CN209369051U - A kind of pre-embedded device in concrete - Google Patents
A kind of pre-embedded device in concrete Download PDFInfo
- Publication number
- CN209369051U CN209369051U CN201822043493.3U CN201822043493U CN209369051U CN 209369051 U CN209369051 U CN 209369051U CN 201822043493 U CN201822043493 U CN 201822043493U CN 209369051 U CN209369051 U CN 209369051U
- Authority
- CN
- China
- Prior art keywords
- hole
- tube body
- screw thread
- attaching nut
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 34
- 239000010959 steel Substances 0.000 claims abstract description 34
- 238000009434 installation Methods 0.000 abstract description 11
- 238000010276 construction Methods 0.000 abstract description 5
- 239000000463 material Substances 0.000 abstract description 3
- 230000005540 biological transmission Effects 0.000 description 8
- 238000010586 diagram Methods 0.000 description 4
- 238000009408 flooring Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 210000003734 kidney Anatomy 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses the pre-embedded devices in a kind of concrete, it with the inner opening of through-hole connection and sets the outward opening of internal screw thread, the fixed steel plate washer being located in inner opening respectively including being equipped with the tube body of through-hole, being located at tube body both ends, be located at inner opening for cover board that steel plate washer covers, the attaching nut connecting by external screw thread with the internal screw thread on tube body outward opening, the steel plate washer is equipped with the non-circular hole that be connected to the through-hole of tube body, the attaching nut equipped with axially through internal thread hole.The utility model can the embedment when concrete wall pours, I-steel Cantilever Beams are installed by the utility model when construction, the mounting platform of installation scaffold is provided, construction is completed after removing scaffold and I-steel Cantilever Beams, attaching nut can be dismantled together to withdrawal, reused, consumptive material is few, cost is greatlyd save, economic benefit is obvious.
Description
Technical field
The utility model belongs to construction auxiliary device, and in particular to the pre-embedded device in a kind of concrete.
Background technique
Scaffold is to guarantee each work progress is gone on smoothly and is set up workbench.High-rise building generallys use outstanding
An I-steel Cantilever Beams erecting scaffold is arranged every multilayer in outrigger scaffold.It, need to be by work when traditional I-steel Cantilever Beams are installed
Word steel is laid on flooring, then be fixed on flooring with reinforcing bar, by shear wall because installing caused by I-steel Cantilever Beams excessively heaviness
Extremely tired and trouble, time-consuming, when passing through shear wall, can destroy wall section causes design strength to give a discount, and causes carpenter
Formwork erection difficulty increases, and when dismounting is even more difficult.For this purpose, it is proposed that using installation of embedded parts I-steel Cantilever Beams side
Case, to solve the disadvantage that traditional I-steel Cantilever Beams.But there is also one for the scheme of this installation of embedded parts I-steel Cantilever Beams
Some insufficient, mainly all component stays in concrete walls body built-in fitting after use, causes certain waste of material, at
This high problem.
Utility model content
The purpose of the utility model is to provide in a kind of concrete that part accessory is recyclable, at low cost, easy for installation
Pre-embedded device.
The technical scheme adopted for realizing the purpose of the utility model is as follows:
Pre-embedded device in concrete provided by the utility model, including being equipped with the tube body of through-hole, being located at tube body both ends point
The inner opening that is not connected to through-hole and the outward opening for setting internal screw thread, the fixed steel plate washer being located in inner opening, be located at inner opening will
Cover board that steel plate washer covers, the attaching nut that is connect by external screw thread with the internal screw thread on tube body outward opening, on the steel plate washer
Equipped with the non-circular hole that the through-hole with tube body is connected to, the attaching nut be equipped with axially through internal thread hole.
The interior hexagonal pothole cooperated with spanner is equipped at the internal thread hole of described attaching nut one end.
The utility model further includes mounting assembly matched with the pre-embedded device, mounting assembly include band handle and with institute
The screw rod for stating the internal thread hole connection of attaching nut, the locking nut being located on screw rod.
The beneficial effects of the utility model
1, the utility model can the embedment when concrete wall pours, it is outstanding that I-steel installed by the utility model when construction
Outrigger provides the mounting platform of installation scaffold, and construction is completed after removing scaffold and I-steel Cantilever Beams, can be by attaching nut
Disassembly is withdrawn together, is reused, consumptive material is few, greatlys save cost, and economic benefit is obvious.
2, each components are all made of the factorial production in the utility model, easy to manufacture, easy to install and use.
The technical solution of the utility model is further illustrated with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the sectional view along AA in Fig. 1.
Fig. 3 is the right view of Fig. 1.
Fig. 4 is the scheme of installation of the utility model.
Fig. 5 is the schematic diagram using the utility model installation overhanging I-steel.
Fig. 6 is the main view of power transmission component.
Fig. 7 is the top view of power transmission component.
Fig. 8 is the schematic diagram of one of power transmission component and the utility model mated condition.
Fig. 9 is two schematic diagram of power transmission component Yu the utility model mated condition.
Specific embodiment
See Fig. 1, the pre-embedded device 1 in concrete provided by the utility model, such as Fig. 1 --- shown in Fig. 3, including it is equipped with logical
The tube body 101 in hole 104 is located at inner opening 105 and the external-open for setting internal screw thread 102 that 101 both ends of tube body are connected to through-hole 104 respectively
Mouthful, fixed be located at non-rotatable rectangular steel plate washer 108 in inner opening 105, be located at inner opening 105 and hide rectangular steel plate washer 108
The cover board 106 of lid, the attaching nut 103 being connect by external screw thread 109 with the internal screw thread 102 on tube body outward opening, attaching nut
103 be equipped with axially through internal thread hole 110, be equipped at the internal thread hole 110 of 103 one end of attaching nut and to cooperate with spanner
Interior hexagonal pothole 111, rectangular steel plate washer 108 is equipped with the non-circular hole rectangular opening 107 being connected to the through-hole 104 of tube body 101, non-circular
Hole is also possible to elliptical aperture, kidney slot, polygonal hole etc..
In order to install the pre-embedded device 1 of utility model, it is also necessary to matched mounting assembly 2, as shown in figure 4, installation
Component 2 includes the screw rod 202 with handle 201, the butterfly locking nut 203 being located on screw rod 202.
The application of the utility model
The pre-embedded device of the utility model is installed: when the template a of casting concrete wall is arranged, in the position of different floors
The pre-embedded device 1 for setting installation utility model, from the screw rod 202 of the outside of template a mounting assembly 2 and the connection of pre-embedded device 1
The internal thread hole 110 of nut 103 connects, and screws butterfly locking nut 203 and the tube body 101 of pre-embedded device 1 is fixed in template a
Side (referring to fig. 4);After the completion of concrete wall b is poured, template a is dismantled, mounting assembly 2 is removed, pre-embedded device 1 is mounted on
(referring to Fig. 5) on concrete wall b.
Installation overhanging I-steel: being shown in Fig. 5, overhanging I-steel 3 include ontology 301, be located at it is upper above 301 free end of ontology
Otic placode 303 and scaffold positioning pin 302, the lower ear plate 305 being located at below 301 free end of ontology, be located at 301 fixing end of ontology and
If the pedestal 304 of two mounting holes, the brace 5 is connected by the upper ear plate 303 of pivot pin 306 and overhanging 3 free end of I-steel
It connects.
Installation overhanging I-steel 3 needs to be fixed in the pre-embedded device 1 of the utility model by power transmission component 4.Power transmission group
Part 4 as shown in Figure 6, Figure 7, including rod piece 401, be symmetrically arranged at rod piece head radially the fixture block 402 of evagination, be located at rod piece tail portion
External screw thread 403, the gasket 405 being located on rod piece 401 and the nut 404 being located on 401 external screw thread 403 of rod piece, the fixture block
402 can pass through the rectangular opening 107 in pre-embedded device 1 on steel plate washer 108.
Power transmission component 4 and the cooperation of pre-embedded device 1 are as shown in Figure 8, Figure 9, first with interior six on spanner and attaching nut 103
Angle pothole 111 cooperation attaching nut 103 is disassembled from pre-embedded device 1, by the fixture block 402 of 4 rod piece 401 of power transmission component from
1 tube body of pre-embedded device, 101 outward opening is protruded into along through-hole 104, across steel plate washer 108 rectangular opening 107(referring to Fig. 8), then revolve
It turn 90 degrees so that fixture block 402 is stuck on rectangular steel plate washer 108 axially, tightens nut 404, can make to be clipped in gasket 405 and pre-
The object buried between 1 tube body 101 of device is fixed in pre-embedded device 1 (referring to Fig. 9).
Two overhanging I-steel 3 side by side are installed according to above-mentioned way, the upright bar pipe fitting of scaffold is covered in overhanging I-shaped
It, can be by scaffold support on overhanging I-steel 3 on scaffold positioning pin 302 on steel 3.
Claims (3)
1. the pre-embedded device in a kind of concrete, it is characterized in that include tube body equipped with through-hole, be located at tube body both ends respectively with it is logical
The inner opening and set the outward opening of internal screw thread, the fixed steel plate washer being located in inner opening, be located at inner opening for steel plate washer that hole is connected to
The cover board of covering, the attaching nut being connect by external screw thread with the internal screw thread on tube body outward opening, the steel plate washer be equipped with
Tube body through-hole connection non-circular hole, the attaching nut be equipped with axially through internal thread hole.
2. the pre-embedded device in concrete according to claim 1, it is characterized in that the internal screw thread of described attaching nut one end
The interior hexagonal pothole cooperated with spanner is equipped at hole.
3. the pre-embedded device in concrete according to claim 1 or 2, it is characterized in that further including matching with the pre-embedded device
The mounting assembly of set, mounting assembly include with handle and the screw rod connecting with the internal thread hole of the attaching nut, being located at screw rod
On locking nut.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822043493.3U CN209369051U (en) | 2018-12-06 | 2018-12-06 | A kind of pre-embedded device in concrete |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822043493.3U CN209369051U (en) | 2018-12-06 | 2018-12-06 | A kind of pre-embedded device in concrete |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209369051U true CN209369051U (en) | 2019-09-10 |
Family
ID=67831466
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201822043493.3U Expired - Fee Related CN209369051U (en) | 2018-12-06 | 2018-12-06 | A kind of pre-embedded device in concrete |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209369051U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111058621A (en) * | 2019-12-26 | 2020-04-24 | 江苏恒桂创科建筑工程科技有限公司 | Early system of tearing open of floor template free of support |
| CN111236441A (en) * | 2020-01-14 | 2020-06-05 | 中国建筑第八工程局有限公司 | Connecting structure of wallboard and main body structure and construction method thereof |
| CN111764620A (en) * | 2020-06-29 | 2020-10-13 | 中科盛博建设集团有限公司 | Pre-buried detachable scaffold |
| CN112696002A (en) * | 2020-12-29 | 2021-04-23 | 曹晓良 | Scaffold wall connecting piece manufacturing system |
| CN116791875A (en) * | 2023-06-29 | 2023-09-22 | 中建新疆建工(集团)有限公司 | Pre-buried system of overhanging scaffold and construction method |
| CN116927353A (en) * | 2023-06-15 | 2023-10-24 | 淮北矿业(集团)工程建设有限责任公司 | Frame shear structural reinforced concrete aluminum membrane plate supporting embedded part and use method thereof |
-
2018
- 2018-12-06 CN CN201822043493.3U patent/CN209369051U/en not_active Expired - Fee Related
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111058621A (en) * | 2019-12-26 | 2020-04-24 | 江苏恒桂创科建筑工程科技有限公司 | Early system of tearing open of floor template free of support |
| CN111058621B (en) * | 2019-12-26 | 2024-06-04 | 江苏恒桂创科建筑工程科技有限公司 | Early system of tearing open of floor template support-free |
| CN111236441A (en) * | 2020-01-14 | 2020-06-05 | 中国建筑第八工程局有限公司 | Connecting structure of wallboard and main body structure and construction method thereof |
| CN111764620A (en) * | 2020-06-29 | 2020-10-13 | 中科盛博建设集团有限公司 | Pre-buried detachable scaffold |
| CN111764620B (en) * | 2020-06-29 | 2021-12-07 | 中科盛博建设集团有限公司 | Pre-buried detachable scaffold |
| CN112696002A (en) * | 2020-12-29 | 2021-04-23 | 曹晓良 | Scaffold wall connecting piece manufacturing system |
| CN116927353A (en) * | 2023-06-15 | 2023-10-24 | 淮北矿业(集团)工程建设有限责任公司 | Frame shear structural reinforced concrete aluminum membrane plate supporting embedded part and use method thereof |
| CN116791875A (en) * | 2023-06-29 | 2023-09-22 | 中建新疆建工(集团)有限公司 | Pre-buried system of overhanging scaffold and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209369051U (en) | A kind of pre-embedded device in concrete | |
| CN209244226U (en) | A cable-stayed I-beam cantilever beam for scaffolding | |
| CN109322482A (en) | A kind of cast-in-place wall column formwork of convenient adjustable reinforces support construction and its construction method | |
| CN114108837B (en) | Pre-buried sleeve device and installation method thereof | |
| CN114108836A (en) | Pre-buried installation device and installation method thereof | |
| CN102720347A (en) | Scaffold tool type wall connecting piece and construction method thereof | |
| CN203795825U (en) | Scaffold and wall connector and scaffold and wall connecting structure | |
| CN217053788U (en) | Large-tonnage embedded part | |
| CN203499017U (en) | Wall tie bar pre-embedded positioning device | |
| CN202969728U (en) | Embedded barrel nut anchor | |
| CN209799022U (en) | semicircular bolt clamping ring component | |
| CN219316499U (en) | Inclined support device for prefabricated wallboard with assembled structure | |
| CN217420503U (en) | Tool type cast-in-place beam formwork system | |
| CN201671339U (en) | Fixing device for wall bodies and beam column templates of buildings | |
| CN208763436U (en) | A kind of PC component supporting apparatus | |
| CN212957567U (en) | Assembled enclosure scaffold | |
| CN202416574U (en) | Embedded interconnection type lacing bar component with external protrusive inside screwed hole | |
| CN203499016U (en) | Wall tie bar pre-embedded positioning thread sleeve | |
| CN114075871A (en) | Triangular overhanging support base for slip form | |
| CN214784805U (en) | An embedded part that replaces the inner expansion pipe | |
| CN114060378A (en) | Embedded installation structure and installation method | |
| CN216239024U (en) | Wall connecting piece | |
| CN214302826U (en) | Detachable pre-buried anchor assembly | |
| JP4203856B2 (en) | Retaining wall construction method and retaining wall structure | |
| KR200420412Y1 (en) | Formwork fixture |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190910 Termination date: 20201206 |