and cooling effect is obvious;2, ventilation equipment of the blower as routine, It can be installed according to the space layout of specific curing kilns, flexibility ratio is strong, when concrete model is selected, for the preferred corrosion resistant of operating environment The blower of corrosion material.
For the demand of curing kilns major heat in warming-up section and constant temperature zone, temperature descending section is natural cooling in the utility model.? When carrying out heat Calculation, need to consider the heat waste of curing kilns, the factors such as heating of Tai Moche and prefabricated components.Actual production process In, die station and the number of components not instead of fixed value, the parameter changed at random in kiln.So multipoint temperature sensor reality can be passed through When monitoring kiln in each point temperature, when somewhere sensor detection temperature in continuous 1 minute be more than setting value when, open blower, with Achieve the purpose that temperature control in setting value section, enhances the automation and intelligent level of device entirety.The fortune of Tai Moche Scanning frequency degree was closely related with the steam-cured time to be ensured, was moved by running track end traction device to Tai Moche The control of beat, the Tai Moche that straight line is persistently walked can satisfy the time requirement in curing kilns, securely and reliably.
What is especially required emphasis has, 1, prefabricated components completed on the Tai Moche of movement maintenance, it is new by movement+work Type production method avoids wasting for quiescent time in steam curing process, shortens the whole production cycle, improve production The production efficiency of line.2, the maintenance parameter of three sections of different temperature zones of the regulation that horizontal-extending curing kilns can be more accurate, makes Every section of temperature and moisture distribution is more uniform, guarantees that prefabricated components maintenance quality can lower energy consumption again simultaneously.3, equipment is simple, It is easy to operate, it is reliable for operation, reduce cost of equipment maintenance and operating cost.And be more easier to implement, it is building coagulation The large-scale promotion application of cob wall plate prefabricated member production line creates condition.
Need to illustrate has, and the utility model curing kilns ontology can be the multiforms such as steel structure frame or brick mix structure Formula;Drain valve should be also set on steam conveying pipe, avoid generating " water hammer " phenomenon etc. inside jet chimney, and these All it is that those skilled in the art can make on the basis of understanding the utility model thought based on its basic skills, therefore herein No longer enumerate.
Finally, it will be appreciated that embodiment of above is merely to illustrate that the principles of the present invention and uses Illustrative embodiments, however the utility model is not limited thereto.For those of ordinary skills, it is not departing from In the case where the principles of the present invention and essence, various changes and modifications can be made therein, these variations and modifications are also considered as this The protection scope of utility model.

Claims (9)

1. a kind of building concrete wallboard prefabricated components production line curing kilns, which is characterized in that including both ends open, level Extend and the curing kilns ontology with closed side wall, the both ends open are respectively inlet and outlet, between inlet and outlet Curing kilns chamber body is the channel passed through for prefabricated components to be conserved, and curing kilns ontology is set gradually from its import to its outlet There are warming-up section, constant temperature zone, temperature descending section, temp and humidity regulator and Temperature Humidity Sensor, the temperature are provided in curing kilns ontology Humidity control apparatus includes heater heating device, steam conveying pipe and blower with nozzle.
2. curing kilns as described in claim 1, which is characterized in that the blower is separately positioned on the warming-up section and the perseverance The separated place of the separated place of temperature section and the constant temperature zone and the temperature descending section, also, the blower of warming-up section and constant temperature zone separated place From the air draught of warming-up section side to one Lateral supply of constant temperature zone, the blower of constant temperature zone and temperature descending section separated place from the air draught of temperature descending section side to One Lateral supply of constant temperature zone.
3. curing kilns as claimed in claim 2, which is characterized in that two separated places are respectively arranged with from the curing kilns The partition that the roof of ontology extends downwardly, the blower are arranged at the partition or are close to partition setting.
4. curing kilns as claimed in claim 2 or claim 3, which is characterized in that be additionally provided on the roof of the constant temperature zone to described The blower of the external air draft of curing kilns ontology.
5. curing kilns as described in claim 1, which is characterized in that the heater heating device is arranged in the curing kilns ontology The lower part of inner cavity.
6. curing kilns as claimed in claim 5, which is characterized in that the heater heating device is steam heating heat exchanger or heat Water Heat supply and heat exchange device and/or electric heating heat exchanger.
7. curing kilns as described in claim 1, which is characterized in that the steam pressure of the steam conveying pipe is 0.2- 0.4MPaG。
8. curing kilns as described in claim 1, which is characterized in that be provided with platform on the bottom surface of the inner cavity of the curing kilns ontology Mould mobile device, the platform mould for being loaded with prefabricated components to be conserved are carried by the mobile device and are driven across in curing kilns ontology Chamber, and the maintenance of prefabricated components is completed on the move.
9. curing kilns as described in claim 1, which is characterized in that rail is arranged on the bottom surface of the inner cavity of the curing kilns ontology Road, prefabricated components to be conserved are carried the inner cavity that curing kilns ontology is moved through along the track by the Tai Moche with traveling wheel, And the maintenance of prefabricated components is completed on the move.
CN201821339566.7U 2018-08-17 2018-08-17 Building concrete wallboard prefabricated components production line curing kilns Active CN209408849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821339566.7U CN209408849U (en) 2018-08-17 2018-08-17 Building concrete wallboard prefabricated components production line curing kilns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821339566.7U CN209408849U (en) 2018-08-17 2018-08-17 Building concrete wallboard prefabricated components production line curing kilns

Publications (1)

Publication Number Publication Date
CN209408849U true CN209408849U (en) 2019-09-20

Family

ID=67930147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821339566.7U Active CN209408849U (en) 2018-08-17 2018-08-17 Building concrete wallboard prefabricated components production line curing kilns

Country Status (1)

Country Link
CN (1) CN209408849U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111186006A (en) * 2020-01-07 2020-05-22 苏州嘉盛万城建筑工业有限公司 Steam and electric auxiliary heating dual-purpose pre-curing kiln for PC (polycarbonate) production line
CN111300619A (en) * 2020-03-31 2020-06-19 中国十七冶集团有限公司 Automatic temperature control system of prefabricated box girder steam health preserving
CN111391097A (en) * 2020-03-27 2020-07-10 湖南三一快而居住宅工业有限公司 Curing kiln and production line

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111186006A (en) * 2020-01-07 2020-05-22 苏州嘉盛万城建筑工业有限公司 Steam and electric auxiliary heating dual-purpose pre-curing kiln for PC (polycarbonate) production line
CN111186006B (en) * 2020-01-07 2021-04-13 苏州嘉盛万城建筑工业有限公司 Steam and electric auxiliary heating dual-purpose pre-curing kiln for PC (polycarbonate) production line
CN111391097A (en) * 2020-03-27 2020-07-10 湖南三一快而居住宅工业有限公司 Curing kiln and production line
CN111300619A (en) * 2020-03-31 2020-06-19 中国十七冶集团有限公司 Automatic temperature control system of prefabricated box girder steam health preserving

Similar Documents

Publication Publication Date Title
CN209408849U (en) Building concrete wallboard prefabricated components production line curing kilns
CN108705666A (en) Building concrete wallboard prefabricated components production line curing kilns
CN107081845A (en) A kind of three-dimensional maintenance tunnel of prefabricated concrete element
CN105437361A (en) Precast concrete component curing forming device
CN202869211U (en) Multi-channel direct-firing tunnel kiln and waste heat recycling utilizing system thereof
CN203947018U (en) Indirect cooled glass liquid supply channel
CN107366926A (en) A kind of flue gas for wet desulphurization takes off white system and method
CN104110959B (en) For low energy consumption curing kilns and the preparation method of apparatus for concrete member curing
CN104824820B (en) A kind of portable flue-curing device
CN206996193U (en) A kind of flue gas takes off white device
CN105674602A (en) Directional water taking device for solar layered heat-storage water tank
CN204136208U (en) The low energy consumption apparatus for concrete member curing kiln that access way levels is arranged
CN203928702U (en) For the low energy consumption curing kilns of apparatus for concrete member curing
CN201157896Y (en) Casting parts thermal insulation pit
CN108177286A (en) A kind of energy saving and environment friendly plastic dipping production line
CN204401072U (en) Continous way bar plate heating stove
CN208645645U (en) Precast concrete die station
CN205272284U (en) Humiture automatic control formula curing kilns of precast concrete component
CN207299123U (en) A kind of steam Waste heat heating device
CN205537018U (en) A dry sterilization oven of multilayer for handling xiLin bottle
CN104191512B (en) The low energy consumption apparatus for concrete member curing kiln that access way levels is arranged
CN206999266U (en) A kind of three-dimensional maintenance tunnel of prefabricated concrete element
CN201876146U (en) Kiln afterheat utilizing system
CN204682499U (en) A kind of portable flue-curing device
CN208155041U (en) The cooling area kiln of nitrogen atmosphere protection pushed slab kiln

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant